Design for future climate: adapting buildings competition – Phase 1 D4FC Factsheet 26: Office Rationalisation Programme

Contact details Project description

Name: Peter Woodford Remodelling of two 1960s offices to provide ‘modern working’ environments and design of a new office facility, in Company: Cornwall Council order to offer better use of property holdings and to reduce Email: [email protected] the council’s property portfolio and liability. Tel: 01872 326970 This releases asset value for reinvestment and reduction of corporate carbon footprint by disposal of inefficient building General project information stock. Work involves internal remodelling (essentially to Name of project: Cornwall Council Office Rationalisation create open-plan flexible work areas and drop-in areas), as Programme well as better public interface facilities, improved internal environmental performance and higher occupancy ratios. Location of project: (Dolcoath office), () and (proposed Project specific new office) Type of project: Alteration and refurbishment at The contract at Camborne undertook wholesale remodelling Camborne and Truro and new build at and refurbishment of the complete four-storey building. This Bodmin allowed greater flexibility of work spaces, and also allowed decant of staff to this building from a number of smaller Cost of project: About £29m offices in the Camborne and areas. Project team The work at County Hall (Grade II listed building) is divided into two phases. Phase one (valued at £1.8m) refurbished Client: Cornwall Council Property Services the main entrance and infill an undercroft to create a new Project management: Cornwall Council PM team ‘public link’ area, with reception, meeting rooms and social areas for public interaction with council staff and services Designer: HLM Architects at Camborne, Poynton enquiries. Phase two which was undertaken in a series of Bradbury Wynter Cole Architects at work tranches around the multi-storey building) carried Truro and Bodmin out significant internal alterations to implement new office Contractor: Mansells at Camborne, Keir at Truro layout and ‘modern working’ scenarios. (TBA) A new office facility (initially targeted at Passivhaus Other organisations involved: EC Harris (cost consultants standards but down graded to provide low carbon/ at Camborne and Truro), Cyril Sweett (cost consultants low energy) will centralise Cornwall Council facilities at Bodmin), Parsons Brinkerhoff (M&E consultants in the Bodmin area. This will allow the disposal of nine at Camborne and Bodmin), Hoare Lea and Partners separate properties (both lease and freehold) which are (M&E consultants at Truro), Centre for Energy and the currently scattered across a wide geographical footprint Environment, University of , (TSB D4FC technical and offing office facilities housed in poor and inefficient partner with Cornwall Council) accommodation.

D4FC Factsheet 26 1 Design for future climate: adapting buildings competition – Phase 1

Project timescales and dates base thermal model created in IES Virtual Environment software Design and assessment period (pre-planning): Camborne zz custom weather files for the specific areas are being – completed mid 2012, Truro (Phase 1) – completed April generated, as the UKCP09 weather generator would 2011, (Phase 2) in four tranches to early 2014, Bodmin – normally use weather files based on (60 miles detail design started 2013 to the east) Construction period (post-consent): 2014 to April 2015 4 What has the client agreed to implement as a result of Further project details your adaptation work? zz a biomass boiler was installed at the Camborne project 1 What approach did you take in assessing risks and zz other features will be considered more fully as the work identifying adaptation measures to mitigate the risks? at Bodmin and Truro moves through detail design: zz increase solar gains from increasing high-pressure {{ natural ventilation dominant weather patterns {{ solar shading options zz limited night-time cooling due to reduced diurnal cycle {{ heating/cooling strategies. zz milder winters which may improve the cost effectiveness of biomass boilers 5 What were the major challenges so far in doing this zz more intense rainfall adaptation work? zz higher summer temperatures with higher peak zz working within the construction and structure of the temperatures existing building stock, and the Listed Building consent zz greater fluctuations in weather patterns. influence zz variation of the nature and levels of occupancy These key considerations were factors in developing zz creation of location specific weather files can be time proposals based around adding insulation to external walls, consuming solar shading via brise soleil, solar shading using films, reducing occupancy, and incorporating night-time zz timetable for the live building project is not related to the ventilation. TSB timetable, and intervention from the D4FC team was seen as a distraction for the project design team. 2 How have you communicated the risks and recommendations with your client? What methods 6 What advice would you give others undertaking worked well? adaptation strategies? zz we used a range of graphical presentations, diagrams zz establish clear roles and responsibilities and tables to covey the technical data to our client zz ensure that D4FC/TSB representatives are there to help, zz as work progressed, we will develop a more and are not seen as a burden on the design teams comprehensive presentation, which will be used to zz budget setting is critical to project successes – D4FC/ inform the wider audience within Cornwall Council as TSB roles must reflect the potential to add value to the well as form the basis of a presentation to teams in processes, not just add cost. Cornwall Council Consultancy Framework.

3 What tools have you used to assess overheating and flood risks? zz the Prometheus probabilistic design summer year weather tapes developed by and

D4FC Factsheet 26 2 Design for future climate: adapting buildings competition – Phase 1

D4FC Factsheet 26 3