The Proposed Boitshoko Solar Power Plant Near Kathu, Northern Cape Province FINAL ENVIRONMENTAL IMPACT REPORT 7 October 2016 THE PROPOSED BOITSHOKO SOLAR POWER PLANT NEAR KATHU, NORTHERN CAPE PROVINCE PROJECT DETAIL DEA Reference No. : 14/12/16/3/3/2/935 Project Title : Proposed Boitshoko Solar Power Plant near Kathu, Northern Cape Province Authors : Mrs. Carli Otte Ms. Marélie Griesel Ms. Liesl De Swardt Client : Boitshoko Solar Power Plant (RF) (Pty) Ltd. Report Status : Final Environmental Impact Report Submission date : 7 October 2016 When used as a reference this report should be cited as: Environamics (2016) Final EIR: Proposed Boitshoko Solar Power Plant near Kathu, Northern Cape Province. COPYRIGHT RESERVED This technical report has been produced for Boitshoko Solar Power Plant (RF) (Pty) Ltd. The intellectual property contained in this report remains vested in Environamics and Boitshoko Solar Power Plant (RF) (Pty) Ltd. No part of the report may be reproduced in any manner without written permission from Environamics or Boitshoko Solar Power Plant (RF) (Pty) Ltd. 1 TABLE OF CONTENTS PROJECT DETAIL .....................................................................................................................1 TABLE OF CONTENTS ..............................................................................................................2 LIST OF TABLES ......................................................................................................................5 LIST OF FIGURES .....................................................................................................................5 LIST OF TABLES ......................................................................................................................6 APPENDICES ..........................................................................................................................7 GLOSSARY OF TERMS AND ACRONYMS ..................................................................................8 EXECUTIVE SUMMARY ...........................................................................................................9 EXECUTIVE SUMMARY ......................................................................................................... 10 1 INTRODUCTION ....................................................................................................... 13 1.1 LEGAL MANDATE AND PURPOSE OF THE REPORT ............................................................ 13 1.2 DETAILS OF THE ENVIRONMENTAL ASSESSMENT PRACTITIONER (EAP) .......................... 15 1.3 DETAILS OF SPECIALISTS ................................................................................................... 15 1.4 STATUS OF THE EIA PROCESS ............................................................................................ 19 1.5 STRUCTURE OF THE REPORT ............................................................................................. 20 2 ACTIVITY DESCRIPTION ............................................................................................ 24 2.1 THE LOCATION OF THE ACTIVITY AND PROPERTY DESCRIPTION ..................................... 24 2.2 ACTIVITY DESRIPTION ....................................................................................................... 26 2.3 PHOTOVOLTAIC TECHNOLOGY ......................................................................................... 27 2.4 LAYOUT DESCRIPTION ....................................................................................................... 28 2.5 SERVICES PROVISION ........................................................................................................ 31 3 LEGISLATIVE AND POLICY CONTEXT .......................................................................... 35 3.1 INTRODUCTION ................................................................................................................. 35 3.2 LEGISLATIVE CONTEXT ...................................................................................................... 37 2 3.3 POLICY CONTEXT ............................................................................................................... 41 3.4 OTHER LEGISLATION ......................................................................................................... 49 3.5 RELEVANT GUIDANCE ....................................................................................................... 49 3.6 CONCLUSION ..................................................................................................................... 49 4 THE NEED AND DESIRABILITY ................................................................................... 50 4.1 THE NEED FOR THE PROPOSED ACTIVITY ......................................................................... 50 4.2 THE DESIRABILITY OF THE PROPOSED ACTIVITY ............................................................... 50 5 DESCRIPTION OF ENVIRONMENTAL ISSUES ............................................................... 54 5.1 CONSIDERATION OF ALTERNATIVES ................................................................................. 54 5.1.1 No-go alternative .............................................................................................................. 55 5.1.2 Location alternatives ......................................................................................................... 55 5.1.3 Activity alternatives .......................................................................................................... 56 5.1.4 Technical alternatives ....................................................................................................... 57 5.1.5 Design and layout alternatives ......................................................................................... 59 5.1.6 Technology alternatives .................................................................................................... 60 5.2 PUBLIC PARTICIPATION PROCESS ..................................................................................... 61 5.2.1 General .............................................................................................................................. 61 5.2.2 Consultation process......................................................................................................... 66 5.2.3 Registered I&APs ............................................................................................................... 66 5.2.4 Issues raised by I&APs and consultation bodies ............................................................... 66 5.3 THE ENVIRONMENTAL ATTRIBUTES ASSOCIATED WITH THE PREFERRED ALTERNATIVE 67 5.3.1 Biophysical environment .................................................................................................. 67 5.3.2 Description of the socio-economic environment ............................................................. 76 5.4 SITE SELECTION MATRIX ................................................................................................... 80 5.5 CONCLUDING STATEMENT ON ALTERNATIVES................................................................. 85 6 DESCRIPTION OF THE IMPACTS AND RISKS................................................................ 86 6.1 SCOPING METHODOLOGY ................................................................................................ 87 3 6.1.1 Checklist analysis .............................................................................................................. 87 6.1.2 Matrix analysis .................................................................................................................. 89 6.2 KEY ISSUES IDENTIFIED ................................................................................................... 104 6.2.1 Impacts during the construction phase .......................................................................... 104 6.2.2 Impacts during the operational phase ............................................................................ 104 6.2.3 Impacts during the decommissioning phase .................................................................. 104 7 CUMULATIVE EFFECTS ASSESSMENT ....................................................................... 119 7.1 Introduction .................................................................................................................... 119 7.2 Geographic Area of Evaluation ....................................................................................... 120 7.3 Temporal Boundary of Evaluation .................................................................................. 121 7.4 OTHER PROJECTS IN THE AREA ....................................................................................... 121 7.4.1 Existing projects in the area ............................................................................................ 121 7.4.2 Projects in the foreseeable future .................................................................................. 122 7.5 SPECIALIST INFORMATION ON CUMULATIVE EFFECTS................................................... 123 7.5.1 Geology ........................................................................................................................... 125 7.5.2 Soil, Land Capability and Agricultural Potential .............................................................. 126 7.5.3 Ecology ............................................................................................................................ 126 7.5.4 Birds ...............................................................................................................................
Recommended publications
  • Explore the Northern Cape Province
    Cultural Guiding - Explore The Northern Cape Province When Schalk van Niekerk traded all his possessions for an 83.5 carat stone owned by the Griqua Shepard, Zwartboy, Sir Richard Southey, Colonial Secretary of the Cape, declared with some justification: “This is the rock on which the future of South Africa will be built.” For us, The Star of South Africa, as the gem became known, shines not in the East, but in the Northern Cape. (Tourism Blueprint, 2006) 2 – WildlifeCampus Cultural Guiding Course – Northern Cape Module # 1 - Province Overview Component # 1 - Northern Cape Province Overview Module # 2 - Cultural Overview Component # 1 - Northern Cape Cultural Overview Module # 3 - Historical Overview Component # 1 - Northern Cape Historical Overview Module # 4 - Wildlife and Nature Conservation Overview Component # 1 - Northern Cape Wildlife and Nature Conservation Overview Module # 5 - Namaqualand Component # 1 - Namaqualand Component # 2 - The Hantam Karoo Component # 3 - Towns along the N14 Component # 4 - Richtersveld Component # 5 - The West Coast Module # 5 - Karoo Region Component # 1 - Introduction to the Karoo and N12 towns Component # 2 - Towns along the N1, N9 and N10 Component # 3 - Other Karoo towns Module # 6 - Diamond Region Component # 1 - Kimberley Component # 2 - Battlefields and towns along the N12 Module # 7 - The Green Kalahari Component # 1 – The Green Kalahari Module # 8 - The Kalahari Component # 1 - Kuruman and towns along the N14 South and R31 Northern Cape Province Overview This course material is the copyrighted intellectual property of WildlifeCampus. It may not be copied, distributed or reproduced in any format whatsoever without the express written permission of WildlifeCampus. 3 – WildlifeCampus Cultural Guiding Course – Northern Cape Module 1 - Component 1 Northern Cape Province Overview Introduction Diamonds certainly put the Northern Cape on the map, but it has far more to offer than these shiny stones.
    [Show full text]
  • REIPPP Projects
    REIPPP Projects Window 1 Projects Net capacity Technology Project Location Technology Developer Contractor Status MW supplier Klipheuwel – Dassiefontein Group 5, Dassiesklip Wind Energy Facility Caledon, WC Wind 26,2 Sinovel Operational Wind Energy fFcility Iberdrola MetroWind Van Stadens Wind Port Elizabeth, EC Wind 26,2 MetroWind Sinovel Basil Read Operational Farm Hopefield Wind Farm Hopefield, WC Wind 65,4 Umoya Energy Vestas Vestas Operational Noblesfontein Noblesfontein, NC Wind 72,8 Coria (PKF) Investments 28 Vestas Vestas Operational Red Cap Kouga Wind Farm – Port Elizabeth, EC Wind 77,6 Red Cap Kouga Wind Farm Nordex Nordex Operational Oyster Bay Dorper Wind Farm Stormberg, EC Wind 97,0 Dorper Wind Farm Nordex Nordex Operational South Africa Mainstream Jeffreys Bay Jeffereys Bay, EC Wind 133,9 Siemens Siemens Operational Renewable Power Jeffreys Bay African Clean Energy Cookhouse Wind Farm Cookhouse, EC Wind 135,0 Suzlon Suzlon Operational Developments Khi Solar One Upington, NC Solar CSP 50,0 Khi Dolar One Consortium Abengoa Abengoa Construction KaXu Solar One Pofadder, NC Solar CSP 100,0 KaXu Solar One Consortium Abengoa Abengoa Operational SlimSun Swartland Solar Park Swartland, WC Solar PV 5,0 SlimSun BYD Solar Juwi, Hatch Operational RustMo1 Solar Farm Rustenburg, NWP Solar PV 6,8 RustMo1 Solar Farm BYD Solar Juwi Operational Mulilo Renewable Energy Solar De Aar, NC Solar PV 9,7 Gestamp Mulilo Consortium Trina Solar Gestamp, ABB Operational PV De Aar Konkoonsies Solar Pofadder, NC Solar PV 9,7 Limarco 77 BYD Solar Juwi Operational
    [Show full text]
  • Optimising the Concentrating Solar Power Potential in South Africa Through an Improved GIS Analysis
    energies Article Optimising the Concentrating Solar Power Potential in South Africa through an Improved GIS Analysis Dries. Frank Duvenhage 1,* , Alan C. Brent 1,2 , William H.L. Stafford 1,3 and Dean Van Den Heever 4 1 Engineering Management and Sustainable Systems, Department of Industrial Engineering, the Solar Thermal Energy Research Group and the Centre for Renewable and Sustainable Energy Studies, Stellenbosch University, Stellenbosch 7602, South Africa; [email protected] (A.C.B.); wstaff[email protected] (W.H.L.S.) 2 Sustainable Energy Systems, School of Engineering and Computer Science, Victoria University of Wellington, Wellington 6140, New Zealand 3 Green Economy Solutions, Natural Resources and the Environment, Council for Scientific and Industrial Research, Stellenbosch 7600, South Africa 4 Legal Drone Solutions, Stellenbosch 7600, South Africa; [email protected] * Correspondence: [email protected] Received: 11 May 2020; Accepted: 16 June 2020; Published: 23 June 2020 Abstract: Renewable Energy Technologies are rapidly gaining uptake in South Africa, already having more than 3900 MW operational wind, solar PV, Concentrating Solar Power (CSP) and biogas capacity. CSP has the potential to become a leading Renewable Energy Technology, as it is the only one inherently equipped with the facility for large-scale thermal energy storage for increased dispatchability. There are many studies that aim to determine the potential for CSP development in certain regions or countries. South Africa has a high solar irradiation resource by global standards, but few studies have been carried out to determine the potential for CSP. One such study was conducted in 2009, prior to any CSP plants having been built in South Africa.
    [Show full text]
  • DCSP Newsletter 42018
    From: Annelie Pitz-paal [email protected] Subject: Fwd: DCSP Newsletter 4/2018 Date: 11. June 2019 at 14:26 To: Sabrina Braemer [email protected] Gesendet mit der WEB.DE Mail App Anfang der weitergeleiteten E-Mail Von: "Deutsche CSP - Newsletter" Datum: 3. Dezember 2018 um 11:57 An: [email protected] Betreff: DCSP Newsletter 4/2018 Newsletter Ihre Newsletter-Registrierung: Sind Sie weiter interessiert? Wir freuen uns, dass Sie bisher unsere Newsletter erhalten wollen. Aufgrund der neuen Datenschutzverordnung müssen wir Sie bitten, uns kurz zu bestätigen, dass Sie den Newsletter auch weiterhin beziehen möchten. Klicken Sie dazu einfach auf den folgenden Button. Herzlichen Dank! Ja, Ich will den Newsletter weiterhin beziehen Guten Tag, sehr geehrte Damen und Herren, im Folgenden übersenden wir Ihnen eine Übersicht mit aktuellen Branchen-News. Mit freundlichen Grüßen Ihr Vorstand des Deutschen Industrieverband Concentrated Solar Power. International News Project overview of CGN Solar Delingha 50MW parabolic trough CSP plant The CGN Solar Delingha 50MW parabolic trough CSP plant is one of China’s first batch of demonstration CSP projects and one of China’s first batch of demonstration CSP projects and leads the construction progress. The project has a total investment of 1.938 billion yuan and is equipped with 9 hours of molten salt heat storage. Once completed, CGN Solar Delingha 50MW parabolic trough CSP plant will be the first commercial parabolic trough project and the first operational demonstation CSP project in China. (cspplaza, 07.08.2018) Mehr Ten "CSP+" Power Station Development Modes In view of the fact that CSP still faces the problems of high investment cost and high cost of electricity, the development mode of “CSP+” seems a good choice for building new plants.
    [Show full text]
  • The Case of Bokpoort CSP Plant in South Africa
    Dispatchable Solar Energy 24/7 – The Case of Bokpoort CSP plant in South Africa Nandu Bhula Deputy Managing Director (Southern Africa) At A Glance We develop power and desalination water plants In over a decade we have become the second largest power & water developer in the GCC region, and a name to contend with internationally. We have achieved this by developing, investing in and operating a world-class 2004 portfolio... Saudi Arabia 58 37.7+ 5.8 Assets* GW Power* Mm3 per day Desalinated Water* 2008 – 2010 Oman 12 $59+ bn 21.5% Jordan Countries USD of Assets Portfolio in Renewable Under Energy based on Management** Share of project cost 2012 – 2014 3,500+ 30+ ~60% Morocco Employees Nationalities Local South Africa Employment Turkey in projects * Figures inclusive of advanced development projects ** There is another $10.5 bn of projects in advanced development DEVELOP INVEST OPERATE 2015 – UAE We win bids as lead developer, While taking significant, We operate and maintain our by partnering with the best and long-term stakes in all our plants plants to the highest global Egypt focusing on cost leadership. standards Vietnam 15/12/2020 CSP – Status across the Globe •CSP technology implemented in 23 countries 30 000 across the globe 25 000 20 000 •Over 6,000MW in operation 15 000 10 000 •Over 3,500MW in construction 5 000 - •Almost 25,000MW planned or in development Planned CSP Under Operational stages Projects Construction Source: https://solargis.com/maps-and-gis-data/overview/ 15/12/2020 ACWA Power CSP’s in MENA Region 150MW 950MW – (3 x 200MW CSP Trough, 1 x - Tower CSP+PV Hybrid 100MW CSP Tower & 250MW PV) 200MW - Trough 160MW - Trough 510MW – CSP Complex 15/12/2020 South African Renewable Energy IPP Program (REIPPP) • Started in 2011, the REIPPP is widely recognized as one of the most successful renewable energy procurement models in the world.
    [Show full text]
  • Corporate Responsibility Corporate Responsibility 2017
    Corporate responsibility Corporate responsibility 210 7 AR | 2017 Investec corporate sustainability Wealth & Investment Wealth Asset Management Specialist Banking Contents Corporate responsibility 01 at Investec 04 Profit Corporate responsibility 3 Overview of our financial year ending Highlights 4 31 March 2017 51 Message from the chief executive officer 6 Communication and stakeholder The way we do business engagement 7 05 Corporate governance and risk 53 Compliance 57 People 02 Information technology 59 Supporting our employees 12 Procurement 61 Transformation in South Africa 18 Supporting our community 20 Appendix Supporting our clients 33 06 Independent assurance statement 63 Global Reporting Initiative (GRI Standards: Planet 03 core option) 65 Green business 35 Policies and programmes 82 Conserving the environment 42 Contact details 83 Direct operational impact and carbon footprint 44 About this report Using this report For easy reading we have provided cross-referencing tools set out below: Scope and reporting framework This corporate responsibility report highlights Investec’s corporate responsibility performance over Page references Audited information Website the period 1 April 2016 to Refers readers to information Denotes information Indicates that additional 31 March 2017. We incorporate elsewhere in the report that has been externally information is available material information from the main or to Investec’s 2017 verified on our website: integrated annual report www.investec.com geographies in which we operate. This report
    [Show full text]
  • Griqua Identity – and Often As Equally Contested - Is the Matter of Terminology
    INTRODUCTION Most scholars acknowledge that the origins of the Griqua people are rooted in the complex relationships between autochthonous KhoeSan, slaves, Africans and European settlers. Coupled with the intricacies that underpin the issue of Griqua identity – and often as equally contested - is the matter of terminology. Christopher Saunders and Nicholas Southey describe the Griquas as Pastoralists of Khoikhoi and mixed descent, initially known as Bastards or Basters, who left the Cape in the late 18th century under their first leader, Adam Kok 1 (c.1710- c.1795).1 They explain the name „bastards‟ as [The] term used in the 18th century for the offspring of mixed unions of whites with people of colour, most commonly Khoikhoi but also, less frequently, slaves.”2 Even in the context of post-apartheid South Africa, issues of identity and ethnicity continue to dominate the literature of the Griqua people. As the South African social anthropologist, Linda Waldman, writes: The Griqua comprise an extremely diverse category of South Africans. They are defined 3 neither by geographical boundaries nor by cultural practices. Waldman goes on to illustrate the complexities surrounding attempts to categorise the Griqua people by explaining how the Griqua have been described by some as a sub-category of the Coloured people,4 by others as either constituting a separate ethnic group,5 by others as not constituting a separate ethnic group6, and by still others as a nation.7 1 Christopher Saunders and Nicholas Southey, A dictionary of South African history. Cape Town: David Philip, 2001: 81-82. 2 Saunders and Southey, A dictionary of South African history: 22.
    [Show full text]
  • April 2017 2017 | 1 a REPUTABLE ENGINEERING POWERHOUSE of AFRICAN HERITAGE
    POWER THE OFFICIAL PUBLICATION OF THE SOUTH AFRICAN INSTITUTE OF ELECTRICAL ENGINEERSwattnow | APRIL | april 2017 2017 | 1 A REPUTABLE ENGINEERING POWERHOUSE OF AFRICAN HERITAGE • Motor Control Centres • Containerised Control Centres • Power Distribution Boards • Sub-Distribution Boards • PLC/Automation Panels • Electronic Drive Panels • Control Desks • General Control Panels • E.P.C. • Project Consulting Contact Megan Schoeman 011 979 4100 [email protected] www.lvsb.co.za 2 | wattnow | april 2017 LVS ADVERT.indd 1 13/03/2017 09:11 A REPUTABLE ENGINEERING POWERHOUSE OF AFRICAN HERITAGE UTILITIES VS GENERATORS 20 EMBEDDED GENERATORS NEEDS TO BE CONNECTED FEATURES LIGHTNING PROTECTION 36 PV SYSTEMS WILL FORM INTEGRAL PART OF THE FUTURE 20 ESKOM'S DEATH SPIRAL 42 MOTHBALLING POWER STATIONS 46 • Motor Control Centres SAVE THE TURBO ALTERNATORS 48 • Containerised Control Centres 36 • Power Distribution Boards • Sub-Distribution Boards • PLC/Automation Panels • Electronic Drive Panels • Control Desks WATTSUP 42 • General Control Panels 8 • E.P.C. CALENDAR • Project Consulting 60 WATT? 62 LOOKING BACK... APRIL 64 64 Contact Megan Schoeman 011 979 4100 [email protected] www.lvsb.co.za SAIEE @saiee wattnow | april 2017 | 3 LVS ADVERT.indd 1 13/03/2017 09:11 MANAGING EDITOR Minx Avrabos | [email protected] TECHNICAL EDITORS Derek Woodburn Jane-Anne Buisson-Street April is here, the days are becoming CONTRIBUTORS shorter and the nights longer, which J Alberts means our power consumption, will J de Kock T Blom in all probability increase. Eskom M Cary has really come to the party for the D Basson consumer and hopefully there will J Buisson-Street be no loadshedding - which seems to be something of the ill-forgotten EVENTS past.
    [Show full text]
  • The Proposed Life Solar Plant Near Postmasburg, Northern Cape Province
    FINAL ENVIRONMENTAL IMPACT REPORT 7 October 2016 THE PROPOSED LIFE SOLAR PLANT NEAR POSTMASBURG, NORTHERN CAPE PROVINCE PROJECT DETAIL DEA Reference No. : 14/12/16/3/3/2/933 Project Title : Proposed Life Solar Plant near Olifantshoek, Northern Cape Province Authors : Mrs. Carli Otte Ms. Marelie Griesel Ms. Liesl de Swardt Client : Life Solar (RF) (Pty) Ltd. Report Status : Final Environmental Impact Report Submission date : 7 October 2016 When used as a reference this report should be cited as: Environamics (2016) Final EIR: Proposed Life Solar Plant near Postmasburg, Northern Cape Province. COPYRIGHT RESERVED This technical report has been produced for Life Solar (RF) (Pty) Ltd. The intellectual property contained in this report remains vested in Environamics and Life Solar (RF) (Pty) Ltd. No part of the report may be reproduced in any manner without written permission from Environamics or Life Solar (RF) (Pty) Ltd. 1 TABLE OF CONTENTS PROJECT DETAIL .....................................................................................................................1 TABLE OF CONTENTS ..............................................................................................................2 LIST OF TABLES ......................................................................................................................5 LIST OF FIGURES .....................................................................................................................5 LIST OF TABLES ......................................................................................................................6
    [Show full text]
  • Presentación De Powerpoint
    4ª reunión del GT de Tecnologías de Concentración 5/junio/2018 Grupo de Trabajo de Tecnologías de Concentración AGENDA - PLATAFORMA TECNOLÓGICA DE ENERGÍA SOLAR DE CONCENTRACIÓN 1. Información General de la Plataforma Tecnológica. 2. Presentación de los datos actualizados de generación termosolar. España y EE.UU. 3. Presentación de la situación de Normalización del sector termosolar, tanto normas AENOR/UNE como IEC - PSA 4. Presentación de resultados del Estudio de Valor de CSP/STE contratado al consorcio ADAYC + MRC dentro del marco de subcontrataciones de Solar Concentra. ADAYC + MRC 5. Presentación del estudio “Impacto Sustitución Nuclear por Termosolar en el año 2020” – SERLED CONSULTORES 6. Presentación del Proyecto Europeo – Solar CV. Definición del Currículum Europeo para el Operador del Campo Solar en Energía Termosolar, creación de una plataforma de formación e-learning (incluyendo un e- simulador) - AGENEX 7. Actualización del sector a nivel internacional. 8. Monitoreo del sector de las baterías. 9. Ruegos y Preguntas. 05/06/2018 GT Tecnologías de Concentración 2 1. Información General de la Plataforma ▪ Coordinación con el resto de Plataformas para aclarar la situación administrativa de la convocatoria para el siguiente periodo bianual. ▪ Reunión de Coordinación del CCPTE (Comité de Coordinación de la Plataformas Tecnológicas del ámbito Energético) → Jornada CCPTE 2018 ▪ Participación en la Jornada del Congreso Genera 2018 → Situación y potencial térmico y eléctrico, jueves 14 de junio a las 16h, Sala N-115 del pabellón 8 de Feria de Madrid. CIEMAT, ADAYC, SOLAR CONCENTRA, PROTERMOSOLAR ▪ Participación en la Jornada de Presentación de Iniciativas Tecnológicas Prioritarias, el 20 de Junio en Sevilla 05/06/2018 GT Tecnologías de Concentración 3 AGENDA - PLATAFORMA TECNOLÓGICA DE ENERGÍA SOLAR DE CONCENTRACIÓN 1.
    [Show full text]
  • Frances Baard District Municipality
    FRANCES BAARD DISTRICT MUNICIPALITY REVIEWED ENVIRONMENTAL MANAGEMENT FRAMEWORK DRAFT July 2019 TITLE AND APPROVAL PAGE Frances Baard District Municipality Project Name: Reviewed Environmental Management Framework Authority Reference: N/A Report Status Draft Client: Prepared By: Nemai Consulting +27 11 781 1730 147 Bram Fischer Drive, +27 11 781 1731 FERNDALE, 2194 [email protected] PO Box 1673, SUNNINGHILL, www.nemai.co.za 2157 Report Reference: 10692–20190717 R-PRO-REP|20150514 Authorisation Name Date Author: D. Henning 17 July 2019 Reviewed By: N. Naidoo 17 July 2019 This Document is Confidential Intellectual Property of Nemai Consulting C.C. © copyright and all other rights reserved by Nemai Consulting C.C. This document may only be used for its intended purpose Frances Baard District Municipality Reviewed EMF (Draft) AMENDMENTS PAGE Amendment Date: Nature of Amendment Number: 17/07/2019 First Version for Public Review 0 Frances Baard District Municipality Reviewed EMF (Draft) EXECUTIVE SUMMARY A. INTRODUCTION An Environmental Management Framework includes a framework of spatially represented information connected to significant environmental (i.e. ecological, social and economic) parameters. It is one of the key instruments used in strategic environmental planning. In its formal context, the Environmental Management Framework that is adopted by the Minister or Member of the Executive Council will be taken into consideration when reviewing an application for environmental authorisation following the completion of an Environmental Impact Assessment, where the proposed development is contemplated within the areas to which the EMF applies The Frances Baard District Municipality identified the need to review its Environmental Management Framework that was developed in 2010.
    [Show full text]
  • Contribution of Institutional Investors Public Disclosure Authorized Private Investment in Infrastructure 2011–H1 2017 Public Disclosure Authorized ©
    Public Disclosure Authorized Public Disclosure Authorized Contribution of Institutional Investors Public Disclosure Authorized Private Investment in Infrastructure 2011–H1 2017 Public Disclosure Authorized © Acknowledgement & Disclaimer This report was written by Deblina Saha (Task Team Leader), Seong Ho Hong, Akhilesh Modi and Iuliia Zemlytska with editorial inputs from Luba Vangelova and design by Victoria Adams-Kotsch. The team is very grateful for the support and guidance received from Laurence Carter (Senior Director, IPG Group), Jordan Schwartz (Director, IPG Group), Abha Joshi-Ghani (Senior Adviser, IPG Group) and Cledan Mandri-Perrott (Head of Infrastructure Finance and PPPs, Singapore). The team is thankful to Jeffrey Delmon (Senior Infrastructure Finance Specialist, IPG Group), Mark Giblett (Senior Infra- structure Finance Specialist, IPG Group), Steven Hong (Senior Manager, Global Infrastructure Hub), Rana Karadsheh (Manager, IFC), Samuel Maimbo (Senior Adviser, CFOFD), Darwin Marcelo (Senior Infrastructure Economist, IPG Group), Mark M. Moseley (COO, Global Infrastructure Hub), Fiona Stewart (Lead Financial Sector Specialist, FCI) and Hin Lung Yuen (Senior Infrastructure Finance Spe- cialist, Global Infrastructure Facility) for providing valuable comments which helped shape the report. This report relies on data solely obtained from the Private Participation in Infrastructure Database. The database records investment commitments for infrastructure projects in low- and middle-income countries globally, at the time of financial closure. Infrastructure refers to energy, transport, and water and sanitation projects serving the public, including natural gas transmission and distribution, but excluding oil and gas extraction. The PPI Database represents the best efforts of a research team to compile publicly available informa- tion, and should not be seen as a fully comprehensive resource.
    [Show full text]