Exhibitor Manual Contents

Total Page:16

File Type:pdf, Size:1020Kb

Load more

London’s premier Life Science & Healthcare networking conference genesis 2014 9 December 2014 Queen Elizabeth II Conference Centre, Westminster, London, UK genesisconference.com Exhibitor Manual Contents What You Need To Do Now 3 Charles Kendall BioLogistics 3 Build Up 4 Pull Out 4 Floor Plan 5 Venue Location and Delivery 6 Deliveries and Collections 8 Delivery Note 9 Collection Note 10 General Information 11 3 Genesis 2014 Exhibitor Manual What You Need To Do Now Thank you for booking your exhibition space for Genesis 2014. Please note that until payment has been received, any stand reservations cannot be confirmed and partnering login details will not be issued. In order to facilitate our preparations of the Genesis Delegate Handbook, please send in: • 100 word company profile • Company logo (EPS or 300dpi jpeg) • Company contact details - web address - email address - contact name - job title Please send the above details to Polly Pollock at [email protected] Each exhibition stand is 2m x 3m and will be provided with a clothed table and 2 chairs. Only stands in the Fleming Room have a shell scheme whilst those in the Benjamin Britten Lounge do not. Should you require any further furniture or electrics, we suggest you contact Dimension 8 https://www.dimension8. com/onlineordering2.php Click on the online ordering section, fill out your company details, selectevent from the drop down menu and use the password ‘Genesis2014’. Charles Kendall BioLogistics We are delighted to confirm our alliance with Charles Kendall BioLogistics as our preferred carrier. Should you wish to use their professional services please contact Mike Barrett directly on +44 (0)208 831 1485, or email on [email protected] Please note: Any subsequent arrangements made with Dimension 8 or Charles Kendall are the sole responsibility of your organisation. One Nucleus does not accept responsibility for any arrangements made with Dimension 8, Charles Kendall or any other third party. • Items left on the premises. • The Genesis Conference organisers accept no liability for any belongings left on the premises over- night. • All items are left at the owners risk. Should you wish to hire overnight lockable cupboards please contact Dimension 8. For any exhibition queries please contact Claire Abrams on 01223 896455 or [email protected] 4 Genesis 2014 Exhibitor Manual Build Up Date Schedule Monday 8 December 2014 Construction of all stands Each organisation will be allocated a specific set up time. Exact set up times will be confirmed 1 week before the conference. Please watch out for email updates and please do not book any travel arrangements until you have spoken to the organisers about your specific set up time. Tuesday 9 December 2014 Construction of stands continues. 07.00 - 08.00 NB: All stands must be constructed by 08.00 as delegates start arriving. Date Show Open Hours Tuesday 9 December 2014 08.30 - 18.30 Pull Out Date Schedule Tuesday 9 December 2014 Breakdown of stands Fleming Room 18.00 - 22.00 Benjamin Britten Lounge 19.00 - 22.00 All boxes must be labelled with the collection note which can be found on page 8 For safety reasons, pull out cannot commence until ALL visitors have left the hall. All stand fitting and exhibits must be clear of the halls by 22.00 on Tuesday 9 December 2014 when tenancy of the hall ends. Anything left on a stand after this time will be deemed as rubbish and disposed of by the halls. Charges to exhibitors for this service are high. 5 6 6 Genesis 2014 Exhibitor Manual Venue Location and Delivery Queen Elizabeth II Conference Centre, Broad Sanctury, Westminster, London, SW1P 3EE UK Directions to the Venue The Queen Elizabeth II Conference Centre (QEIICC) is located on Broad Sanctuary in Westminster, central London and can easily be reached by public transport. The postcode is SW1P 3EE. By Tube You can plan your tube journey and buy travel cards online using the Transport for London website. Westminster Station (0.1 miles) - Circle, District, Jubilee lines Exit the station via Exit 6 through the underground tunnel towards Parliament Square. You will come to street level on Whitehall. Turn left into Parliament Square, cross the road ahead of you then turn right into Broad Sanctuary. The Centre is on your right, directly opposite Westminster Abbey. (This is a step-free station.) St James Park Station (0.1 miles) - Circle, District lines Take the Broadway exit from the tube station and walk straight down Tothill Street. At the end of this street turn left and you will see the Centre directly in front of you. (This is NOT a step-free station.) Victoria Station (0.7 miles) - Circle, District, Victoria lines Exit from the front of the station, turn right and walk down Victoria Street. At the end of Victoria Street is Broad Sanctuary, the Centre is on the left, opposite Westminster Abbey. (This is NOT a step-free station.) By Bicycle There are many cycle routes across Greater London. To plan the best route for you to get to the QEIICC visit the Transport for London cycle website. By Bus Buses 11,24,53,77a and 88 all stop at Parliament Square. The Centre is just to the west of the square, directly opposite Westminster Abbey. To plan your bus route, use the Transport for London journey planner. By Road Please be advised that it is quicker and easier to travel to the QEIICC using public transport and that it is within the congestion charging zone. There is no car parking at the Centre, however there are several public car parks nearby. 7 7 Genesis 2014 Exhibitor Manual By Train To plan your train journey to London you can use National Rail Enquiries. There are three mainline rail stations within a mile of the Centre. These are Charing Cross, Victoria and Waterloo. To plan your travel from the other mainline terminals in central London (St Pancras International, King’s Cross, Paddington, Liverpool Street, London Bridge) use the Transport for London journey planner. Walking from Charing Cross (0.7 miles) Exit the front of Charing Cross Station and turn left towards Trafalgar Square. Turn left down Whitehall and continue until Parliament Square. Follow Parliament Square around to the right and turn right onto Broad Sanctuary. The Centre is on your right directly opposite Westminster Abbey. Walking from Victoria (0.7 miles) Exit the front of Victoria Station, walk across the bus stand area and turn right onto Victoria Street. Continue along Victoria Street until you reach Westminster Abbey. The Centre is on your left, directly opposite the Abbey. Walking from Waterloo (1 mile) Exit the station onto York Road. Turn left and walk to the roundabout with County Hall Hotel on your right. Cross York Road and take Westminster Bridge Road on your right. Cross the bridge to Parliament Square and follow Parliament Square around to the right. Turn right onto Broad Sanctuary. The Centre is on your right directly opposite Westminster Abbey. St Pancras International - Eurostar You can reach St Pancras International Station easily by public transport from Victoria Station. For more information on travelling on the Eurostar, contact National Rail Enquiries on 0845 7484950. By Air It will take you 45 minutes to an hour to reach the QEIICC on public transport from any of London’s airports. Heathrow Airport - Approximate journey time: 1 hour Take the tube to Green Park on the Piccadilly Line. Change to the Jubilee Line and stop at Westminster. Alternatively take the Heathrow Express to Paddington, and then take the Circle Line tube to Westminster. Gatwick Airport - Approximate journey time: 45 minutes Take the Gatwick Express to Victoria Railway Station. The Centre is a 15-minute walk from Victoria via Victoria Street. Stansted Airport - Approximate journey time: 1 hour Take the Stansted Express to Liverpool Street and then take the Circle Line tube to Westminster tube station. London City Airport - Approximate journey time: 45 minutes Take the Jubilee Line from the airport to Westminster tube station. Luton Airport - Approximate journey time: 1 hour 15 minutes Take one of the special connecting buses from the airport to Luton rail station. Take one of the frequent trains to Kings Cross, and from here take the Circle Line tube to Westminster. 8 8 Genesis 2014 Exhibitor Manual Deliveries and Collections All deliveries to the exhibition must be clearly marked with the following: GENESIS CONFERENCE Queen Elizabeth II Conference Centre Storey’s Gate Loading Bay Westminster London SW1P 3EE Contents of delivery Company Name Stand Number Box X of X Access to the QEII Conference Centre Loading Bay The loading bay is situated on Storey’s Gate in Westminster and is located within the Transport for London Congestion Zone. The loading bay is a shared facility for all deliveries and collections at the QEII therefore, vehicles are permitted access on a first come first served basis. Due to the dimensions of the loading bay and the fact that only one vehicle is permitted at any one time, during exhibition set up and breakdown the following conditions must be adhered to: • The loading bay is left clear at all times unless loading/unloading is in progress • The vehicle is not left unattended when transferring items to and from exhibition area, whilst the vehicle is removed from the loading bay • All corridors and fire exits are left clear to ensure access is maintained at all times Deliveries and Collections All deliveries must be made to the loading bay and the QEII must be advised on the quantity of items, estimated time of arrival/departure, destination and appropriate contact names. Movement of Deliveries There is no facility to move palletised products from lifts to the exhibition stands therefore everything needs to be in boxes and moved on trolleys only.
Recommended publications
  • Investigation Into Reliability of the Jubilee Line

    Investigation Into Reliability of the Jubilee Line

    Investigation into Reliability: London Underground Jubilee Line An Interactive Qualifying Project submitted to the Faculty of WORCESTER POLYTECHNIC INSTITUTE in partial fulfilment of the requirements for the degree of Bachelor of Science By Jack Arnis Agolli Marianna Bailey Errando Berwin Jayapurna Yiannis Kaparos Date: 26 April 2017 Report Submitted to: Malcolm Dobell CPC Project Services Professors Rosenstock and Hall-Phillips Worcester Polytechnic Institute This report represents work of WPI undergraduate students submitted to the faculty as evidence of a degree requirement. WPI routinely publishes these reports on its web site without editorial or peer review. For more information about the projects program at WPI, see http://www.wpi.edu/Academics/Projects. Abstract Metro systems are often faced with reliability issues; specifically pertaining to safety, accessibility, train punctuality, and stopping accuracy. The project goal was to assess the reliability of the London Underground’s Jubilee Line and the systems implemented during the Jubilee Line extension. The team achieved this by interviewing train drivers and Transport for London employees, surveying passengers, validating the stopping accuracy of the trains, measuring dwell times, observing accessibility and passenger behavior on platforms with Platform Edge Doors, and overall train performance patterns. ii Acknowledgements We would currently like to thank everyone who helped us complete this project. Specifically we would like to thank our sponsor Malcolm Dobell for his encouragement, expert advice, and enthusiasm throughout the course of the project. We would also like to thank our contacts at CPC Project Services, Gareth Davies and Mehmet Narin, for their constant support, advice, and resources provided during the project.
  • Uncovering the Underground's Role in the Formation of Modern London, 1855-1945

    Uncovering the Underground's Role in the Formation of Modern London, 1855-1945

    University of Kentucky UKnowledge Theses and Dissertations--History History 2016 Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945 Danielle K. Dodson University of Kentucky, [email protected] Digital Object Identifier: http://dx.doi.org/10.13023/ETD.2016.339 Right click to open a feedback form in a new tab to let us know how this document benefits ou.y Recommended Citation Dodson, Danielle K., "Minding the Gap: Uncovering the Underground's Role in the Formation of Modern London, 1855-1945" (2016). Theses and Dissertations--History. 40. https://uknowledge.uky.edu/history_etds/40 This Doctoral Dissertation is brought to you for free and open access by the History at UKnowledge. It has been accepted for inclusion in Theses and Dissertations--History by an authorized administrator of UKnowledge. For more information, please contact [email protected]. STUDENT AGREEMENT: I represent that my thesis or dissertation and abstract are my original work. Proper attribution has been given to all outside sources. I understand that I am solely responsible for obtaining any needed copyright permissions. I have obtained needed written permission statement(s) from the owner(s) of each third-party copyrighted matter to be included in my work, allowing electronic distribution (if such use is not permitted by the fair use doctrine) which will be submitted to UKnowledge as Additional File. I hereby grant to The University of Kentucky and its agents the irrevocable, non-exclusive, and royalty-free license to archive and make accessible my work in whole or in part in all forms of media, now or hereafter known.
  • Finchley Road This Page Is Intentionally Left Blank

    Finchley Road This Page Is Intentionally Left Blank

    Rail Accident Report Train travelling with doors open on the Jubilee line 1 September 2018 Report 06/2019 July 2019 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2019 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.gov.uk/raib. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Website: www.gov.uk/raib Derby UK DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Preface Preface The purpose of a Rail Accident Investigation Branch (RAIB) investigation is to improve railway safety by preventing future railway accidents or by mitigating their consequences. It is not the purpose of such an investigation to establish blame or liability. Accordingly, it is inappropriate that RAIB reports should be used to assign fault or blame, or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The RAIB’s findings are based on its own evaluation of the evidence that was available at the time of the investigation and are intended to explain what happened, and why, in a fair and unbiased manner.
  • John Self Obe

    John Self Obe

    JOHN SELF OBE WWW.FCPWORLD.NET KEY SKILLS JOHN SELF has nearly 50 years experience in metro and railway Rail engineering, rolling operations, senior management, engineering and advisory roles. He stock, operations, rail joined London Underground as a trainee and rose through the ranks safety, benchmarking, PPPs, franchises, to become General Manager of some of the busiest lines. He then concessions moved to the national rail industry, as Director of Safety at the EMPLOYMENT Strategic Rail Authority, and then served as the first Chief Executive 2004-current Partner, First of the newly created Rail Safety and Standards Board. Recently, John has been Class Partnerships Ltd, UK advising Transport for London and private sector franchise bidders on the London 2003-2004 Interim Chief Overground and Crossrail projects and has assisted Eko Rail with development of Executive, Rail Safety and plans for the Lagos Metro. Standards Board, UK 2000-2003 Director, Safety, He has managed large operating budgets and diverse front line workforces, Strategic Rail Authority, UK delivering regular and reliable services, safely, while achieving significant 1997-2000 President, productivity improvements and efficiencies. CoMET From its formation, John was active in the educational activities of the Institution of 1966-2000 London Underground Limited, UK - Railway Operators, and is a former chair of the Education and Professional General Manager, Jubilee Development Committee and was Lead Tutor for the modules on safety and and East London Lines, engineering.
  • UK Jubilee Line Extension (JLE)

    UK Jubilee Line Extension (JLE)

    UK Jubilee Line Extension (JLE) - 1 - This report was compiled by the OMEGA Centre, University College London. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. - 2 - CONTENTS A INTRODUCTION Type of Project Location Major Associated Developments Current Status B BACKGROUND TO PROJECT Principal Project Objectives Key Enabling Mechanisms and Timeline of Key Decisions Principal Organisations Involved • Central Government Bodies/Departments • Local Government • London Underground Limited • Olympia & York • The coordinating group • Contractors Planning and Environmental Regime • The JLE Planning Regime • The Environmental Statement • Project Environmental Policy & the Environmental Management System (EMS) • Archaeological Impact Assessment • Public Consultation • Ecological Mitigation • Regeneration Land Acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route Description Main Termini and Intermediate Stations • Westminster
  • The Jubilee Line Upgrade

    The Jubilee Line Upgrade

    THE JUBILEE LINE UPGRADE by Mike Palmer Upgrade Operations, Jubilee Line, London Underground A report of the LURS meeting at All Souls Club House on 13 October 2009 Mike prefaced the talk by explaining how the Northern Line upgrade and Jubilee Line were similar and those who attended the Northern Line Upgrade talk several months ago would hear some similarities. Mike also explained how some of the talk would be relatively complex and different to any automatic signalling system on LU at the moment: to understand the complexity of the upgrade he would have to teach us some of the concepts behind the new system. It was also made clear to the audience that as the upgrade at time of the talk was overdue, some areas of questioning, such as details of slippage, cost, contractual relationships, would not and could not, for legal reasons, be answered. Mike started off his career in 1982 as a railman, becoming a guard on the District Line at Acton with other well-known figures such as Colin Smith, Dave Rowe and Kim Rennie. He moved to become an Information Assistant between 1985 and 1986 where a familiar Brian Hardy gave him the job. He then moved to become a Line Controller on the Piccadilly, District, Jubilee Metropolitan and Bakerloo from 1986-1989, a Duty Train Manager on the Piccadilly and District between 1989-1993, and then the Duty Operations Manager for the District Line from 1993 to 1995. Following this, he then became a Service Control Manager for the Jubilee and East London lines.
  • Global Gateway London an International Center for Scholarship and Collaboration

    Global Gateway London an International Center for Scholarship and Collaboration

    GLOBAL GATEWAY LONDON AN INTERNATIONAL CENTER FOR SCHOLARSHIP AND COLLABORATION WELCOME TO NOTRE DAME The University of Notre Dame boasts a network of extraordinary facilities and programs located around the world—the Notre Dame Global Gateways. Under the aegis of Notre Dame International (NDI), the Global Gateways are academic and intellectual centers where scholars, students, and leaders from universities, government, business, and the community gather to discuss issues of topical and enduring relevance. At each Global Gateway, the Notre Dame community and its many international partners and colleagues work together to advance knowledge across all disciplines with a view to the common good. London is home to one of six Notre Dame Global Gateways, with the others located in Beijing, Chicago, Dublin, Jerusalem, and Rome. The London Global Gateway consists of two major facilities: an academic center (Fischer Hall at Trafalgar Square) and a 270-bed residence building (Conway Hall, close to the South Bank near Waterloo Station). These two facilities, located in vibrant Central London, are within easy walking distance of each other. Whether for hosting a large conference or merely for providing office space for a day or two, Fischer Hall and Conway Hall serve the needs of the Notre Dame community in London. • The Summer Engineering Program in LONDON London exposes Notre Dame students to innovative technological achievements PROGRAMS during a six-week program. • The Law Summer Program is open The London Global Gateway is active to Notre Dame and non-Notre Dame year-round, hosting a myriad of activities law students and has between 30 including graduate and undergraduate and 40 participants.
  • University of Cambridge Research Horizons

    University of Cambridge Research Horizons

    HRESOEARRCH IZONS In this issue BIODIVERSITY CONSERVATION plus objects of devotion, an infrastructure revolution and the making of modern Germany University of Cambridge research magazine www.cam.ac.uk/research/ Issue 17 2 | Guest editorial Contents Issue 17, February 2012 Biodiversity conservation M A R K Research news 3–5 M N I S Z K Spotlight: 6–17 O Biodiversity conservation Research, policy, practice: 6–7 conservation in the round Canopy commerce: forest 8–9 conservation and poverty alleviation The crystal ball of 10 –11 conservation Conservation clusters: 12 making the case Games for nature 13 A lost world? How 14 –15 zooarchaeology can inform biodiversity conservation Landscape, literature, life 16 –17 Cambridge is famous as the centre of ‘Silicon Fen’ – the cluster of high-tech businesses drawn together geographically by the benefits of a world-leading research-intensive University and Preview 18 –19 rich networking opportunities. Much less well known is the fact that Cambridge is home to one of the world’s largest clusters of people and institutions working to understand and Kaiser, Reich and the making conserve global biodiversity. of modern Germany Life on Earth is at risk from an unprecedented rate of environmental change that threatens the natural resources on which humanity depends. Biodiversity – the genes, species and Features 20 –31 ecosystems that comprise nature – provides food, fuel, medicines and other vital ‘ecosystem Autophagy: when 20 –21 services’, along with countless intangible benefits, for society. ‘self-eating’ is good for you But biodiversity is in steep decline, and its sustainable management is a major challenge for the 21st century.
  • Tacsound Is a Non�Profit Division of the Teachers' Association (Canada) Affiliated with the Royal Scottish Country Dance Society

    Tacsound Is a NonProfit Division of the Teachers' Association (Canada) Affiliated with the Royal Scottish Country Dance Society

    TACSound is a non-profit division of the Teachers' Association (Canada) affiliated with the Royal Scottish Country Dance Society. Your volunteer manager, Lydia Hedge, is TACSound pleased to offer you a unique selection of available recorded music for Scottish Country Dancing and your listening pleasure. Recorded Music Division of TO ORDER: Teachers’ Association (Canada) ONLINE : Go to http://sound.tac-rscds.org Select the albums you want, add them to your CART then proceed to the CHECKOUT pages to select shipping method and payment option. Payment online can be by PayPal or Invoice/Cheque (which includes VISA). If you are a member of TAC, you are entitled to a 5% discount . You need a Discount Coupon to receive this online. Contact Lydia for your coupon number. (See next page for more details about discounts) BY MAIL : Complete an Order Form (back of this catalogue) including Item #,Title/Group. Mail it to: TACSound ℅ Lydia Hedge 624 Three Fathom Harbour Road RR#2, Head of Chezzetcook Nova Scotia Canada B0J 1N0 Do not send payment but please note on the order form whether you want to remit in Canadian dollars, U.S. dollars, or Sterling. We will send an invoice at the current exchange rate with the goods. March 2010 Catalogue BY PHONE : 902-827-2033 BY EMAIL : Just compose an email, indicating which albums you want. Send it to: All Prices Shown are in Canadian Dollars [email protected] or: [email protected] All prices shown in the catalogue are in Canadian dollars and are subject to change without notice because of price changes from our suppliers or currency fluctuations.
  • Statement of Community Involvement Download

    Statement of Community Involvement Download

    MORDEN WHARF. STATEMENT OF COMMUNITY INVOLVEMENT REGENERATION RETHOUGHT Lowick The News Building 3 London Bridge Street London, SE1 9SG Report Author Tom Dewey, Account Director [email protected] +44 (0)203 743 6250 CONTENTS 1. EXECUTIVE SUMMARY ....................................................................................................... 4 2. INTRODUCTION ................................................................................................................... 6 2.2. The site and local area ................................................................................................... 9 2.3. A brief history ............................................................................................................... 10 2.4. Planning policy context ................................................................................................ 11 2.5. Scheme description ..................................................................................................... 11 3. STAKEHOLDER AUDIT ...................................................................................................... 14 3.2. Political stakeholders ................................................................................................... 14 3.3. Local groups and organisations .................................................................................. 14 3.4. Local businesses, schools and community facilities .................................................. 15 3.5. Neighbouring developers ...........................................................................................
  • Lambeth Council and Transport for London Will Assess How Developments Can Take Account of and Address Transport Requirements

    Lambeth Council and Transport for London Will Assess How Developments Can Take Account of and Address Transport Requirements

    Chapter 7: Site Specific Guidance Site Specific Guidance There are many sites in Waterloo where Lambeth would welcome redevelopment, but this section sets out guidance for particular sites where clarification of the development issues is required. Likely site specific s.106 obligations are highlighted, but developments will need to comply with Lambeth’s SPD on s.106 Planning Obligations. This section covers the following sites: MDO 93 Shell Centre - Hungerford Car Park MDO 94 South Bank Centre MDO 91 Waterloo Station MDO 92 Elizabeth House MDO 107 Union Jack Club - Lower Marsh - IMAX & ‘City Square’ MDO 108 Cornwall Road bus garage 7.1 Shell Centre (MDO 93) Site History 7.1.1 Shell International put forward a plan to redevelop the Shell Centre on York Road in 2001. The plan would create a new 10-storey building on the upstream podium with office, retail and leisure uses and development within the courtyard of the Shell Centre. The ground floor spaces of the existing shell centre tower would be converted to retail uses and be open to the public. The public realm across the Shell Centre would be greatly improved. Current status 7.1.2 Planning permission and conservation area consent was granted on appeal in 2004 for a scheme including part demolition and the erection of a mixed use building of 69,000sqm on the podium site (01/02543/FUL). Development Principles 7.1.3 The UDP states that “the Council will promote the contribution this site can make to permeability and pedestrian linkages as well as to open space provision either in its own right or to generating improvements to open space within the wider area”.
  • Platform for Design

    Platform for Design

    Platform for Design Hugh Pearman Platform for Design This edition published in the United Kingdom in 2016 by Crossrail Limited: 25 Canada Square, Canary Wharf, London, E14 5LQ. Text © Crossrail Limited 2016 Design & Layout © Crossrail Limited 2016 ISBN 978-0-9933433-1-5 Writer: Hugh Pearman Editor: Sarah Allen Art Direction & Design: Andrew Briffett Design: Chris Hanham Contributions from Crossrail staff and its partners All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission of the copyright holder. Crossrail Limited is registered in England and Wales No. 4212657. Registered Office: 25 Canada Square, Canary Wharf, London, E14 5LQ. 2 Platform for Design Hugh Pearman Platform for Design Platform for Design 5 Forewords 8 Chapter 1 The history 16 Chapter 2 Design approach 24 Chapter 3 The well-tempered environment 38 Chapter 4 The stations 140 Chapter 5 The new trains 144 Chapter 6 The culture line 4 Platform for Design Foreword from Andrew Wolstenholme OBE Chief Executive Officer, Crossrail By 2030 the capital’s population is set to reach ten million and its transport system must be ready to meet this demand. The railway that Crossrail is building – to be known as the Elizabeth line from 2018 – is part of the UK’s plan to maintain London’s place as a world city. The new railway will be a high frequency, high capacity service “The railway has been planned linking 40 stations over 100 kilometres, from Reading in the west to to deliver a well-integrated Shenfield and Abbey Wood in the east.