High Speed 2 Links the North West with London Will Get Divert Much-Needed Investment from Clogged Up

Total Page:16

File Type:pdf, Size:1020Kb

High Speed 2 Links the North West with London Will Get Divert Much-Needed Investment from Clogged Up TRIM What would happen if HS2 isn’t built? Questions, questions The West Coast Main Line (WCML) which Won’t investment in High Speed 2 links the North West with London will get divert much-needed investment from clogged up. Network Rail has made clear our local services? that by 2024, despite measures to increase Today’s government has pledged that they capacity – for instance, by running longer won’t allow that to happen. And with the lines trains – the route will be effectively full; between Liverpool, Manchester, Preston and many of the busiest long distance services will Blackpool being electri ed, they can fairly What will be carrying passengers who will have to stand, point to recent investment commitments because all of the seats will be taken. The risk producing results on the ground. is that what can be enjoyed today will not be High Speed 2 inde nitely available for future generations. Isn’t high-speed rail just for wealthy business travellers? do for the North West? Services from the North West will be No. The business case for HS2 assumes competing for ever-scarcer timetable slots that there are no premium fares charged on the rail network against outer London for using high-speed rail services. Research commuter services which are expected to suggests that on these assumptions, the increase. The North West will lose out as average fare to London on high-speed rail London commuter services expand. This might be (in today’s prices) around £40. would be disastrous for the region’s economic growth prospects. Jobs depend on connectivity, Will HS2 services only serve central London? for passengers and to the national ports for No. Government has decided that there freight. The extra capacity HS2 provides is should be a connection built between High essential if the North West’s connectivity is to Speed 2 and the Channel Tunnel Rail Link be maintained and improved. (now known as High Speed 1) from the outset in 2026. This means that direct straight- How can I express my support for HS2? through-to Europe services could operate between the cities of the North West and Government is consulting. It is perhaps to be Paris, Brussels, Amsterdam and Frankfurt. expected that people living near the line of route will object to HS2. The objectors hope In the subsequent stages when high-speed that people and businesses that will bene t infrastructure is extended to Manchester, from HS2 stay silent. Without your support, there will also be a direct high-speed link HS2 may yet be defeated. So here’s what you to Heathrow Airport for services from the need to do: North West. This will allow both Heathrow and Manchester Airports to concentrate » Respond to the Department for Transport on medium/long haul ights, saving consultation (highspeedrail.dft.gov.uk, carbon and getting best economic value or phone for a copy of the consultation from our national airports. There is also documents on 0300 321 1010) the possibility that the extension of HS2 northwards would provide for a station at » Write to your MP, asking him or her to Manchester Airport too. strongly support High Speed 2 For answers to many more questions, » Write a letter to your local (or national) go to www.greengauge21.net newspaper, saying why HS2 deserves to proceed in the wider national interest » Sign up to the Campaign for High Speed Rail (www.campaignforhsr.com) Produced by Greengauge 21 on behalf of the North West Business Leadership Team and the North West Rail Campaign TRIM TRIM The North West stands to be a big winner to Carlisle and Glasgow To London from... Today’s timings Journey time with HS2 from the High Speed 2 rail project, getting Manchester 2h07 1h40 nearly a quarter of the economic bene ts. Liverpool 2h08 1h50 LANCASTER The rst stage of the national high-speed Source: HS2 Ltd HSR London to the West Midlands and beyond p147 rail network, the line between London and and 2010–11 national rail timetable the West Midlands (HS2), is planned to open PRESTON in 2026. With onward running over existing WIGAN lines, this brings high-speed services to the WARRINGTON It’s not just the biggest cities that gain. North West and bene ts the North West’s LIVERPOOL MANCHESTER With complementary investment in the STOCKPORT economy to the tune of £5bn. RUNCORN Northern Hub – work on the new line across WILMSLOW Manchester is now scheduled to be carried But the boost to the region’s economy begins CREWE WCML out by the end of 2016 – there will be better even earlier. Experience across Europe onward connections to places such as Bolton shows that once high-speed plans become and Rochdale. With the southern section rm, businesses know they can plan on the of the West Coast Main Line freed up by dramatically greater accessibility that high- the transfer of the fastest services to HS2, speed rail brings, and tailor their investment new direct London services from Blackpool decisions accordingly. So the stimulus to become possible too. regeneration will start before 2020. As HSR is extended northwards in So what are the Day 1 high speed First phase of HS2 subsequent stages, these journey times will services for the North West? – Day 1, 2026 get faster still. But the important point is HS2 this: the North West gets new high-speed HS2 Ltd’s plans show high-speed rail services from Day 1, 2026. services between London and the North West are comprehensive and frequent: LONDON HS1 High Speed service to London PARIS (trains per hour each way) BRUSSELS Glasgow Central AMSTERDAM Crewe 1 COLOGNE MARSEILLES Liverpool 2 BARCELONA MILAN Manchester 3 GENEVA … Preston 1 (2 in peak period) Preston Runcorn 1 Liverpool Lime Street Wigan Manchester Piccadilly Stockport 3 Runcorn Warrington 2 (3 in peak period) Crewe Warrington Stockport Wigan 1 (2 in peak period) Stafford Wilmslow Wilmslow 1 Birmingham Fazeley Street Modelled HS2 service pattern Birmingham Interchange Running on HS2 Additional peak hour service Running on existing line HS2 station Existing station Old Oak Common London Euston TRIM.
Recommended publications
  • Midland Main Line Upgrade Programme Economic Case Department for Transport
    Midland Main Line Upgrade Programme Economic Case Department for Transport 30 August 2017 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Notice This document and its contents have been prepared and are intended solely for Department for Transport’s information and use in relation to Midland Main Line Upgrade Programme Business Case. Atkins assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 108 pages including the cover. Document history Job number: 5159267 Document ref: v4.0 Revision Purpose description Originated Checked Reviewed Authorised Date Interim draft for client Rev 1.0 - 18/08/2017 comment Revised draft for client Rev 2.0 18/08/2017 comment Revised draft addressing Rev 3.0 - 22/08/2017 client comment Rev 4.0 Final 30/08/2017 Client signoff Client Department for Transport Project Midland Main Line Upgrade Programme Document title Midland Main Line Upgrade Programme: KO1 Final Business Case Job no. 5159267 Copy no. Document reference Atkins Midland Main Line Upgrade Programme | Version 4.0 | 30 August 2017 | 5159267 2 Midland Main Line Upgrade Programme Economic Case Report OFFICIAL SENSITIVE: COMMERCIAL Table of contents Chapter Pages Executive Summary 7 1. Introduction 12 1.1. Background 12 1.2. Report Structure 13 2. Scope of the Appraisal 14 2.1. Introduction 14 2.2. Scenario Development 14 3. Timetable Development 18 3.1. Overview 18 4. Demand & Revenue Forecasting 26 4.1. Introduction 26 4.2. Forecasting methodology 26 4.3. Appraisal of Benefits 29 4.4.
    [Show full text]
  • High Speed Two: Full Speed Ahead?
    High Speed Two: Full Speed Ahead? The UK government has given the “green light” to the High Speed Two (HS2) rail project in its entirety, following the outcome of the Oakervee Review, ending months of speculation over the future of the scheme. Phase 2b of the project, linking Crewe to Manchester and Birmingham to Leeds via Sheffield, is subject to further review. It now forms part of an ambitious “High Speed North” integrated masterplan, including Northern Powerhouse Rail and other local rail improvements. What will this mean for landowners, occupiers and others who are directly affected by the HS2 scheme? Time will tell. However, the announcement is likely to be welcomed, as it provides certainty that the project will now proceed, although concerns over the long-term plans for delivery of Phase 2b will persist. HS2 Limited’s remit will be to “…focus solely on getting On all fronts, the government’s announcement gives phases 1 and 2A built on something approaching on time grounds for optimism. The government has pledged to learn and on budget” and, in respect of Phase 2b, new “delivery lessons from Phase 1 and improve how the project is being arrangements” will be put in place, but not before “…an delivered, highlighting the need for better communication and integrated plan for rail in the north” has been introduced. engagement with local communities impacted by the scheme. Grand plans no doubt, but close attention will be paid to the detail, including the enabling legislation required to deliver Major concerns will also remain over the delivery of the Phase 2a of the project and future plans for the design and scheme, including timescales for completion of each phase, delivery arrangements for Phase 2b.
    [Show full text]
  • Hampton Court to Berrylands / Oct 2015
    Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth.
    [Show full text]
  • Management Case for High Speed 2
    Management Case for High Speed 2 1 Contents Introduction 4 Timetable to an operational railway 5 Governance 7 Planning 16 Risk Management 17 Issue Management 18 Change Control 19 Assurance 24 Benefit Realisation and Evaluation 25 Communication and Stakeholder Management 26 Building Capability and Capacity 28 Document Control 30 Annex A – Governance Framework for High Speed 2 31 Annex B – Remit letter 32 Annex C – DfT High Speed Rail Organogram 36 Annex D – HS2 Ltd Organogram 37 Annex E – Risk and Issue Management Strategy 38 Annex F - Integrated Assurance and Approvals Plan 53 Annex G – Benefit Realisation and Evaluation Strategy 73 Annex H - Communications Plan 84 Annex I – Resource Management Plan 111 2 Purpose 1. The purpose of the Management Case is to provide confidence that credible and robust arrangements are in place to deliver the High Speed 2 (HS2) programme to time, cost and quality. It includes: . an outline of the HS2 programme and how it will be delivered; . governance arrangements for the programme, including the role of the High Speed Rail Programme Board, the separate Project Boards and HS2 Ltd’s own governance; . details on the programme of work planned and how key milestones are tracked; . evidence on how risks and issues are managed and escalated; . detail on how change is and will be managed within the programme; . arrangements for programme and project assurance; . our communication plan for the programme, including how we engage with stakeholders; . how we plan to manage and record the benefits from the programme; . contingency and resource planning arrangements; and . document control arrangements. 2.
    [Show full text]
  • High Speed Two Limited
    High Speed Two Limited High Speed 2 Infrastructure Maintenance Depot (IMD) High Speed Two Limited H igh Speed 2 Infrastructure Maintenance Depot (IMD) March 2011 This r eport t akes i nto a ccount t he particular instructions and requirements of our client. It i s not i ntended f or a nd s hould n ot be relied u pon b y any third p arty a nd no responsibility i s u ndertaken to any t hird Ove Arup & Partners Ltd party The Arup Campus, Blythe Gate, Blythe Valley Park, Solihull, West Midlands. B90 8AE Tel +44 (0)121 213 3000 Fax +44 (0)121 213 3001 www.arup.com Job number High Speed Two (HS2) High Speed 2 Infrastructure Maintenance Depot Contents Page 1 Introduction 1 1.1 The December 2009 Report 1 1.2 Layout of this Report 1 2 Scope of Work, Methodology and Deliverables 2 2.1 Scope of Work 2 2.2 Meeting 1 2 2.3 Intermediate instructions 3 2.4 Meeting 2 3 3 Current Rail Operations and Future Developments 4 3.1 Context 4 3.2 Oxford - Bletchley 4 3.3 Aylesbury – Claydon Line 4 3.4 High Speed 2 5 3.5 Evergreen 3 5 3.6 East West Project 5 4 Functional Requirements 6 5 Site Location Options 7 5.1 Introduction 7 5.2 Quadrant 1 9 5.3 Quadrant 2 11 5.4 Quadrant 3 15 5.5 Quadrant 4 17 5.6 Sites on HS2 (north) 18 6 Cost Estimates 20 6.1 Matrix table for all Site options 20 7 Conclusion 21 8 Selected Option Development 23 8.1 General layout 23 8.2 Specific site details 27 8.3 Site operation 28 8.4 West end connections 29 9 Calvert Waste Plant 30 9.1 Rail Access 30 9.2 Heat and power generation 32 10 Use of site as a potential construction depot 33
    [Show full text]
  • Delivering High Speed 2 Major Project Report
    DELIVERING HIGH SPEED 2 MAJOR PROJECT REPORT New rail reality Developing a £33bn rail network to transform Uk’s north-soUth 03|2012 CONNECTIONS Special report | High Speed 2 03 | 2012 Foreword 04 infrastructure specialists who supply the rail Introduction industry. Many of them are already helping HS2 Ltd chief executive Alison Munro us deliver Crossrail, Thameslink, electrifica- updates on the project’s progress tion, and upgrades to major stations like Reading and Birmingham. But even the 08 largest of these schemes will be dwarfed in Technical challenge size by HS2. So the challenge is for British Why the current London to West firms to develop the expertise to compete Midlands route is the best for key high speed contracts, and help deliver Britain’s Victorian engineering HS2 on time and on budget. 12 pioneers built a railway that was the The government’s National Infrastructure Euston envy of the world. Such was their Plan makes clear the importance of a predict- vision and singular focus that able and transparent pipeline of infrastruc- Expanding the station presents a ❝ following the opening of the first intercity line regeneration opportunity ture projects that will help the private sector between Manchester and Liverpool in 1830, it invest and plan for the future. HS2 will form 14 took just a little over two decades to construct a a key element of that long-term pipeline, Euston masterplan national rail network which linked all our major providing certainty about future contracting cities, and transformed our economy. Designs for Euston station opportunities following the Yet the modern reality is that since the terminus are vital to the project completion of Crossrail in 2017.
    [Show full text]
  • Prologis Park Birmingham Interchange Goes Above and Beyond What You’Ve Come to Expect from Traditional Industrial & Distribution Property
    THE OPPORTUNITY DESIGNED TO REDEFINE Redefining the everyday, Prologis Park Birmingham Interchange goes above and beyond what you’ve come to expect from traditional industrial & distribution property. In addition to stunning, sophisticated working environments with carefully considered and highly crafted details, these landmark buildings take effortless to the next level, providing added excellent local amenities and outstanding connectivity to both UK and international locations. Pushing boundaries and exceeding expectations, this is where form and function works. FEATURES & BENEFITS ALL THINGS CONSIDERED Prologis Park Birmingham Interchange is a speculative development of 310,000 sq ft on 16 acres in an established commercial location, providing the very best industrial & distribution opportunities in the West Midlands. New Grade ‘A’ industrial & An established location, Flexible space available from distribution space with with local occupiers that include 76,975 sq ft – 233,025 sq ft headquarters style specification. Jaguar Land Rover and Rolls-Royce. (7,151 sq m – 21,648 sq m). Rare availability in a Only a 3 minute drive to Outstanding, modern highly sought after east Birmingham Airport. headquarters style office Birmingham location. accommodation. A superb work / life balance Innovation brought to you by the Fully funded with buildings with an abundance of amenities UK’s leading developer and owner of available autumn 2018. available on your doorstep. logistics property – Prologis. Up to 15m Major catchment area with In close proximity
    [Show full text]
  • Northern Rail Priorities Statement Five Priorities for Immediate Action and Investment
    NORTHERN ECONOMIC FUTURES COMMISSION NORTHERN RAIL PRIORITIES STATEMENT FIVE PRIORITIES FOR IMMEDIATE ACTION AND INVESTMENT March 2012 © IPPR North 2012 Institute for Public Policy Research 1 IPPR North | Northern rail priorities statement: Five priorities for immediate action and investment Foreword in skills.2 Rail investment will provide the platform for The Northern Economic Futures Commission is sustainable growth for the northern regions. More developing a medium-term strategy for sustainable specifically, investment in infrastructure priorities that economic development in the North of England. This is a make rail franchises cheaper to run reduce long-term sizeable challenge, yet one which needs to be taken on subsidies, increasing productivity and making growth if the North is to be at the vanguard of the UK’s recovery more sustainable. and able to compete in the global economy. Alongside • The economic interdependence of the North’s eight skills and innovation, transport infrastructure is crucial city-regions will only increase: Much economic growth for ensuring that the northern economy is the driver of over the coming years will be driven by the expansion of national prosperity that it has the potential to be. knowledge-based sectors that increasingly rely on larger Our work in the area of transport continues to develop employment catchment areas. To ensure that growth is not the Northern Way Transport Compact’s previous constrained, transport provision will need to be improved consideration of what the strategic transport priorities and better joined up between and within the city regions. A for the North of England should be.1 But the urgency is report by LSE’s Spatial Economics Research Centre (SERC) now far greater.
    [Show full text]
  • LNW Route Specification 2017
    Delivering a better railway for a better Britain Route Specifications 2017 London North Western London North Western July 2017 Network Rail – Route Specifications: London North Western 02 SRS H.44 Roses Line and Branches (including Preston 85 Route H: Cross-Pennine, Yorkshire & Humber and - Ormskirk and Blackburn - Hellifield North West (North West section) SRS H.45 Chester/Ellesmere Port - Warrington Bank Quay 89 SRS H.05 North Transpennine: Leeds - Guide Bridge 4 SRS H.46 Blackpool South Branch 92 SRS H.10 Manchester Victoria - Mirfield (via Rochdale)/ 8 SRS H.98/H.99 Freight Trunk/Other Freight Routes 95 SRS N.07 Weaver Junction to Liverpool South Parkway 196 Stalybridge Route M: West Midlands and Chilterns SRS N.08 Norton Bridge/Colwich Junction to Cheadle 199 SRS H.17 South Transpennine: Dore - Hazel Grove 12 Hulme Route Map 106 SRS H.22 Manchester Piccadilly - Crewe 16 SRS N.09 Crewe to Kidsgrove 204 M1 and M12 London Marylebone to Birmingham Snow Hill 107 SRS H.23 Manchester Piccadilly - Deansgate 19 SRS N.10 Watford Junction to St Albans Abbey 207 M2, M3 and M4 Aylesbury lines 111 SRS H.24 Deansgate - Liverpool South Parkway 22 SRS N.11 Euston to Watford Junction (DC Lines) 210 M5 Rugby to Birmingham New Street 115 SRS H.25 Liverpool Lime Street - Liverpool South Parkway 25 SRS N.12 Bletchley to Bedford 214 M6 and M7 Stafford and Wolverhampton 119 SRS H.26 North Transpennine: Manchester Piccadilly - 28 SRS N.13 Crewe to Chester 218 M8, M9, M19 and M21 Cross City Souh lines 123 Guide Bridge SRS N.99 Freight lines 221 M10 ad M22
    [Show full text]
  • Illustrative Option Schemes in CP5 HLOS
    Illustrative Option schemes in CP5 HLOS The Department worked with Network Rail, the train operators and the transport authorities in the major cities to build up shared information on current rail usage. As far as practicable a shared view was also agreed on forecast demand, using standard rail industry models but adjusting these where there was evidence of likely stronger growth. This forecast growth is stated as a peak demand to be met in the HLOS. The forecast growth was assessed against current plans for train service provision in 2019. Illustrative train service enhancements that provided the capacity to meet this demand were identified and modelled for the morning peak services in London, Birmingham, Manchester and Leeds. In many cases these were directly based on the work undertaken by recent rail industry Route Utilisation Strategies (RUS). In some cases, notably in Leeds and Manchester, recent Government commitments to funding electrification and capacity enhancements had happened after the RUS and so the Department worked with key stakeholders to determine the most likely train service patterns the infrastructure changes might produce. The illustrative peak train services are not what will happen; that will be guided both by the rail industry’s response to the HLOS in the Strategic Business Plan for CP5 where the industry will set out how it proposes to meet the HLOS, and by the outcome of future train operator franchise competitions. But the illustrative train services are needed for the Department to confirm that a value for money solution can be provided to meet peak demand. It is likely the rail industry will produce a more detailed and efficient solution, and in this context the illustrative option can be viewed as the simple answer that should be bettered.
    [Show full text]
  • East Midlands Route Study March 2016 Foreword March 2016 Network Rail – East Midlands Route Study 02
    Long Term Planning Process East Midlands Route Study March 2016 Foreword March 2016 Network Rail – East Midlands Route Study 02 We are delighted to present the East Midlands Route Study, a The work carried out within this Route Study enables us to identify document which sets out the building blocks of our strategic vision any gaps between the planned capability of the network in 2023, for delivering rail growth throughout the East Midlands over the and the capability required to meet forecast growth for passenger next 30 years. and freight demand. By also looking ahead over the longer term to 2043, we can build our understanding of capacity needs in the The East Midlands route serves many different rail markets, long future, making plans to deliver those in the most efficient manner. distance and commuting services operate regularly into London St Pancras International. Strong links between urban centres, such as Network Rail has led the development of the East Midlands Route Nottingham, Leicester and Derby, help people travel for work, Study which was published as a Draft for Consultation in January education and leisure. Being located at the heart of Britain’s rail 2015, and was open for consultation until April 2015. The study has network means the Route forms a key part of major cross country been developed using a collaborative approach with input from the and freight journeys. rail industry, local authorities, users and developers from the freight industry, the Department for Transport and Rail Delivery Group. Over recent years, the rail industry has seen consistent growth in demand and this is forecast to continue.
    [Show full text]
  • Learning Lessons Developing the Northern Powerhouse Northern Hub & North West Electrification
    Learning Lessons developing the Northern Powerhouse Northern Hub & North West Electrification David Woods FPWI Senior Project Engineer 8th Dec 2015 / 1 Learning Lessons developing the Northern Powerhouse What is the Northern Powerhouse Northern Hub and NW Electrification overview Background and work completed Major hub interventions including Ordsall Chord Electrification Phases and Route Enhancements Recent successes and lessons learnt/learning 8th Dec 2015 / 2 What is “The Northern Powerhouse” The Northern Powerhouse is a concept with the aim to transform Northern growth, rebalance the country’s economy and establish the North as a global powerhouse - aiming to bridge the economic gap between the north and south by attracting investment and improving transport links between its towns and cities Transport is a fundamental part of achieving these goals and how we will develop the long-term investment programmes needed for improvement in transport links between the North's major cities, to allow them to compete together as one major economy. The plan covers rail, highway, airport, freight and integrated transport. Rail plan to address: journeys too slow – particularly east to west overcrowding infrequency of services poor rolling stock – access for all peak times – overcrowding north to south Northern Hub and Electrification is the 1st phase of the Northern Powerhouse ~ £2BN investment. Leading to the overall investment of £10BN to the Northern Powerhouse by 2033 - linked to the benefits of HS2. 8th Dec 2015 / 3 Rolling Stock comparison
    [Show full text]