Date: November 18, 2019 To: Heritage Preservation Commission From: George Gause Re: Consultation and Comment for Metro Transit Rush Line Bus Rapid Transit Area of Potential Effects (APE)

Background The Federal Transit Administration (FTA) in cooperation with Metro Transit and the is proposing the Rush Line Bus Rapid Transit (BRT) Project that is a proposed 14-mile bus transit route with stations between Union Depot in Saint Paul and downtown White Bear Lake.

The FTA initiated the consultation process under the regulations for Section 106 of the National Historic Preservation Act (NHPA) on July 1, 2018. The HPC requested consulting party status to participate in the concurrence with the survey and evaluation findings and with the determination of effect, if any, the project will have on National Register of Historic Places (NRHP) properties or those determined to meet the criteria for listing on the NRHP.

The Area of Potential Effect (APE) parameters has been set after consultation with the Advisory Council for Historic Preservation. The HPC has 30 days to comment (November 29th, 2019)

HERITAGE PRESERVATION COMMISSION COMMENTS The HPC serves as an advisory body to the Mayor and City Council on municipal heritage preservation matters. Chapter 73.04(1) states the HPC shall review and comment on plans and studies which relate to the historic and architectural heritage of the city.

STAFF RECOMMENDATION Heritage Preservation and City staff have concern that more detail has not been show for the three proposed Lowertown platforms. Our last comments to the Department of Transportation alerted them that there could be an adverse impact to the historic district.

Union Depot Station Wacouta Street Platform Union Depot Station Sibley Street Platform 5th/6th Street Station 5th Street Platform

The above station platforms could have an adverse impact on Lowertown Historic Local, State and National District and efforts to minimize impacts of the station design should be made.

• The size of the station should not to block views in the district. • Station materials and design/ornamentation: metal should have a dark finish, ornamentation should not conflict with the historic character of the district, lighting should be directed downward, signage should be minimal and historically appropriate.

MDOT responded to our comments: The two BRT stations proposed for Lowertown will be built by Gold Line, but will be designed to accommodate both projects. The City has provided input on both stations. The 15% plans are included in the Gold Line Environmental Assessment, which is currently out for public comment (available on the Project website). Moving forward, the forthcoming Gold Line Section 106 Programmatic Agreement requires additional consultation to inform the design.

SUGGESTED MOTION I move that the HPC concurs with the Area of Potential Effect submitted for the Rush Line Bus Rapid Transit are reiterate that additional review and consultation will be required for the three proposed Lowertown Historic District platforms for Rush Line and Gold Lined as per presented testimony, submitted documentation and information provided in the staff report.

Office of Environmental Stewardship Cultural Resources Unit 395 John Ireland Boulevard, Mail Stop 620 Saint Paul, Minnesota 55155

Date: September 27, 2019

To: William Wheeler, Federal Transit Administration, Region 5 Elizabeth Breiseth, Federal Transit Administration, Region 5

From: Barbara Howard

Re: METRO Rush Line Bus Rapid Transit Project Area of Potential Effects Parameters Rush Line Bus Rapid Transit The Rush Line Bus Rapid Transit (BRT) Project (Project) is a proposed 14-mile transit route between Saint Paul and White Bear Lake. It includes 21 stations that would serve the communities of Saint Paul, Maplewood, Vadnais Heights, Gem Lake, White Bear Township, and White Bear Lake. Approximately 75 to 80 percent of the route will be in dedicated transit lanes or business access and transit (BAT) lanes, with service every 10 minutes during rush hours and every 15 minutes other times. Park-and-rides are proposed as part of the project at the Highway 36, Transit Center, and County Road E stations. The analysis and design of this transit route is being led by Ramsey County.

The Project may receive funding from the United States Department of Transportation, Federal Transit Administration (FTA) and, therefore, must comply with the National Environmental Policy Act of 1969, as amended, and Section 306108 (previously and hereinafter referred to as Section 106) of the National Historic Preservation Act (54 United States Code [USC] 300101 et seq.), and its implementing regulations, 36 Code of Federal Regulations [CFR] 800. The Project is also subject to other applicable federal and state mandates such as the Minnesota Historic Sites Act, Minnesota Field Archaeology Act, and Minnesota Private Cemeteries Act.

The FTA has delegated authority to the Minnesota Department of Transportation’s (MnDOT) Cultural Resources Unit (CRU) to complete many aspects of the Section 106 process on its behalf for the Project, including preparing Section 106 documentation, analyses, and recommendations to inform FTA determinations. This memorandum has been prepared to help support a draft Area of Potential Effects (APE) for the Project. Introduction Although the information presented within this document is based on parameters previously developed for the Gold Line BRT Project, conversations with FTA and within MnDOT CRU staff suggest several changes from past precedent:

• Based on recent guidance provided by the Advisory Council on Historic Preservation, FTA has delineated a single APE for all project effects rather than two APEs based on the type of property expected to be found or the anticipated effect (i.e., direct or indirect). • The table outlining the parameters for indirect effects allows for greater discretion in adjusting the APE based on specific project elements and onsite conditions.

We recognize the APE may need to be expanded or contracted as the engineering and design work advances. The parameters outlined below will serve as a starting point for CRU analysis in order to recommend any future APE modifications to FTA.

METRO Rush Line BRT Project 1 September 27, 2019 Area of Potential Effects Parameters Effects Analysis The Rush Line BRT has the potential for both direct and indirect effects to historic properties resulting from activities associated with BRT construction and operation. Potential physical effects include those related to acquisition, ground-disturbing activities, and alterations to existing properties. Additional direct effects may include vibration, noise, visual effects, and changes in traffic. Indirect effects may include potential development catalyzed near station areas. Each of these potential types of effects is discussed below in relation to project elements.

As part of considering whether there is potential for noise and vibration impacts throughout the corridor, MnDOT CRU has reviewed FTA’s screening distances for noise and vibration for busway and BRT projects and for specific bus facilities (Transit Noise and Vibration Impact Assessment Manual, September 2018). Due to their rubber tires and suspension systems, buses do not typically cause ground-borne noise or vibration concerns as part of bus operations. Noise analysis conducted to date indicates that potential noise impacts from the operation of the electric bus fleet will be limited to the roadway right-of-way. However, temporary noise and vibration as a result of construction activities is possible, as noted in descriptions, below. Running Ways and Guideways In addition to operating in mixed traffic within existing roadway limits, the Rush Line BRT anticipates operating along new dedicated guideways, on new dedicated transit lanes along existing streets, and along new BAT lanes within existing road rights-of-way.

Bus traffic will operate at speeds ranging from 5 miles per hour (mph) to 50 mph, depending on location and the type of running way in use. In downtown Saint Paul, buses will primarily operate up to 25 mph in mixed traffic and in dedicated transit lanes. Outside of downtown Saint Paul, buses will operate between 25 and 40 mph in areas where they operate in mixed traffic and in dedicated transit lanes. On the dedicated guideways along Phalen Boulevard and within the Ramsey County Regional Railroad Authority (RCRRA) Corridor, buses will operate at speeds up to 45 mph. Finally, along TH 61, buses will operate in BAT lanes and mixed traffic up to the posted speeds of 40-50 mph. The introduction of new bus traffic has been considered throughout, with careful consideration given to areas where bus traffic is operating on new dedicated guideways and where there is a high volume of existing traffic.

Physical effects will be minimal where existing road limits (i.e., curb-to-curb) will incorporate mixed traffic or a dedicated bus lane without extensive construction. Other segments of the corridor may require realignment or minor expansion of the road limits both within and outside of the existing rights- of-way, increasing the limits of disturbance and the potential for temporary construction noise and vibration. The dedicated guideway and a few segments of the corridor where dedicated bus lanes are proposed will require more intense earthmoving and construction activities resulting in temporary noise and vibration. The majority of the dedicated guideway is along the RCRRA Corridor, which has extant fill embankments up to 30 feet above the surrounding ground level in some areas, increasing the potential extent of visual effects. This corridor is the former corridor for the Lake Superior & Mississippi Railroad (LS&M; RA-SPC-6064), portions of which have previously been considered eligible for listing on the National Register of Historic Places.

METRO Rush Line BRT Project 2 September 27, 2019 Area of Potential Effects Parameters Stations There are 21 stations proposed along the route, including modifications to two existing stations. In addition to the physical effects of ground disturbance and the temporary noise and vibration effects associated with proposed construction, BRT stations will introduce new elements along the project corridor visible to properties within sight lines of these facilities. New stations will typically include one or two platform(s), which are anticipated to be 80 to 100 feet long, with 60-foot platforms in some locations due to site constraints. Typical stations also include off-board fare collection, above-ground shelters, wheelchair ramps, and amenities such as lighting, benches, bike racks, trash receptacles, security systems, and signage. The Project team is working with communities to determine whether additional amenities are desired and can be incorporated into the Project design. These may include designated vehicle drop-off/pick-up zones, bicycle lockers and tune-up stations, landscaping, and other design features. Modifications to existing platforms are proposed at the Maplewood Mall Transit Center (opened in 2013; MnSHPO No. 2010-1249) and at the St. Paul Union Depot (RA-SPC-5225, listed on the National Register in 1974 with a boundary expansion in 2014).

Please note that with the exception of certain features proposed for the Union Depot Station, the platforms associated with Union Depot (including the Union Depot bus deck, the southbound platform at Wacouta Street, and northbound platform at Sibley Street) and the 5th/6th Street Station coincide with platforms currently proposed and being reviewed under Section 106 as part of the Gold Line BRT Project (MnSHPO No. 2014-0398). The Rush Line-specific design features proposed for the Union Depot Station will be included as part of this Project review, which will also consider the cumulative effect of the additional increased bus traffic for these areas. The Rush Line Project team is coordinating with the Gold Line Project team on design throughout this area.

Transit-oriented development (TOD) around station areas has the potential to affect historic properties, as well. In general, transit is merely a catalyst for redevelopment, so most TOD is considered an indirect effect. Actual redevelopment opportunities are based on global market conditions and local economic stability as well as established land use policies and zoning ordinances. Through their station area planning process, Ramsey County is conducting analysis and preparing recommendations for communities to use in local planning efforts. Communities may or may not formally adopt those recommendations. As station area planning documents are prepared, MnDOT CRU will review them to make recommendations to FTA about any potential need to adjust the APE based on community adoption of station area plans. Park-and-Ride Facilities Two new park-and-ride facilities are being considered as part of the Project. An existing surface parking lot near the County Road E Station may be modified to set aside a dedicated parking area for the Project (approximately 70 parking spaces). At the Highway 36 Station, a new parking lot and/or parking structure (up to 3 stories and 550 parking spaces) is being considered, as well as a potential trail head and rain garden. In addition, an existing park-and-ride facility located at the Maplewood Mall Transit Center (opened in 2013; MnSHPO No. 2010-1249) is proposed to be used for the Rush Line BRT project; no increase in parking capacity is currently proposed. In addition to the physical effects of ground disturbance and the temporary noise and vibration effects associated with construction and/or modification of park-and-ride facilities, permanent effects may include visual effects due to structural elements, paving, and lighting, and changes to existing traffic patterns.

METRO Rush Line BRT Project 3 September 27, 2019 Area of Potential Effects Parameters Grade Separation Structures Reactivating the RCRRA ROW with motorized vehicles requires consideration of the busway’s intersections with existing roadways and trails. In many cases, signalized intersections are anticipated. However, the Project is currently proposing seven (7) grade separation structures. In addition to the physical effects of ground disturbance and the temporary noise and vibration effects associated with construction, which may include pile driving, these bridges will introduce (or reintroduce where bridges were once located) visual elements to properties within the sight lines of the structures. These visual elements may include the bridge itself, as well as associated approaches, pedestrian or bicycle facilities, lighting, retaining walls, and landscaping. In addition to the seven (7) grade separation structures, an extant underpass within the RCRRA ROW is proposed for closure. As project designs are developed, MnDOT CRU will review the size and the methods of construction for bridges and retaining walls to make recommendations to FTA about any potential need to adjust the APE. Roadways, Parking Lots, Pedestrian Accommodations, and Bicycle Facilities Street and intersection improvements have the potential to result in both the physical effects of ground disturbance and temporary noise and vibration effects associated with construction. Changes to existing and introduction of new signalized intersections may result in changes to traffic. In addition to shifting the Bruce Vento Trail within a portion of the LS&M Railroad Corridor to accommodate the dedicated guideway, at-grade and grade-separated intersections with other recreational trails and pedestrian and bicycle facilities are being considered. The physical effects of ground disturbance and the temporary noise and vibration effects associated with construction are considered, along with the visual effects on the surrounding properties. Although project maps illustrate potential future expansion of the Bruce Vento Trail by Ramsey County, since expansion of the trail is not being caused by the proposed Project, only the realignment of the trail directly related to the current Project is being considered as part of the APE delineation. Utilities, Borrow/Fill Areas, and Floodplain/Stormwater/Wetland Mitigation Areas In addition to the physical effects of ground disturbance and temporary noise and vibration associated with construction, utilities, borrow/fill areas, and floodplain/stormwater/wetland mitigation areas may have visual impacts to surrounding properties. MnDOT CRU will review these elements as they are added to, and better defined within, the Project scope and make recommendations to FTA about any potential need to adjust the APE. Land Acquisition Proposed land acquisition may include partial or full parcel acquisition. Land proposed for acquisition and any other areas of ground disturbing activity associated with land acquisition will be included within the APE. The potential effects of specific project elements proposed for the acquired parcels are considered as appropriate. Operations and Maintenance Facilities (OMFs) No new OMFs are currently planned as part of the Project. The East Metro Garage (opened in 2001; MnSHPO No. 1999-1621) may be used for Rush Line BRT maintenance and may receive interior modifications to accommodate the electric bus fleet. Any potential noise or vibration due to construction is anticipated to be limited to the current land parcel. If OMFs are added to the Project scope or if additional exterior changes are proposed to the East Metro Garage, MnDOT CRU will review them to make recommendations to FTA about any potential need to adjust the APE. Potential effects

METRO Rush Line BRT Project 4 September 27, 2019 Area of Potential Effects Parameters might include the physical effects of ground disturbance, temporary noise and vibration effects associated with construction, and visual effects due to structural elements, paving, and lighting. APE Parameters General parameters and rationale for the development of the APE are listed below. The APE as delineated includes all ground disturbing activities within the anticipated limits of disturbance (LOD) for the project. The LOD includes all areas of proposed construction activities, other potential ground- disturbing activities associated with construction (such as staging/storage/borrow excavation), and proposed land acquisition. The entirety of the public right-of-way (ROW) within the RCRRA/LS&M corridor is incorporated into the LOD in order to accommodate the extensive modifications proposed to shift the Bruce Vento recreational trail and construct dedicated BRT guideway. The APE parameters also consider all other potential direct or indirect effects, including physical, auditory, atmospheric, or visual impacts to historic properties or their settings, and cumulative and reasonably foreseeable effects caused by the Project.

In certain project areas, the parameters have been modified during APE delineation to account for the known size and scale of proposed structures, anticipated construction methods, the potential for obstructed or unobstructed views to or from the project, or anticipated traffic impacts or development pressures. As planning and design advance and project details are further defined, the APE will continue to be reassessed by MnDOT CRU to account for project effects that are not known or fully understood at this time. MnDOT CRU will make recommendations to FTA about any potential need to adjust the APE.

Project Element APE and Rationale Running Ways and Guideways New dedicated guideway All properties within 250 feet of the guideway centerline(s) [or the construction limits/LOD, where appropriate] to account for potential physical effects, visual effects, above- grade elements (e.g., lighting, trees, signage, etc.), new bus traffic on a current recreational trail, and temporary noise/vibration during construction. This may be increased or decreased depending on onsite conditions, anticipated visibility of the guideway and related BRT traffic, and the presence of intervening landscape features or buildings. BRT operating in mixed traffic and on All properties within 125 feet of the guideway centerline(s) new dedicated transit lanes (including [or the construction limits/LOD, where appropriate] to business access and transit BAT lanes) account for potential physical effects, visual effects, changes in traffic, and temporary noise/vibration during construction. Where appropriate, this may be decreased to the construction limits/LOD where proposed construction will be limited to repainting, repair, and/or mill and overlay of existing pavement.

METRO Rush Line BRT Project 5 September 27, 2019 Area of Potential Effects Parameters Project Element APE and Rationale Stations and Park-and-Ride Facilities New stations and Park-and-Ride All properties within 250 feet of the parcel’s perimeter [or Structures the construction limits/LOD, where appropriate] to account for potential physical effects, visual effects, new traffic, and temporary noise/vibration during construction. This may be modified in response to future station area planning, depending on local adoption of Project recommendations. Modifications to existing stations and For minor modifications, such as reconfiguration or park-and-ride structures reconstruction of existing station platforms and minor exterior alterations to existing structures, all properties within the parcel’s perimeter [or the construction limits/LOD, where appropriate] to account for potential physical effects and temporary noise/vibration during construction. For additions or extensive exterior modifications, all properties within 175 feet of the parcel’s perimeter [or the construction limits/LOD, where appropriate] to account for potential physical effects, visual effects, new traffic, and temporary noise/vibration during construction. This may be increased if the modification results in a substantial increase in height or footprint. New surface parking facilities with bus All properties within 175 feet of the parcel’s perimeter [or traffic or modifications to existing the construction limits/LOD, where appropriate] to account surface parking facilities to for potential physical effects, visual effects, new traffic, and accommodate buses (surface parking temporary noise/vibration during construction. facilities without bus traffic, below) Bridges and Grade-Separation Structures New bridge locations or replacements All properties within 250 feet of the parcel’s perimeter [or proposed for the same location (no the construction limits/LOD, where appropriate] to account pile driving) for potential physical effects, visual effects, new traffic or changes in existing traffic, and temporary noise/vibration during construction. New bridge locations or replacements All properties within 600 feet of the parcel’s perimeter [or proposed for the same location (pile the construction limits/LOD, where appropriate] to account driving) for potential physical effects, visual effects, new traffic or changes in existing traffic, and temporary noise/vibration during construction. Modifications to existing bridges All properties within 175 feet of the structure [or the resulting in no substantial increase in construction limits/LOD, where appropriate] to account for size (no pile driving) potential physical effects, visual effects, and temporary noise/vibration during construction. This may be decreased to the construction limits/LOD where proposed construction will be limited to minor repairs and/or mill and overlay of existing roadway surface over bridges.

METRO Rush Line BRT Project 6 September 27, 2019 Area of Potential Effects Parameters Project Element APE and Rationale Retaining walls (no pile driving) All property within 100 feet of the construction limits/LOD to account for physical effects, temporary noise/vibration during construction, and potential visual effects. This may be increased or decreased depending the change in grade and the method of construction. Adjacent/Intersecting Roadways, Parking Lots, and Pedestrian/Bicycle Facilities Minor modifications, including mill All properties within the construction limits/LOD to account and overlay, of existing roadways for physical effects and temporary noise and vibration within existing paved roadway limits effects during construction. (i.e., curb to curb). New and relocated/realigned All properties within 125 feet of the perimeter of the roadways not within existing paved construction limits/LOD to account for temporary and roadway limits permanent noise and vibration effects, new traffic, and permanent visual effects. New surface parking facilities, All property within 125 feet of the construction limits/LOD modifications to existing surface to account for physical effects and potential visual effects of parking facilities, and new access above-grade elements (e.g., security and pedestrian-scaled roads (surface parking facilities to lighting, trees, signage, etc.), new traffic, and temporary accommodate park-and-ride or bus noise/vibration during construction. For modifications to traffic, above) existing surface parking facilities, this may be decreased to the construction limits/LOD where proposed improvements will be limited to repainting, reconfiguration not impacting access, and/or mill and overlay of existing pavement. New pedestrian/bicycle facilities, All property within 50 feet of the construction limits/LOD to including pedestrian (ADA) ramps, account for physical effects, temporary noise/vibration sidewalks, and trails during construction, and potential visual effects. Above-grade amenities (e.g., All property within 100 feet of the construction limits/LOD pedestrian-scaled lighting, trees, to account for physical effects, temporary noise/vibration signage, etc.) during construction, and potential visual effects. Utilities, Borrow/Fill Areas, and Floodplain/Stormwater/Wetland Mitigation Areas Below ground utilities (no pile driving) All property within 25 feet of the construction limits/LOD to account for physical effects and temporary noise/vibration during construction. Above ground utility lines other than All property within 125 feet of the parcel’s perimeter [or the high-voltage transmission lines (no construction limits/LOD, where appropriate] to account for pile driving) physical effects, potential visual effects, and temporary Borrow/Fill areas noise/vibration during construction. Floodplain/stormwater/wetland mitigation areas Land Acquisition Partial or full parcel land acquisition All property within the full parcel perimeter. Modifications to the acquired land will be handled in other Project Elements within this table

METRO Rush Line BRT Project 7 September 27, 2019 Area of Potential Effects Parameters Project Element APE and Rationale Operations and Maintenance Facilities (OMF) OMF (new) All properties within 0.25 miles (2,640 feet) from the parcel perimeter to account for physical effects, permanent visual effects, and noise/vibration during construction and operation. Modifications to existing OMFs For interior modifications and/or minor exterior alterations to buildings, all properties within the parcel’s perimeter [or the construction limits/LOD, where appropriate] to account for potential physical effects and temporary noise/vibration during construction. For additions or extensive exterior modifications, all properties within 175 feet of the parcel’s perimeter to account for potential physical effects, visual effects, new traffic, and temporary noise/vibration during construction. This may be increased if the modification results in a substantial increase in height or footprint.

METRO Rush Line BRT Project 8 September 27, 2019 Area of Potential Effects Parameters Rush Line BRT Ramsey County, Minnesota

N Olive St E University Ave Area of Potential Effect (10/7/19) W University Ave Grove St Limits of Disturbance (7/22/19) 14th Street Alignment (7/15/19) Station N Lafayette Rd Station Platforms (7/15/19) N Mississippi St Mississippi N Spruce St Bridges (9/19/19)

E 14th St N Robert St ^_ Potential Stormwater (BMP) Points (9/20/19) M-867 N Pine St Balsam St ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Central Park Pl Rev Dr Martin Retaining Walls (9/24/19) LutherJr BlvdKing

John St

E 12th St Olive St 9th St E

E Columbus Ave

E 9th Pl Pine St 16

E 11th St N John St 15 E 10th St N Jackson St E 8th St N Temperance St 14 10th Street 13 12 N Cedar St Station 11

Broadway St 10 N Wacouta St 9 W 12th St N Wall St 8 7 W 11th St 6th Street 6 5 Station Union Depot E Prince St N Minnesota St 3 4 Wacouta Street 2 E 7th Pl Station 1

W 10th St E Exchange St

N Wabasha St N Sibley St 0 90 Meters E 6th St 1:4,910 W Exchange St E 4th St Saint Peter St 0 500 Feet [ E 5th St Union Depot Union Depot E Kellogg Blvd W 9th St Bus Deck Saint Josephs La Sibley Street Station Station

5th Street Warner Rd Station Area of Potential Effect W 6th St N Market St As Revised on 10/7/2019

E 2nd St

N Washington St Shepard Rd Page 1 of 16 Rush Line BRT E Cayuga St Ramsey County, Minnesota

N Clark St Terrace Ct Terrace

Whitall St St Arkwright N Area of Potential Effect (10/7/19)

NWesminster St Limits of Disturbance (7/22/19) N AgateSt N Alignment (7/15/19) E Granite St Cayuga Street Station Platforms (7/15/19) Station Bridges (9/19/19)

NSylvan St Potential Stormwater (BMP) Points (9/20/19) Genessee St ^_ ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Buffalo St Trails and Sidewalks (9/24/19) E Sycamore St E Bush Retaining Walls (9/24/19) Ave

Elk St

W Acker St Pl Lightner E Acker St ^_

Courtland Pl Courtland

E Minnehaha Ave N Mississippi St Mississippi N

E Phalen Blvd 16 15 Olive Street N Rivoli St N Lorient St E Mount Station Ida St 14 13 Empire Dr ^_ 12 ^_ 11 10 9 8 E Arch St 7 W Pennsylvania Ave E Pennsylvania Ave 6 5 3 4 2

N Jackson St 1 W Winter St

Linden St ^_ Wales St Mt. Airy Street Station Lorient St Lorient E Mount Airy St 0 90 Meters W Como Ave 1:4,910 0 500 Feet

N Olive St [ E Valley St

N Lafayette Rd John St John W Charles Ave E University Ave

N Capitol Hts N Cedar St Cedar N E 13th St Area of Potential Effect E 12th St

W Sherburne Ave NPine St As Revised on 10/7/2019

N Robert St Page 2 of 16 E Jenks Ave Rush Line BRT Ramsey County, Minnesota

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) E Case Ave Alignment (7/15/19) Station Platforms (7/15/19)

N Walsh St NWalsh St NWeide Bridges (9/19/19) E Sims Ave ^_ Potential Stormwater (BMP) Points (9/20/19)

N Greenbrier St NGreenbrier ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19)

N Jessie St

NDesoto St Retaining Walls (9/24/19) E York Ave

NBurr St N Arkwright St N Arcade Street

E York St N Clark St Station

E Wells St

Payne Avenue Wadena Ave Neid La Station

Whitall St 16 15 14 NSt Edgerton ^_ ^_ Cayuga Street 13 12 Station ^_ Phalen Blvd ^_ ^_ ^_ 11 E Pennsylvania Ave 10 N Wesminster St Arcade 9 E Phalen Blvd Street Ramp 8 E Bush Ave Ave Payne N 7 6 5

Stroh Dr 3 4 2 E Reaney Ave 1

NBradley St

E Minnehaha Ave 0 90 Meters 1:4,930 0 500 Feet [

N Rivoli St E Mount Ida St

E Beech St

Drewry La Drewry Preble St Preble

E Beaumont St

E Margaret St N Otsego St Otsego N

E Fred St N Hope St Sinnen St St Arcade N Area of Potential Effect N Bedford St Bedford N N Maple St Dellwood Pl Maury St As Revised on 10/7/2019 E 6th St

Ave

NBates Page 3 of 16 E Cook Ave Rush Line BRT Ramsey County, Minnesota Cook Avenue

Station Area of Potential Effect (10/7/19) E Lawson Ave Limits of Disturbance (7/22/19) Alignment (7/15/19) ^_ Station Platforms (7/15/19) E Jenks Ave Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

N Cypress St Cypress N Trails and Sidewalks (9/24/19) E Case Ave

M-1138 Retaining Walls (9/24/19) N Mendota St Mendota N ^_ E Sims Ave

N Russel St Russel N E York Ave

N Duchess St 16

N Earl N 15 Street W Street Service Rd Service ^_ 14 E Wells St 13 Phalen Blvd 12

N Earl St Earl N 11

NForest St

NewcombeSt 10 9 E 7th St Ocean St Ocean 8 Mendota Cir 7 6 Earl St Earl 5 3 4 E Ross Ave 2

N AtlanticSt N 1

Arcade Street Ramp E Bush Ave 0 90 Meters N Duluth St Duluth N 1:4,920

0 500 Feet [ N Frank St Frank N

E Reaney Ave Johnson Pkwy

E Minnehaha Ave

Area of Potential Effect As Revised on 10/7/2019 E Beech St Page 4 of 16 Rush Line BRT

½

½ Ramsey County, Minnesota

½

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) E Ivy Ave E Wheelock Pkwy Alignment (7/15/19) Station Platforms (7/15/19) Bridges (9/19/19)

E Hyacinth Ave Potential Stormwater (BMP) Points (9/20/19) East Shore Dr ^_ ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19) E Orange Ave

^_

E Hawthorne Ave ½

Maryland ½ ½ Avenue Station E Maryland Ave

16 ½

½ 15 ½ 14 13

E Rose Ave 12 N Prosperity Ave Prosperity N N Old Prosperity Ave 11

10 N Clarence St Clarence N

Burnquist St 9

Lane Pl 8 N Frank St NFrank E Geranium Ave 7

Johnson Pkwy 6 N Barclay St Barclay N 5 3 4 Johnson 2

N Duluth St E Jessamine Ave Parkway Bridge 1

½

½

½

Magnolia La E Magnolia Ave 0 90 Meters 1:4,910 0 500 Feet E Mechanic Ave [

E Cook Ave

N AtlanticSt N

Phalen Blvd

Cook Avenue Station

E Lawson Ave N Etna St Etna N E Ames Ave Area of Potential Effect As Revised on 10/7/2019

E Jenks Ave ^_ Page 5 of 16 Larpenteur Avenue

Station ½

½

½ Edward

St N St St St Rush Line BRT

Duluth Atlantic

English Frank St Frank E Larpenteur Ave Ramsey County, Minnesota

Area of Potential Effect (10/7/19)

½

½

½ Limits of Disturbance (7/22/19)

½ Alignment (7/15/19) ½

½ Station Platforms (7/15/19) Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) E Idaho Ave ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19)

Brighton Pl

N Duluth St

N Atlantic St Atlantic N

N Chamber St Chamber N

½

½

½

½

½ ½ E Hoyt Ave

NEnglish St

16 15 14 13 12 11 East Shore Dr E Nebraska Ave 10 9 ^_ 8 7 6 5 3 4 2 ½ 1 ½

½

½

½

½ E Arlington Ave

^_ 0 90 Meters 1:4,910 0 500 Feet [

E Wheelock Pkwy Area of Potential Effect ½

½ ½ As Revised on 10/7/2019

Page 6 of 16 Shryer Ave E Rush Line BRT

Ramsey County, Minnesota Chamber St Chamber

½

½ Area of Potential Effect (10/7/19)

½ ½ Limits of Disturbance (7/22/19) Gateway Trail Ryan Ave E

½ Underpass Alignment (7/15/19)

½

½ Station Platforms (7/15/19) Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19)

Frost Avenue Curve St Dieter St N St Dieter Manton St N MantonSt

Hazelwood St Hazelwood Retaining Walls (9/24/19) Station N BarclaySt

Frost Ave E ½

Clarence St N ClarenceSt

Ide St N St Ide

½ Walter St ½

Fenton Ave

Birmingham St N

Summer Ave ^_ 16 ^_ 15 14 13

PhalenPl 12 Frisbie Ave 11 10 9

½ Gordon Ave 8 ½ Ripley Ave ½ 7 6

English St English 5 3 4

Hagen Dr 2 1

Sophia Ave

½

Edward St N ½

½

Frank St Frank Atlantic St Atlantic 0 90 Meters 1:4,920

Duluth St Duluth 0 500 Feet [

East Shore Dr Larpenteur Avenue

Station ½

½

½

E Larpenteur Ave

N English St Area of Potential Effect

½

½ As Revised on 10/7/2019

½

N Duluth St Duluth N

N Atlantic St Atlantic N N Chamber St Chamber N

½ Page 7 of 16

½ ½ ^_

^_

½ ½

½ Grandview Ave E Rush Line BRT ^_ Ramsey County, Minnesota

Barclay St Area of Potential Effect (10/7/19) Viking Dr Viking Dr N Service Rd Limits of Disturbance (7/22/19) Alignment (7/15/19) Highway Station Platforms (7/15/19) MSAS 108 36 Bridge Bridges (9/19/19) Potential Stormwater (BMP) Points (9/20/19)

Sherren Ave E ^_ ½

½ ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19) ½ Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19) Cope Ave E Cope Ct

Lark Ave Lark Ave E

½ ½ ½

Ide Ct N Laurie Rd E 16

15 Duluth St Duluth

Atlantic St 14 13 Mcafee Cir County Road B Sandhurst Ave E 12 Leland Rd

EnglishSt 11 10 ^_ 9 8 7 Junction Ave St Hazelwood 6

Birmingham St N St Birmingham 5 3 4 Burke Ave E 2

Burke Cir 1

Duluth Pl

Barclay NSt ½

½ ½

½ ½

½ Weaver Trail

Chambers St Underpass ^_ Eldridge Ave E 0 90 Meters 1:4,920 0 500 Feet [

Belmont La E

Curve St

Skillman Ave E Chamber St Chamber Area of Potential Effect

As Revised on 10/7/2019 Manton St N MantonSt

ClarenceN St

St N St Shryer Ave E Dieter Page 8 of 16

½

½

½ ^_

Trail Underpass Rush Line BRT

Fitch Rd Ramsey County, Minnesota Kohlman Ave

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) ½

½ ½ Alignment (7/15/19) ½

½

½ Station Platforms (7/15/19)

ElmSt Barclay St

Bridges (9/19/19) Germain Ct Germain Maplewood Dr Maplewood ^_ Potential Stormwater (BMP) Points (9/20/19) ½ ½ ½ ½ ½½½½ ½ ½ Potential Linear Stormwater (BMP) Sites (9/20/19)

CSAH½ 23

½ Trails and Sidewalks (9/24/19)

½ English St N St English Retaining Walls (9/24/19)

Hilltop Ct

N Duluth St St Hazelwood

Edgehill Ct

16 ½ ½ 15 ClarenceSt ½ 14 13 12 11 10 Demont Ave E 9 8 7 6 5 Ave N Ave Brooks Ave E

½ Hazelwood 3 4 ½ 2 ½ 1

0 90 Meters 1:4,910 Highway 36 Sextant Ave E 0 500 Feet [ Station N St Germain

^_ N Barclay St Kennard St N St Kennard Gervais Ave Gervais Ave E

^_

½ ½

½ Grandview Ave E Area of Potential Effect

EnglishSt ^_ As Revised on 10/7/2019 Viking Dr Page 9 of 16 Legacy Rush Line BRT

Rabt Legacy Pkwy Rabt Ramsey County, Minnesota

Kennard

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) Alignment (7/15/19) Station Platforms (7/15/19) Bridges (9/19/19) CSAH 19 ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19)

Countryview Dr St. John's Saint Johns Blvd Boulevard Maplewood Mall Station Transit Center Station

Hazelwood Ave N Kennard St N St Kennard

16 15 14 Beam Ave E 13 12 11 Southlawn Dr Southlawn 10 9 8 7

6 ½

^_ ½ 5 ½ 3 4 2 Radatz Ave E 1

Hazelwood St Hazelwood 0 90 Meters ^_ 1:4,910 0 500 Feet [

Fitch Rd ^_ Vale Ave

Trail Underpass N St Gem Area of Potential Effect As Revised on 10/7/2019 E Kohlman Kohlman Ave Ave

St

Barclay

ElmSt Page 10 of 16

½

½

½ ½

½

½ ^_ Rush Line BRT Ramsey County, Minnesota

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) Alignment (7/15/19) ^_ Station Platforms (7/15/19) Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19) T-140

^_ Buerkle Cir Buerkle Road US Highway 61 Service Rd Station Buerkle Rd

16

Fanum Rd 15 14 13 12 11 10 9 8 7 I-694 6 Bridge 5 3 4 2 1

M-612 M-613 E Co Rd D E County Rd D ^_ 0 90 Meters ^_ 1:4,940 0 500 Feet [

Kennard St

CSAH 19

M-608

Kennard Area of Potential Effect

Hazelwood St Hazelwood Legacy Rabt Legacy Pkwy

Rabt As Revised on 10/7/2019 St N St

Kennard Page 11 of 16 ^_

Rush Line BRT Ramsey County, Minnesota

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) Alignment (7/15/19) ^_ Linden Pl Station Platforms (7/15/19) Bridges (9/19/19)

Hoffman Rd Potential Stormwater (BMP) Points (9/20/19)

Scheuneman Rd ^_ ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) County Road E Retaining Walls (9/24/19) Station

Linden Ave County Rd E

16 ^_ 15 14

Hoffman Rd E 13

International Dr International 12 11 10 Commerce Ct Commerce Blvd 9

8 English St English Montmorency St Montmorency 7 6 5 Willow Lake Blvd 3 4 2 1 Elm St

Fair Oaks Dr 0 90 Meters 1:4,930

Fair

Oaks Ct 0 500 Feet [

Savannah Ave

^_

Area of Potential Effect As Revised on 10/7/2019 ^_ Page 12 of 16 Rush Line BRT Lake Aires Blvd Ramsey County, Minnesota

Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19) ^_ Alignment (7/15/19) Pine St Station Platforms (7/15/19) Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19) Birch St Trails and Sidewalks (9/24/19)

Retaining Walls (9/24/19) Linden St Linden

Cedar Avenue Station

Scheuneman Rd Kingsley Ave

16 Roth St 15 14

Hill Ave Hill 13 12

11 Highland Ave Highland ^_ Cedar Ave 10 9 8 7 6

Keri Ann La Ann Keri 5 3 4 2 1

Cedar La

Linden Ave

Hoffman Rd Cheri Ct 0 90 Meters 1:4,920

Auger Ave Auger 0 500 Feet [ ^_ Richard Ct

Tony Ct

Area of Potential Effect As Revised on 10/7/2019

Page 13 of 16 ^_ Rush Line BRT Old White Bear Ave

M-415 Ramsey County, Minnesota

Cottage Area of Potential Effect (10/7/19) Park Rd Limits of Disturbance (7/22/19) Alignment (7/15/19) Station Platforms (7/15/19) ^_ Bridges (9/19/19) ^_ Potential Stormwater (BMP) Points (9/20/19) ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19)

Otter Lake Rd

White Bear Pkwy

16 15 14 Hoffman Rd 13 12 11 10 9 8

Douglas La 7 6 5 Goose Lake Rd 3 4 2 1 M-8 Rishworth La

Floral Dr 0 90 Meters

White Bear N Ave White 1:4,910 0 500 Feet [

Scheuneman Rd Ash St CSAH 12

Linden St Ave Highland Area of Potential Effect Nicholas Ct As Revised on 10/7/2019

Dotte Ct Dotte

Lake Aires Blvd Dotte Dr Page 14 of 16

^_ Ave

Ave

Cook

Miller Rush Line BRT 2nd St

Ramsey County, Minnesota Krech Ave Krech

Wood Ave Wood

Campbell Ave Campbell Bald Eagle Ave Eagle Bald Birch Lake Ave Area of Potential Effect (10/7/19) Limits of Disturbance (7/22/19)

Banning Ave Banning

Alignment (7/15/19) Burson Ave Burson Station Platforms (7/15/19)

Clark Ave Clark Webber St Bridges (9/19/19) 1st St Murray Ave Murray ^_ Potential Stormwater (BMP) Points (9/20/19) Elm St ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Florence St Shady La

1st Ave 1st Lake Ave Retaining Walls (9/24/19)

Eugene St 4th Ave 4th

2nd Ave 2nd Lake Ave N CSAH 96

16 15 14 Clarence St 13 12 11

3rd Ave 3rd 10 9 Park St 8

Lincoln Ave 7 6 5 3 4 Hinckley St 2 Lake AveLake S 1

Whitaker St Whitaker ^_ Street 0 90 Meters Station ^_ 1:4,930 0 500 Feet [ Whitaker Ct

Old White Bear Ave

White Bear Ave N M-415

Cottage Park Rd Area of Potential Effect

Circle Dr

Hoffman Rd As Revised on 10/7/2019 Page 15 of 16 ^_ Rush Line BRT Ramsey County, Minnesota

Area of Potential Effect (10/7/19) 11th St Limits of Disturbance (7/22/19) Campbell Cir Alignment (7/15/19) Station Platforms (7/15/19) Bridges (9/19/19) 10th St ^_ Potential Stormwater (BMP) Points (9/20/19)

Long Ave ½½½½Potential Linear Stormwater (BMP) Sites (9/20/19)

Trails and Sidewalks (9/24/19) Retaining Walls (9/24/19)

9th St Walnut Ave Walnut

Division Ave Division

8th St Downtown White Bear Lake Johnson Ave Station

16 7th St 15

Stewart Ave 14

Washington Ave Washington 13

12 Bald Eagle Ave Eagle Bald

11 Morehead Ave Morehead

Bloom Ave Bloom 6th St 10 9 8

CentralAve 7 Manitou Island Rd 6

Lake Ave N 5th St 5 3 4 2 Cook Ave Cook 1

4th St

0 90 Meters Banning Ave Banning

1:4,920

Campbell Ave Campbell Miller Ave Miller Murray Ave 0 500 Feet [

3rd St

2nd St Area of Potential Effect Birch Lake Ave

Clark Ave Clark As Revised on 10/7/2019

Burson Ave Burson

Ave Lincoln

1st Ave 1st 1st St Page 16 of 16

U.S. Department REGION V 200 West Adams Street Illinois, Indiana, Suite 320 of Transportation Michigan, Minnesota, Chicago, IL 60606-5253 Federal Transit Ohio, Wisconsin 312-353-2789 312-886-0351 (fax) Administration

October 29, 2019

Sarah J. Beimers, Manager Government Programs and Compliance MN State Historic Preservation Office Minnesota Historical Society 50 Sherburne Ave, Suite 203 St. Paul, MN 55155

RE: Section 106 Area of Potential Effects; Metro Transit Rush Line, Twin Cities Region, Minnesota; SHPO Number 2019-0985

Dear Ms. Beimers:

As part of its responsibilities under 36 CFR § 800 – Protection of Historic Properties and the National Historic Preservation Act (NHPA), the Federal Transit Administration (FTA) initiated Section 106 consultation with your office for the Rush Line Corridor Bus Rapid Transit (BRT) Project (the Project) in the Twin Cities Region, Minnesota on September 5, 2018.

The Ramsey County Regional Railroad Authority (RCRRA), in conjunction with the Metropolitan Council (the grantee) is proposing to build an approximately 14-mile long Dedicated BRT line from downtown St. Paul to White Bear Lake. There will be approximately twenty stations, including Union Depot in downtown St. Paul and the Maplewood Mall Transit Center. Approximately 85%-90% of the route will be dedicated guideway (only buses allowed), with service every 10 minutes during the morning and afternoon commuter peak hours, 15 minutes during non-peak hours, and 30 minutes during late evening hours.

In compliance with Section 106 of the NHPA, and in accordance with the procedures related to the identification of historic properties described in the implementing regulations at 36 CFR § 800, FTA has determined the Area of Potential Effects (APE) for the Project. The enclosed APE Parameters Memo provides details related to the APE and rational for various project elements throughout the corridor. This correspondence serves as documentation of our determination of the APE, pursuant to 36 CFR § 800.4(a)1.

FTA requests you provide any comments on our determination of the APE following your review of the enclosures. Your timely response will greatly help us incorporate your concerns into the development of the project. For that purpose, we respectfully request that you provide comments within 30 days of receiving this correspondence. Thank you in advance for your RE: APE Determination - Rush Line Corridor BRT Project Twin Cities Region, Minnesota Page 2 of 2

assistance on this project. Please contact Bill Wheeler, Community Planner, at 312-353-2639 or [email protected] with any questions.

Sincerely,

Jay M. Ciavarella Director, Office of Planning and Program Development

cc: Bill Wheeler, FTA Elizabeth Breiseth, FTA Marisa Merriman, United States Army Corps of Engineers Benjamin Orne, United States Army Corps of Engineers Barbara Howard, Minnesota Department of Transportation Andrew Gitzlaff, Ramsey County Regional Railroad Authority Michael Rogers, Ramsey County Regional Railroad Authority Charles Carlson, MetroTransit Jeanne Witzig, Kimley-Horn Bill Dermody, City of Saint Paul George Gause, Saint Paul Heritage Preservation Commission Michael Martin, City of Maplewood Peter Boulay, Maplewood Heritage Preservation Commission Nolan Wall, City of Vadnais Heights Anne Kane, City of White Bear Lake Bill Short, White Bear Township Gloria Tessier, City of Gem Lake

Enclosure: APE Maps APE Parameters Memo