Central Coalfields Limited Office of the General Manager(A), Sirka M/S___Address
Central Coalfields Limited Office of the General Manager(A), Sirka LIMITED TENDER NOTICE No.: GM (A)/Mining /CT/GDC-SND/ 14/ 272 Dated: 17.07.2014 M/s_______________________________________ Address___________________________________ __________________________________________ Limited tenders in two parts are invited from all the working transport contractors of Argada Area, Kuju Area, Barka-Sayal Area, H.Bagh Area & Rajrappa Area for loading and transportation of coal from Gidi-C Pit head stock (Heap No. 4 & 6 of Grade G- 6 & G- 8) to Saunda siding/Feeder Breaker of Barka-Sayal Area by contractor’s pay loader and contractor’s tipping trucks, Distance 11.56 KM for a period of four months as under: Description of work Quantity in T e Earne st Money 1. Transportation of coal from Gidi - Rs .49,165 / - only ( Rupees forty nine C Pit head stock heap No. (4 & 6 of thousand one hundred sixty five ) only Grade 6 & G 8) to Saunda 50,000 Te to be deposited by way of Bank Draft / siding/Feeder breaker via Gidi-W, Banker’s Cheque payable in favor of Officer’s Club Bhurkunda, PO’s Central Coalfields Limited ARGADA AREA Office, Bhurkunda, Distance 11.56 payable at Ramgarh. KM weighment to be done at Gidi-C as well as Saunda Weighbridge. 2. Loading of coal by contractor’s pay loader into contractor’s tipping 50,000 Te. trucks. Estimated value of work: Rs. 49,16,500.00 only (Rupees forty nine lakh sixteen thousand five hundred and paise zero) only at the diesel price of @Rs. 59.25 as on 13.05.14 Requirement of tipping trucks -- 6 (Six) Nos. -
Booth Name and Location
BOOTH NAME AND LOCATION id PC BLK_NAME BOOTH_NO build_name BOOTH_LOC SENSITIVE build_id m_VOTERS f_VOTERS VOTERS 1 BARKATHA CHANDWARA 1 AAGANBADI KENDRA HARLI AAGANBADI KENDRA HARLI NORMAL 1 282 276 558 2 BARKATHA CHANDWARA 2 U.P.S. BIRSODIH U.P.S. BIRSODIH NORMAL 2 376 350 726 3 BARKATHA CHANDWARA 3 U.M.S. CHAMGUDOKHURD U.M.S. CHAMGUDOKHURD NORMAL 3 325 290 615 4 BARKATHA CHANDWARA 4 N.P.S. CHAMGUDOKALA N.P.S. CHAMGUDOKALA NORMAL 4 280 257 537 5 BARKATHA CHANDWARA 5 U.M.S. CHARKIPAHRI U.M.S. CHARKIPAHRI NORMAL 5 493 420 913 6 BARKATHA CHANDWARA 6 U.M.S. DIGTHU GAIDA U.M.S. DIGTHU GAIDA NORMAL 6 539 470 1009 7 BARKATHA CHANDWARA 7 SAMUDAYIK BHAWAN POKDANDA SAMUDAYIK BHAWAN POKDANDA NORMAL 7 337 341 678 8 BARKATHA CHANDWARA 8 U.M.S. PIPRADIH U.M.S. PIPRADIH NORMAL 8 605 503 1108 9 BARKATHA CHANDWARA 9 U.P.S. ARNIYAO U.P.S. ARNIYAO NORMAL 9 139 120 259 10 BARKATHA CHANDWARA 10 U.P.S. BANDACHAK U.P.S. BANDACHAK NORMAL 10 246 217 463 11 BARKATHA CHANDWARA 11 U.P.S. GARAYANDIH U.P.S. GARAYANDIH NORMAL 11 409 404 813 12 BARKATHA CHANDWARA 12 M.S. KANKO EAST PART M.S. KANKO EAST PART NORMAL 12 498 436 934 13 BARKATHA CHANDWARA 13 M.S. KANKO WEST PART M.S. KANKO WEST PART NORMAL 13 594 507 1101 14 BARKATHA CHANDWARA 14 U.P.S. KURMIDIH U.P.S. KURMIDIH NORMAL 14 195 159 354 15 BARKATHA CHANDWARA 15 U.M.S. -
Page-1/9 TENDER DOCUMENT Sealed Tenders Are Invited in Two
Corporate Identity Number – U14292JH1975GOI001223 क्रमांक: सीएमपीडीआई/क्षे.सं.-3/गवेषण /2016/V.Hiring/64 ददनांक: 18/01/2016 Page-1/9 TENDER DOCUMENT Sealed Tenders are invited in Two Bid System (Part A&B) from travel agents / vehicle owners for hiring of New Vehicles Registration not older than year-2011 as given below: Hiring of 06 (six) nos. of vehicles for one year from the date of deployment ‘on monthly basis system’ (No. of days available in the month). The details of the tender are described below: Hiring of 06 (six) nos. of vehicles for one year from the date of deployment ‘on monthly basis system’ Tender Fee (Non-refundable / Non-transferable) ; Rs.250 /- (Rupees Two Hundred Fifty) only Issued against Cash Receipt / D.D. No. : No. ______________________Date_________________ Tender No.: CMPDI / RI-III / Expl /2016/ V.Hiring/64 Dated: 18/01/2016 Earnest Money Deposit Rs.1,960/=(Rupees one thousand nine hundred sixty only) per vehicle. Due date for submission of tender: On or before 11.02.2016 up to 3.00 P.M. Due date of opening of Part A: 11.02.2016 at 4.00 P.M. (If the tender is not opened on the above date due to unforeseen circumstances, then it will be opened on the next working day.) Tenders shall be submitted during office hours in the office of the “HOD (Exploration), Regional Institute –III, Gondwana Place, Kanke Road, Ranchi-834008 (Jharkhand)” along with the original tender document or downloaded tender document duly signed in all pages. Date of submission & opening etc. -
Sl.No. Area Project Village Vill-Address Khata-No Plot Nos
Employment Details for the Year 2018-19 (Jan'19 To March'19) Relation Name of Person offered with the Place of Posting Designati Sl.No. Area Project Village Vill‐Address Khata‐No Plot Nos. Block‐Name District F/H‐Name Empl.Ref. No. Empl‐Letter‐Date Employment Land‐ (Area) on Owner PD/MP/Apptt/Land Security Deptt. CCL 1 Hazaribagh Kedla OC Kedla PO ‐ Kedla PS ‐ Mandu 15 951(P),955,959,960,962. Mandu Ramgarh Mohan Turi S/o Kamal Turi Self 02.01.2019 Cat‐I (T) Loser/L‐428 (HQ)Ranchi PD/MP/Apptt/Land P&IR Deptt. 2 M&A Amrapali Binglat, Saradhu,Honhe PO ‐ Kasiyadih PS ‐ Tandwa 45,31,31,2,53,46 413,305,305,1422,222, 568 Tandwa Chatra Narsingh Saw S/o Iswari Saw Self 11.01.2019 Cat‐I (T) Loser/L‐438 CCL,(HQ)Ranchi 344,345,354,376,389,472,689,842, PO ‐ Ganeshpur PS ‐Balumath & 973,1014,1422,22,25,28,56,58,185, Balumath & Latehar & PD/MP/Apptt/Land 3 M&A Magadh Ara, Kundi & Saradhu 132,4,4,254 Umesh Kumar S/o Keshwari Saw Self 11.01.2019 Rajhara Cat‐I (T) Tandwa 145,162,311,205,247,317,227,352, Tandwa Chatra Loser/L‐440 107,144(P),144(P),107,677. PD/MP/Apptt/Land Security Deptt. CCL 4 Kuju Topa Orla & Topa PO ‐ Topa PS ‐Mandu 19,76,58,58,59,28. 58,1053/2,670/8,670/4,863, 29. Mandu Ramgarh Binod Karmali S/o Mahaveer Karmali Self 15.01.2019 Cat‐I (T) Loser/L‐445 (HQ)Ranchi 36,91,176,178,282,327,342,355,362, 428,501,677,709,28,47,227,251,256, 267,326,358,376,399,400,429,502, PD/MP/Apptt/Land Security Deptt. -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
Hazaribagh, District Census Handbook, Bihar
~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar. -
Pre-Feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for Production of 3.0MTPA Hot Metal with Blast
2019 PRE-FEASIBILITY REPORT FOR INTEGRATED STEEL PLANT OF ELECTROSTEEL STEELS LIMITED FOR PRODUCTION OF 3.0 MTPA HOT METAL WITH BLAST FURNACE (1×1050 m3, 1×350 m3, 1×1700 m3) ALONG WITH CPP OF CAPACITY 160 MW M/s ELECTROSTEEL STEELS LIMITED (an enterprise of Vedanta Limited) at Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar , Dist Bokaro, Jharkhand -827013 Pre-feasibility Report for Integrated Steel Plant of Electrosteel Steels Limited for production of 3.0MTPA Hot Metal with Blast Furnace (1×1050 m3, 1×350 m3, 1×1700 m3) along with CPP of Capacity 160 MW located at village Siyaljori, Bhagabandh, Budhibinor, Alkusha, Dhandabar, Bandhdih, Hutupathar, Dist Bokaro, Jharkhand-827013 Table of Contents CHAPTER-1............................................................................................................ 7 EXECUTIVE SUMMARY........................................................................................... 7 CHAPTER-2.......................................................................................................... 11 INTRODUCTION OF THE PROJECT......................................................................... 11 2.0 INTRODUCTION ..........................................................................................................11 2.1 IDENTIFICATION OF THE PROJECT & PROJECT PROPONENT.......................................12 2.2 BRIEF DESCRIPTION AND NATURE OF THE PROJECT...................................................13 2.2.1 Chronology of the Project Implementation..........................................................13 -
Jainagar Coal Block Summary
JAINAGAR COAL BLOCK SUMMARY PART A Sr. Features Details No . 1. Location Coal Block Jainagar Latitude 23° 38' 34" N to 23° 39' 9" N (Provisional) Longitude 85° 17' 3" E to 85° 18' 12" E (Provisional) Topo Sheet No. 73 E/6 Coalfield South Karanpura Villages - Tehsil/Taluka Patratu District Ramgarh. State Jharkhand. 2. Connectivity with Block Ramgarh is a railway station on the Gomoh-Barkakhana section of the South Nearest Rail Head Eastern Railway and Patratu railway station is on the Gomoh-dehri-on-Sone loop of the Eastern Railway. A good motorable road has been constructed passing through the western of Road the area connecting Patratu railway station (3 km.) and Ramgarh (27 km.). Airport Ranchi Airport 3. Area Geological Block Area 1.3 sq.km. (As per shape file. Refer Note No. 3) Forest Area Approx. 15 % (As per FSI map) Non-Forest Area Approx. 85 % 4. Climate and Topography Average Annual Rainfall - Temperature (Min. — Max.) - Local Surface There are two nalas in the area, one on the eastern boundary – the Nalkari Drainage Channels Nala flowing towards north, the other on the northern portion of the area the Bawandhara nala flowing towards east. The later joins the former at the north-eastern corner of the area which in turn joins the Damodar river further north-east. These nalas are practically dry except during rains. Rivers Nalkari Nala/Nadi. 5. Exploration Status Regionally Explored. Exploration Agency GSI. Total Number of Boreholes with meterage 13 Boreholes; 3212.43 m. Borehole Density Approx. 10 Boreholes/sq.km. The dips of the Barakar vary from 20° to 45° towards north in the eastern General Dip of Seams part of the area and about 20° towards east in the western part of the area. -
1 BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826
BCCL Bharat Coking Coal Limited (A Subsidiary of Coal India Ltd) Contract Management Cell Koyla Bhawan:Koyla Nagar Dhanbad-826 005 (India) Tele-Fax: 0326-2230206 e-mail: [email protected] Tender Notice No. BCCL/ CGM(CMC)/Global/ Amlabad/ 2013/117 Date: 29.01.2013 COMPANY TENDER NOTICE NO. & DATE PROJECT / AREA Amlabad Bharat Coking Coal Limited underground mine, BCCL/ CGM(CMC)/ Global/ EJ Area, BCCL. Amlabad/ 2013/ 117. Date: 29.01.2013 Sealed turn-key tenders are invited for the following work: Name and Description of Work Location Contract period Development of Amlabad under ground mines and Amlabad under The contract period extraction of coal from vergin and remnant area ground mine, EJ start from the date of through existing entries and/or additional drifts, Area, BCCL. signing of the exploitation of the virgin/ developed seams by Mass contract. Period of Production Technology package for a minimum contract shall consist guaranteed production of 3.6 million tonne of coal of Pre-Commercial during commercial production of 9 (nine) years on Production Period turnkey basis. Work includes additional exploration (if and Commercial desired so by the contractor), preparation of Mining production period. Plan, Detailed Project Report & EMP (Environment The Commercial Clearance), obtaining all necessary approvals from Production Period concerned authorities and restoring shaft entries, shall be 9 (Nine) additional drifts/ shafts deepening & widening etc. in production years. order to meet the guaranteed production. 1.1 EARNEST MONEY Rs. 25,00,000 (Twenty five lacs) or equivalent USD as Earnest Money / Bid Security is to be deposited in the form of irrevocable Bank guarantee from any Scheduled Bank payable at its branch at Dhanbad / Kolkata with validity of 28 (Twenty eight) days beyond the validity of the Bid in the format given in the Bid Document. -
Land Use/Vegetation Cover Mapping of North and South Karanpura Coalfields Based on Satellite Data for the Year- 2012
Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 CMPDI A Miniratna Company Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi CMPDI Restricted Report on Vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data of the Year‐ 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi RSC-561410027 [ Page i of iv] CMPDI Document Control Sheet (1) Job No. RSC/561410027 (2) Publication Date March 2013 (3) Number of Pages 28 (4) Number of Figures 7 (5) Number of Tables 7 (6) Number of Plates 1 (7) Title of Report Land use /vegetation cover mapping of North & South Karanpura Coalfield based on satellite data of the year 2012. (8) Aim of the Report To prepare Land use / vegetation cover map of North & South Karanpura Coalfield on 1:50000 scale based on IRS R-2 L4FMX satellite data for assessing the impact of coal mining on land use pattern and vegetation cover (9) Executing Unit Remote Sensing Cell, Geomatics Division Central Mine Planning & Design Institute Limited, Gondwana Place, Kanke Road, Ranchi 834008 (10) User Agency Central Coalfields Ltd. (11) Authors Mr A. K. Singh Chief Manager (Remote Sensing) Mr. N.P.Singh, General Manager(Geomatics) (12) Security Restriction Restricted Circulation (13) No. of Copies 8 (14) Distribution Statement Official RSC-561410027 [ Page ii of iv] CMPDI Contents Page No. Document -
Ramgarh District, Jharkhand State
भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Open cast mines at Ramgarh district केन्द्रीय भसू िजल बो셍ड Central Ground water Board Ministry of Water Resources जल िंिाधन िंत्रालय (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाालय, रााँची Mid-Eastern Region म鵍य-पूर्वी क्षेत्र Patna पटना सितंबर 2013 September 2013 भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Prepared By रोज अनीता कू जूर (वैज्ञाननक ग ) Rose Anita Kujur (Scientist C) रा煍य एकक कायाालय, रााँची म鵍य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna GROUND WATER INFORMATION BOOKLET OF RAMGARH DISTRICT, JHARKHAND STATE CONTENTS Sl.No. Details Page No. RAMGARH DISTRICT AT A GLANCE 1.0 INTRODUCTION 1.1 Administration 1 1.2 Drainage 4 1.3 Studies/Activities Carried Out By CGWB 4 2.0 HYDROMETEROLOGY 2.1 Rainfall 4 2.2 Climate 4 3.0 GEOMORPHOLOGY AND SOIL TYPES 3.1 Geomorphology 4 3.2 Soil 5 4.0 GROUND WATER SCENARIO 4.1 Hydrogeology 5 4.2 Depth to Water Level 5 4.3 Water Level Trend 6 4.4 Aquifer Parameters 10 4.5 Ground Water Quality 10 4.6 Ground Water Resource 10 5.0 GROUND WATER MANAGEMENT STRATEGY 5.1 Ground Water Development 15 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS 15 7.0 AWARENESS AND TRAINING ACTIVITY 7.1 Mass Awareness Program(MAP) & Water 16 Management Programme(WMTP) by CGWB 8.0 AREAS NOTIFIED BY CGWB / CGWA 16 9.0 RECOMMENDATIONS 16 Figure.No. -
District Survey Report of Stone District- Ramgarh
District Survey Report of Stone District- Ramgarh Prepared in accordance with Para 7 (iii) a of S.O.3611 (E) Dated 25th July 2018 of Ministry of Environment, Forest and Climate Change Notification August 2018 District Survey Report (Stone), Ramgarh District, Jharkhand CONTENT CHAPTER NO. Description Page No. Preamble 1 1. Introduction 2-3 2. Overview of mining activity in the district 4-5 3. General profile of the District 6-13 4. Geology of the district 14-15 5. Drainage of Irrigation pattern 16 6. Land Utilization Pattern of the District: Forest, Agricultural, 17 Horticultural, Mining etc. 7. Surface water and Ground water Scenario of the district 18-21 8. Rainfall of the District and Climatic Condition 22 9. Details of Mining leases in the district 23-30 10. Detail of Royalty or Revenue received in last 3 years 31 11. Detail of production of minor mineral in last 3 years 31 12. Mineral Map of the District 32 13. List of Letter of Intent(LOI) Holders in the District 33 14. Total Mineral Reserves Available in the District 33-34 15. Quality / Grade of Mineral Available in the District 34 16. Use of Mineral 34-35 17. Demand and Supply of the Mineral in the last three years 35 18. Mining Leases Marked on the Map of the District 36 19. Details of the area where there is a cluster of mining leases 36 20. Details of Eco-Sensitive Area in the District 37 21. Impact on the Environment due to mining activity 37-38 22. Remedial Measures to mitigate the impact of mining on the 39 Environment 23.