IEE: Bangladesh: Joydevpur-Chandra – Tangail-Elenga Road Subproject

Total Page:16

File Type:pdf, Size:1020Kb

IEE: Bangladesh: Joydevpur-Chandra – Tangail-Elenga Road Subproject Initial Environmental Examination July 2012 BAN: SASEC Road Connectivity Project Joydevpur-Chandra – Tangail - Elenga Road Subproject Prepared by Roads and Highways Department, Ministry of Communication for the Asian Development Bank. ii CURRENCY EQUIVALENTS (as of 11 July 2012) Currency unit – Taka (BDT) BDT1.00 = $0.0122226975 $1.00 = BDT81.815000 ABBREVIATIONS ADB Asian Development Bank AASHTO American Association of State Highway & Transportation Officials AADT Average Annual Daily Traffic BWDB Bangladesh Water Development Board BOQ Bill of Quantity BOD Bio - Chemical Oxygen Demand BMD Bangladesh Meteorological Department CBR California Bearing Ratio CNRS Centre for Natural Resource Studies CEGIS Centre for Environment and Geographical Information Systems CITES Convention on International Trade in Endangered Species of Wild Fauna and Flora COD Chemical Oxygen Demand DEM Digital Elevation Model dB(A) Decibel ( measurement of noise) DBH Diameter at Breast Height DBM Disaster Management Bureau DG Diesel Generators DO Dissolved Oxygen DMB Dhaka-Mawa-Bhanga DOE Department of Environment DOF Department of Fisheries DPR Details Project Report DSC Design and Supervision Consultant EA Executing Agency ECA Environmental Conservation Act ECR Environment Conservation Rules EmoP Environmental Monitoring Plan EIA Environmental Impact Assessment EMP Environmental Management Plan FB Faridpur-Barisal FGD Focus group discussions FD Forest Division GHG Greenhouse Gas GIS Geographical Information System GOB Government of Bangladesh HDM Highway Development & Management Model HFL Highest Flood Level HGV Heavy Goods Vehicle IECs Important Ecosystem Components IPCC Intergovernmental Panel on Climate Change IWM Institute for Water Modelling IRC Indian Road Congress JCTE Joydevpur- Chandra – Tangail - Elenga iii JARP Jamuna Access Road Project LD Litre/day LGED Local Government Engineering Department IUCN International Union for Conservation of Nature LHS Left Hand Side LRP Location Reference Point MOEF Ministry of Environment & Forest, Bangladesh MIS Management Information System ND Non Detectable NDEM National Digital Elevation Model NWRD National Water Resource Database NGO Non Governmental Organization N - xxx National Highway Number Nox Oxides of Nitrogen PRP Prority Road Project PCU Passenger Car Units PRA Participatory rural appraisal PIU Project Implementing Unit PC Precast concrete PWD People Works Department RAS Rapid Assessment Survey RCC Reinforced Concrete Cement REA Rapid Environmental Assessment RHD Road and Highway Department RHS Right Hand Side RMP Road Master Plan RP Resettlement Plan ROB Railway Over Bridge ROW Right of Way RSPM Respiratory Suspended Particulate Matter RUB Railway Under Bridge SAARC South Asian Association of Regional Cooperation SMVT Slow moving vehicular traffic SFP Social Forestry Project SIA Social impact Assessment Sox Oxides of Sulphur SPM Suspended Particulate Matter SPS Safeguard Policy Statement SW South West TA Technical Assistance TDS Total Dissolved Solids TWG Transport Working Group VOSD Voluntary Organization for Sustainable Development WHO World Health Organisation WARPO Water Resources Planning Organization WEIGHTS AND MEASURES dB (A) decibel (A-weighted) masl meters above sea level kl kilolitre km kilometre km/h kilometre per hour m meter iv m3 cubic meter sq.ft. square foot NOTE In this report, "$" refers to US dollars. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Contents Executive Summary vii I. Introduction .................................................................................................................... 1 A. Background............................................................................................................ 1 B. Purpose of the Report ............................................................................................ 1 C. Extent of the study ................................................................................................. 1 D. IEE Content ........................................................................................................... 2 E. Methodology .......................................................................................................... 2 II. Description of the Project and legal framework ............................................................... 5 A. Rationale ............................................................................................................... 5 B. The Joydevpur-Elenga (JCTE Road) ..................................................................... 5 C. Road Components and Project Design Details ...................................................... 5 D. Alignment and ROW .............................................................................................. 7 E. Details of Rail Over Bridges (ROBs) and Flyovers: ............................................. 14 F. Relocation of Utilities ........................................................................................... 15 G. Construction Material and Sources ...................................................................... 15 H. Existing Traffic and Forecast ................................................................................ 16 I. Project Schedule .................................................................................................. 16 J. ADB‟s Environmental Categorisation ................................................................... 16 III. Legal and Administrative Framework ........................................................................... 22 A. Regulatory Requirements for the Projects ............................................................ 22 B. International Treaties ........................................................................................... 26 C. Asian Development Bank Policies ........................................................................ 26 D. Project Category .................................................................................................. 26 E. Administrative Framework .................................................................................... 27 IV. Description of the Environment .................................................................................... 28 A. Background.......................................................................................................... 28 B. Physical Environment .......................................................................................... 29 C. Water Quality ....................................................................................................... 49 D. Air quality and Noise Levels ................................................................................. 52 E. Terrestrial Ecosystem .......................................................................................... 52 F. Forests and Floral Species .................................................................................. 57 G. Tree within RoW .................................................................................................. 59 H. Aquatic Ecology ................................................................................................... 67 I. Socio-Economic Environment .............................................................................. 67 V. Anticipated Environmental Impacts and Mitigation Measures ....................................... 73 A. Impacts on Physical Environment ........................................................................ 73 B. Impact on Biological Environment ........................................................................ 91 C. Impact on Socio-Economic Environment .............................................................. 93 VI. Environmental Management Plan (EMP) and Grievance Redress Mechanism ............. 96 A. The EMP .............................................................................................................. 96 B. Environmental Monitoring Plan (EMoP) ............................................................. 100 C. Institutional Capacity .......................................................................................... 102 D. Mitigation, Monitoring and Institution Strengthening Cost ................................... 103 VII. Information Disclosure, Consultation and Participation ............................................... 105 A. Introduction ........................................................................................................ 105 B. Public Consultation Milestone ............................................................................ 105 C. Information Disclosed ........................................................................................ 105 D. Compliance with Relevant Regulatory Requirements ......................................... 106 E. Major Comments Received ................................................................................ 106 F. Integration of comments....................................................................................
Recommended publications
  • RP: Bangladesh: SASEC Road Connectivity Project
    Resettlement Plan July 2012 BAN: SASEC Road Project Joydevpur–Chandra–Tangail–Elenga Road Subproject Prepared by the Government of the People‟s Republic of Bangladesh, for the Asian Development Bank. ii CURRENCY EQUIVALENTS (as of 6 July 2012) Currency unit – Taka (Tk) Tk.1.00 = $0.012 $1.00 = Tk. 82 ABBREVIATIONS ADB Asian Development Bank APD Additional Project Director CCL Cash Compensation under Law CE Chief Engineer CMP Current Market Price CPRs Common Property Resources CRO Chief Resettlement Officer CRS Commercial Resettlement Site CSC Construction Supervision Consultant CSOs Civil Society Organizations CUL Compensation under Law DAM Department of Agriculture Marketing DC Deputy Commissioner DCP Disclosure Consultation and Participation DCRO Deputy Chief Resettlement Officer DDC Detailed Design Consultant DHs Displaced Households DPM Deputy Project Managers DPs Displaced Persons EA Executing Agency EC Entitlement Card EM External Monitor EP Entitled Person FGD Focused Group Discussion GOB Government of Bangladesh GRC Grievance Redress Committee HSC Higher Secondary Certificate IGS Income Generating Schemes INGO Implementing Non-Government Organization IOL Inventory of losses IR Involuntary Resettlement IVC Inventory Verification Committee JCTE Joydevpur–Chandra–Tangail–Elenga Road JMBP Jamuna Multipurpose Bridge Project JSC Junior School Certificate JVS Joint Verification Survey JVT Joint Verification Team LA Land Acquisition LAO Land Acquisition Officer LAR Land Acquisition and Resettlement M&E Monitoring and Evaluation MOC Ministry
    [Show full text]
  • Bangladesh, Year 2019: Update on Incidents According to the Armed Conflict Location & Event Data Project (ACLED)
    BANGLADESH, YEAR 2019: Update on incidents according to the Armed Conflict Location & Event Data Project (ACLED) compiled by ACCORD, 29 June 2020 Number of reported incidents with at least one fatality Number of reported fatalities National borders: GADM, November 2015b; administrative divisions: GADM, November 2015a; China/India border status: CIA, 2006; geodata of disputed borders: GADM, November 2015b; Natural Earth, undated; incident data: ACLED, 20 June 2020; coastlines and inland waters: Smith and Wessel, 1 May 2015 BANGLADESH, YEAR 2019: UPDATE ON INCIDENTS ACCORDING TO THE ARMED CONFLICT LOCATION & EVENT DATA PROJECT (ACLED) COMPILED BY ACCORD, 29 JUNE 2020 Contents Conflict incidents by category Number of Number of reported fatalities 1 Number of Number of Category incidents with at incidents fatalities Number of reported incidents with at least one fatality 1 least one fatality Protests 930 1 1 Conflict incidents by category 2 Riots 405 107 122 Development of conflict incidents from 2010 to 2019 2 Violence against civilians 257 184 195 Battles 99 43 63 Methodology 3 Strategic developments 15 0 0 Conflict incidents per province 4 Explosions / Remote 7 2 2 violence Localization of conflict incidents 4 Total 1713 337 383 Disclaimer 6 This table is based on data from ACLED (datasets used: ACLED, 20 June 2020). Development of conflict incidents from 2010 to 2019 This graph is based on data from ACLED (datasets used: ACLED, 20 June 2020). 2 BANGLADESH, YEAR 2019: UPDATE ON INCIDENTS ACCORDING TO THE ARMED CONFLICT LOCATION & EVENT DATA PROJECT (ACLED) COMPILED BY ACCORD, 29 JUNE 2020 Methodology GADM. Incidents that could not be located are ignored.
    [Show full text]
  • South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1
    Bangladesh: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1 Project Name South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1 Project Number 40540-017 Country Bangladesh Project Status Approved Project Type / Modality of Loan Assistance Source of Funding / Amount Loan 3592-BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1 Ordinary capital resources US$ 250.00 million Loan 3593-BAN: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1 concessional ordinary capital resources lending / Asian US$ 50.00 million Development Fund Loan: South Asia Subregional Economic Cooperation Dhaka-Northwest Corridor Road Project, Phase 2 - Tranche 1 Japan International Cooperation Agency US$ 242.52 million Strategic Agendas Environmentally sustainable growth Inclusive economic growth Regional integration Drivers of Change Governance and capacity development Partnerships Sector / Subsector Transport - Road transport (non-urban) Gender Equity and Effective gender mainstreaming Mainstreaming Description The project will improve the road connectivity and efficiency of Dhaka-Northwest international trade corridor. To ensure the sustainability of the outcome, an associated technical assistance is proposed to assist the government in updating its master plan for roads and improving its planning capacity. Project Rationale and Bangladesh reached lower middle-income status in July 2015. With its young and rapidly growing Linkage to Country/Regional population, Bangladesh has the potential to become a major exporter of labor-intensive products. Its Strategy location between South and Southeast Asia provides the country good prospects of becoming a regional trading hub. But the country's transport infrastructure is inadequate, which raises costs, reduces competitiveness, and impedes intra-regional trade.
    [Show full text]
  • Division Name District Name Upazila Name 1 Dhaka 1 Dhaka 1 Dhamrai 2 Dohar 3 Keraniganj 4 Nawabganj 5 Savar
    Division name District Name Upazila Name 1 Dhaka 1 Dhamrai 1 Dhaka 2 Dohar 3 Keraniganj 4 Nawabganj 5 Savar 2 Faridpur 1 Alfadanga 2 Bhanga 3 Boalmari 4 Char Bhadrasan 5 Faridpur Sadar 6 Madhukhali 7 Nagarkanda 8 Sadarpur 9 Saltha 3 Gazipur 1 Gazipur Sadar 2 Kaliakoir 3 Kaliganj 4 Kapasia 5 Sreepur 4 Gopalganj 1 Gopalganj Sadar 2 Kasiani 3 Kotalipara 4 Maksudpur 5 Tungipara 5 Jamalpur 1 Bakshiganj 2 Dewanganj 3 Islampur 4 Jamalpur Sadar 5 Madarganj 6 Melandah 7 Sharishabari 6 Kishoreganj 1 Austogram 2 Bajitpur 3 Bhairab 4 Hosainpur 5 Itna 6 Karimganj 7 Katiadi 8 Kishoreganj Sadar 9 Kuliarchar 10 Mithamain 11 Nikli 12 Pakundia 13 Tarail 7 Madaripur 1 Kalkini 2 Madaripur Sadar 3 Rajoir 4 Shibchar 8 Manikganj 1 Daulatpur 2 Ghior 3 Harirampur 4 Manikganj Sadar 5 Saturia 6 Shibalaya 7 Singair 9 Munshiganj 1 Gazaria 2 Lauhajang 3 Munshiganj Sadar 4 Serajdikhan 5 Sreenagar 6 Tangibari 10 Mymensingh 1 Bhaluka 2 Dhubaura 3 Fulbaria 4 Fulpur 5 Goffargaon 6 Gouripur 7 Haluaghat 8 Iswarganj 9 Mymensingh Sadar 10 Muktagacha 11 Nandail 12 Trishal 11 Narayanganj 1 Araihazar 2 Bandar 3 Narayanganj Sadar 4 Rupganj 5 Sonargaon 12 Norshingdi 1 Belabo 2 Monohardi 3 Norshingdi Sadar 4 Palash 5 Raipura 6 Shibpur 13 Netrokona 1 Atpara 2 Barhatta 3 Durgapur 4 Kalmakanda 5 Kendua 6 Khaliajuri 7 Madan 8 Mohanganj 9 Netrokona Sadar 10 Purbadhala 14 Rajbari 1 Baliakandi 2 Goalunda 3 Pangsha 4 Rajbari Sadar 5 Kalukhale 15 Shariatpur 1 Bhedarganj 2 Damudiya 3 Gosairhat 4 Zajira 5 Naria 6 Shariatpur Sadar 16 Sherpur 1 Jhenaigati 2 Nakla 3 Nalitabari 4 Sherpur Sadar
    [Show full text]
  • Aquatic Ecology and Dangerous Substances: Bangladesh Perspective
    Diffuse Pollution Conference Dublin 2003 8C Ecology: AQUATIC ECOLOGY AND DANGEROUS SUBSTANCES: BANGLADESH PERSPECTIVE Institute for Environment and Development Studies 5/12-15, Eastern view (5th floor), 50, D.I.T Extension Road, Dhaka -1000, Bangladesh. E-mail: [email protected] ; Phone: +880 2 9354128 ; Fax: +880 2 8315394 Bangladesh had always been predominantly and agricultural based country and in early days pollution was never even felt in this region. Since early sixties, of necessity, industries of various kinds started to spring up slowly. It appears in a survey that ecological imbalance is being caused continuously due to discharge of various industrial wastes into air and water bodies. It has also been found that the intensity of pollution caused by the factories and industrial units depend on their type, location, raw materials, chemical effects, production process and discharge of gaseous, liquid and solid pollutants to the natural environment. All of Bangladesh's sewage and industrial wastes are flushed directly into Ganges and Brahmaputra Rivers. There are wide spread fears that as the region develops in industrial infrastructure, industrial pollution will accelerate, compounding the problems posed by raw municipal wastes. About 900 polluting industries in Bangladesh dispose of untreated industrial wastes directly into rivers, although the effluents contain 10 to 100 times the allowable levels permissible for human health. The Ganges-Brahmaputra delta is the largest delta in the world and the rivers contribute one-third of the global sediment transport to the world oceans. The rivers flow through 10 per cent global population and carry untreated rural, urban, municipal and industrial wastes to the Bay of Bengal.
    [Show full text]
  • Planning and Prioritisation of Rural Roads in Bangladesh Final Report- Volume 2
    Planning and Prioritisation of Rural Roads in Bangladesh Final Report- Volume 2 Department of Urban and Regional Planning (DURP) Bangladesh University of Engineering and Technology (BUET) February 2018 (Revised) Planning and Prioritisation of Rural Roads in Bangladesh The analyses presented and views expressed in this report are those of the authors and they do not necessarily reflect the views of the Government of Bangladesh, Local Government Engineering Department, Research for Community Access Partnership (ReCAP) or Bangladesh University of Engineering and Technology (BUET). Cover Photo: Mr. Md. Mashrur Rahman using LGED’s GIS Database Quality assurance and review table Version Author(s) Reviewer(s) Date Department URP, BUET Les Sampson and October 13, 2017 1 Maysam Abedin, ReCAP Department URP, BUET Abul Monzur Md. Sadeque and October 19, 2017 Md. Sohel Rana, LGED Department URP, BUET Les Sampson and January 10, 2018 2 Maysam Abedin, ReCAP Department URP, BUET Abul Monzur Md. Sadeque and January 27, 2018 Md. Sohel Rana, LGED ReCAP Project Management Unit Cardno Emerging Market (UK) Ltd Oxford House, Oxford Road Thame OX9 2AH United Kingdom Page 2 Planning and Prioritisation of Rural Roads in Bangladesh Key words Bangladesh, Rural Road, Rural Road Prioritisation, Rural Road Network Planning, Core Road Network, Multi Criteria Analysis, Cost Benefit Analysis, Local Government Engineering Department. RESEACH FOR COMMUNITY ACCESS PARTNERSHIP (ReCAP) Safe and sustainable transport for rural communities ReCAP is a research programme, funded by UK Aid, with the aim of promoting safe and sustainable transport for rural communities in Africa and Asia. ReCAP comprises the Africa Community Access Partnership (AfCAP) and the Asia Community Access Partnership (AsCAP).
    [Show full text]
  • List of Pourashava (Division and Category Wise)
    List of Pourashava (Division and Category wise) SL No. Division District City Corporation/Pourashava Category 1 Barishal Pirojpur Pirojpur A 2 Barishal Pirojpur Mathbaria A 3 Barishal Pirojpur Shorupkathi A 4 Barishal Jhalokathi Jhalakathi A 5 Barishal Barguna Barguna A 6 Barishal Barguna Amtali A 7 Barishal Patuakhali Patuakhali A 8 Barishal Patuakhali Galachipa A 9 Barishal Patuakhali Kalapara A 10 Barishal Bhola Bhola A 11 Barishal Bhola Lalmohan A 12 Barishal Bhola Charfession A 13 Barishal Bhola Borhanuddin A 14 Barishal Barishal Gournadi A 15 Barishal Barishal Muladi A 16 Barishal Barishal Bakerganj A 17 Barishal Patuakhali Bauphal A 18 Barishal Barishal Mehendiganj B 19 Barishal Barishal Banaripara B 20 Barishal Jhalokathi Nalchity B 21 Barishal Barguna Patharghata B 22 Barishal Bhola Doulatkhan B 23 Barishal Patuakhali Kuakata B 24 Barishal Barguna Betagi B 25 Barishal Barishal Wazirpur C 26 Barishal Pirojpur Bhandaria C 27 Chattogram Chattogram Patiya A 28 Chattogram Chattogram Bariyarhat A 29 Chattogram Chattogram Sitakunda A 30 Chattogram Chattogram Satkania A 31 Chattogram Chattogram Banshkhali A 32 Chattogram Cox's Bazar Cox’s Bazar A 33 Chattogram Cox's Bazar Chakaria A 34 Chattogram Rangamati Rangamati A 35 Chattogram Bandarban Bandarban A 36 Chattogram Khagrchhari Khagrachhari A 37 Chattogram Chattogram Chandanaish A 38 Chattogram Chattogram Raozan A 39 Chattogram Chattogram Hathazari A 40 Chattogram Cumilla Laksam A 41 Chattogram Cumilla Chauddagram A 42 Chattogram Chandpur Chandpur A 43 Chattogram Chandpur Hajiganj A
    [Show full text]
  • Study on Surface Water Availability for Future Water Demand for Dhaka City
    STUDY ON SURFACE WATER AVAILABILITY FOR FUTURE WATER DEMAND FOR DHAKA CITY MD EHSANUL HAQUE DOCTOR OF PHILOSOPHY (WATER RESOURCES ENGINEERING) DEPARTMENT OF WATER RESOURCES ENGINEERING BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY DHAKA, BANGLADESH FEBRUARY, 2018 STUDY ON SURFACE WATER AVAILABILITY FOR FUTURE WATER DEMAND FOR DHAKA CITY by Md Ehsanul Haque A thesis submitted to the Department of Water Resources Engineering Bangladesh University of Engineering and Technology, Dhaka in partial fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY (WATER RESOURCES ENGINEERING) DEPARTMENT OF WATER RESOURCES ENGINEERING BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY DHAKA, BANGLADESH February, 2018 CERTIFICATE OF APPROVAL Signature of the Student Md Ehsanul Haque Signature of the Supervisor Professor Dr. Md. Abdul Matin iii ii To My Father Late Lt Col Shamsul Haque & My Mother Mrs Suraiya Haque iii ACKNOWLEDGEMENTS All praises are solely to the most merciful and beneficent Almighty Allah for enabling the author to complete the research work and to prepare this manuscript for fulfillment of the degree of Doctor of Philosophy in Water Resources Engineering. The author deems it is a great pleasure and honor to express his deep sense of gratitude, heartfelt indebtedness and sincere appreciation to his Thesis Supervisor Professor Dr. Md. Abdul. Matin, Department of Water Resources Engineering, Bangladesh University of Engineering and Technology for providing scholastic guidance, supervision and affectionate inspiration for successful achievement and outstanding contribution of the research work as well as preparation of this thesis. The author extends his sincere appreciation and immense indebtedness to his research to the distinguished members Professor Dr.
    [Show full text]
  • Evaluation of Netherlands-Funded Ngos in Bangladesh
    Evaluation of Netherlands-funded NGOs in Bangladesh Ministry of Foreign Affairs, Policy and Operations Evaluation Department (IOB) ISBN 90-5328-163-0 Photographs: Ron Giling/LINEAIR Maps and figures: Geografiek, Amsterdam Pre-press services: Transcripta, Beerzerveld Printed by: Ridderprint BV, Ridderkerk Preface The evaluation of Netherlands supported NGOs in Bangladesh forms part of a study undertaken by the Policy and Operations Evaluation Department (IOB) on the Netherlands bi-lateral aid programme for Bangladesh in the period 1972–96. The support to NGOs through the regular aid programme and through the Co-financing Programme has been important to the Netherlands’ pursuance of poverty alleviation objectives in Bangladesh. A total of Dfl. .247 million has been disbursed through these channels, some three quarters of which after 1990. The position of NGOs in Bangladeshi society is quite unique. Bangladesh is home to the largest national NGOs in the world, as well as to a multitude of middle- and small-sized NGOs that operate on a national, regional or local level. The Bangladeshi NGOs literally reach out to millions of people in both rural and urban areas. This study comprises extensive case studies of a cross section of NGOs in Bangladesh. Both the Bangladeshi NGOs that were subject of study and their partners in the Netherlands, Bilance (formerly Cebemo), ICCO and Novib, have been closely involved in the various stages of the study. The study has concentrated on the credit and training activities that constitute the mainstay of NGO programmes. It is concluded that these activities effectively target the poorer sections of the population, particularly women.
    [Show full text]
  • 40540-014: SASEC Road Connectivity Project
    Semiannual Social Monitoring Report Project No. 40540-014 June 2019 SASEC Road Connectivity Project Improvement of Joydevpur-Chandra-Tangail-Elenga Road (N-4), Construction of RHD Headquarters Building at Tejgaon Dhaka Improvement of Benapole and Burimari Land Port This Semiannual Social Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 2949-BAN (SF): SASEC Road Connectivity Project Improvement of Joydevpur-Chandra-Tangail-Elenga Road (N-4), Construction of RHD Headquarters Building at Tejgaon Dhaka Improvement of Benapole and Burimari Land Port SOCIAL MONITORING REPORT Project Number: 40540-014 Semi-Annual Social Monitoring Report July 2019 Project Implementation Consultants: Kunhwa Engineering & Consulting Co. Ltd. (South Korea) in Joint Venture With Korea Consultants International Co. Ltd. (South Korea) Intercontinental Consultants and Technocrats Pvt. Ltd. (India) in association With Development Design Consultants Ltd. (Bangladesh) 2949-BAN (SF): SASEC Road Connectivity Project Improvement of Joydevpur-Chandra-Tangail-Elenga Road (N-4), Construction of RHD Headquarters Building at Tejgaon Dhaka Improvement of Benapole and Burimari Land Port Seventh Semi-Annual Social Monitoring Report SASEC Road Connectivity Project: January to June 2019 Project Implementation Consultants: Kunhwa Engineering & Consulting Co. Ltd. (South Korea) in Joint Venture With Korea Consultants International Co.
    [Show full text]
  • Division Zila Upazila Name of Upazila/Thana 10 10 04 10 04
    Geo Code list (upto upazila) of Bangladesh As On March, 2013 Division Zila Upazila Name of Upazila/Thana 10 BARISAL DIVISION 10 04 BARGUNA 10 04 09 AMTALI 10 04 19 BAMNA 10 04 28 BARGUNA SADAR 10 04 47 BETAGI 10 04 85 PATHARGHATA 10 04 92 TALTALI 10 06 BARISAL 10 06 02 AGAILJHARA 10 06 03 BABUGANJ 10 06 07 BAKERGANJ 10 06 10 BANARI PARA 10 06 32 GAURNADI 10 06 36 HIZLA 10 06 51 BARISAL SADAR (KOTWALI) 10 06 62 MHENDIGANJ 10 06 69 MULADI 10 06 94 WAZIRPUR 10 09 BHOLA 10 09 18 BHOLA SADAR 10 09 21 BURHANUDDIN 10 09 25 CHAR FASSON 10 09 29 DAULAT KHAN 10 09 54 LALMOHAN 10 09 65 MANPURA 10 09 91 TAZUMUDDIN 10 42 JHALOKATI 10 42 40 JHALOKATI SADAR 10 42 43 KANTHALIA 10 42 73 NALCHITY 10 42 84 RAJAPUR 10 78 PATUAKHALI 10 78 38 BAUPHAL 10 78 52 DASHMINA 10 78 55 DUMKI 10 78 57 GALACHIPA 10 78 66 KALAPARA 10 78 76 MIRZAGANJ 10 78 95 PATUAKHALI SADAR 10 78 97 RANGABALI Geo Code list (upto upazila) of Bangladesh As On March, 2013 Division Zila Upazila Name of Upazila/Thana 10 79 PIROJPUR 10 79 14 BHANDARIA 10 79 47 KAWKHALI 10 79 58 MATHBARIA 10 79 76 NAZIRPUR 10 79 80 PIROJPUR SADAR 10 79 87 NESARABAD (SWARUPKATI) 10 79 90 ZIANAGAR 20 CHITTAGONG DIVISION 20 03 BANDARBAN 20 03 04 ALIKADAM 20 03 14 BANDARBAN SADAR 20 03 51 LAMA 20 03 73 NAIKHONGCHHARI 20 03 89 ROWANGCHHARI 20 03 91 RUMA 20 03 95 THANCHI 20 12 BRAHMANBARIA 20 12 02 AKHAURA 20 12 04 BANCHHARAMPUR 20 12 07 BIJOYNAGAR 20 12 13 BRAHMANBARIA SADAR 20 12 33 ASHUGANJ 20 12 63 KASBA 20 12 85 NABINAGAR 20 12 90 NASIRNAGAR 20 12 94 SARAIL 20 13 CHANDPUR 20 13 22 CHANDPUR SADAR 20 13 45 FARIDGANJ
    [Show full text]
  • Ground Water Sustainability Assessment for the Greater Dhaka
    GROUND WATER SUSTAINABILITY ASSESSMENT FOR THE GREATER DHAKA WATERSHED AREA CONTENT Executive Summary 1 Background 2 Objectives of the study 3 Description of the study area 3 Industrial establishment 4 Lithological mapping 5 Groundwater flow system abstraction and head distribution 6 Groundwater sustainability assessment 8 Groundwater scenario at business as usual case 8 Groundwater scenario at business plus case 9 Conclusions and recommendations 9 Recommendation for the next course of action 10 Annex 1: Review of literature 13 Annex 2: Methodology 16 TABLE OF FIGURE Figure 1: Water abstraction rate at BAU Case 1 Figure 2 : Water abstraction rate at BAU Plus 1 Figure 3 : Projected depth of water table 1 Figure 4 : Location of the project area and river system 3 Figure 5 : Location and type of the industries in the project area 4 Figure 6 : Lithological cross section of the study area 5 Figure 7 : Abstraction and Natural Recharge 6 Figure 8 : Sector wise ground water abstraction 6 Figure 9 : Long term Groundwater level fluctuation 6 Figure 10 : Existing groundwater head distribution in the study area 7 Figure 11 : Total Water Abstraction, water level declination rate and depth of water table at BAU case 8 Figure 12 : Cross section of the Projected GW head in BAU case 8 Figure 13 : Cross section of the Projected GW head in BAU Plus case 8 Figure 14 : Water demand over years at BAU plus case 9 Figure 15 : Total Water Abstraction, water level declination rate and depth of water table at BAU plus case 9 Figure 16 : Conceptual diagram of MAR 12 Figure 17 : Model grid reference 17 EXECUTIVE SUMMARY In the context of the changing global environment and socio-political and economic conditions of Bangladesh, especially in the greater Dhaka, resources management with its optimum use is one of the biggest concerns for business sustainability.
    [Show full text]