Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project Social Monitoring Report Project No.: 46543-002 November 2019 Tajikistan: Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project Prepared by: SMEC International (Pty) Ltd, Australia for the Ministry of Transport of the Republic of Tajikistan and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 REPUBLIC OF TAJIKISTAN MINISTRY OF TRANSPORT ADB Grant: 0356-TAJ (SF) CAREC Corridor 3&5 Enhancement Project (Kangurt-Baljuvon_Khovaling Road section) Final Social Safeguard Monitoring Report October 2019 SMEC International Pty. Ltd. CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 2 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 DOCUMENT CONTROL This Social Safeguard Monitoring Report is produced in accordance with the requirements of the Contract for the Provision of Construction Supervision Services to the Ministry of Transport, Republic of Tajikistan for 42.50 km Kangurt-Baljuvon-Khovaling Road under CAREC Corridor 3 & 5 Enhancement Project of the Asian Development Bank Grant 0356-Taj (SF). The Project Management and Construction Supervision Consultant (PMSC) of these Contracts is SMEC International Pty. Ltd. This report reviews the actions that the PIURR and Contractors have undertaken in accordance with the Social Development Issues in the Kangurt-Baljuvon-Khovaling road section. Prepared By Kh. Khairul Matin Social and Resettlement Safeguard Specialist SMEC International Pty. Ltd. Date: October, 2019 CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 3 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 TABLE OF CONTENTS ACRONYMS & ABBREVIATIONS ...................................................................................... 6 DEFINITION OF SELECTED TERMS................................................................................. 7 EXECUTIVE SUMMARY ...................................................................................................... 8 A. INTRODUCTION TO THE PROJECT ............................................................................................... 11 I. Introduction ..................................................................................................................11 II. Project Locations .........................................................................................................12 III. Description of the Kangurt-Baljuvon Road.....................................................................12 IV. Physical Progress of the Project Activities ....................................................................13 V. Project Impacts ..............................................................................................................14 B SOCIAL SAFEGUARD MONITORING................................................................................................. 15 I. Scope of Monitoring .....................................................................................................15 II. Methodologies adopted during monitoring ....................................................................15 III. Monitoring Results .......................................................................................................16 C. GRIEVANCE REDRESS MECHANISM ......................................................................... 19 I. Process of Grievance Resolution ....................................................................................19 II. Observation on Grievances ............................................................................................20 D. CONCLUSION AND RECOMMENDATION ................................................................... 21 I. Conclusion .....................................................................................................................21 II. Recommendation ...........................................................................................................21 CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 4 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 LIST OF TABLES Table 1: Description of the Kangurt-Baljuvon-Khovaling Road …………..………………………13 Table 2: Steps and procedures of grievance resolution …………...………………………………19 FIGURES Figure-1: Kangurt-Baljuvon-Khovaling Road Section ……………………………….……………..12 CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 5 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 ACRONYMS & ABBREVIATIONS AH Affected Household AP Affected People ADB Asian Development Bank ADF Asian Development Fund AIDS Acquired Immune Deficiency Syndrome CAREC Central Asia Regional Economic Cooperation CBA Collective Bargaining Authority CC Civil Code of The Republic of Tajikistan CPR Community Property Resources CROW Construction Right of Way DDR Due Diligence Report DP Displaced Person EA Executing Agency FGD Focus Group Discussion GOT Government of Tajikistan GRC Grievance Redress Committee GRM Grievance Redress Mechanism HH Household HIV Human Immunodeficiency Virus LARP Land Acquisition and Resettlement Plan M&E Monitoring and Evaluation MOT Ministry of Transport PIU RR Project Implementation Unit For Road Rehabilitation PMSC Project Management & Supervision Consultant RoW Right of Way RoT Republic of Tajikistan SF Special Fund SPS Safeguard Policy Statement STD Sexually Transmitted Diseases TJS Tajikistan Somoni (Currency) USD United States Dollar WEIGHTS AND MEASURES 1ha (Hectare) = 10000sq.m (square meter) 1 km (kilometer) = 1000 m (Meter) 1 Metric Ton = 1000 kg (kilogram) CURRENCY EQUIVALENTS (As of September 2019) Currency unit = Tajikistan Somoni (TJS) U S Dollar (US$) US$1.00 = TJS 9.68 CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 6 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 DEFINITION OF SELECTED TERMS Compensation means payment in cash or kind for an asset to be acquired or affected by a Project at replacement cost at current market value. Displaced Persons In the context of involuntary resettlement, displaced persons are those who are physically displaced (relocation, loss of residential land, or loss of shelter) and/or economically displaced (loss of land, assets, access to assets, income sources, or means of livelihoods) as a result of i) involuntary acquisition of land or ii) involuntary restrictions on land use or on access to legally designated parks and protected areas. Encroachers mean those people who move into the Project area after the cut-off date and are therefore not eligible for compensation or other rehabilitation measures provided by the Project. Entitlement means the range of measures comprising cash or kind compensation, relocation cost, income rehabilitation assistance, transfer assistance, income substitution/business restoration, which are due to DPs, depending on the type, extent and nature of their losses, and which suffice to restore their social and economic base. Hukumat This is the District administration in Tajikistan Jamoat This is the Sub-district administration under each District (Hukumat) Land Acquisition means the process whereby a person is compelled by a public agency to alienate all or part of the land s/he owns or possesses, to the ownership and possession of that agency, for public purposes, in return for fair compensation. Presidential Land means land for which use rights have been allocated by Presidential Decree but ownership remains with the state. CAREC Corridors 3 &5 Enhancement Project SMEC International Pty. Ltd 7 Final Social Safeguard Monitoring Report for Kangurt-Baljuvon-Khovaling Road October 2019 EXECUTIVE SUMMARY Introduction to the Project: The Government of the Republic of Tajikistan (RT) undertook a project to develop CAREC Corridors 3 and 5 and their associated sub-network under financing of the ADB worth USD 70 million ADF Grant: 0356-TAJ (SF) and contributing USD 19 million from its own Government budget, Objective of the project was to support sustainable transport and economic development to the region. Under the project improvement of the 89 km Sayron- Karamik road and rehabilitation of the 86.70km Vose to Khovaling road was completed and defect liability period was over on 30 November 2018 and 24.8.2018 respectively. Land acquisition and displacement was taken place in Vose-Khovaling road section only. Therefore, one Land Acquisition and Resettlement Plan (LARP) was prepared and implemented by Project Implementation Unit (PIU) under Ministry of Transport (MOT) in Vose-Khovaling road. Compensation and other benefits to the affected people were paid following the policy of the LARP. Grievances were redressed and people were relocated after payment of compensation. Final Monitoring report on LARP implementation of Vose-Khovaling road was prepared in October 2018 and duly uploaded on ADB website
Recommended publications
  • The Republic of Tajikistan Ministry of Energy and Industry
    The Republic of Tajikistan Ministry of Energy and Industry DATA COLLECTION SURVEY ON THE INSTALLMENT OF SMALL HYDROPOWER STATIONS FOR THE COMMUNITIES OF KHATLON OBLAST IN THE REPUBLIC OF TAJIKISTAN FINAL REPORT September 2012 Japan International Cooperation Agency NEWJEC Inc. E C C CR (1) 12-005 Final Report Contents, List of Figures, Abbreviations Data Collection Survey on the Installment of Small Hydropower Stations for the Communities of Khatlon Oblast in the Republic of Tajikistan FINAL REPORT Table of Contents Summary Chapter 1 Preface 1.1 Objectives and Scope of the Study .................................................................................. 1 - 1 1.2 Arrangement of Small Hydropower Potential Sites ......................................................... 1 - 2 1.3 Flowchart of the Study Implementation ........................................................................... 1 - 7 Chapter 2 Overview of Energy Situation in Tajikistan 2.1 Economic Activities and Electricity ................................................................................ 2 - 1 2.1.1 Social and Economic situation in Tajikistan ....................................................... 2 - 1 2.1.2 Energy and Electricity ......................................................................................... 2 - 2 2.1.3 Current Situation and Planning for Power Development .................................... 2 - 9 2.2 Natural Condition ............................................................................................................
    [Show full text]
  • TAJIKISTAN TAJIKISTAN Country – Livestock
    APPENDIX 15 TAJIKISTAN 870 км TAJIKISTAN 414 км Sangimurod Murvatulloev 1161 км Dushanbe,Tajikistan / [email protected] Tel: (992 93) 570 07 11 Regional meeting on Foot-and-Mouth Disease to develop a long term regional control strategy (Regional Roadmap for West Eurasia) 1206 км Shiraz, Islamic Republic of Iran 3 651 . 9 - 13 November 2008 Общая протяженность границы км Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy (Regional Roadmap for West Eurasia) TAJIKISTAN Country – Livestock - 2007 Territory - 143.000 square km Cities Dushanbe – 600.000 Small Population – 7 mln. Khujand – 370.000 Capital – Dushanbe Province Cattle Dairy Cattle ruminants Yak Kurgantube – 260.000 Official language - tajiki Kulob – 150.000 Total in Ethnic groups Tajik – 75% Tajikistan 1422614 756615 3172611 15131 Uzbek – 20% Russian – 3% Others – 2% GBAO 93619 33069 267112 14261 Sughd 388486 210970 980853 586 Khatlon 573472 314592 1247475 0 DRD 367037 197984 677171 0 Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy Regional meeting on Foot-and-Mouth Disease to develop a long term Regional control strategy (Regional Roadmap for West Eurasia) (Regional Roadmap for West Eurasia) Country – Livestock - 2007 Current FMD Situation and Trends Density of sheep and goats Prevalence of FM D population in Tajikistan Quantity of beans Mastchoh Asht 12827 - 21928 12 - 30 Ghafurov 21929 - 35698 31 - 46 Spitamen Zafarobod Konibodom 35699 - 54647 Spitamen Isfara M astchoh A sht 47
    [Show full text]
  • Republic of Tajikistan
    E4132 REPUBLIC OF TAJIKISTAN Public Disclosure Authorized Environmental Land Management and Rural Livelihoods Project (ELMARL) Public Disclosure Authorized ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL MANAGEMENT FRAMEWORK Public Disclosure Authorized December 2012 Public Disclosure Authorized 1 TABLE OF CONTENTS Acronyms ............................................................................................................................................................................ 3 Executive Summary. ........................................................................................................................................................... 4 1. Background ..................................................................................................................................................................... 7 1.1. Country Context ........................................................................................................................................................ 7 2. Project Description .......................................................................................................................................................... 7 2.1. Project Objectives ..................................................................................................................................................... 7 2.2. Key Results .............................................................................................................................................................. 7
    [Show full text]
  • Appendix 7 Tajikistan Prisoner List 2016
    APPENDIX 7 TAJIKISTAN PRISONER LIST 2016 BIRTH DATE OF THE NO. NAME DATE RESIDENCY RESPONSIBILITIES ARREST COMMENTS 1 Saidumar Huseyini 1961 Dushanbe Political council member and the 09.16.2015 Various extremism (Umarali Khusaini) first deputy chairman of the Islamic charges. Case went to the Renaissance Party of Tajikistan (IRPT) Constitutional Court on 9 February 2016. 2 Muhammadalii Hayit 1957 Dushanbe Political council member and 09.16.2015 Various extremism deputy chairman of IRPT charges. Case went to the Constitutional Court on 9 February 2016. 3 Vohidkhon Kosidinov 1956 Dushanbe Political council member and 09.17.2015 Various extremism chairman of the charges. Case went to the elections department of IRPT Constitutional Court on 9 February 2016. 4 Fayzmuhammad 1959 Dushanbe IRPT chairman of research, 09.16.2015 Various extremism Muhammadalii political council member charges. Case went to the Constitutional Court on 9 February 2016. 5 Davlat Abdukahhori 1975 Dushanbe IRPT foreign relations, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 6 Zarafo Rahmoni 1972 Dushanbe IRPT chairman advisor, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 7 Rozik Zubaydullohi 1946 Dushanbe IRPT academic chairman, 09.16.2015 Various extremism political council member charges. Case went to the Constitutional Court on 9 February 2016. 8 Mahmud Jaloliddini 1955 Hisor District IRPT chairman advisor, 02.10.2015 political council member 9 Hikmatulloh 1950 Dushanbe Editor of “Najot” newspaper, 09.16.2015 Various extremism Sayfullozoda IRPT political council member charges.
    [Show full text]
  • Formative Research on Infant and Young Child Feeding
    FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING Final Report AND MATERNAL NUTRITION 2016 IN TAJIKISTAN Conducted by Dornsife School of Public Health & College of Nursing and Health Professions, Drexel University, Philadelphia, PA USA For UNICEF Tajikistan Under Drexel’s Long Term Agreement for Services In Communication for Development (C4D) with UNICEF And Contract # 43192550 January 11 through November 30, 2016 Principal Investigator Ann C Klassen, PhD , Professor, Department of Community Health and Prevention Co-Investigators Brandy Joe Milliron PhD, Assistant Professor, Department of Nutrition Sciences Beth Leonberg, MA, MS, RD – Assistant Clinical Professor, Department of Nutrition Sciences Graduate Research Staff Lisa Bossert, MPH, Margaret Chenault, MS, Suzanne Grossman, MSc, Jalal Maqsood, MD Professional Translation Staff Rauf Abduzhalilov, Shokhin Asadov, Malika Iskandari, Muhiddin Tojiev This research is conducted with the financial support of the Government of the Russian Federation Appendices : (Available Separately) Additional Bibliography Data Collector Training, Dushanbe, March, 2016 Data Collection Instruments Drexel Presentations at National Nutrition Forum, Dushanbe, July, 2016 cover page photo © mromanyuk/2014 FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING AND MATERNAL NUTRITION IN TAJIKISTAN TABLE OF CONTENTS Section 1: Executive Summary 5 Section 2: Overview of Project 12 Section 3: Review of the Literature 65 Section 4: Field Work Report 75 Section 4a: Methods 86 Section 4b: Results 101 Section 5: Conclusions and Recommendations 120 Section 6: Literature Cited 138 FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING FORMATIVE RESEARCH ON INFANT AND YOUNG CHILD FEEDING 3 AND MATERNAL NUTRITION IN TAJIKISTAN AND MATERNAL NUTRITION IN TAJIKISTAN SECTION 1: EXECUTIVE SUMMARY Introduction Tajikistan is a mountainous, primarily rural country of approximately 8 million residents in Central Asia.
    [Show full text]
  • Joint Forest Management (JFM)
    Joint Forest Management Manual for facilitators, NGOs and projects based on Experience with implementing participatory forest management as practiced in Tajikistan between 2006 and 2015 Content Abbreviation ....................................................................................................................................... 6 Explanation of terms used ...................................................................................................................... 7 1. Background .................................................................................................................................... 9 2. Introducing Joint Forest Management to the community ............................................................... 13 2.1. Field Visit ........................................................................................................................... 14 2.2. Information Seminar ........................................................................................................... 16 2.3. Community agreement ....................................................................................................... 19 2.4. Definition and demarcation of JFM plots ............................................................................ 20 2.5. Selection of forest users ....................................................................................................... 22 2.6. JFM contract ......................................................................................................................
    [Show full text]
  • Central Asia Regional Economic Cooperation Corridors 2, 3, and 5 (Obigarm-Nurobod) Road Project: Report and Recommendation of Th
    Report and Recommendation of the President to the Board of Directors Project Number: 52042-001 November 2019 Proposed Grant Republic of Tajikistan: Central Asia Regional Economic Cooperation Corridors 2, 3, and 5 (Obigarm–Nurobod) Road Project Distribution of this document is restricted until it has been approved by the Board of Directors. Following such approval, ADB will disclose the document to the public in accordance with ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 17 October 2019) Currency unit – somoni (TJS) TJS1.00 = $0.1032 $1.00 = TJS9.6911 ABBREVIATIONS ADB – Asian Development Bank AIIB – Asian Infrastructure Investment Bank CAREC – Central Asia Regional Economic Cooperation CSC – construction supervision consultant EBRD – European Bank for Reconstruction and Development EMP – environmental management plan GAP – gender action plan km – kilometer LARP – land acquisition and resettlement plan m – meter MOT – Ministry of Transport OFID – OPEC Fund for International Development PAM – project administration manual PBM – performance-based maintenance PCC – project coordinating committee PIURR – Project Implementation Unit for Roads Rehabilitation PMC – project management consultant PPRA – project procurement risk assessment NOTE In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Werner Liepach, Central and West Asia Department (CWRD) Director Dong-Soo Pyo, Transport and Communications Division, CWRD Team leader Kamel Bouhmad, Transport Specialist, CWRD
    [Show full text]
  • Socio-Political Change in Tajikistan
    Dissertation zur Erlangung des Grades des Doktors der Philosophie Dissertation for the Obtainment of the Degree of Doctor of Philosophy Universität Hamburg Fachbereich Sozialwissenschaften Institut für Politikwissenschaft University of Hamburg Faculty of Social Sciences Institute for Political Science Socio-Political Change in Tajikistan The Development Process, its Challenges Since the Civil War and the Silence Before the New Storm? By Gunda Wiegmann Primary Reviewer: Prof. Rainer Tetzlaff Secondary Reviewer: Prof. Frank Bliss Date of Disputation: 15. July 2009 1 Abstract The aim of my study was to look at governance and the extent of its functions at the local level in a post-conflict state such as Tajikistan, where the state does not have full control over the governance process, particularly regarding the provision of public goods and services. What is the impact on the development process at the local level? My dependent variable was the slowed down and regionally very much varying development process at the local level. My independent variable were the modes of local governance that emerged as an answer to the deficiencies of the state in terms of providing public goods and services at the local level which led to a reduced role of the state (my intervening variable). Central theoretic concepts in my study were governance – the processes, mechanisms and actors involved in decision-making –, local government – the representation of the state at the local level –, local governance – the processes, mechanisms and actors involved in decision- making at the local level and institutions – the formal and informal rules of the game. In the course of my field research which I conducted in Tajikistan in the years 2003/2004 and in 2005 I found that the state does not provide public goods and services to the local population in a sufficient way.
    [Show full text]
  • 40046-013: Completion Report
    Completion Report Project Number: 40046-013 Loan Number: 2356 April 2015 Tajikistan: Khatlon Province Flood Risk Management Project This document is being disclosed to the public in accordance with ADB’s Public Communications Policy 2011. CURRENCY EQUIVALENTS Currency Unit – somoni (TJS) At Project Design At Project Completion (31 August 2007) (6 April 2015) TJS1.00 = $0.29 $0.17 $1.00 = TJS3.44 TJS5.80 ABBREVIATIONS ADB – Asian Development Bank CES – Committee for Emergency Situations CIS – Chubek irrigation system CPS – country partnership strategy DMF – design and monitoring framework EIRR – economic internal rate of return ha – hectare Hydromet – Agency for Hydrometeorology ICB – international competitive bidding JFPR – Japan Fund for Poverty Reduction km – kilometer MLRWR – Ministry of Land Reclamation and Water Resources NCB – national competitive bidding NGO – nongovernment organization O&M – operation and maintenance PCR – project completion report PIO – project implementation office PMO – project management office PPTA – project preparatory technical assistance SDR – special drawing rights WRM – water resources management GLOSSARY jamoat – administrative unit below the district, comprising a group of villages; also the lowest level of local government administration NOTES (i) The fiscal year (FY) of the government and its agencies ends on 31 December. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2009 ends on 31 December 2009. (ii) In this report, "$" refers to US dollars. Vice-President W. Zhang, Operations Group 1 Director General K. Gerhaeusser, Central and West Asia Department (CWRD) Director A. Siddiq, Environment, Natural Resources and Agriculture Division, CWRD Team leader R. Takaku, Senior Water Resources Specialist, CWRD Team members G.
    [Show full text]
  • Wfp255696.Pdf
    Summary of Findings, Methods, and Next Steps Key Findings and Issues Overall, the food security situation was analyzed in 13 livelihood zones for September–December 2012. About 870,277 people in 12 livelihood zones is classified in Phase 3- Crisis. Another 2,381,754 people are classified in Phase 2- Stressed and 2,055,402 in Phase 1- Minimal. In general, the food security status of analyzed zones has relatively improved in the reporting months compared to the previous year thanks to increased remittances received, good rainfall and good cereal production reaching 1.2 million tons, by end 2012, by 12 percent higher than in last season. The availability of water and pasture has also increased in some parts of the country, leading to improvement in livestock productivity and value. Remittances also played a major role in many household’ livelihoods and became the main source of income to meet their daily basic needs. The inflow of remittances in 2012 peaked at more than 3.5 billion USD, surpassing the 2011 record of 3.0 billion USD and accounting for almost half of the country’s GDP. Despite above facts that led to recovery from last year’s prolong and extreme cold and in improvement of overall situation, the food insecure are not able to benefit from it due to low purchasing capacity, fewer harvest and low livestock asset holding. Several shocks, particularly high food fuel prices, lack of drinking and irrigation water in many areas, unavailability or high cost of fertilizers, and animal diseases, have contributed to acute food insecurity (stressed or crisis) for thousands of people.
    [Show full text]
  • Safeguards Document Tajikistan: Central Asia Regional Economic
    Safeguards Document Project Number: 46543-002 Grant Number: 0356-TAJ Period covered: 2017 Tajikistan: Central Asia Regional Economic Cooperation Corridors 3 and 5 Enhancement Project Prepared by Ministry of Transport/Project Implementation Unit for Roads Rehabilitation Dushanbe, Republic of Tajikistan This report on safeguards compliance is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CAREC Corridors 3 and 5 Enhancement Project: Contract for Engineering, Works Supervision and Project Management Services Grant 0356-TAJ Safeguards Document November 2017 Due Diligence Report (Social Safeguard) TAJ: CAREC Corridors 3 and 5 Enhancement Project Assessment of Compliance with the Safeguard Requirements for proposed works on rehabilitation of proposed 43kmKangurt- Baljuvan-Khovaling Road Prepared by: Ministry of Transport / Project Implementation Unit Roads Rehabilitation for the Asian Development Bank This report on safeguards compliance is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • International Alert's Tajikistan Case Study, Climate Change, Complexity and Resilient Communities
    CLIMATE CHANGE, COMPLEXITY AND RESILIENT COMMUNITIES Case study: Tajikistan Shreya Mitra and Janani Vivekananda, September 2013 CONTEXT Central Asia faces the double burden of fragility and climate change. Uneven distribution of resources across the various Central Asian countries poses significant risks to stability, with climate change adding an additional layer of insecurity. The collapse of the Soviet Union left some Central Asian countries with an abundance of water resources but limited fossil fuel energy and others with less water but more fossil fuel reserves. Transboundary sharing of water and energy resources has caused escalating tensions between the various neighbours in the region. Climate change will act as a threat multiplier by negatively impacting on the availability of these natural resources, with rising temperatures and frequent and more intensified drought already decreasing the water reserves available to upstream countries. Hydropower resources are concentrated in Kyrgyzstan and Tajikistan, the upstream countries of Central Asia’s Amu Darya and Syr Darya rivers. These countries however, have a negligible share of fossil fuels. Water is therefore the cheapest source of electricity for them. Downstream countries Uzbekistan, Turkmenistan and Kazakhstan, on the other hand, are dependent upon water flows, especially for irrigation from the upstream countries, but are better endowed with fossil fuels and are suppliers of gas and coal to their upstream neighbours. Hydropower is especially important for the upstream countries during winter months, when heating needs are highest. As flows during winter are limited, Kyrgyzstan and Tajikistan store water in large reservoirs during the summertime, when water flows are more abundant. The summer months however, are precisely the months when the irrigation needs of the downstream countries are most acute.
    [Show full text]