Chapter 6 – Capital Improvement Program

Total Page:16

File Type:pdf, Size:1020Kb

Chapter 6 – Capital Improvement Program CHAPTER 6: Capital Improvement Plan Report Prepared by: Contents 6 CAPITAL IMPROVEMENT PLAN ......................................................................... 6-1 6.1 Fleet Program ................................................................................................. 6-1 6.1.1 Vehicle Rehabilitation Program ................................................................ 6-3 6.1.2 Vehicle Replacement ................................................................................ 6-3 6.1.3 Vehicle Expansion .................................................................................... 6-4 6.1.4 Total Fleet Changes ................................................................................. 6-5 6.1.5 Estimated Cost and Funding .................................................................... 6-7 6.2 Facilities .......................................................................................................... 6-8 6.2.1 Operations/Maintenance and Equipment.................................................. 6-8 6.2.2 Passenger Amenities .............................................................................. 6-11 6.3 Technology Upgrades ................................................................................... 6-17 6.4 Other Improvements ..................................................................................... 6-18 6.5 Ten-Year Total .............................................................................................. 6-19 Tables Table 1 | ART Fleet Inventory....................................................................................... 6-1 Table 2 | ART Fleet Vehicle Rehabilitations ................................................................. 6-3 Table 3 | ART Fleet Vehicle Replacements .................................................................. 6-4 Table 4 | ART Fleet Vehicle Expansions ...................................................................... 6-5 Table 5 | ART Fleet Rehabilitation, Replacement, and Expansion Summary ............... 6-6 Table 6 | ART Fleet Costs and Funding ($1,000s) (FY2017-2026) .............................. 6-8 Table 7 | Operations and Maintenance Facilities Costs ($1,000s) (FY2017-2026) .... 6-10 Table 8 | Passenger Amenities Costs ($1,000s) (FY2017-2026) ............................... 6-15 Table 9 | Technology Upgrade Costs ($1,000s) (FY2017-2026) ................................ 6-18 Table 10 | Other Improvements Costs ($1,000s) (FY2017-2026)............................... 6-19 Table 11 | Arlington County CIP Project Costs Summary (FY2017-2026) ................. 6-20 Table 12 | Arlington County CIP Project Funding Summary (FY2017-2026) .............. 6-21 Capital Improvement Plan 6 CAPITAL IMPROVEMENT PLAN This chapter describes the Capital Improvement Plan (CIP) adopted by Arlington County for FY2017 to FY2026. These capital improvements are necessary for the operation and implementation of the TDP recommendations outlined in Chapter 4. Improvements are grouped into four categories: the Fleet Program (which includes vehicle rehabilitations, replacements, and expansions to the Arlington Transit bus system1); Facilities (which include operations and maintenance facilities as well as passenger amenities); Technology Upgrades; and Other Improvements. Funding for these projects are organized according to Federal, State, Regional, and Local sources. Previously approved funds, such as approved but unissued bonds from past fiscal years, are also separately itemized. For the ten-year TDP period, CIP projects related to the TDP recommendations are estimated to cost approximately $513,677,000. The County assumes that the majority of costs will be covered by Regional and Local funds (Regional funding will cover 39 percent of this cost, while State funds will cover 29 percent). 6.1 Fleet Program Arlington Transit currently owns and operates a fleet of 65 vehicles for fixed-route revenue service. All vehicles are low-floor vehicles powered by compressed natural gas (CNG). Table 1 outlines Arlington Transit’s current fleet composition. Table 1 | ART Fleet Inventory Capacity FTA Number Year Make / Model Length (Seated / Effective of VIN No. Standing) Life (Years) Vehicles 1N903509X7A140080, 1N90350907A140086, 1N90350977A140084, Bus STD 1N90350997A140085, 2007 NABI 35 LFW 30/15 12 8 35 FT 1N90350937A140079, 1N90350937A140082, 1N90350957A140083, 1N90350917A140081 1 Arlington County transit riders are also served by a regional rail (Metrorail) and bus system (Metrobus), both operated by the Washington Metropolitan Area Transit Authority (WMATA). Capital improvements funded by WMATA for the operation of Metrorail and Metrobus services are not reflected in this chapter. Arlington County Transit Development Plan Page | 6-1 Capital Improvement Plan Capacity FTA Number Year Make / Model Length (Seated / Effective of VIN No. Standing) Life (Years) Vehicles 1N90351468A140646, 1N90351418A140635, 1N90351428A140644, 1N90351408A140643, 1N90351448A140645, Bus STD 1N90351438A140636, 2008 NABI 35 LFW 30/15 12 12 35 FT 1N90351498A140642, 1N90351498A140639, 1N90351458A140637, 1N90351478A140638, 1N90351458A140640, 1N90351478A140641 1N90310311AA40111, 1N90310331AA40112, 1N90310351AA40113, 1N90310331AA40109, 1N90310321AA40117, Bus STD 1N90310301AA40116, 2010 NABI 31 LFW 25/13 10 12 31 FT 1N90310341AA40118, 1N90310371AA40114, 1N90310391AA40115, 1N90310321AA40120, 1N90310361AA40119, 1N903103X1AA40110 1N9031335BA140321, Bus STD 2011 NABI 31 LFW 25/13 10 3 1N9031333BA140320, 31 FT 1N9031337BA140322 1GB6G5BG1B1184072, 1GB6G5BG2B1183948, ARBOC Spirit of Cut-a-Way 1GB6G5BG8B1183078, 2011 17/9 7 6 Mobility 28 FT 1GB6G5BG0B1183401, 1GB6G5BG0B1183852, 1GB6G5BG8B1184330 1GB6G5BG6D1146422, 1GB6G5BG9D1146270, 1GB6G5BG5D1153555, ARBOC Spirit of Cut-a-Way 1GB6G5BG4D1153238, 2013 17/9 7 8 Mobility 28 FT 1GB6G5BG3D1154526, 1GB6G5BG4D1154759, 1GB6G5BGXD1154619, 1GB6G5BG8D1154375 Arlington County Transit Development Plan Page | 6-2 Capital Improvement Plan Capacity FTA Number Year Make / Model Length (Seated / Effective of VIN No. Standing) Life (Years) Vehicles 1N9040565EA140337, 1N9040567EA140338, 1N9040569EA140339, NABI 40 LFW -56 Bus STD 1N9040565EA140340, 2014 38/19 7 8 328000 40 FT 1N9040567EA140341, 1N9040569EA140342, 1N9040560EA140343, 1N9040562EA140344 1N9040563FA140094, 1N9040565FA140095, 1N9040567FA140096, NABI 40 LFW -56- Bus STD 1N9040569FA140097, 2015 38/19 12 8 02 337000 40 FT 1N9040560FA140098, 1N9040562FA140099, 1N9040565FA140100, 1N9040567FA140101 Total Fleet 65 6.1.1 Vehicle Rehabilitation Program To extend the useful life of its fleet, ART performs a mid-life rehabilitation of all of its heavy-duty vehicles in the sixth year of service. A mid-life rehabilitation extends the FTA- recommended 12-year useful life of a bus by another four years. The oldest vehicles in ART’s fleet [thirteen (13) NABI 35 LFW buses] will undergo refurbishing in FY 2017. An additional 12 buses will be rehabilitated in FY 2018. ART plans to rehab at total of 63 buses over the next 10 years. The total cost of fleet rehabilitation between FY 2017 through FY 2026 is estimated to be $11,731,000. Table 2 outlines the rehabilitations anticipated during the ten-year period. Table 2 | ART Fleet Vehicle Rehabilitations Vehicle Fiscal Year Size 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total 31' 0 12 3 0 0 0 0 0 0 3 18 35' 13 0 0 0 0 0 0 0 0 0 13 40' 0 0 3 5 4 4 5 5 5 1 32 Total 13 12 6 5 4 4 5 5 5 4 63 6.1.2 Vehicle Replacement Between FY2017-2026, Arlington will retire a total of 49, but require only 43 vehicle replacements. In most cases, Arlington County intends to replace retired vehicles with vehicles of a similar size. There are some instances, however, when retired vehicles will Arlington County Transit Development Plan Page | 6-3 Capital Improvement Plan be replaced with higher-capacity buses to accommodate service expansion and increased ridership. These exceptions occur in three years: • 2022, when eight (8) 35-foot buses will retire and be replaced with eight (8) 40- foot, low-floor CNG buses • 2024, when two (2) 40-foot, low-floor CNG buses will be purchased in anticipation of three (3) 31-foot buses retiring in 2025, and • 2025, when twelve (2) 35-foot buses will retired and be replaced with eleven (11) 40-foot, low floor CNG buses The total cost of fleet replacements between FY 2017 and FY 2026 is projected to be $27,445,000. Table 3 outlines the rehabilitations anticipated during the ten-year period. Table 3 | ART Fleet Vehicle Replacements Vehicle Fiscal Year Size 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Total 28' 0 0 4 3 3 0 0 0 0 0 10 31' 0 0 0 0 0 0 0 12 0 0 12 35' 0 0 0 0 0 0 0 0 0 0 0 40' 0 0 0 0 0 8 0 2 11 0 21 Total 0 0 4 3 3 8 0 14 11 0 43 6.1.3 Vehicle Expansion Arlington County intends to expand its ART fleet with twenty-six (26) new heavy-duty vehicles in response to growth in ridership and the conversion of some Metrobus routes to ART. Ultimately, the fleet will only expand by 20 additional buses during this 10 year TDP when retired vehicles and replacements are counted. The existing fleet will expand by five (5) new 31-foot, low-floor CNG buses (purchased in 2020 and 2024) and twenty- one (21) new 40-foot, low-floor CNG buses (purchased in 2018, 2020, and 2024).2 The total cost of expansions is estimated to be $16,624,000. Table 4 outlines the rehabilitations anticipated during the ten-year period. 2 The County assessed the need to expand the existing ART fleet to include articulated buses, but demand over the next
Recommended publications
  • Shirlington Transit Center
    Bus Service from Shirlington Station VD BL O Ge Farragut N LD M or O D e ge POTOMAC Mt Vernon Greensboro IS O mo W North Union AD M ria as Foggy M IN l P hin McPherson Square McLean Y IO k gt Bottom- Farragut Station LE N 72 wy on L DR Sq Tysons DO GWU West Williamsburg Corner Blvd Metro Gallery Judiciary 23A Marymount 66 7Y Center Place Square 23T University RIVER N GLEBE RD 7Y Tysons 23A 10B Washington Blvd Corner 23B Rosslyn 23T 18th St Center East Falls Church Ballston-MU Virginia Sq-GMU Clarendon Court House WASHINGTON 75 77 Federal Triangle Archives Highland St 66 St Monroe N Wilson Blvd Wilson Blvd Clarendon Blvd Theodore Jefferson St ST RANDOLPH Roosevelt West Falls Church 75 75 Bridge Constitution Ave W 7th St a s Lincoln The Mall Kensington St Kensington h in Memorial L’E nfant Federal g to Plaza Center SW 495 10B n Smithsonian B lv 23A d 7Y 23B ARLINGTON 23T N GLEBE RD 66 Henderson Rd Carlin Springs Rd Arlington Cemetery Jefferson Davis Hwy 72 Arlington 22A Courthouse Rd Arlington Blvd W National a 395 T 6th St s Cemetery S h D 77 in Dunn Loring 2N WALTER REED DR g Carlin Springs Rd to BARCROFT n B Arlington lv George Mason HallDr 23A d Navy Annex 23B 10B 66 Arlington Blvd 23T 7A 7F S GLEBE RD Columbia Pike 7Y 7C 22A 87 Pentagon d Dinwiddie St COLUMBIA R Greenbrier St 7th HEIGHTS YOU EADS ST Columbia Pike ST HAYES Leesburg Pike 8th Rd DOUGLAS ARE 7A Columbus St KENMORE ST 7F 22A PARK Memorial Pkwy George Washington Jefferson St HERE Army-Navy 7C 22A 7Y 15TH ST F 72 Country r e St Lynn d Four Mile 10B Club Pentagon e 395 87 87 r Run Dr i City c k 77 23A S schematic map t Walter Reed Dr 23B LEGEND not to scale 23T Army-Navy Dr A SHIRLEY HWY R Arlington Mill Dr SHIRLINGTON RD L I 72 87 N Adams St 23RD ST Rail Lines Metrobus Routes 75 G 75 T Crystal City Chesterfield Rd O 23A N 10B Metrobus Major Route Columbia Pike S GLEBE RD 28th St D R 23B 23A I Frequent, seven-day service on Skyline Leesburgin Pike Lang St D w Avalon G 23B Metrorail the core route.
    [Show full text]
  • Accessible Transportation Options for People with Disabilities and Senior Citizens
    Accessible Transportation Options for People with Disabilities and Senior Citizens In the Washington, D.C. Metropolitan Area JANUARY 2017 Transfer Station Station Features Red Line • Glenmont / Shady Grove Bus to Airport System Orange Line • New Carrollton / Vienna Parking Station Legend Blue Line • Franconia-Springfield / Largo Town Center in Service Map Hospital Under Construction Green Line • Branch Ave / Greenbelt Airport Full-Time Service wmata.com Yellow Line • Huntington / Fort Totten Customer Information Service: 202-637-7000 Connecting Rail Systems Rush-Only Service: Monday-Friday Silver Line • Wiehle-Reston East / Largo Town Center TTY Phone: 202-962-2033 6:30am - 9:00am 3:30pm - 6:00pm Metro Transit Police: 202-962-2121 Glenmont Wheaton Montgomery Co Prince George’s Co Shady Grove Forest Glen Rockville Silver Spring Twinbrook B30 to Greenbelt BWI White Flint Montgomery Co District of Columbia College Park-U of Md Grosvenor - Strathmore Georgia Ave-Petworth Takoma Prince George’s Plaza Medical Center West Hyattsville Bethesda Fort Totten Friendship Heights Tenleytown-AU Prince George’s Co Van Ness-UDC District of Columbia Cleveland Park Columbia Heights Woodley Park Zoo/Adams Morgan U St Brookland-CUA African-Amer Civil Dupont Circle War Mem’l/Cardozo Farragut North Shaw-Howard U Rhode Island Ave Brentwood Wiehle-Reston East Spring Hill McPherson Mt Vernon Sq NoMa-Gallaudet U New Carrollton Sq 7th St-Convention Center Greensboro Fairfax Co Landover Arlington Co Tysons Corner Gallery Place Union Station Chinatown Cheverly 5A to
    [Show full text]
  • Bus Service from Pentagon
    Bus Service from Pentagon - Dupont Shaw Sunset Hills Rd POTOMAC RIVER Circle Howard U schematic map Wiehle Ave BUS SERVICE AND BOARDING LOCATIONS LEGEND not to scale 267 WASHINGTON 599 The table shows approximate minutes between buses; check schedules for full details Farragut Mt Vernon Rail Lines Metrobus Routes 599 Wiehle- Foggy Bottom- Farragut North McPherson Union Square MONDAY TO FRIDAY SATURDAY SUNDAY Reston East GWU West Square NY 7Y Station BOARD AT Spring Hill Ave 16A Metrobus Major Route K St ROUTE DESTINATION BUS BAY AM PEAK MIDDAY PM PEAK EVENING DAY EVENING DAY EVENING 10th St 13Y Metrorail Frequent, seven-day service on the core route. On branches, service levels vary. Metro Gallery Judiciary LINCOLNIA-NORTH FAIRLINGTON LINE Station and Line Greensboro 66 Center Place Square 9A Metrobus Local Route RESTON 7A Lincolnia via Quantrell Ave U5 30-50 40 -- 15-40 60 30-60 40 60 Less frequent service, with some evening North St Capitol Metrorail 599 7F Lincolnia via N Hampton Dr, Chambliss St U5 60 40 -- 60 60 -- -- -- and weekend service available. Tysons Corner 7Y Under Construction Washington Blvd 18th St 14th St 7Y New York Ave & 9th St NW U9 7-25 -- -- -- -- -- -- -- 18P Metrobus Commuter Route 42 Rosslyn E St Peak-hour service linking residential areas McLean East Falls Church 22A Ballston-MU Virginia Square-GMU Clarendon Court House 16X 7A 7Y Southern Towers U5 -- -- 5-15 -- -- -- -- -- to rail stations and employment centers. 22C St 23rd Federal LINCOLNIA-PARK CENTER LINE Commuter 16X MetroExtra Route Triangle Archives Rail Station Limited stops for a faster ride.
    [Show full text]
  • Smart Location Database Technical Documentation and User Guide
    SMART LOCATION DATABASE TECHNICAL DOCUMENTATION AND USER GUIDE Version 3.0 Updated: June 2021 Authors: Jim Chapman, MSCE, Managing Principal, Urban Design 4 Health, Inc. (UD4H) Eric H. Fox, MScP, Senior Planner, UD4H William Bachman, Ph.D., Senior Analyst, UD4H Lawrence D. Frank, Ph.D., President, UD4H John Thomas, Ph.D., U.S. EPA Office of Community Revitalization Alexis Rourk Reyes, MSCRP, U.S. EPA Office of Community Revitalization About This Report The Smart Location Database is a publicly available data product and service provided by the U.S. EPA Smart Growth Program. This version 3.0 documentation builds on, and updates where needed, the version 2.0 document.1 Urban Design 4 Health, Inc. updated this guide for the project called Updating the EPA GSA Smart Location Database. Acknowledgements Urban Design 4 Health was contracted by the U.S. EPA with support from the General Services Administration’s Center for Urban Development to update the Smart Location Database and this User Guide. As the Project Manager for this study, Jim Chapman supervised the data development and authored this updated user guide. Mr. Eric Fox and Dr. William Bachman led all data acquisition, geoprocessing, and spatial analyses undertaken in the development of version 3.0 of the Smart Location Database and co- authored the user guide through substantive contributions to the methods and information provided. Dr. Larry Frank provided data development input and reviewed the report providing critical input and feedback. The authors would like to acknowledge the guidance, review, and support provided by: • Ruth Kroeger, U.S. General Services Administration • Frank Giblin, U.S.
    [Show full text]
  • Metro Metro 2017 − 2026 Cip
    METRO METRO METRO 2017 − 2026 CIP Metro Funding Project Description The Washington Metropolitan Area Transit Authority (WMATA/Metro) is a unique federal-state-local partnership formed to provide mass transit service to the Washington Metropolitan region. WMATA's Adopted FY 2017 - FY 2022 Capital Budget consists of $6.0 billion of critical system projects necessary to maintain the Metrobus, Metrorail, and Metroaccess systems over the next six years. The program focuses heavily on replacement / rehab of the system's aging rail infrastructure with minimal enhancement investments. Also included is the funding of an additional 220 7000-series railcars and associated rail power system upgrades. These additional railcars will be used to retire all 192 of the original 5000-series railcars, one of the most unreliable series in the current fleet. The remaining 28 railcars will be used for minimal capacity expansion along the red line. Funding for the WMATA capital program is from a combination of state, federal, regional and local sources. For Arlington, the total adopted six-year funding commitment is approximately $186 million, consisting of $106 million of annual subsidy payments, and $80 million of planned debt issuance by WMATA. Over ten-years, Arlington has programmed $280 million, with increased funding in the out-years primarily for service expansion projects. This fully funds Arlington's baseline funding of WMATA, and funds $55 million of planned debt issuance based on historical capital program execution rates. A combination of general obligation bonds, state grants and regional gas tax are used to fund Arlington's share of WMATA subsidy. A new multi-year capital funding agreement is currently being drafted among WMATA contributing jurisdictions to cover fiscal years 2018 -2023 and is anticipated to begin in the fall of 2016.
    [Show full text]
  • STAR Rider Guide Policies and Procedures Effective September 2020
    STAR Rider Guide Policies and Procedures Effective September 2020 To request a trip with STAR contact the STAR Call Center at: Phone: 703-228-1900 TDD: 800-828-1120 or 711 Email: [email protected] 1 Table of Contents Introduction What is STAR? .....................................................................3 Who May Use STAR? ...........................................................3 Reasonable Accommodations ………………………………..4 Trip Service Times and Locations …………………………....5 Holidays ………………………………………………………....5 Requesting a Trip How to Request a Trip …………………………………………6 Favorite Locations File ………………………………………....8 STAR on the Web ………………………………………………8 Standing Order Trip Requests ………………………………..10 Reviewing Your Trip Schedule ……………………………….11 Same Day Reservations ………………………………………11 Will-Call Return Trips ………………………………………….12 Trip Procedures Pick-Up Procedures …………………………………………...13 Shared Trips ……………………………………………………14 Running Late for Your Trip? …………………………………..14 Where is my Ride? …………………………………………….15 Same Day Accessible Rides on the Bus and Train ………..15 Personal Care Attendants and Companions ……………….16 Fares STAR Fares …………………………………………………….16 Coupon Books ………………………………………………….17 Zone Map ……………………………………………………….18 Commuter Store Locations ……………………………………18 Cancellation and Weather Policies Cancellation and No Show Policy ……………………………19 Suspension Policy ……………………………………………..19 Severe Weather Policy ………………………………………...20 STAR Oversight Customer Rights and Responsibilities ……………………….21 Policy Oversight ………………………………………………...23 Key Contacts ……………………………………………………23
    [Show full text]
  • Senior Centers Paratransit
    Buses & Trains TaxiCabs ARLINGTON COUNTY ParaTransit TRANSPORTATION SERVICES FOR OLDER ADULTS AND PERSONS Senior Centers WITH DISABILITES Discount Programs This brochure gives Arlington residents age 55 and over an overview of the many transportation services available in Arlington County. Both County and community based transportation programs and services are included. These programs provide a wide range of options designed to meet specific needs. Please note: some of the transit options listed are for individuals with disabilities and there is no age requirement to use these services. For each program or service, a description is provided that includes eligibility requirements and contact information to receive more information and applications. Fees are varied based on the individual program and are listed when applicable. Additional information for these and other programs for Arlington residents age 60 and older can be obtained from the: Aging & Disability Resource Center (ADRC) 703-228-1700, TTY 703-228-1788 [email protected] https://aging-disability.arlingtonva.us NOTE: TTY stands for Text Telephone. It is a special device that allows people who are deaf, hard of hearing, or speech impaired to use the phone to communicate. A TTY is required at both ends of the conversation in order to communicate. 2 Table of Contents Fixed Route Transportation 4 Arlington Transit (ART) Washington Metro Area Transit Authority (WMATA) Reduced Fare Programs Travel Training Taxi Cab 8 Transportation Network Companies (TNCs) 8 Super Senior Taxi 9 Senior Center Adult Transportation (SCAT) 10 Social 60+ Café Transportation 11 Senior Loops 12 Paratransit 13 Metro Access STAR Transportation for Medicaid Participants 16 Volunteer Organizations 17 Frequently Called Numbers 18 Commuter Store Locations 19 3 FIXED ROUTE TRANSPORTATION ARLINGTON TRANSIT (ART): ART Bus: Arlington Transit operates 16 routes within Arlington County, Virginia, supplementing Metrobus with cross-county routes as well as neighborhood connections to Metrorail and Virginia Railway Express (VRE).
    [Show full text]
  • Falls Church Mclean Washington Alexandria
    Canal Rd NW Wisconsin Ave NW 924 926 Leesburg Pike Capital LANGLEY Beltway Dolley Madison Blvd George Washington Pkwy 721 15K 495 15L GEORGETOWN Dranesville Rd BEVERLY RD 15K Lewinsville Rd N Glebe Rd MCLEAN 53B Military Rd George Washington Pkwy 724 53 554 Old Glebe POTOMAC RIVER See Central DC inset 558 Rd on reverse side Spring Hill Rd Williamsburg Blvd Reston Pkwy M ST NW Lake Newport Rd Farm Farm Credit Dr Lewinsville Rd 38B Leesburg Pike Lorcom Ln 62 Lorcom Ln Fairfax County Pkwy Center Harbor Rd Credit DOLLEY MADISON BLVD RB4 Admin OLD DOMINION DR 15L RB4 556 Jones Branch Dr 5A 15L non-stop 5A to Rosslyn HERNDON Wiehle Ave 574 424 494 495 480 23A Walnut Branch Rd 432 Tysons 3Y 21st St Baron Cameron Ave 23T 924 480 424 432 Westpark 423 599 WASHINGTON Bennington RB4 556 552 Spout Run Pkwy Woods Rd Baron Cameron 558 599 494 495 423 Transit Station Westpark Dr WHITTIER AVE Yorktown 5A non-stop to/from Park & Ride 558 574 724 Herndon Monroe 926 RB5 RB5 Blvd LEE HWY Spout Run Pkwy Dr Run Park Sully Rd 574 724 61 Foggy Bottom-GWU Park Ave 574 52 LEE HWY 55 Park & Ride LEE HWY Loudoun County RB5 Baron Cameron Ave 401 423 McLean CHAIN BRIDGE RD Stevenage Rd 5A KEY BRIDGE Transit offers Rd Village Ring Rd Tysons Blvd 62 53 574 267 402 International 424 721 Tyco Rd N GLEBE RD commuter service Kmart Dr Utah St Quincy St 55 574 494 Little Falls 62 Scott St 15K from Leesburg, Herndon Pkwy 937 23A 2T Galleria Dr Rd 61 Veitch St Veitch Lake Fairfax Dr Key 552 495 Sycamore St Patrick 15L Ashburn and other ANDERSON RD 23T 3Y 15L Monroe St Grace
    [Show full text]
  • Annapolis Transit Development Plan 2018 I
    Annapolis Transit Transit Development Plan DRAFT REPORT December 2018 Prepared for Annapolis Transit, City of Annapolis, Maryland Prepared by KFH Group, Inc. Bethesda, Maryland Table of Contents Table of Contents Chapter 1: Review of Existing Services Introduction .................................................................................................................... 1-1 Annapolis Transit Services ............................................................................................ 1-2 Funding and Fare Policy ................................................................................................ 1-21 Service Performance Evaluation ................................................................................... 1-25 Existing Facilities, Fleet, and Technology ...................................................................... 1-37 Marketing and Communications .................................................................................... 1-44 Pedestrian and Bicycle Access ...................................................................................... 1-45 Other Area Transportation Providers ............................................................................. 1-48 Chapter 2: Review of Transit Needs Introduction .................................................................................................................... 2-1 Demographics and Land Use ........................................................................................ 2-1 Stakeholder and Public Input ........................................................................................
    [Show full text]
  • Bus Information From
    Bus Information From E m o ry Ol ne G y P rov r e Rd Wickham Dr La in yt c o e n P North sv h d il il R le ip ld R ie n Branch r D f L D d d r ve oo rs l A W e 57 Park e dha S v at d Browns Bridge Rd J7 en a o 52 R Montgomery La d yb r Y5 k O ro 58 dw eforest o G n J9 ke R 53 a 53 Y5 General e a Y7 Y8 Lakeforest Mall Oa 90 t ks n White Flint StationH r 61 Y7 Hospital Blvd J7 J9 J7 J9 54 B o O a Park & Ride l t Y9 vd ln p g d M R e S Y8 54 55 57 59 61 n o Y5 y 53 J7 J9 i rn J7 J9 54 55 124 r ingw S 53 h 115 e o a Y9 Goshen Rd Y5 Y7 od Y7 n d 56 61 54 Russell s t Dr d Z2 Y5 Y7 Y8 a s Ashton Rd 55 56 57 58 y R Metropolitan 64 a Rock Y8 Y9 Y8 Y9 270 59 S Y9 52 53 Ave 59 61 W c 52 Z2 pr Grove 61 61 n Z2 52 ing e u Z2 52 R Bro Dr r 65 57 Creek Sparta d oke Farm o wy M n k R 52 im MD 124 P 54 60 d t G Park Z2 l y 55 Z2 52 a Park & Ride rr i B r Rd e a 57 60 P 59 ring F r d p re 57 d l dy S J9 56 d 64 O San e S lney Metropolitan ri Gaithersburg t O Z2 Grove Rd 61 205 J7 ck Z2 Cl Montgomery op Firstfield J9 J9 A Scaggsville Rd p County ve 52 er 201 70 Lime Kiln Rd R 56 Fairgrounds 57 Y5 d Rd e 61 202 79 Bready Rd 355 v Y7 61 A J9 204 100 124 Z2 New Hampshire t i Y8 205 r 58 Br r D 201 im D m 124 M y Olney idc Y9 st u 202 m o 90 m u d o e a n r 53 d 56 u ty n d Theatre R 53 108 e e a D 54 S H c R r 204 w y l A J9 Ave u 57 l p i i B MD 117 il d 71 78 h o E Dia 60 M m o P o d Park & Ride 57 nd Washington 64 205 A e v e w l ve 65 i e Towne Av c r B Old e Z2 n w i o Bank St 54 r o d 124 J9 54 D Grove P D N r iamo 54 nd Ave 59 B oc a 71 78 205 53 to
    [Show full text]
  • Transit Performance in the I-66 Inside the Beltway Corridor
    TRANSIT PERFORMANCE IN THE I-66 INSIDE THE BELTWAY CORRIDOR June 2018 This report summarizes the performance of public transportation systems serving the I-66 inside the Beltway corridor in Northern Virginia. In December 2017, the Commonwealth of Virginia instituted dynamic tolling during peak periods along I-66, from the Capital Beltway in Fairfax County to the Roosevelt Bridge leading to Washington, D.C. This stretch of roadway was previously a restricted facility, limited to high occupancy vehicles (HOV2) during commuting hours, inbound (east) in the morning and outboard (west) in the afternoon. Upon implementation of the dynamic tolling, the Northern Virginia Transportation Commission (NVTC) initiated the I-66 Commuter Choice program, a multimodal grant program that funds transit and transportation demand management services to complement the tolling in order to move more people through the corridor during peak periods. As part of this effort, NVTC began tracking the overall transit performance changes along this corridor. OVERVIEW Public transportation plays an important role along the I-66 inside the Beltway corridor, transporting approximately 40 percent of commuters during peak periods. That’s a more than three times greater transit mode share than Northern Virginia as a whole. Public transit ridership along the corridor generally follows regional and national public transportation ridership trends, which have showed some decline. In contrast to this trend, express buses, some of which are funded by the I-66 Commuter Choice program, experienced strong and growing ridership, while demonstrating faster and more reliable running times due to I-66 tolling and resulting traffic condition improvements. KEY FINDINGS • Public transportation plays a vital role along the I-66 corridor.
    [Show full text]
  • Service Planning Process, Highlights Detailed Assumptions Made During This Process, and Documents Characteristic of the Proposed Service Plan
    Crystal City/Potomac Yard Corridor Interim Transit Improvement Project Draft Technical Memorandum: Service Implementation Plan December 2005 1.0 INTRODUCTION 1.1 Overall Concept and Project Phasing The Crystal City/Potomac Yard Corridor Interim Transit Improvement Project is focused on developing an implementation program for interim transit improvements in the corridor running between the Pentagon/Pentagon City and Crystal City, in Arlington, to Potomac Yard and the Braddock Road Metrorail Station in Alexandria. These improvements will coincide with the development of Potomac Yard and redevelopment in Pentagon City and Crystal City. It is anticipated that this interim plan would precede implementation of a higher capacity transit system in the corridor. This memorandum outlines the service planning process, highlights detailed assumptions made during this process, and documents characteristic of the proposed service plan. The focus of the implementation will be phased steps toward rationalizing corridor transit service. This phased implementation will transition from multiple providers to a uniform, branded, premium service running between southern termini at the Braddock Road Metrorail Station and Potomac Yard Town Center, and northern termini at the Pentagon and Pentagon City. This memorandum discusses three phases of a corridor-wide transit implementation plan (immediate, short-term, and mid-term) but focuses on the mid-term (4 to 7 year) time frame, wherein a uniform branded service is assumed to extend the length of the study corridor. 2.0 EXISTING CONDITIONS 2.1 Existing Transit Service in the Potomac Yard area The Crystal City/Potomac Yard corridor is currently served by six Metrobus routes and one Arlington Transit (ART) route, described below.
    [Show full text]