TUNNELS in BRAZIL “Expansión De Las Obras Metroviarias En Grandes Centros Urbanos”

Total Page:16

File Type:pdf, Size:1020Kb

TUNNELS in BRAZIL “Expansión De Las Obras Metroviarias En Grandes Centros Urbanos” TUNNELS IN BRAZIL “Expansión de las Obras Metroviarias en grandes Centros Urbanos” Geol. MSc Eng. MBA Buenos Aires 2013 july Hugo Cássio Rocha History • Tunneling in Brazil started in second half of 19th century • 1858 – 1865: Construction of 15 tunnels (section 2 of the ‘Dom Pedro II Railroad’, in Rio de Janeiro), with lengths varying from 25 to 2,238 meters – the Grand tunnel – in a total of 5,220m. Visita do Imperador ao vazamento do Túnel Grande (Silva Telles, 2006) History • 1865: 20 tunnels (Central line – from Rio de Janeiro to Belo Horizonte) • 1877 – 1879: New uses of Air Drills and Dynamite in the Maritime branch of the Dom Pedro II Railroad. • 1928 – 1937: 37 new tunnels (over 5km) along the former Sorocabana Railroad, for the access from São Paulo to the Port of Santos. One of the Sorocabana Railroad Tunnels 1938 – 9 de julho Tunnel -São Paulo The 60s • Several urban road tunnels in Rio de Janeiro - in normal operation since then. • Sewers and water supply tunnels. • Some Hydro Tunnels Joá Tunnel- Rio de Janeiro. The 70´s • Metro São Paulo – Line 1 – partly excavated with na open face TBM Single-track open face TBM • Imigrantes – 7 Tunnels (total = 3899m) Imigrantes Highway – ascending branch • Ferrovia do aço- total extension tunnels -75 km The 80s and 90s • Sao Paulo Subway: Line 2 • Road Tunnels in Sao Paulo • Several hydropower plans, including Serra da Mesa (Undergroung caves measuring 30 m width and 70m height) Sao Paulo Subway Linha 2– Brazilian TBM – The 90s Single Track Tunnel Diameter = 6.00 meters Sao Paulo Subway –The 90s Trianon Station Sao Paulo –The 90s Sebastião Camargo Tunnel – photo by Sebastião Salgado Sao Paulo – The 2000s Cidade Jardim Tunnel The book “Túneis do Brasil” presents a summary about the Tunneling in Brazil history Tunnel volume by tunnel type (106 m3) Sewer and Utilities Underpasses 0,03 1,44 highway 7,03 Hydroelectric 9,37 Subway 1,86 Railway 7,24 Recent Projects • Line 2 extension – Metro São Paulo. • Line 4 – Metro São Paulo. • Gastau – Hard Rock TBM – aprox. 5 km • Line 1 Extension Rio de Janeiro – Drill and Blast – during the last years, 2 stations + line tunnels • Several other projects Line 2 - Sao Paulo Subway Line 2 - Sao Paulo Subway Line 2 - Sao Paulo Subway Line 2 - Sao Paulo Subway Multi- Shaft Station Vila Prudente Linha 2 Recent Projects • Line 2 extension – Metro São Paulo. • Line 4 – Metro São Paulo. • Gastau – Hard Rock TBM – aprox. 5 km • Line 1 Extension Rio de Janeiro – Drill and Blast – during the last years, 2 stations + line tunnels • Several other projects 3 shafts Station da Luz Linha 4 S-336, Tuneladora EPB Diameter: 9.460mm Potência cabeça de corte: 3.200kW Velocidade da Cabeça- 0-4 rpm Weight 715 t Torque- 22815 kNm 20 motores Abertura de face 36 % 2 copy cutter de rocha e 2 de solo Empuxo 84500 Kn ( 96500 max) 15 pares de macacos Excentricidade 10 mm Articulação ativa c/ 20 cilindros Radius min 250m Extensão túnel: 6.500m Pressão de trabalho 4 bar Geologia: Areias,Argilas, siltes, gnaisse Linhas de inj. de graxa- 40 Linhas de inj. de grout- 12 TBM – Line 4 Herrenknecht (Alemanha) Recent Projects • Line 2 extension – Metro São Paulo. • Line 4 – Metro São Paulo. • Gastau – Hard Rock TBM – aprox. 5 km • Line 1 Extension Rio de Janeiro – Drill and Blast – during the last years, 2 stations + line tunnels • Several other projects Recent Projects • Line 2 extension – Metro São Paulo. • Line 4 – Metro São Paulo. • Gastau – Hard Rock TBM – aprox. 5 km • Line 1 Extension Rio de Janeiro – Drill and Blast – during the last years, 2 stations + line tunnels • Several other projects Subway –Rio de Janeiro Rio de Janeir0 Cantagalo Station Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Line 1 extension - Rio de Janeiro Subway Projects under Construction • Line 4 – Rio de Janeiro Subway • Line 5 – Sao Paulo Subway • Maravilha Harbor – Rio de Janeiro – 1600 m of three ways Tunnels • Harbor LLX projects – 1400 m of tunnels Expansão de General Osório Line 4 – Rio de Janeiro Subway LINHA 1 Station Jardim de Alah Station Station São Gávea / PUC Conrado Station Station Antero de Quental Nossa Sra da Paz Station J. Oceânico TRECHO OESTE TRECHO SUL Em obras Fase de Projeto Line 4 – Rio de Janeiro Subway Line 4 – Rio de Janeiro Subway Line 4 – Rio de Janeiro Subway Line 4 – Rio de Janeiro Subway Expansão de General Osório Line 4 – Rio de Janeiro SubwayLINHA 1 Station Jardim de Alah Station Station São Gávea / PUC Conrado Station Station Antero de Quental Nossa Sra da Paz Station J. Oceânico TRECHO OESTE TRECHO SUL Em obras Fase de Projeto TRECHO SUL Line 4 – Rio de Janeiro Subway Gávea EXPANSÃO GENERAL OSÓRIO Station LINHA 1 Gávea / PUC Leblon Ipanema Station Station Station Antero de Quental Jardim de Alah Nossa Sra da Paz •Project extension: 5.5 km •Conceptual Study/Project : FGV •Number of Stations: 4 •Basic project: Consórcio Novo Rio •Excavation Method: TBM LinaLine 4 4 – Rio de Janeiro Subway Traçado Vertical GEOLOGY STUDY COBERTURA NOSSA ANTERO DE GENERAL BÁSICA: 10 A 11m JARDIM SENHORA GÁVEA QUENTAL OSÓRIO DE ALAH DA PAZ Lina 4 TBM – Tunnel Boring Machine Lina 4 TBM – Tunnel Boring Machine Montagem TBM – General Expansion Osório TBM 9000 Lina 4 TBM – Tunnel Boring Machine Montagem TBM – Operational structure Central de Central de Ar Comprimido Tratamento de Água TBM Almoxarifado Oficina Estoque de Aduelas Central de Grout Descarte de Material transportado por Correia Transportadora Projects under Construction • Line 4 – Rio de Janeiro Subway • Line 5 – Sao Paulo Subway • Maravilha Harbor – Rio de Janeiro – 1600 m of three ways Tunnels • Harbor LLX projects – 1400 m of tunnels Projects under Construction • Line 4 – Rio de Janeiro Subway • Line 5 – Sao Paulo Subway • Maravilha Harbor – Rio de Janeiro – 1600 m of three ways Tunnels • Harbor LLX projects – 1400 m of tunnels Projects under Construction • Line 5 – Sao Paulo Subway Multi shaft Station Adolfo Pinheiro Station Station Linha 5 Conventional Tunnel (NATM) Túnel de via e poço Rebaixo Revestimento 1ª fase 2 x EPBS- f 6,9 m EPBS- f 10,5 m Fotos cedidas pela Odebrecht EPBS- f 10,5 m Fotos de 01/07/2013 cedidas pela Odebrecht Station Moema - Perspectiva Station Moema Brooklin Lina 4 Lina 4 Lina 4 Station Chacara Klabin Lina 4 Station Hospital São Paulo Station Santa Cruz Lina 4 Projects under Construction • Line 4 – Rio de Janeiro Subway • Line 5 – Sao Paulo Subway • Maravilha Harbor – Rio de Janeiro – 1600 m of three ways Tunnels • Harbor LLX projects – 1400 m of tunnels Projects under Construction • Porto Maravilha – Rio de Janeiro: Sistema de Túneis Urbanos, parte de um projeto de urbanização da Prefeitura Projects under Construction • Porto Maravilha – Rio de Janeiro: Sistema de Túneis Urbanos, parte de um projeto de urbanização da Prefeitura Projects under Construction • Linha 4 – Metrô Rio de Janeiro • Linha 5 – Metrô de São Paulo • Porto Maravilha – Rio de Janeiro – total 1600 m de túnel via tripla • Projeto porto LLX – 1400 m de túneis Projects under Construction • Porto LLX – Projects under Construction • Porto LLX – Future projects Length Project (km) TAV – High Speed Rail Rio-Sao Paulo > 100 Future Projects • High Speed Rail System The proposed alignment includes 91 km of tunnels (47 km in urban areas), in a investment estimated for about US$6.3 billion (tunnels only) Future projects Length Project (km) Underground urban railway 8 Metro Line 4 Extension 1,5 Metro Line 6 35,1 Metro Line 15 11,5 Roberto Marinho Urban highway 4,5 Ring Road North Section 10 Metrô – São Paulo – Line 6 Geological Section- Line 6 23% TBM VCA/ Poços 73% NATM 4% Brasilândia Station Station Brasilândia Brasilândia Station Station PUC-Cardoso de Almeida PUC-Cardoso de Almeida Station PUC-Cardoso de Almeida Station Metrô – São Paulo – Line 15 Metrô – São Paulo – Line 2 Métodos Construtivos Lina 4 Future projects Length Project (km) Metro East Line 10,5 East Line- Fortaleza East Line- Fortaleza Geological section 4 TBM EPB Vista Geral das Estações com túneis em nível General view of the station with level tunnels Estações com túneis em nível Vista Geral das Estações com túneis sobrepostos Schematic representation on a satellite photo Future projects Length Project (km) Highway tunnels 4.7 Railway tunnels 35 Metro Curitiba Line 2 20.2 METRO DE CURITIBA Linha Azul Norte – sul Extensão da linha – 14,2 km Elevados - 2,2 Km Subterrâneo - 12,0 Km Estações - 13 Unds METRO DE CURITIBA Linha Norte – sul METRO DE CURITIBA Linha Azul Norte – sul METRO DE CURITIBA Escavação em Cut and Cover METRO DE CURITIBA Escavação em Túnel – 5km METRO DE CURITIBA Escavação das Estações METRO DE CURITIBA Escavação das Estações TUNNELS FOR BETTER LIVE See you in Foz do Iguaçu!!!! .
Recommended publications
  • Delegate Pack
    Dear Delegate, Thank you for participating in the Fourth Global Studies Conference! We are pleased you will be joining in Rio De Janeiro, Brazil and hope you are looking forward to coming together with colleagues and members of the Climate Change Impacts and Responses community from 18 to 20 this July. In preparation for the conference, we have put together some information that we hope will be helpful as you begin to prepare for the conference and your arrival in Rio De Janeiro. In this document, you will find information such as city maps, conference venue maps, transportation information, accommodation information, conference registration information, presentation information, and paper and journal information. This packet is a starting point for your preparations, and we realize you may have some additional questions after reviewing the presented material. For any questions, please do not hesitate to contact the conference secretariat at [email protected]. We hope your planning goes well, and we look forward to meeting you in Rio De Janeiro! Best Regards, Izabel Szary & Abigail Manekin Conference Producers I. Letter from Secretariat II. Transportation Driving Directions Taxi Bus Subway III. Conference Information Venue Information JW Marriot Registration Information Accommodation Information JW Marriot Presentation Information Online Presentations Equipment Program Paper and Journal Information Submitting Your Paper Submission Deadline and Further Information Activities and Extras Transportion Driving Directions –from Rio de Janeiro-Galeão International Airport (GIG) to JW Marriott 9.3 miles - Take Linha Vermelha and follow the signs to Centro/ Copacabana, Perimetral. Then take Aterro do Flamengo, Praia de Botafogo, cross Tunnel do Pasmado and Tunnel Novo.
    [Show full text]
  • Best Practice in National Support for Urban Transportation Part 2: Growing Rapid Transit Infrastructure — Funding, Financing, and Capacity
    São Paulo, Brazil. Image: Ana Paula Hirama Best Practice in National Support for Urban Transportation Part 2: Growing Rapid Transit Infrastructure — Funding, Financing, and Capacity Lead Authors: Walter Hook & Colin Hughes Contributing Authors: Yoga Adiwinarto, Xiaomei Duan, Javier Garduno, Aimee Gauthier, Justin John, Chris Kost, Sofia Martin-Puerta, Jacob Mason, Luc Nadal, Ana Nassar, Jamie Osborne, Carlos Felipe Pardo, Pedro Torres, Xianyuan Zhu 2 | Best Practice in National Support for Urban Transportation Contents Executive Summary 5 Funding Rapid Transit 6 Debt Financing for Rapid Transit 9 Institutional Capacity for Rapid Transit 9 1. Introduction 11 1.1. The Urban Transport Project Funding and Financing Database 11 1.2. Funding versus Financing 13 2. Urban Transit Funding and Cost of Infrastructure 14 2.1. Funding and Cost of Infrastructure: Key Determinants of RTR Growth 15 2.2. The Institutional Source of Funding for Rapid Transit Infrastructure 17 2.3. The Reliability of Funding 22 2.4. Summary of Findings on Funding for Urban Transport 24s 3. Financing Urban Transit 26 3.1. Responsible Borrowing and Credit Worthiness 26 3.2. Comparative Average Levels of Debt Finance 28 3.3. Sources of Debt Financing by Country 30 3.3.1. Bond Finance–Dominated Countries: France and the United States 31 3.3.2. National Development Bank–Led Financing: Brazil 32 3.3.3. Multilateral Development Banks and Commercial Credit: Colombia 33 3.3.4. Commercial Credit–Dominated Financing: China, Mexico, and India 35 3.3.5. Bilateral and Export Credit Lending: Indonesia 37 3.4. Summary of Conclusions Regarding Financing of Rapid Transit 4.
    [Show full text]
  • Alstom in Brazil 2017
    ALSTOM IN BRAZIL 2017 Present in Brazil for more than 60 years, Alstom has been participating in the You have the possibility to Please respect the size of development of the country’s infrastructure, contributing to integrate a map, a picture, a the font per block: the social progress and . Alstom 14 for the context respecting the environment. scheme… Dedicated to the rail . Alstom 12 for key figures transport sector, its contribution is attested with . Alstom 12 for the text, 11 products and services in the mainly passenger operators, for second level such as São Paulo Metro, Rio de Janeiro Metro and Tramway, Brasília Metro and it has been implementing technological solutions for freight transport operators such as Vale. For more than 10 times Alstom Alstom is the first rail signalling manufacturer in Brazil. As the result of a Brazil has been awarded by great need for urban mobility and new private projects being bid in the Railway Magazine including as Best Manufacturer of passenger country, Alstom shows a strong resumption for the railway sector: To illustrate the activities, cars and Best Technology Creator. Main references – National you can add pictograms. All KEY FIGURES . Passenger Transportation the pictograms are available . CMSP (São Paulo Metro): for Lines 1, 2 and 3 supply of 66 Automatic on Partners (Graphic Chart You can put the figures in KEY FIGURES Train Control (ATCs) and Communication-based Train Control (CBTC) bigger and in colour to be More than 1,500 employees Driverless System. For Line 5, supply of the main ventilation system for 2015 – PowerPoint the stations and tunnels of the new stretch.
    [Show full text]
  • Brazil Passenger Rail Technologies REVERSE TRADE MISSION
    Brazil Passenger Rail Technologies REVERSE TRADE MISSION BUSINESS BRIEFING Monday, August 13, 2018 • 9:00 AM–4:30 PM Grand Hyatt Hotel • San Francisco, CA CONNECT WITH USTDA AGENDA U.S. TRADE AND DEVELOPMENT AGENCY Business Briefing to U.S. Industry “Brazil Passenger Rail Technologies Reverse Trade Mission” Monday, August 13, 2018 9:00 - 9:30 a.m. Registration 9:25 - 9:30 a.m. Administrative Remarks – KEA 9:30 - 9:40 a.m. Welcome and USTDA Overview by Ms. Gabrielle Mandel, Country Manager for the Latin American and the Caribbean Region and Mr. Rodrigo Mota, Representative in Brazil - U.S. Trade and Development Agency (USTDA) 9:40 - 9:55 a.m. Presentation by Mr. Fortes Flores - President Director of ANPTrilhos and President Director of Metro Rio 9:55 - 10:10 a.m. Presentation by Ms. Adriana Mendes - ANATEL 10:10 - 10:25 a.m. Presentation by Mr. Fabio Uccelli - CBTU 10:25 - 10:40 a.m. Presentation by Ms. Sonia Antunes - Supervia 10:40 - 10:55 a.m. Presentation by Mr. David Levenfus - TRENSURB 10:55 - 11:10 a.m. Networking Break 11:10 - 11:25 a.m. Presentation by Mr. Felipe Copche - CMSP 11:25 - 11:40 a.m. Presentation by Mr. Jose Bissacot - CPTM 11:40 - 11:55 a.m. Presentation by Mr. Leonardo Balbino - Metro Bahia 11:55 - 12:10 p.m. Presentation by Mr. Joao Menesacal - Metrofor 12:10 - 12:25 p.m. Presentation by Mr. Eduardo Copello - CTB 12:25 - 12:40 p.m. Presentation by Mr. Carlos Cunha - Metro - DF 12:40 - 12:55 p.m.
    [Show full text]
  • Participation in Brazilian Passenger Railway Operation Project Through Concession and PPP Kazuhiko Ono, Takefumi Uchida
    Globalization of Japanese Railway Business Participation in Brazilian Passenger Railway Operation Project through Concession and PPP Kazuhiko Ono, Takefumi Uchida Participation in Brazilian Passenger responsible for development of urban traffic infrastructure Railway Operation Projects have not introduced fundamental measures taking into account the medium to long-term increase in public transport A newspaper article published during the soccer World Cup users. They have gone no further than development is still fresh in my memory—it reported that the line of cars centering on bus networks to improve the current situation, rushing home to watch the Brazil–Mexico game on television which in turn has worsened road congestion. One of the in São Paulo, Brazil’s largest city, reached an all-time record reasons for the grass-roots demonstrations in Brazil in 2013 length of 300 km. There are other statistics showing that a was dissatisfaction with public transport facilities that had normal 30-minute commute by car anywhere else takes an seen no development or improvement at all. This was the average of 50 minutes in São Paulo and 56 minutes in Rio trigger forcing the government to position development de Janeiro during the peak traffic rush hour. The economic of urban traffic infrastructure as a top priority, announcing losses from this are serious. financial support for such development in each state. Brazil’s middle class has been expanding with the Consequently, moves to develop infrastructure in each city economic growth in the 2000s backed up by rising prices have gained momentum. of natural and food resources, leading to a rapid increase in Public-private partnership (PPP) using private-sector automobile ownership (Fig.
    [Show full text]
  • Transportation Sector Resource Guide
    The U.S. Trade and Development Agency The U.S. Trade and Development Agency helps companies create U.S. jobs through the export of U.S. goods and services for priority development projects in emerging economies. USTDA links U.S. businesses to export opportunities by funding project planning activities, pilot projects and reverse trade missions while creating sustainable infrastructure and economic growth in partner countries. USTDA promotes economic growth in emerging economies by facilitating the participation of U.S. businesses in the planning and execution of priority development projects in host countries. The Agency’s objectives are to help build the infrastructure for trade, match U.S. technological expertise with overseas development needs, and help create lasting business partnerships between the United States and emerging economies. This guide was funded by the U.S. Trade and Development Agency (USTDA), an agency of the U.S. Government. The opinions, findings, conclusions, or recommendations expressed in this document are those of the author(s) and do not necessarily represent the official position or policies of USTDA. USTDA makes no representation about, nor does it accept responsibility for, the accuracy or completeness of the information contained in this guide. May 2016 Brazil’s Priority Transportation Projects 3 TABLE OF CONTENTS 1. INTRODUCTION ............................................................................................ 8 1.1 Brazil Market Challenges and Entry Strategies ............................................................................
    [Show full text]
  • A Review of Recent Developments in Bus Rapid Transit System
    MRR No. 327 A Review of Recent Developments in Bus Rapid Transit System Afiqah Omar Fauziana Lamin Kak D Wing Ahmad Noor Syukri Zainal Abidin Mohd Rasid Osman Khairil Anwar Abu Kassim A Review of Recent Developments in Bus Rapid Transit System Afiqah Omar Fauziana Lamin Kak D Wing Ahmad Noor Syukri Zainal Abidin Mohd Rasid Osman Khairil Anwar Abu Kassim _______________________________________________________________________________________ ©MIROS, 2020. All Rights Reserved. Published by: Malaysian Institute of Road Safety Research (MIROS) Lot 125-135, Jalan TKS 1, Taman Kajang Sentral, 43000 Kajang, Selangor Darul Ehsan, Malaysia. Perpustakaan Negara Malaysia Cataloguing-in-Publication Data Afiqah Omar A Review of Recent Development in Bus Rapid Transit System / Afiqah Omar, Fauziana Lamin, Kak D Wing, Ahmad Noor Syukri Zainal Abidin, Mohd Rasid Osman, Khairil Anwar Abu Kassim. (Research Report ; MRR No. 327) ISBN 978-967-2078-74-6 1. Bus rapid transit--Research--Malaysia. 2. Urban transportation--Research--Malaysia. 3. Government publications--Malaysia I. Fauziana Lamin. II. Kak D Wing. III. Ahmad Noor Syukri Zainal Abidin. IV. Mohd Rasid Osman. V. Khairil Anwar Abu Kassim. VI. Title. VII. Series. 388.413220720595 Printed by: Malaysian Institute of Road Safety Research (MIROS) Typeface: Calibri Size: 11 pt. DISCLAIMER None of the materials provided in this report may be used, reproduced or transmitted, in any form or by any means, electronic or mechanical, including recording or the use of any information storage and retrieval system, without written permission from MIROS. Any conclusion and opinions in this report may be subject to reevaluation in the event of any forthcoming additional information or investigations.
    [Show full text]
  • The Impact of Bus Rapid Transit System on Land Prices in Mexico City
    The Impact of Bus Rapid Transit System on Land Prices in Mexico City Durfari Janive Velandia Naranjo © 2013 Lincoln Institute of Land Policy Lincoln Institute of Land Policy Working Paper The findings and conclusions of this Working Paper reflect the views of the author(s) and have not been subject to a detailed review by the staff of the Lincoln Institute of Land Policy. Contact the Lincoln Institute with questions or requests for permission to reprint this paper. [email protected] Lincoln Institute Product Code: WP13DV1 Abstract This paper estimates the effect of the Bus Rapid Transit (BRT) system of Mexico City on residential land prices in the formal real estate market. Specifically, we estimate the effects of Line 1 (on Insurgentes Ave.) and Line 2 (on Axis 4 South) of the Metrobus, which is the name of the BRT in the Mexico City. A quasi-experimental approach is used, with the roadways mentioned as the treatment group and a control group compring the southern section of Insurgentes Avenue (where the Metrobus was not initiallty built) and Axis 6 South (which is a road that runs parallel to Line 2). The strategy used to ensure that the treatment group can be compared with the control group, and to isolate possible effects of ongoing infrastructure works, was to estimate the effects by area on different sections of the BRT. The main findings are that the north and south end segments of Insurgentes Avenue are comparable and allow for an unbiased estimation. Line 1 produced an increase of approximately 15 percent in land prices, while the estimates for Line 2 showed no evidence that land prices were affected by the BRT infrastructure investment.
    [Show full text]
  • Sustainability Management Plan: Rio 2016™ Olympic and Paralympic Games
    Sustainability Management Plan: Rio 2016™ Olympic and Paralympic Games March 2013 - version 1 Sustainability Management Plan: Rio 2016™ Olympic and Paralympic Games 1 Introduction....................................................................... 4 2 Vision, mission, values and principles ......................... 6 3 Organising the Games ..................................................... 8 4 Scope .............................................................................. 10 4.1 Scope of the Sustainability Management Plan ....................................................... 10 4.2 Scope of this document ........................................14 5 Planet: reduced environmental footprint .................. 17 5.1 Transport and logistics ..........................................19 5.2 Sustainable construction and urban improvements ................................................. 28 5.3 Environmental conservation and clean-up ..... 39 5.4 Waste management ..............................................51 6 People: Games for everybody ...................................... 58 6.1 Involvement and raising awareness ..................60 6.2 Universal accessibility .........................................64 6.3 Diversity and inclusion ........................................ 70 7 Prosperity: responsibility and transparency ............. 74 7.1 Sustainable supply chain .......................................75 7.2 Management and transparency ......................... 79 8 Final considerations ......................................................
    [Show full text]
  • Bus Rapid Transit Case Studies from Around the World
    SOCIAL, ENVIRONMENTAL AND ECONOMIC IMPACTS OF BRT SYSTEMS Bus Rapid Transit Case Studies from Around the World A program of the www.embarq.org Report by: Aileen Carrigan, Senior Associate Robin King, Director of Urban Development and Accessibility Juan Miguel Velasquez, Associate Transport Planner Matthew Raifman, Policy Expert Nicolae Duduta, Associate Transport Planner Design and layout by: Nick Price and Alizah Epstein, Graphic Designer [email protected] Social, Environmental and Economic Impacts of BRT Systems 1 CONTENTS EXECUTIVE SUMMARY 3 INTRODUCTION 19 OVERVIEW OF BUS RAPID TRANSIT 23 BRT IMPACTS ON CITIES 33 EMBARQ'S BRT IMPACT 45 EVALUATION APPROACH CASE STUDY: BOGOTA, COLOMBIA'S 49 TRANSMILENIO PHASES 1 AND 2 CASE STUDY: MEXICO CITY, MEXICO'S 59 METROBÚS LINE 3 CASE STUDY: JOHANNESBURG, 67 SOUTH AFRICA'S REA VAYA PHASE 1A CASE STUDY: ISTANBUL, TURKEY'S 77 METROBÜS FUTURE OUTLOOK FOR BRT 87 CONCLUSIONS AND RECOMMENDATIONS 97 REFERENCES 101 APPENDIX 108 2 About EMBARQ ACKNOWLEDGMENTS This report was funded by HSBC. Additional funding EMBARQ catalyzes and helps implement environmentally, support was provided by Bloomberg Philanthropies. socially and financially sustainable urban mobility and Data and analysis for the Bogota case study were urban planning solutions to improve people’s quality based upon an ex-post evaluation of TransMilenio of life in cities. Founded in 2002 as a program of the prepared previously by EMBARQ’s Dario Hidalgo for World Resources Institute (WRI), EMBARQ operates Colombia’s National Planning Department, which also through a global network of centers in Brazil, China, drew upon analysis/modeling completed by Steer India, Mexico, Turkey and the Andean region.
    [Show full text]
  • Rio 2016 Olympics: E Exclusion Games
    Mega-Events and Human Rights Violations in Rio de Janeiro Dossier World Cup and Olympics Popular Committee of Rio de Janeiro | november 2015 Rio 2016 Olympics: e Exclusion Games LIST OF MAPS, FIGURES AND TABLES Housing Map 1.1. Location of Minha Casa, Minha Vida developments by size of development and type of occupation – Rio de Janeiro, 2012 | 18 Mega-Events and Human Rights Violations Table 1.1. Summary of the Number of Families Removed or under !reat of Removal by Community in the City of Rio de Janeiro, in 2015 | 36 in Rio de Janeiro Dossier Table 1.2. Property value increase according to the FIPE ZAP Index of O"ered Real Estate Prices – August 2015 | 40 World Cup and Olympics Popular Committee Mobility of Rio de Janeiro | november 2015 Table 2.1. Main ongoing collective transportation projects in Rio de Janeiro | 44 Sports Figure 4.1. Original zoning of the APA of Marapendi | 86 Figure 4.2. Golf Course, land reserved for operational activities of the Olympic events, and unassigned protection areas of Marapendi Park | 89 Public Safety Table of people killed and wounded at Complexo do Alemão as reported by the local Pacifying Police Unit (UPP) | 113 Information and Budget Graph 9.1. Total Budget for the Olympics according to the Finality of expenses (in thousands of millions), August 2015 | 140 Table 9.1. Investments of the Public Policies Plan, Olympic Project – Rio de Janeiro, 2015 | 142 Table 9.2. Responsibility Matrix of the Rio de Janeiro Olympics, August 2015 | 144 Table of resource shares, according to the Government, September 2015 | 145 Table of resource shares, according to the Popular Committee, September 2015 | 145 Table 9.3.
    [Show full text]
  • Creditor's Protection and Bank Loans: Market Power and Bankruptcy Reform's Effects
    Creditor's Protection and Bank Loans: market power and bankruptcy reform's effects Supplementary Material Leonardo S. Alencar, Rodrigo Augusto Silva de Andrade, Klenio de Souza Barbosa April 2020 521 The Degree of Competition in Bank Loans and Bankruptcy Reforms: a two-stage strategy Leonardo S. Alencar* Rodrigo Augusto Silva de Andrade** Klenio de Souza Barbosa Abstract This is the supplementary material for “Creditor’s Protection and Bank Loans: Market Power and Bankruptcy Reform’s Effects.” It contains additional tables and figures that are necessary to fully document the research contained in the paper and to facilitate the readers’ ability to understand the work. Keywords: Bank Competition, Creditor’s Protection Reforms, Interest Rate of Loans. JEL Classification: G21, G33, L11. The Working Papers should not be reported as representing the views of the Banco Central do Brasil. The views expressed in the papers are those of the author(s) and do not necessarily reflect those of the Banco Central do Brasil. * Research Department, Banco Central do Brasil. E-mail: [email protected] ** Financial System Monitoring Department, Banco Central do Brasil. E-mail: [email protected] (Corresponding author) SKEMA Business School- Université Côte d'Azur. E-mail: [email protected] 1 “The Degree of Competition in Bank Loans and Bankruptcy Reforms: A Two-Stage Strategy” S1 Introduction This supplementary material presents the estimation of the effect of market power level in Brazil- ian bank credit market on hampering the reducing effects of the new Brazilian bankruptcy legal statement. Instead of industry concentration indexes, we use a modification of the H-Statistics proposed by Panzar and Rosse (1987).
    [Show full text]