Sydney Green Grid District

Total Page:16

File Type:pdf, Size:1020Kb

Sydney Green Grid District DISTRICT SYDNEY GREEN GRID SPATIAL FRAMEWORK AND PROJECT OPPORTUNITIES 29 TYRRELLSTUDIO PREFACE Open space is one of Sydney’s greatest assets. Our national parks, harbour, beaches, coastal walks, waterfront promenades, rivers, playgrounds and reserves are integral to the character and life of the city. In this report the hydrological, recreational and ecological fragments of the city are mapped and then pulled together into a proposition for a cohesive green infrastructure network for greater Sydney. This report builds on investigations undertaken by the Office of the Government Architect for the Department of Planning and Environment in the development of District Plans. It interrogates the vision and objectives of the Sydney Green Grid and uses a combination of GIS data mapping and consultation to develop an overview of the green infrastructure needs and character of each district. FINAL REPORT 23.03.17 Each district is analysed for its spatial qualities, open space, PREPARED BY waterways, its context and key natural features. This data informs a series of strategic opportunities for building the Sydney Green Grid within each district. Green Grid project opportunities have TYRRELLSTUDIO been identified and preliminary prioritisation has been informed by a comprehensive consultation process with stakeholders, including ABN. 97167623216 landowners and state and local government agencies. MARK TYRRELL M. 0410 928 926 This report is one step in an ongoing process. It provides preliminary E. [email protected] prioritisation of Green Grid opportunities in terms of their strategic W. WWW.TYRRELLSTUDIO.COM potential as catalysts for the establishment of a new interconnected high performance green infrastructure network which will support healthy PREPARED FOR urban growth. Future reports should be undertaken to assess the future DEPARTMENT OF delivery and implementation strategies of Green Grid projects. PLANNING AND ENVIRONMENT IN ASSOCIATION WITH THE OFFICE OF THE GOVERNMENT ARCHITECT 30 SPATIAL FRAMEWORK MAJOR 2 CATCHMENTS ADDITIONAL WEST PEOPLE 550,500 BY 2036 NORTH WEST HECTARES CENTRAL OPEN SPACE CENTRAL 10,296 SOUTH OF THE DISTRICT SOUTH WEST 13% IS OPEN SPACE 31 LEGEND Boundary Train Station Rail Line Motorway Roads Open Space Private Open Space Water DENSITY (Dwellings/Ha) High >60 Medium < 45 Low < 25 <0.01 SCALE 1:60,000 @ A1 0 1.5 3km Figure WC.1: West Central District Open Space and Density Map 32 TYRRELLSTUDIO WEST CENTRAL LANDSCAPE 1.1 CHARACTER THE HISTORY OF DEVELOPMENT AND THE CHARACTER OF SYDNEY HAS BEEN INFLUENCED BY TOPOGRAPHY AND THE UNDERLYING NATURAL FEATURES. THE SYDNEY GREEN GRID BUILDS UPON THE GEOMORPHOLOGY OF PLACE TO CREATE LOCALLY RESPONSIVE OPEN SPACE STRATEGIES. THESE LANDSCAPE FEATURES HAVE BEEN USED TO ESTABLISH A FRAMEWORK FOR FUTURE PROJECT AND DEVELOPMENT OPPORTUNITIES. Parramatta Park, Parramatta Blacktown Showground Sydney Olympic Park The landscape setting of the district is Sydney. The gentle topography and richer Olympic Park, Rookwood Cemetery and comprised of three major water catchments soils of the Cumberland Plain relative to the Prospect Reservoir. Prospect Reservoir is and their associated estuarine and fresh surrounding sandstone plateaus have made of major importance in the Sydney drinking water areas: the Hawkesbury Nepean; the the area suitable for a range of land uses water supply infrastructure network. Parramatta River and Sydney Harbour; the including agriculture and more recently urban In terms of heritage, the district has a long Georges River and Botany Bay catchments. expansion. Much of the area’s biodiversity is history of Aboriginal occupation manifest in now under threat, however the area retains The district is highly urbanised in the southern a large body of Aboriginal cultural heritage. many important environmental values. part, with the north consisting of extensive Evidence of European settlement and rural lands and Aboriginal and Crown land Built-up areas are interspersed with agriculture is manifest in its historic rural reserves. The urbanised part of the district industrial estates and feature extensive open properties and associated cultural plantings. forms the southern section of the district from space systems along the creek corridors, Today, the district is one of the metropolitan Sydney Olympic Park to Blacktown, and the together with native vegetation. They are area’s most culturally diverse regions. rural lands from Cattai Creek catchment to complemented by a system of parks, Marsden Park. including a number of large regional parks with well developed sport and recreation With less than 800mm of rainfall per year, infrastructure. They include the Western the Cumberland Plain is the driest part of Sydney Parklands, Parramatta Park, Sydney 33 STRATEGIC 1.2 CONTEXT The West Central District includes the Open Space Initiatives Local Government Areas of Auburn, Increased population densities associated Blacktown, Cumberland City, Parramatta with proposed urban renewal areas will and The Hills Shire. The district will place pressure on existing open space. be a significant focus for growth and Greater open space quality, quantity and infrastructure development over the next connections within these areas has the 20 years. potential to improve the quality of life for Parramatta CBD communities and residents beyond the boundaries of any proposed development. Parramatta lies at the heart of the district and forms Sydney’s second CBD. As A number of initiatives are already in set out in A Plan for Growing Sydney, place reflect the strategic objectives of opportunities for urban renewal to the Sydney Green Grid. For example the be investigated in the centre include: Parramatta Cycleway upholds the principle Parramatta CBD, Westmead Health of increasing public access to and along Precinct, Parramatta North, Rydalmere the river foreshore and providing a variety Education Precinct and Camellia. of open space, recreation opportunities and active living connections. The Duck Strategic Centres and the North West River Cycleway has the potential to Growth Centre connect the Parramatta and Georges River Blacktown, Norwest, Castle Hill, Rouse via Salt Pan Creek. Hill Marsden Park and Sydney Olympic These initiatives along with infrastructure Park will support Parramatta as secondary and development projects and providing centres. The district also includes the improved access between centres, northernmost portion of the Western forms an important starting point for the Sydney Employment Lands (WSEL). implementation of the Green Grid strategy Western Sydney Infrastructure across Sydney. Major infrastructure investment will occur With significant population growth in the district. Construction of the Sydney projected across the Sydney Metropolitan Metro Northwest is currently underway region many suburbs will undergo dramatic and will provide a corridor connecting change to the existing character or land- Castle Hill with Rouse Hill and the North use within their region. The integration West Growth Centre (NWGC). Potential of open space with future transport and extension of the Sydney Metro Northwest development projects will contribute to to Marsden Park within the NWGC and increased liveability for communities. on to WSEL and Blacktown is being investigated. The potential Parramatta Light Rail with connections to centres THE VARIOUS AND UNIQUE LANDSCAPES OF SYDNEY ARE Bankstown, Sydney Olympic Park, Castle RECOGNISED AS AN ASSET THAT CAN REINFORCE CHARACTER, Hill and Liverpool. IDENTITY AND ENVIRONMENTAL RESILIENCE. DELIVERED ALONGSIDE Urban Renewal Urban renewal and housing growth INFRASTRUCTURE AND URBAN RENEWAL AN ENHANCED NETWORK will be focused around established OF OPEN SPACE AND GREEN INFRASTRUCTURE CAN SERVE TO SHAPE and new centres and along key public transport corridors including the Sydney AND SUPPORT NEW AND EXISTING COMMUNITIES. Metro Northwest, the Western Line, the Cumberland Line, the Carlingford Line, Sydney Rapid Transit and bus T-Ways. The North West Growth Centre and Sydney Metro Northwest will afford the opportunity to ensure new developments provide new open space and integrated networks of pedestrian and cycle connections to accommodate the needs of existing and new residents. 34 THE HILLS SHIRE NORTH KELLYVILLE NORTH WEST PRIORITY GROWTH AREA ROUSE HILL MARSDEN PARK SYDNEY METRO NORTHWEST CASTLE West Central District Location Plan HILL NORWEST BLACKTOWN CITY COUNCIL BLACKTOWN MOUNT DRUITT EPPING LEGEND CITY OF PARRAMATTA COUNCIL Motorway Roads Train Station Rail Line WESTERN Strategic Centre SYDNEY EMPLOYMENT District Centre AREA WESTMEAD WENTWORTH POINT Urban Renewal Corridor GREATER Key Regional Open Space PARRAMATTA GPOP URBAN District Open Space RENEWAL AREA SYDNEY Local Open Space OLYMPIC PARK Private Open Space CUMBERLAND CITY COUNCIL Priority Precincts and WESTERN SYDNEY Priority Growth Areas PRIORITY GROWTH Sydney Metro Northwest AREA SCALE 1:60,000 @ A1 0 1.5 3km Figure WC.2: West Central District LGA Plan 35 WEST CENTRAL PROJECT OPPORTUNITY 1.3 CLUSTERS THE STRATEGIC FRAMEWORK PROVIDES AN OVERVIEW OF REGIONAL OPEN SPACE OPPORTUNITIES AS A SERIES OF PROJECT OPPORTUNITY CLUSTERS. IT IS ENVISAGED THAT THESE CLUSTERS FORM A STARTING POINT FOR ENSURING THE MORE GENERALISED DISTRICT STRATEGIES AND ANY FUTURE PROJECT DELIVERY RESPONDS TO THE LOCAL STRATEGIC CONTEXT AND LANDSCAPE CONDITIONS. WC.1.1 THE PARRAMATTA RIVER WC.1.3 NORTHERN AND WESTERN WC.1.6 LAKE PARRAMATTA AND WC.1.8 PROSPECT CREEK AND WC.1.10 ROPES AND SOUTH CREEKS WC.1.12
Recommended publications
  • Senate Official Hansard No
    COMMONWEALTH OF AUSTRALIA PARLIAMENTARY DEBATES Senate Official Hansard No. 5, 2005 TUESDAY, 8 MARCH 2005 FORTY-FIRST PARLIAMENT FIRST SESSION—SECOND PERIOD BY AUTHORITY OF THE SENATE INTERNET The Journals for the Senate are available at http://www.aph.gov.au/senate/work/journals/index.htm Proof and Official Hansards for the House of Representatives, the Senate and committee hearings are available at http://www.aph.gov.au/hansard For searching purposes use http://parlinfoweb.aph.gov.au SITTING DAYS—2005 Month Date February 8, 9, 10 March 7, 8, 9, 10, 14, 15, 16, 17 May 10, 11, 12 June 14, 15, 16, 20, 21, 22, 23 August 9, 10, 11, 15, 16, 17, 18 September 5, 6, 7, 8, 12, 13, 14, 15 October 4, 5, 6, 10, 11, 12, 13 November 7, 8, 9, 10, 28, 29, 30 December 1, 5, 6, 7, 8 RADIO BROADCASTS Broadcasts of proceedings of the Parliament can be heard on the following Parliamentary and News Network radio stations, in the areas identified. CANBERRA 1440 AM SYDNEY 630 AM NEWCASTLE 1458 AM GOSFORD 98.1 FM BRISBANE 936 AM GOLD COAST 95.7 FM MELBOURNE 1026 AM ADELAIDE 972 AM PERTH 585 AM HOBART 747 AM NORTHERN TASMANIA 92.5 FM DARWIN 102.5 FM FORTY-FIRST PARLIAMENT FIRST SESSION—SECOND PERIOD Governor-General His Excellency Major-General Michael Jeffery, Companion in the Order of Australia, Com- mander of the Royal Victorian Order, Military Cross Senate Officeholders President—Senator the Hon. Paul Henry Calvert Deputy President and Chairman of Committees—Senator John Joseph Hogg Temporary Chairmen of Committees—Senators the Hon.
    [Show full text]
  • River Mileages and Drainage Areas for Illinois Streams—Volume 2, Illinois River Basin
    RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN By R. W. Healy U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS 1979 CONTENTS Conversion Table . .iv Abstract . .1 Introduction . .1 Methods . .2 Explanation of tables . .2 References . .3 Index . .291 ILLUSTRATIONS Figure 1. Map showing Illinois counties . .4 2. Map showing stream systems, hydrologic units, and major cities in Illinois. .6 TABLE Table 1. River mileages and drainage areas for Illinois streams . .8 i CONVERSION TABLE Multiply inch-pound unit By To obtain SI (metric) unit mile (mi) 1.609 kilometer (km) square mile (mi2) 2.590 square kilometer (km2) iv RIVER MILEAGES AND DRAINAGE FOR ILLINOIS STREAMS— Volume 2, Illinois River Basin By R. W. Healy ABSTRACT River mileages are presented for points of interest on Illinois streams draining 10 square miles or more. Points of interest include bridges, dams, gaging stations, county lines, hydrologic unit boundaries, and major tributaries. Drainage areas are presented for selected sites, including total drainage area for any streams draining at least 100 square miles. INTRODUCTION Expansion of water-resource investigations within the State of Illinois has amplified the need for a common index to locations on streams. A common index would aid in the coordination of various stream-related activities by facilitating data collection and interpretation.
    [Show full text]
  • Professionals Australia's Response on Behalf of Members in Relation to The
    Professionals Australia’s response on behalf of members in relation to the proposed restructure PA met with engineers who work in the Engineering Division on two occasions at WNSW Parramatta offices with members dialling-in from regional NSW. PA encouraged members to put forward their professional views on the proposed restructure on whether it addressed existing problems. PA has received some very detailed responses from our members. It is clear there is a high level of concern that the restructure will have undesired impacts on both employees and the functions of Engineering. Many members have taken the opportunity to respond directly to the WNSW email address set up for feedback. This submission does not repeat those comments. This submission is concerned with the first order issue – Does the restructure enhance the undertaking of engineering functions by WaterNSW or not? The next level of concerns which appear to be the main focus of the input provided via the WNSW email are the detail of position descriptions and the arrangements for filling the structure. We understand such matters have also attracted a large number of comments and concerns from members. However, those issues arise only when the first order issue is satisfied. The focus of this submission is whether the restructure has accurately identified the deficiencies and whether the proposal will address those deficiencies. What can a restructure address? A restructure can address issues such as resourcing levels, specific function focus and functional alignment. It cannot address issues caused by dysfunctional organisational behaviour, lack of effective processes, etc. Does the restructure enhance engineering functions at WNSW? The view of WNSW engineers is that overall the restructure will not result in the enhanced performance of the engineering functions required by WNSW.
    [Show full text]
  • Sydney Water in 1788 Was the Little Stream That Wound Its Way from Near a Day Tour of the Water Supply Hyde Park Through the Centre of the Town Into Sydney Cove
    In the beginning Sydney’s first water supply from the time of its settlement Sydney Water in 1788 was the little stream that wound its way from near A day tour of the water supply Hyde Park through the centre of the town into Sydney Cove. It became known as the Tank Stream. By 1811 it dams south of Sydney was hardly fit for drinking. Water was then drawn from wells or carted from a creek running into Rushcutter’s Bay. The Tank Stream was still the main water supply until 1826. In this whole-day tour by car you will see the major dams, canals and pipelines that provide water to Sydney. Some of these works still in use were built around 1880. The round trip tour from Sydney is around 350 km., all on good roads and motorway. The tour is through attractive countryside south Engines at Botany Pumping Station (demolished) of Sydney, and there are good picnic areas and playgrounds at the dam sites. source of supply. In 1854 work started on the Botany Swamps Scheme, which began to deliver water in 1858. The Scheme included a series of dams feeding a pumping station near the present Sydney Airport. A few fragments of the pumping station building remain and can be seen Tank stream in 1840, from a water-colour by beside General Holmes Drive. Water was pumped to two J. Skinner Prout reservoirs, at Crown Street (still in use) and Paddington (not in use though its remains still exist). The ponds known as Lachlan Swamp (now Centennial Park) only 3 km.
    [Show full text]
  • Sewage Treatment System Impact Monitoring Program
    Sewage Treatment System Impact Monitoring Program Volume 1 Data Report 2019-20 Commercial-in-Confidence Sydney Water 1 Smith Street, Parramatta, NSW Australia 2150 PO Box 399 Parramatta NSW 2124 Report version: STSIMP Data Report 2019-20 Volume 1 final © Sydney Water 2020 This work is copyright. It may be reproduced for study, research or training purposes subject to the inclusion of an acknowledgement of the source and no commercial usage or sale. Reproduction for purposes other than those listed requires permission from Sydney Water. Sewage Treatment System Impact Monitoring Program | Vol 1 Data Report 2019-20 Page | i Executive summary Background Sydney Water operates 23 wastewater treatment systems and each system has an Environment Protection Licence (EPL) regulated by the NSW Environment Protection Authority (EPA). Each EPL specifies the minimum performance standards and monitoring that is required. The Sewage Treatment System Impact Monitoring Program (STSIMP) commenced in 2008 to satisfy condition M5.1a of our EPLs. The results are reported to the NSW EPA every year. The STSIMP aims to monitor the environment within Sydney Water’s area of operations to determine general trends in water quality over time, monitor Sydney Water’s performance and to determine where Sydney Water’s contribution to water quality may pose a risk to environmental ecosystems and human health. The format and content of 2019-20 Data Report predominantly follows four earlier reports (2015-16 to 2018-19). Sydney Water’s overall approach to monitoring (design and method) is consistent with the Australian and New Zealand Environment and Conservation Council (ANZECC 2000 and ANZG 2018) guidelines.
    [Show full text]
  • School of Civil and Environmental Engineering
    1 Contents From the Head of School Highlights of 2005 Organisational Framework of the School Page 1 OVERVIEW OF SCHOOL 7 2 SCHOOL STAFF 9 3 RESEARCH ACTIVITIES 21 4 UNDERGRADUATE TEACHING ACTIVITIES 23 5 POSTGRADUATE TEACHING PROGRAMS 26 6 GRADUATES - 2005 28 7 AWARDS & PRIZE WINNERS 28 8 SCHOOL FACILITIES, CENTRES & LABORATORIES REPORTS 29 9 INTERACTIONS WITH INDUSTRY, THE PROFESSION & THE COMMUNITY 43 APPENDIX A – RESEARCH GRANTS & CONTRACTS 2005 50 APPENDIX B - ARC GRANT SUCCESS 2005 57 APPENDIX C - RESEARCH STUDENTS & TOPICS 2005 59 APPENDIX D – PUBLICATIONS 2005 63 2 Courier Address 4th Floor, Room 407 School of Civil and Environmental Engineering Civil Engineering Building, H20 Via Gate No.11, Botany Street, Randwick The University of New South Wales UNSW SYDNEY NSW 2052 AUSTRALIA Phone: +61 (0)2 9385 5033 Fax: +61 (0)2 9385 6139 Web: http://www.civeng.unsw.edu.au/ Email General Enquiries [email protected] ACKNOWLEDGEMENTS To all staff who provided information and photographs for this report Co-ordinated and compiled by Professor NJ Ashbolt Betty Wong Printed by UNSW Publishing and Printing Services School of Civil and Environmental Engineering UNSW ©Annual Report 2005 School of Civil & Environmental Engineering, UNSW Annual Report 2005 3 From the Head of School Professor Nicholas Ashbolt* Head, School of Civil and Environmental Engineering *Professor Nicholas Ashbolt accepted the role of the Head of School in August 2005 after the stepping down of the former Head, Professor Ian Gilbert, who took up his awarded ARC Australian Professorial Federation Fellowship. I am delighted to present herein a summary of disciplines to strengthen innovation and leadership activities and achievements for 2005 from the staff qualities in our graduates.
    [Show full text]
  • Technical Paper 6 Flooding, Hydrology and Water Quality
    ͧ¼²»§ Ó»¬®± É»­¬»®² ͧ¼²»§ ß·®°±®¬ Ì»½¸²·½¿´ п°»® ê Ú´±±¼·²¹ô ¸§¼®±´±¹§ ¿²¼ ©¿¬»® ¯«¿´·¬§ Sydney Metro - Western Sydney Airport Technical Paper 6: Flooding, hydrology and water quality Table of Contents Glossary and terms of abbreviation i Executive Summary vi Project overview vi This hydrology, flooding and water quality assessment vi Assessment methodology vii Existing conditions vii Potential construction impacts vii Potential operation impacts vii Proposed management and mitigation measures vii 1.0 Introduction 1 1.1 Project context and overview 1 1.2 Key project features 1 1.3 Project need 4 1.4 Project construction 4 1.5 Purpose of this Technical Paper 6 1.5.1 Assessment requirements 6 1.5.2 Commonwealth agency assessment requirements 8 1.5.3 Structure of this report 8 1.6 Study area 8 2.0 Legislative and policy context 11 2.1 Off-airport legislation and policy context 11 2.1.1 Commonwealth policy 11 2.1.2 State legislation and policy 12 2.2 On-airport legislative and policy context 18 2.2.1 Airports Act 1996 18 2.2.2 Airports (Environment Protection) Regulations 1997 18 2.3 Guidelines 19 3.0 Methodology 21 3.1 Flooding 21 3.1.1 Operational impact flooding criteria 23 3.2 Geomorphology 25 3.3 Catchment and watercourse health 25 3.4 Water quality 25 3.4.1 Existing Water Quality Environment 26 3.4.2 Water Sensitive Urban Design 26 3.4.3 Impact assessment 26 3.4.4 Water Quality Mitigation Measures 27 3.4.5 Water Quality Monitoring 27 4.0 Existing environment 28 4.1 Existing environment (off-airport) 28 4.1.1 Catchment overview 28
    [Show full text]
  • Placer-Mining in British Columbia
    BRITISH COLUMBIA DEPARTMENT OF MINES €Ion. 11'. A. MCKENEIE,Minister. ROBE DUNN,Deputy Xinister. J. D. GALLOWAY, ProvincinlMineralogist. J. DICKSON,Chief Inspector of Mines. BULLETIN No. 1, 1931 PLACER-MINING IN BRITISH COLUMBIA COMPILED BY JOHN D. GAI;LOVVAY, Provincial Mineralogist. PRINTED BY AUTROKITY OF TAB LEGISLATIVE ASSENBLY. I .._ .. To the Eon. W. A. McKenzie, dlinister of Miines, Victoria, B.G. SIR,-I beg tosubmit herewith a Special bulletin on Placer-mining in British Columbia. This bulletin is in part a reprint of Bnlletio No. 2, 1930, but contains additional information on placer-mining, particularlyrelating to activities during the fieldseason of 1931. Of decided interest is the special report by Dr. R. TV. Rrock on the nlacer possibilities of the Pacific Great Eastern Railway lands. I have the honour to be, Sir, Your obedient servant, JOHN D. GALLOWAY, Provincial Mineralogist. Bureau of aches, Victoria, B.G., September 3rd. 1931. PLACER-MINING I[N BRITISH COLUMBIA. GENER.AL SUMMARY. BY JOHND. GALLOWAY,PROVIKCIAL IIIIKERALOQIST. INTRODUCTION. During 1931 muchinterest has been shown in placer-mining. Prospectinghas been par. ticularly active as many men, finding employment difficult to obtain, hare scoured the hills with gold-pan and shovel in search of the yellow metal, which is now more firmly entrenched as the Symbol of real value than eyer before. Development of placer properties has been vigorously prosecuted and productive hydraulics are enjoyinga successful year. The placer-output will uudoubtedly show a substantial increase for the year, as preliminary figuresindicate that largeramounts of ?:old are beingrecovered in the importantareas of Cariboo and Atlin.
    [Show full text]
  • Reducing the Impact of Weirs on Aquatic Habitat
    REDUCING THE IMPACT OF WEIRS ON AQUATIC HABITAT NSW DETAILED WEIR REVIEW REPORT TO THE NEW SOUTH WALES ENVIRONMENTAL TRUST SYDNEY METROPOLITAN CMA REGION Published by NSW Department of Primary Industries. © State of New South Wales 2006. This publication is copyright. You may download, display, print and reproduce this material in an unaltered form only (retaining this notice) for your personal use or for non-commercial use within your organisation provided due credit is given to the author and publisher. To copy, adapt, publish, distribute or commercialise any of this publication you will need to seek permission from the Manager Publishing, NSW Department of Primary Industries, Orange, NSW. DISCLAIMER The information contained in this publication is based on knowledge and understanding at the time of writing (July 2006). However, because of advances in knowledge, users are reminded of the need to ensure that information upon which they rely is up to date and to check the currency of the information with the appropriate officer of NSW Department of Primary Industries or the user‘s independent adviser. This report should be cited as: NSW Department of Primary Industries (2006). Reducing the Impact of Weirs on Aquatic Habitat - New South Wales Detailed Weir Review. Sydney Metropolitan CMA region. Report to the New South Wales Environmental Trust. NSW Department of Primary Industries, Flemington, NSW. ISBN: 0 7347 1753 9 (New South Wales Detailed Weir Review) ISBN: 978 0 7347 1833 4 (Sydney Metropolitan CMA region) Cover photos: Cob-o-corn Weir, Cob-o-corn Creek, Northern Rivers CMA (upper left); Stroud Weir, Karuah River, Hunter/Central Rivers CMA (upper right); Mollee Weir, Namoi River, Namoi CMA (lower left); and Hartwood Weir, Billabong Creek, Murray CMA (lower right).
    [Show full text]
  • Download the Paper (Pdf)
    Department of Agriculture, Fisheries & Forestry ASSESSMENT OF RISK OF SPREAD FOR STRATEGIC MANAGEMENT OF THE CORE ALLIGATOR WEED INFESTATIONS IN AUSTRALIA - TAKING STOCK FINAL REPORT October 2008 Department of Agriculture, Fisheries and Forestry Assessment of Risk of Spread for Strategic Management of the Core Alligator Weed Infestations in Australia- ‘Taking Stock’ CERTIFICATE OF APPROVAL FOR ISSUE OF DOCUMENTS Report Title: Final Report Document Status: Final Report Document No: NE210541-2008 Date of Issue: 10/10/2008 Assessment of Risk of Spread for Strategic Management Client: Department of Agriculture, Project Title: of the Core Alligator Weed Infestations in Australia - Fisheries & Forestry Taking Stock Comments: Position Name Signature Date Prepared by: Principal Consultant Dr. Nimal Chandrasena 10 October 2008 DAFF, CMAs, DPI, Peer Review by: LGAs and various Given in acknowledgements July-August 2008 others For further information on this report, contact: Name: Dr. Nimal Chandrasena Title: Principal Ecologist, Ecowise Environmental Address: 24 Lemko Place, Penrith, NSW 2750 Phone: 4721 3477 Mobile: 0408 279 604 E-mail: [email protected] Document Revision Control Version Description of Revision Person Making Issue Date Approval 1 Working Draft Dr. Nimal Chandrasena 27 July 2008 2 Final Draft Dr. Nimal Chandrasena 10 October 2008 © Ecowise Environmental Pty Ltd This Report and the information, ideas, concepts, methodologies, technologies and other material remain the intellectual property of Ecowise Environmental Pty Ltd. Disclaimer This document has been prepared for the Client named above and is to be used only for the purposes for which it was commissioned. No warranty is given as to its suitability for any other purpose.
    [Show full text]
  • Government Gazette No 164 of Friday 23 April 2021
    GOVERNMENT GAZETTE – 4 September 2020 Government Gazette of the State of New South Wales Number 164–Electricity and Water Friday, 23 April 2021 The New South Wales Government Gazette is the permanent public record of official NSW Government notices. It also contains local council, non-government and other notices. Each notice in the Government Gazette has a unique reference number that appears in parentheses at the end of the notice and can be used as a reference for that notice (for example, (n2019-14)). The Gazette is compiled by the Parliamentary Counsel’s Office and published on the NSW legislation website (www.legislation.nsw.gov.au) under the authority of the NSW Government. The website contains a permanent archive of past Gazettes. To submit a notice for gazettal, see the Gazette page. By Authority ISSN 2201-7534 Government Printer NSW Government Gazette No 164 of 23 April 2021 DATA LOGGING AND TELEMETRY SPECIFICATIONS 2021 under the WATER MANAGEMENT (GENERAL) REGULATION 2018 I, Kaia Hodge, by delegation from the Minister administering the Water Management Act 2000, pursuant to clause 10 of Schedule 8 to the Water Management (General) Regulation 2018 (the Regulation) approve the following data logging and telemetry specifications for metering equipment. Dated this 15 day of April 2021. KAIA HODGE Executive Director, Regional Water Strategies Department of Planning, Industry and Environment By delegation Explanatory note This instrument is made under clause 10 (1) of Schedule 8 to the Regulation. The object of this instrument is to approve data logging and telemetry specifications for metering equipment that holders of water supply work approvals, water access licences and Water Act 1912 licences and entitlements that are subject to the mandatory metering equipment condition must comply with.
    [Show full text]
  • Parramatta River
    anchorage anchorage ail far enough along the Parramatta River held at Homebush Bay in 2000, there has wetlands, vast stretches of open space, sailing Sand you can’t fail to notice a broken white been a dramatic rise in activity on the river. and rowing clubs, unit blocks and posh parramatta column mounted on a rock near the water’s On any given day, it bustles with yachts and waterfront mansions. Yaralla House, in Concord edge at Henley. powerboats, tinnies, canoes, kayaks and (pictured here) is one of the oldest and largest This simple monument is dedicated to the RiverCat ferries (seven low-wash catamarans and has considerable historical significance. short but spectacular life of Henry Searle, one of named after famous Australian sportswomen). There are four islands along the river: Australia’s greatest scullers, who died in 1889 at The river, which is tidal to Charles Street Rodd Island in Iron Cove, and Cockatoo, just 23. The column also marks the finish line Weir at Parramatta, is jam-packed with things to Spectacle and Snapper islands huddled between where, a year earlier, Searle comprehensively see – if you know what to look for. Woolwich and Birchgrove. In the late 19th defeated the world rowing champion. century, Rodd Island was used as a biological Searle’s Monument is one of the landmarks colonial History laboratory by a team from the Pasteur Institute along the Parramatta River, which officially As a key link between the settlements of Sydney in France, and also as a temporary quarantine merges with Sydney Harbour at Longnose Point, and Parramatta, the Parramatta River played an area for a pet dog that French actress Sarah Birchgrove and Manns Point, Greenwich.
    [Show full text]