Precinct 7: Prospect Recreation

Total Page:16

File Type:pdf, Size:1020Kb

Precinct 7: Prospect Recreation PRECINCT 7: PROSPECT RECREATION The Prospect Recreation Desired Future Character Key Management Priorities Precinct (148 hectares) is To be a major destination for a distinct recreation and tourism, structured and unstructured Environmental Protection tourism destination shaped recreation. To protect critical and Land Stewardship WaterNSW and Sydney Water supply — Work with Sydney Water and by the Prospect Reservoir infrastructure and their cultural WaterNSW to improve biodiversity catchment area and the heritage values. quality and links to the Prospect M4 Motorway. It contains Nature Reserve Objectives — Explore and interpret the area’s PROSPECT RECREATION PROSPECT Wet’n’Wild Water Theme — Protect the integrity of Prospect Aboriginal and non-Aboriginal Park, the state heritage Reservoir, its infrastructure and cultural heritage significant setting of the cultural heritage values Prospect Reservoir, the — Create a major destination precinct Creating Recreational and Atura Hotel, the state for recreation, leisure and tourism Community Facilities — Retain and enhance the walking and — Expand the existing network of heritage significant Royal cycling track network, including the walking and cycling tracks and link Cricketers Arms Hotel, Prospect Cycling Track to the Prospect Cycleway Blacktown Drive-In, popular — Create lookout opportunities to Land Use Opportunities maximise views across the reservoir picnic grounds, Peckys — Unstructured recreation and water body Disability Services, an associated facilities — Build a major new regional recreation all-access playground and — Sport, structured recreation and and tourism destination in a scenic areas of rural landscape. associated facilities landscape setting — Tourism and associated uses — Walking and cycling tracks Community Participation PARKLANDS’ PRECINCTS 7: — PRECINCT PARKLANDS’ — Environmental protection works and and Engagement environmental facilities — Deliver a strong and cohesive — Information, interpretation and precinct image along the M4 and education facilities Reservoir Road — Community facilities — Design a tourism precinct with — Aboriginal and non-Aboriginal programs and events to attract a cultural and heritage interpretation wide variety of future users and — Water supply system and age groups utilities infrastructure Financial Sustainability and Economic Development — Create a vibrant destination precinct for recreation, tourism and complementary uses, which will generate local employment and economic development in Western Sydney via partnerships with private industry, Sydney Water and WaterNSW PLAN OF MANAGEMENT 2030 PLAN OF MANAGEMENT 62 HUNTINGWOOD N Western Motorway M4 Blacktown Creek Tourism Hub Reservoir Road Prospect Wet 'n' Wild Reservoir Prospect RECREATION PROSPECT Nature Reserve Peckys Disability Services TourismTourism Hub Hub PARKLANDS’ PRECINCTS 7: — PRECINCT PARKLANDS’ Walder Park Prospect Creek PROSPECT RECREATION PRECINCT 7 Precinct Boundary Bushland Corridor PLAN OF MANAGEMENT 2030 PLAN OF MANAGEMENT Environmental Conservation Area 63 Heritage Item Parklands Tracks WETHERILL PARK Waterway Gas Infrastructure Electricity Infrastructure LGA Boundary.
Recommended publications
  • Professionals Australia's Response on Behalf of Members in Relation to The
    Professionals Australia’s response on behalf of members in relation to the proposed restructure PA met with engineers who work in the Engineering Division on two occasions at WNSW Parramatta offices with members dialling-in from regional NSW. PA encouraged members to put forward their professional views on the proposed restructure on whether it addressed existing problems. PA has received some very detailed responses from our members. It is clear there is a high level of concern that the restructure will have undesired impacts on both employees and the functions of Engineering. Many members have taken the opportunity to respond directly to the WNSW email address set up for feedback. This submission does not repeat those comments. This submission is concerned with the first order issue – Does the restructure enhance the undertaking of engineering functions by WaterNSW or not? The next level of concerns which appear to be the main focus of the input provided via the WNSW email are the detail of position descriptions and the arrangements for filling the structure. We understand such matters have also attracted a large number of comments and concerns from members. However, those issues arise only when the first order issue is satisfied. The focus of this submission is whether the restructure has accurately identified the deficiencies and whether the proposal will address those deficiencies. What can a restructure address? A restructure can address issues such as resourcing levels, specific function focus and functional alignment. It cannot address issues caused by dysfunctional organisational behaviour, lack of effective processes, etc. Does the restructure enhance engineering functions at WNSW? The view of WNSW engineers is that overall the restructure will not result in the enhanced performance of the engineering functions required by WNSW.
    [Show full text]
  • Sydney Water in 1788 Was the Little Stream That Wound Its Way from Near a Day Tour of the Water Supply Hyde Park Through the Centre of the Town Into Sydney Cove
    In the beginning Sydney’s first water supply from the time of its settlement Sydney Water in 1788 was the little stream that wound its way from near A day tour of the water supply Hyde Park through the centre of the town into Sydney Cove. It became known as the Tank Stream. By 1811 it dams south of Sydney was hardly fit for drinking. Water was then drawn from wells or carted from a creek running into Rushcutter’s Bay. The Tank Stream was still the main water supply until 1826. In this whole-day tour by car you will see the major dams, canals and pipelines that provide water to Sydney. Some of these works still in use were built around 1880. The round trip tour from Sydney is around 350 km., all on good roads and motorway. The tour is through attractive countryside south Engines at Botany Pumping Station (demolished) of Sydney, and there are good picnic areas and playgrounds at the dam sites. source of supply. In 1854 work started on the Botany Swamps Scheme, which began to deliver water in 1858. The Scheme included a series of dams feeding a pumping station near the present Sydney Airport. A few fragments of the pumping station building remain and can be seen Tank stream in 1840, from a water-colour by beside General Holmes Drive. Water was pumped to two J. Skinner Prout reservoirs, at Crown Street (still in use) and Paddington (not in use though its remains still exist). The ponds known as Lachlan Swamp (now Centennial Park) only 3 km.
    [Show full text]
  • BANDING PROJECT REPORT No.5 Prospect Nature Reserve, New
    Corella, 2017, 41: 48-52 BANDING PROJECT REPORT No.5 Prospect Nature Reserve, New South Wales (Abridged version – complete paper can be accessed at www.absa.asn.au) Aim: Avian research at Prospect Nature Reserve has been Protection and Biodiversity Conservation Act 1999 (EPBC Act). conducted as part of an ongoing longitudinal study to document Within Prospect Nature Reserve, both Shale Plains Woodland and monitor the avian faunas occupying remnant areas of and Shale Hills Woodland elements of the Cumberland Plain Cumberland Plain Woodland in the north-western sector of the Woodland are present (Tozer 2003). Cumberland Plain. Other study sites include: Scheyville National Park (Egan et al. 1997), Agnes Banks Nature Reserve (Farrell Approximately two-thirds of the reserve has been mapped et al. 2012), Nurragingy Reserve (Farrell et al. 2015), Windsor as Shale Hills Woodland, with a canopy comprising Grey Box Downs Nature Reserve and Wianamatta Nature Reserve. Eucalyptus moluccana, Forest Red Gum E. tereticornis and Narrow-leaved Ironbark E. crebra, and a shrubby understorey Location: 33° 48′ S; 150° 54′ E. Elevation 61 metres above sea dominated by Blackthorn Bursaria spinosa. The remainder level. The reserve is located at Prospect, approximately five of the reserve is Shale Plains Woodland, with E. moluccana, kilometres south of Blacktown. E. tereticornis, Spotted Gum Corymbia maculata and Thin- leaved Stringybark E. eugenioides representing the dominant Description: Prospect Nature Reserve (Fig. 1) borders Prospect canopy species, and an understorey similar to that of Shale Hills Reservoir and comprises an area of 325.3 hectares. Woodland. The study site (Fig. 1) contains both Shale Hills and Shale Plains Woodlands.
    [Show full text]
  • Submission on the Environmental Impact of Badgerys Creek Airport
    Submission on the environmental impact of Badgerys Creek airport. Dr Anthony Green, Visiting Principal Research Fellow, Microsimulation Risk Group, University of Wollongong 17/12/15 1 EXECUTIVE SUMMARY The Federal and New South Wales State Government have released a preliminary Environmental Impact Statement (EIS) on the operation of a new double runway class 1 airport by 2060. This follows a report in 2012 on the joint Study on Aviation Capacity in the Sydney Region and publication of preliminary plans for the new airport operation in 2014 together with the preliminary EIS for the proposed Airport. This reports concentrates on the decision that an airport is actually needed within the Sydney Basin and the risks associated with siting this airport at Badgerys Creek which have not been adequately assessed within those documents. The forecasts on aircraft flights were based on unrestrained projections. There is no interaction considered with other systems that would limit these forecasts. As a result all passenger numbers, aircraft movements and employment figures are over stated. Furthermore the loss to the economy from not building Badgerys Creek airport are not as great as stated and the cost benefit in building the airport is questionable. The unreliability of forecasts is demonstrated in the forecast for 2014 from 2010 which is 10% higher than the number of aircraft movements that actually occurred in 2014. KSA already has an additional 10% capacity compared to the forecasts. The document also demonstrates that there was no cost benefit comparison with alternative forms of transport or with integrated transport systems. Since 42% of aircraft movements in 2014, were to Brisbane, Canberra, Coolangatta or Melbourne a cost benefit comparison of benefits and risks should have been undertaken involving integrated transport.
    [Show full text]
  • Sydney Green Grid District
    DISTRICT SYDNEY GREEN GRID SPATIAL FRAMEWORK AND PROJECT OPPORTUNITIES 29 TYRRELLSTUDIO PREFACE Open space is one of Sydney’s greatest assets. Our national parks, harbour, beaches, coastal walks, waterfront promenades, rivers, playgrounds and reserves are integral to the character and life of the city. In this report the hydrological, recreational and ecological fragments of the city are mapped and then pulled together into a proposition for a cohesive green infrastructure network for greater Sydney. This report builds on investigations undertaken by the Office of the Government Architect for the Department of Planning and Environment in the development of District Plans. It interrogates the vision and objectives of the Sydney Green Grid and uses a combination of GIS data mapping and consultation to develop an overview of the green infrastructure needs and character of each district. FINAL REPORT 23.03.17 Each district is analysed for its spatial qualities, open space, PREPARED BY waterways, its context and key natural features. This data informs a series of strategic opportunities for building the Sydney Green Grid within each district. Green Grid project opportunities have TYRRELLSTUDIO been identified and preliminary prioritisation has been informed by a comprehensive consultation process with stakeholders, including ABN. 97167623216 landowners and state and local government agencies. MARK TYRRELL M. 0410 928 926 This report is one step in an ongoing process. It provides preliminary E. [email protected] prioritisation of Green Grid opportunities in terms of their strategic W. WWW.TYRRELLSTUDIO.COM potential as catalysts for the establishment of a new interconnected high performance green infrastructure network which will support healthy PREPARED FOR urban growth.
    [Show full text]
  • Impacts of Longwall Coal Mining on the Environment in New South Wales
    IMPACTS OF LONGWALL COAL MINING ON THE ENVIRONMENT IN NEW SOUTH WALES Total Environment Centre PO Box A176 www.tec.org.au Sydney South 1235 Ph: 02 9261 3437 January 2007 Fax: 02 9261 3990 Email: [email protected] CONTENTS 01 OVERVIEW 3 02 BACKGROUND 5 2.1 Definition 5 2.2 The Longwall Mining Industry in New South Wales 6 2.3 Longwall Mines & Production in New South Wales 2.4 Policy Framework for Longwall Mining 6 2.5 Longwall Mining as a Key Threatening Process 7 03 DAMAGE OCCURRING AS A RESULT OF LONGWALL MINING 9 3.1 Damage to the Environment 9 3.2 Southern Coalfield Impacts 11 3.3 Western Coalfield Impacts 13 3.4 Hunter Coalfield Impacts 15 3.5 Newcastle Coalfield Impacts 15 04 LONGWALL MINING IN WATER CATCHMENTS 17 05 OTHER EMERGING THREATS 19 5.1 Longwall Mining near National Parks 19 5.2 Longwall Mining under the Liverpool Plains 19 5.3 Longwall Top Coal Caving 20 06 REMEDIATION & MONITORING 21 6.1 Avoidance 21 6.2 Amelioration 22 6.3 Rehabilitation 22 6.4 Monitoring 23 07 KEY ISSUES AND RECOMMENDATIONS 24 7.1 The Approvals Process 24 7.2 Buffer Zones 26 7.3 Southern Coalfields Inquiry 27 08 APPENDIX – EDO ADVICE 27 EDO Drafting Instructions for Legislation on Longwall Mining 09 REFERENCES 35 We are grateful for the support of John Holt in the production of this report and for the graphic design by Steven Granger. Cover Image: The now dry riverbed of Waratah Rivulet, cracked, uplifted and drained by longwall mining in 2006.
    [Show full text]
  • 0310News.Pub (Read-Only)
    Blue Mountains World Heritage Forever! C o a l , Australia's worst environmental pollutant, and alternatives The guest speaker at our general meeting on Friday 31 October will be Dr Mark Diesendorf, Director of Sustainability Centre Pty Ltd, a Sydney- based company that does applied research, consulting, training and business facilitation on various aspects of ecologically sustainable and socially The proposed 27 million tonne sand Park is too small. If approved the quarry just development. quarry at Newnes Junction will test would be a visually intrusive, polluting, Mark is also Adjunct Professor of whether World Heritage listing has noisy, dusty blight on the wild Sustainability Policy at Murdoch strengthened environment protection in Wollangambe River Valley. University; co-editor and principal the Blue Mountains. The site is not just any bit of author of the book "Human Ecology, A previous proposal for a sand and bushland; it has two high conservation Human Economy: Ideas for an clay quarry on the site was refused in value Newnes Plateau Shrub Swamps. Ecologically Sustainable Future"; and 1996 because of ‘its degrading effect and These plant communities have been vice-president of the Australia New possible damage to the National Park nominated for listing as either an endan- Zealand Society for Ecological and the water quality of the gered or vulnerable plant community Economics. He was formerly co-founder Wollangambe River’. The national park under the Federal Government’s and president of the Australasian Wind is now World Heritage listed and the Environment Protection and Biodiversity Energy Association; and co-founder and scale of the environmental impacts Conservation Act, 1999.
    [Show full text]
  • Bulletin May 2000
    THE PADDINGTON SOCIETY • YOUR RESIDENTS’ ASSOCIATION NEWS BULLETIN Registered by Australia Post Publication No NBG 1470 • PO Box 99 PADDINGTON NSW 2021 • Tel: 9360 6159 May, 2000 PRESIDENT’S REPORT With St John’s Church Site in Oxford Street, we submitted our objections on insensitive and gross The historical nature of Paddington is under over-development of the site. We have liaised with threat as much as ever with the number of large local residents, councillors and Clover Moore developments currently taking place. I feel that MP. We have also written to the National Trust our members are perhaps unaware of just how and the Heritage Council of NSW expressing our actively involved our dedicated committee is in concerns. trying to stem inappropriate and over develop- ment of our suburb. A letter, followed by a submission of objection on another gross over development - the Scottish For several years three members of our commit- Hospital site, has been sent to Woollahra Council. tee, an historian and two architects, worked with Woollahra Council planners, urban designers, heritage consultants and councillors to put into CALLING ON MEMORIES place guidelines specifically for the preservation of Paddington. As a result the ‘Development Please help build the Paddington knowledge Control Plan’ for Paddington has now been bank. Our wonderful collection of photographs, adopted by Council. letters newspaper clippings, conservation plans, submissions are being sorted and catalogued We fully support the local community group ACE by Woollahra Council’s history librarians. on prevention of rezoning and subsequent over development of the White City site. Since April But we would like an even more comprehens- last year we have had representation at the ive history.
    [Show full text]
  • Water Storages in NSW
    PO Box R1437 NSWIC Royal Exchange NSW 1225 NEW SOUTH WALES Tel: 02 9251 8466 Fax: 02 9251 8477 IRRIGATORS’ [email protected] COUNCIL www.nswic.org.au ABN: 49 087 281 746 Submission to the Standing Committee on State Development Adequacy of Water Storages in NSW 120831 Mark Moore Policy Analyst Member Organisations: Bega Cheese Limited, Border Rivers Food & Fibre, Coleambally Irrigation Co-Op Ltd, Cotton Australia, Gwydir Valley Irrigators’ Association Inc., High Security Irrigators Inc, Hunter Valley Water Users’ Association, Lachlan Valley Water, Macquarie River Food & Fibre, Mid Coast Dairy Advancement Group, Mungindi-Menindee Advisory Council, Murray Irrigation Limited, Murray Valley Water Diverters’ Association, Murrumbidgee Groundwater Inc., Murrumbidgee Irrigation Ltd, Murrumbidgee Private Irrigators’ Inc., Murrumbidgee Valley Food and Fibre Association, Namoi Water, NSW Farmers’ Association, Ricegrowers’ Association of Australia, Richmond Wilson Combined Water Users Association, Riverina Citrus, Southern Riverina Irrigators, South Western Water Users’, West Corurgan Private Irrigation District, Western Murray Irrigation, Wine Grapes Marketing Board. Introduction NSW Irrigators’ Council (NSWIC) represents more than 12,000 irrigation farmers across NSW. These irrigators access regulated, unregulated and groundwater systems. Our members include valley water user associations, food and fibre groups, irrigation corporations and commodity groups from the rice, cotton, dairy and horticultural industries. This document represents the views of the members of NSWIC. However each member reserves the right to independent policy on issues that directly relate to their areas of operation, or expertise, or any other issues that they may deem relevant. 1 | P a g e Background NSWIC, being the peak body for irrigators in NSW, appreciates the opportunity to make a submission to this Inquiry.
    [Show full text]
  • Proposed Prospect Water Filtration Plant Upgrade
    Proposed Prospect Water Filtration Plant Reliability Upgrade Project Supporting document for application for State Significant Infrastructure April 2017 Table of Contents 1 Introduction .............................................................................................................. 1 1.1 Background ...................................................................................................................................... 1 1.2 Existing plant operation .................................................................................................................. 1 1.2.1 Source raw water ........................................................................................................................... 1 1.2.2 Water treatment plant process....................................................................................................... 1 1.3 Location ............................................................................................................................................ 2 1.4 Land tenure ...................................................................................................................................... 3 2 Description of the proposal .................................................................................... 7 2.1 Key features ..................................................................................................................................... 7 2.2 Capital investment value ................................................................................................................
    [Show full text]
  • Heritage and Conservation Register 2006-07
    1 Heritage and Conservation Register 2006-07 State Conservation Condition Comments Heritage Management Item name Register Plan (CMP) Good Fair Poor listed? prepared? Alexandra Canal Y Y No major works undertaken this financial year Allawah Reservoir (WS 0001) No major works undertaken this financial year Ashfield Reservoir (elevated) (WS 0003) Y Y No major works undertaken this financial year Balmain Reservoir (covered) (WS 0006) No major works undertaken this financial year Balmain Reservoir Valve House No major works undertaken this financial year Bankstown Reservoir (elevated) (WS 0007) Y Y No major works undertaken this financial year Bantry Bay Reservoir (WS 0008) No major works undertaken this financial year Bantry Bay Water Pumping Station (WPS 122) No major works undertaken this financial year Beattie Street Stormwater Channel No.15 No major works undertaken this financial year Beecroft Reservoir (WS 0009) No major works undertaken this financial year Bennelong Stormwater Channel No. 29 No major works undertaken this financial year Berkeley Reservoir (WS 0011) No major works undertaken this financial year Berkeley Reservoir (WS 0012) No major works undertaken this financial year Berowra Reservoir (elevated) (WS 0013) No major works undertaken this financial year Birds Gully Stormwater Channel No.10 No major works undertaken this financial year Blackwattle Bay Stormwater Channel No.17 No major works undertaken this financial year 2 Heritage and Conservation Register 2006-07 State Conservation Condition Comments
    [Show full text]
  • Prospect Reservoir & Orphan School Creek
    MAKE CYCLING A PART OF CYCLING SAFETY CYCLING OPPORTUNITIES YOUR LIFE AND TIPS Learn to ride Make cycling a part of your life and ensure our local If you are new to cycling or want to improve your skills Prospect Bike path safety Prospect Reservoir precinct open communities are better connected and nicer places to live by: why not join a cycling group? Learn to ride, beginner and Reservoir 6 am–4.30 pm November–March; A reducing traffic congestion There are many shared use paths in Fairfield and 7 am–4.30 pm April–October intermediate levels are available for adults aged 17 and ROAD AD RO ND A making the air cleaner and reducing global warming Liverpool. You can ride your bike on these paths but KLA Walder GREYSTANES over. Shorter family adventure courses are also available PAR Park A making bike paths safer by making them busier. remember to: for you and your children. Contact the Health Promotion IPPS A give way to pedestrians Service at Sydney South West Area Health Service on G Water WETHERILL D Cycling can often be quicker than driving a car or using A ride at a safe speed Supply Ride over the graceful 9828 5911 for more information. CHA Pipeline A NDOS RD PARK Hyland Road O sandstone arches of R public transport in reaching some places and when you A keep to the left Park MERRYLAND S Parkland Rd, which T RI Boothtown aqueduct. D ST O A avoid blocking the path V follows the base of WEST cycle you are also helping the environment.
    [Show full text]