Lötschberg Base Tunnel - the Opening
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
A Construction Project Serving Europe – Factfigures
NEW RAIL LINK NEDERLAND THROUGH Rotterdam THE ALPS (NRLA) Duisburg Zeebrugge Düsseldorf A ONCE-IN-A- Antwerpen Köln CENTURY PROJECT Gent Mechelen Aachen FOR EUROPE Montzen DEUTSCHLAND BELGIË Mannheim Karlsruhe FRANCE Freiburg im Breisgau Basel SWITZERLAND Gotthard Base Tunnel Lötschberg Base Tunnel Domodossola Luino Ceneri Base Tunnel Chiasso Novara Milano ITALIA Genova © Federal office of transport FOT transport office of © Federal FACTS AND FIGURES NRLA The New Rail Link through the Alps (NRLA) is the largest railway construction project ever undertaken in Swiss history. It includes the expansion of two north- south axes for the rail link. The main components of the NRLA are the Lötsch- berg Base Tunnel, the Gotthard Base Tunnel and the Ceneri Base Tunnel. Since 2007 Successful operation of the Lötschberg Base Tunnel 11 December 2016 Commissioning of the Gotthard Base Tunnel The world’s longest railway tunnel will be commissioned on schedule on 11 December 2016. Up to 250 freight trains a day will then travel on the Gotthard axis instead of 180 previously. Transalpine rail transport will become more cost-effective, flexible and rapid. 2020 Opening of the Ceneri Base Tunnel 2020 Four-metre corridor on the Gotthard axis The expansion of the Gotthard axis to create a larger tunnel profile is a key part of the Swiss policy of transferring freight from road to rail. It will enable semi- trailers with a four-metre corner height to also be loaded onto railway wagons for transport on the Gotthard axis on a continuous basis. This further fosters the transfer of transalpine freight transport from road to rail. -
Stellungsnahmen Zur Voranfrage
Oberingenieurkreis I Tiefbauamt des Kantons Bern Schlossberg 20, Postfach Schwellenkorporation Reichenbach 3602 Thun Peter Bettschen (Präsident) Telefon +41 31636 44 00 www.be.ch/tba Bahnhofstrasse 30 info.tbaoikl @bve. be.ch 3013 Reichenbach Roland Kimmerle Direktwahl +41 31 636 4415 roland. [email protected] 26. August 201 9 Leituerfü g u n g Wasserbauplan (Voranfrage) (Art. 6 Abs. 2 Koordinationsgesetz vom 21. Mäz 1994, KoG) Gemeinde Reichenbach im Kandertal [-t1"4 Gewässer Schwarzbach Wasserbauträger Gesamtschwellenkorporation Reichenbach, Bahnhofstrasse 30, w 3713 Reichenbach Projektverfasser Kissling + Zbinden AG lngenieure Planer, Oberlandstrasse 15, 3700 Spiez Ort Reichenbach - Koordinaten 2 619 450 I 1 163 325 bis 2 619 170 t 1 163 945 Vorhaben Hochwassersch utz Schwarzbach Gesuchsdatum 16.08.2019 Geschäfts-Nr. wBP100062 Gesuchsunterlagen Vorprojekt Wasserbau plan (Voranfrage) Kontaktperson Roland Kimmerle 1 Leitverfahren Das Wasserbauplanverfahren gemäss Art.21ff. Gesetz über den Gewässerunterhalt und Wasserbau vom 14. Februar 1989 (WBG) ist Leitverfahren im Sinne des KoG. 2 Leitperson Das Leitverfahren wird vom Oberingenieurkreis I des Tiefbauamts, Roland Kimmerle, geleitet. 3 Stellungnahmen zur Voranfrage Die nachgenannten Stellen werden ersucht, zum Vorhaben (Voranfrage) mit einer Stel- lungnahme innerhalb der gesetzten Frist Stellung zu nehmen. Weitere Stellen werden bei Bedarf beigezogen. DMS #963627 Stelle Frist Tiefbauamt des Kantons Bern, Oberingenieurkreis l, Was- 30.08.2019 serbaupolizei Tiefbauamt des Kantons Bern, -
Wasserkraftanlagen Der Vereinigten Kander- Und Hagnekwerke A.-G
Wasserkraftanlagen der Vereinigten Kander- und Hagnekwerke A.-G. in Bern Autor(en): [s.n.] Objekttyp: Article Zeitschrift: Schweizerische Bauzeitung Band (Jahr): 51/52 (1908) Heft 16 PDF erstellt am: 05.10.2021 Persistenter Link: http://doi.org/10.5169/seals-27504 Nutzungsbedingungen Die ETH-Bibliothek ist Anbieterin der digitalisierten Zeitschriften. Sie besitzt keine Urheberrechte an den Inhalten der Zeitschriften. Die Rechte liegen in der Regel bei den Herausgebern. Die auf der Plattform e-periodica veröffentlichten Dokumente stehen für nicht-kommerzielle Zwecke in Lehre und Forschung sowie für die private Nutzung frei zur Verfügung. Einzelne Dateien oder Ausdrucke aus diesem Angebot können zusammen mit diesen Nutzungsbedingungen und den korrekten Herkunftsbezeichnungen weitergegeben werden. Das Veröffentlichen von Bildern in Print- und Online-Publikationen ist nur mit vorheriger Genehmigung der Rechteinhaber erlaubt. Die systematische Speicherung von Teilen des elektronischen Angebots auf anderen Servern bedarf ebenfalls des schriftlichen Einverständnisses der Rechteinhaber. Haftungsausschluss Alle Angaben erfolgen ohne Gewähr für Vollständigkeit oder Richtigkeit. Es wird keine Haftung übernommen für Schäden durch die Verwendung von Informationen aus diesem Online-Angebot oder durch das Fehlen von Informationen. Dies gilt auch für Inhalte Dritter, die über dieses Angebot zugänglich sind. Ein Dienst der ETH-Bibliothek ETH Zürich, Rämistrasse 101, 8092 Zürich, Schweiz, www.library.ethz.ch http://www.e-periodica.ch —w—« ""S*^ 17. Oktober 1908. SCHWEIZERISCHE BAUZEITUNG 205 INHALT: Wasserkraftanlagen der Vereinigten Kander- und Hagnekwerke Monatsausweis über die Arbeiten am Lötschbergtunnel. Internationaler A.-G. in Bern. — Wettbewerb für einen Musikpavillon für die Eisenbetonausschuss. Schwedische Frachtdampfer auf dem Rhein. Bahn « Promenade du Lao » in Genf. — Einfamilienwohnhaus in Thun. — Der Locarno-Centovalli-Domodossola.— Nekrologie: K. -
The Simplon Tunnel
The Simplon Tunnel THE SIMPLON STORY The commemorative stamp issued this year (1956) celebrated, strictly speaking, only the opening of the first tunnel gallery. The story of the tunnel, one of the greatest engineering feats in railway history, goes back to the year 1877 when M. Lommel, the chief engineer of the "Compagnie du Chemin de Fer", a privately owned undertaking, produced the first plans for the tunnel. The Swiss and Italian governments and private enterprise in both countries agreed, after many years of study, to finance the ambitious project for the building of a 19,803m long tunnel, the cost of which was estimated at the then fantastic sum of over 700 million Swiss francs. A state treaty was concluded between Switzerland and Italy on 25th November 1895 and on 1st August 1898 the first drill was put to the rock near Brig, on the north side of the tunnel. After 6 years and 208 days of almost superhuman effort, at 7.20 in the evening, the last hole had boon drilled - letting light into the tunnel on its south end. It was the 24th of February 1905, a date that made history. Landslides, flooding, avalanches and huge caving-in had been fought and conquered. On 1st June 1906 the first regular train service ran through the Simplon providing the shortest railway link between Northern and Western Europe with the South and the Orient. The First World War interrupted construction of the second gallery and it took many years until in 1922 the tunnel was completed, allowing for two-track traffic. -
Der Kander Durchstich 1711- 1714
Der Kander durchstich 1711- 1714 Chronologie zur Ableitung der Kander in den Thunersee Erstellt von Arthur Maibach, Lokalhistoriker Einigen 25. Dezember 1652 Samuel Bodmer wird in Bern geboren. 1680 Eintritt von Samuel Bodmer, dem gelernten Bäcker, in die bernische Artillerie und Aufstieg zum Leutnant. 1695 Samuel Bodmer erwirbt das Schlossgut und das Bürgerrecht von Amsoldingen und betreibt die Mühle. 1698 Im Dezember legten die gefährdeten Gemeinden bis Belp hinunter dem Rat zu Bern eine Eingabe vor, worin sie baten, die Kander in den Thunersee zu leiten. 1 20. Dezember 1698 Der Rat von Bern setzt eine Kommission ein, welcher Venner von Grafenried, Bauherr von Wattenwyl und Heimlicher von Grafenried angehörten. 23./24. und 25 April 1699 Die Kommission legt ihren Bericht und ihre Anträge dem Rat vor, Die Kommission stellt fest, dass die Ableitung möglich sei, da das Kander Bett bei der Stelle der künftigen Ableitung 150 Schuh (= 43,95 m) höher sei als der Spiegel des Thunersee. 14. Februar 1700 Trotzdem, dass die Kommission das Unternehmen empfahl, traten Verzögerungen ein, weil der Rat der 200 in seinem permanenten Misstrauen gegen den Kleinen Rat verlangte, dass ihm das Geschäft vorgelegt werde. 25./26. und 27. April 1703 Venner Willading, der nachmalige Schultheiss, und Ratsherr von Grafenried nahmen einen Augenschein bei Thun vor, wobei sie das Gefälle der Aare durch Nivellement ermitteln liessen. 11. Februar 1711 Der Rat der 200 zu Bern fasste mit 137 gegen 8 Stimmen den Beschluss, die Kander, entsprechend dem vorliegenden Projekt von Samuel Bodmer, in den Thunersee abzuleiten. 13. Februar 1711 Es wird der Beschluss gefasst, ein Direktorium zur Leitung der Arbeiten einzusetzen. -
Late Neogene Extension in the Vicinity of the Simplon Fault Zone (Central Alps, Switzerland)
Late Neogene extension in the vicinity of the Simplon fault zone (central Alps, Switzerland) Autor(en): Grosjean, Grégory / Sue, Christian / Burkhard, Martin Objekttyp: Article Zeitschrift: Eclogae Geologicae Helvetiae Band (Jahr): 97 (2004) Heft 1 PDF erstellt am: 11.10.2021 Persistenter Link: http://doi.org/10.5169/seals-169095 Nutzungsbedingungen Die ETH-Bibliothek ist Anbieterin der digitalisierten Zeitschriften. Sie besitzt keine Urheberrechte an den Inhalten der Zeitschriften. Die Rechte liegen in der Regel bei den Herausgebern. Die auf der Plattform e-periodica veröffentlichten Dokumente stehen für nicht-kommerzielle Zwecke in Lehre und Forschung sowie für die private Nutzung frei zur Verfügung. Einzelne Dateien oder Ausdrucke aus diesem Angebot können zusammen mit diesen Nutzungsbedingungen und den korrekten Herkunftsbezeichnungen weitergegeben werden. Das Veröffentlichen von Bildern in Print- und Online-Publikationen ist nur mit vorheriger Genehmigung der Rechteinhaber erlaubt. Die systematische Speicherung von Teilen des elektronischen Angebots auf anderen Servern bedarf ebenfalls des schriftlichen Einverständnisses der Rechteinhaber. Haftungsausschluss Alle Angaben erfolgen ohne Gewähr für Vollständigkeit oder Richtigkeit. Es wird keine Haftung übernommen für Schäden durch die Verwendung von Informationen aus diesem Online-Angebot oder durch das Fehlen von Informationen. Dies gilt auch für Inhalte Dritter, die über dieses Angebot zugänglich sind. Ein Dienst der ETH-Bibliothek ETH Zürich, Rämistrasse 101, 8092 Zürich, Schweiz, www.library.ethz.ch http://www.e-periodica.ch 0012-9402/04/010033-14 Eclogae geol. Helv. 97 (2004) 33-46 DOI 10.1007/S00015-004-1114-9 Birkhäuser Verlag, Basel, 2004 Late Neogene extension in the vicinity of the Simplon fault zone (central Alps, Switzerland) Gregory Grosjean, Christian Sue & Martin Burkhard Key words: Central Alps. -
Structural Reinterpretation of the Classic Simplon Tunnel Section of the Central Alps
A. G. MILNES Geological Institute, Swiss Federal Institute of Technology, Zurich, Switzerland Structural Reinterpretation of the Classic Simplon Tunnel Section of the Central Alps ABSTRACT tained, and to some extent also the traditional names. However, it will be shown that the The basement nappe concept arose during nappes were not emplaced simultaneously and the excavation of the Simplon tunnel in the that all were subjected to at least two sub- Central Alps. Recent detailed structural and sequent phases of deformation resulting in petrologic investigations in this classic area major folding. One of these was a phase of have confirmed the concept in general outline. isoclinal folding of regional importance which A complicated structural history has been de- caused widespread inversion of the original duced, however, with two phases of major structural succession. On the basis of these new folding and a period of large-scale faulting after surface findings, an attempt is made to cor- the phase of nappe emplacement. The earlier relate surface with tunnel geology, and a new of the subsequent fold phases was of regional cross section along the tunnel trace is presented. importance and caused widespread inversion of the original structural succession. During this PETROGRAPHIC AND phase, the basement rocks were in their most STRATIGRAPHIC CONSIDERATIONS ductile state and suffered the main part of their The petrography of the area to the southeast internal deformation. of the Simplon Pass (Fig. 1) has recently been described in great detail (Ragni, 1960; Milnes, INTRODUCTION 1964; Wieland, 1966). Two general petro- At 7:20 a.m. on Friday, February 24, 1905, graphic complexes are recognized: "crystalline the last rock barrier in the Simplon tunnel was basement"—consisting of gray-weathering broken through, and a new concept in Alpine quartzo-felspathic gneiss, schistose gneiss, and geology was born, the basement nappe. -
Swiss Pioneers of the Surveying of the Alps
Swiss Pioneers of the Surveying of the Alps Thomas GLATTHARD, Switzerland Key words: surveying, mountains, alps, panoramas, reliefs, maps, engineer’s projects SUMMARY Swiss Pioneers of the Surveying of the Alps: Samuel Bodmer (1652-1724): Correction of River Kander Franz Ludwig Pfyffer (1716-1802): Relief of Central Switzerland Ferdinand Rudolph Hassler (1770-1843): Baseline and triangulation Guillaume-Henri Dufour (1787-1875): Swiss Map “Dufour” Xaver Imfeld (1853-1909): Panoramas, reliefs, maps, engineer’s projects HS 2 - Session II: Famous European Surveyors 1/7 Thomas Glatthard Swiss Pioneers of the Surveying of the Alps Shaping the Change XXIII FIG Congress Munich, Germany, October 8-13, 2006 Swiss Pioneers of the Surveying of the Alps Thomas GLATTHARD, Switzerland 1. INTRODUCTION When we move though the landscape and over mountains – with maps or with GPS receiver – we hardly imagine the work and troubles of surveyors making the measurements and drewing these maps hundred and more years ago. In the age of Internet, GPS, communication satellites and geo data infrastructures the desired information about topography, landscape, traffic ways, food supply possibilities comes at any time and everywhere to us. The desire for such information is old. First plans are old thousands of years ago. Who possessed plans, could prevail over countries and trade routes. Long time maps were secret. Exact maps became only possible, as in 18th and 19th century precise surveying equipment and measurement procedures were developed. With heavy devices the pioneers of the alp topography climbed on the mountain summits and – often under extreme weather conditions – accomplished their complex measurements. Raphael Ritz, 1880 HS 2 - Session II: Famous European Surveyors 2/7 Thomas Glatthard Swiss Pioneers of the Surveying of the Alps Shaping the Change XXIII FIG Congress Munich, Germany, October 8-13, 2006 2. -
Fact-Sheet Wandern
Spiez Marketing AG Info-Center Spiez Bahnhof, Postfach 357, 3700 Spiez Tel. 033 655 90 00, Fax 033 655 90 09 [email protected] / www.spiez.ch Fact-Sheet Wandern Leichte Wanderungen / Spaziergänge Strandweg Faulensee, Spiez – Faulensee (ca. 40 Min): Der flache Klassiker dem See entlang, von einer Schiffländte zur anderen. Geeignet auch für ältere Personen und Kinderwagen. Spiez – Spiezwiler – Wimmis – Heustrich – Mülenen (2 Std. 30 Min.): Leichter Spaziergang entlang des Stauweihers ins Spiezmoos. Von Lattigen am ehemaligen Jagdschlösschen vorbei zur Autobahnbrücke über die Kander. Angenehme Wanderung über Fuss- und Fahrwege bis zur Brücke über die Kander in Heustrich. Spiez – Spiezmoos – Rustwald – Gwatt – Thun (4 Std.): Abwechslungsreiche Wanderung durch den Rustwald nach Gesigen. Entlang der Autobahn zum Steg über die Kander ins Hani. Vom Glütschbachtal hinauf auf die Gwattegg hinunter nach Gwatt. Weiter dem See entlang nach Thun. Spiez – Spiezberg – Einigen – Gwatt – Thun (2 Std. 50 Min.):Teilstück des Thunersee- Rundweges und des Jakobswegs. Sehr abwechslungsreiche Wanderung, anfänglich durch die grüne Spiezer Bucht, durch Wald und Reben, dann auf aussichtsreichem Höhenweg und schliesslich auf vorzüglich angelegtem Uferweg. Historische Baugruppe mit Schloss und Kirche in der Spiezbucht, gepflegte Rebgärten am Spiezberg, Kirchlein von Einigen, Schwindel erregender Strättligsteg, mächtige Baumbestände im Bonstettenpark. Kürzere Hartbelagsstrecken auch ausserhalb des Siedlungsgebietes. Stockhorn – Oberstockenalp – Hinterstockensee – Mittelstation Chrindi (1 Std. 15 Min.): Zug nach Erlenbach und Stockhornbahn aufs Stockhorn. Abstieg zur Oberstockenalp. Umrundung des Hinterstockensees und Ankunft bei der Mittelstation. Thun - Hilterfingen - Oberhofen - Gunten – Merligen (4 Std. 15 Min.): Teilstück des Thunersee-Rundweges. Bis Hünibach prächtige Uferpromenade. Von hier aus Höhenweg parallel zur Seestrasse mit Abstiegsmöglichkeiten zu allen Kulturstätten am sonnseitigen Seeufer zwischen Hilterfingen und Gunten sowie zu den Schiff- und Busstationen unterwegs. -
Selection of the Optimum Tunnel System for Long Railway Tunnels with Regard to the Entire Lifecycle
SELECTION OF THE OPTIMUM TUNNEL SYSTEM FOR LONG RAILWAY TUNNELS WITH REGARD TO THE ENTIRE LIFECYCLE H. Ehrbar & C. Tannò ETH Zurich, Switzerland H.-P. Vetsch Vetsch Rail Consult, Bützberg, Switzerland ABSTRACT: Since more than 30 years long tunnels with a total length of more than 50 kilometres exist. Many of them show a different tunnel system: double track tunnels with service tunnel, two single track tunnels and two single track tunnels with a service tunnel are the existing systems. The decision on the tunnel system of this long tunnels had to be taken at a time when only few information on operation and maintenance costs were available. Today more information on oration a maintenance is available. The paper shows, how the decision-making process should be made today considering the criteria construction, operation and safety with regard to the entire lifecycle. Recommendations on the selection of the tunnel system will be given for different boundary conditions, based on the operation experience of the long tunnel railway tunnels under operation. 1. PROJECT REQUIREMENTS OF LONG RAILWAY TUNNELS Railway tunnel constructions have the purpose of connecting cities, economic regions (Gotthard-Base Tunnel), countries (Eurotunnel, Cross Border Base Tunnel under the Ore Mountains) or even continents (Gibraltar Strait Tunnel) in order to ensure a rapid and environmentally friendly transport of people and goods. Mountains or straits are the typical topographical obstacles that must be overcome with a tunnel. Such tunnels become quickly very long (> 20 km length) due to special topographic boundary conditions for mountain base tunnels and strait tunnels. Figure 1: Longitudinal profile of a subsea tunnel (Eurotunnel) and a mountain base tunnel (Gotthard Base Tunnel) (source Wikipedia and AlpTransit Gotthard) Very long tunnels have to fulfil many project requirements, as each other civil work also. -
Aeschi Bei Spiez Traumhaft Gelegenes Wohn
Aeschi bei Spiez Traumhaft gelegenes Wohn- / Fe- rienhaus Kontaktperson Olivier Baumann Mob. 076 507 85 73 [email protected] Inhaltsverzeichnis 1. Aeschi bei Spiez ................................................................................................................... 3 1.1 Makrolage ..................................................................................................................... 3 1.2 Bevölkerung .................................................................................................................. 3 1.3 Verkehr ......................................................................................................................... 3 1.4 Freizeitangebot ............................................................................................................. 4 1.5 Mikrolage ...................................................................................................................... 4 2. Das Ferienhaus .................................................................................................................... 5 2.1 Angaben aus dem Grundbuch ....................................................................................... 5 2.2 Grundstückinformationen des Kantons Bern ................................................................. 6 2.3 Kurzbeschreibung Haus ................................................................................................ 7 2.4 Verkaufspreis ............................................................................................................... -
Update on Investments in Large TEN-T Projects ______
Update on Investments in Large TEN-T Projects ____________________________________________________________________________________________ DIRECTORATE GENERAL FOR INTERNAL POLICIES POLICY DEPARTMENT B: STRUCTURAL AND COHESION POLICIES TRANSPORT AND TOURISM UPDATE ON INVESTMENTS IN LARGE TEN-T PROJECTS STUDY Policy Department B: Structural and Cohesion Policies ____________________________________________________________________________________________ This document was commissioned by the European Parliament's Committee on Transport and Tourism. AUTHORS Fraunhofer, Institut für System- und Innovationsforschung, Germany - Wolfgang Schade, Lucia Mejia-Dorantes Karlsruhe Institute of Technology, Germany - Werner Rothengatter ProgTrans, Switzerland - Olaf Meyer-Rühle, Stephan Kritzinger RESPONSIBLE ADMINISTRATOR Marc Thomas Policy Department B: Structural and Cohesion Policies European Parliament B-1047 Brussels E-mail: [email protected] LINGUISTIC VERSIONS Original: EN EDITORIAL ASSISTANCE Adrienn Borka ABOUT THE EDITOR To contact the Policy Department or to subscribe to its monthly newsletter please write to: [email protected] Manuscript completed in December 2014 © European Union, 2014. This document is available on the Internet at: http://www.europarl.europa.eu/studies DISCLAIMER The opinions expressed in this document are the sole responsibility of the author and do not necessarily represent the official position of the European Parliament. Reproduction and translation for non-commercial purposes are