Effects of Top-Of-Rail Friction Modifiers on the Friction, Wear and Cracks of Railway Rails

Total Page:16

File Type:pdf, Size:1020Kb

Effects of Top-Of-Rail Friction Modifiers on the Friction, Wear and Cracks of Railway Rails DOCTORAL T H E SIS Saad Ahmed Khan Saad Department of Civil, Environmental and Natural Resources Engineering Division of Operation, Maintenance and Acoustics ISSN 1402-1544 ISBN 978-91-7790-272-0 (print) ISBN 978-91-7790-273-7 (pdf) Effects of top-of-rail friction modifiers Effects of top-of-rail friction modifiers on the friction, wear and cracks of railway rails and cracks of railway Effects of top-of-rail friction wear modifiers on the friction, Luleå University of Technology 2019 on the friction, wear and cracks of railway rails Saad Ahmed Khan Operation and maintenance engineering Effects of top-of-rail friction modifiers on the friction, wear and cracks of railway rails Saad Ahmed Khan Division of Operation, Maintenance and Acoustics Department of Civil, Environmental and Natural Resources Engineering Luleå University of Technology Printed by Luleå University of Technology, Graphic Production 2019 ISSN 1402-1544 ISBN 978-91-7790-272-0 (print) ISBN 978-91-7790-273-7 (pdf) Luleå 2019 www.ltu.se ACKNOWLEDGEMENTS The research work presented in this thesis was carried out between March 2015 and February 2019 at the Division of Operation, Maintenance and Acoustics of Luleå University of Technology. I gratefully acknowledge Luleå Railway Research Center (JVTC) and the Swedish Transport Administration (Trafikverket) for financing the project. I would like to express my gratitude to my supervisor, Professor Jan Lundberg, and my co-supervisors, Dr Christer Stenström and Associate Professor Matti Rantatalo. I am thankful for the confidence that they have placed in my capability to conduct this research work, and for all their support through sharing their ideas, proposing improvements, proofreading manuscripts, finding new ways, and always adopting a positive approach. Many thanks are due to Ingemar Persson at AB DEsolver for assisting me by providing support for simulations and a large amount of useful information during my research. Special thanks are extended to my ex-colleague and my project leader at Trafikverket, Matthias Asplund, for all his support during this project. I am also grateful to Per Gustafsson at LKAB, who helped us to decide the location of the TOR equipment installation and provided information in the initial phase of the project. I would also like to express my thanks to Emil Viberg from Infranord, who arranged for a security person to accompany me every time I went to the railway track for measurements, as well as Stephan Scheriau from Voestalpine Schienen GmbH in Austria for providing rail steel material that was used for making wear probes. Furthermore, I would like to thank all my colleagues at the Division of Operation, Maintenance and Acoustics, especially my co-researcher Thomas Nordmark and laboratory technician Allan Holmgren. I would also like to thank all the PhD students and senior researchers at our division who helped me during the research work for my PhD. I am also grateful to all my friends in and outside the university who supported me during the work on this thesis, but who are too many to be mentioned by name. My deep gratitude is owed to my parents, Asma and Zaheer Ahmed Khan, and to my wife, Hiba, and my son, Daniyal, for all the support and confirmation received from them; without them, my goal would never have been achieved. Saad Ahmed Khan February 2019 Luleå, Sweden i ii ABSTRACT The railway is an economical and environmentally friendly mode of transport for long distances and heavy loads. The demands on the operators are increasing with increased competition in the market, and therefore they are currently demanding more track capacity. In the short term, the existing network is expected to deliver the increased capacity. In order to achieve increased capacity without introducing double track, either the axle load or the number of trains (i.e. the annual gross tonnage) needs to be increased, which will decrease the life of the rail and thus increase the maintenance cost. To increase the lifetime of the rails without compromising with regard to the axle load and speed, one must increase the strength of the rails, decrease the friction forces between the rails and wheels, or introduce a third body with anti-wear and anti-crack properties that can reduce the wear and rolling contact fatigue (RCF) without reducing the traction coefficient below the safety limit. The friction forces depend on several variables, for example third bodies in the wheel-rail interface, the train dynamics, the wheel and rail profiles, etc. Third bodies in the wheel-rail interface are one of the important influencing factors. The additive third bodies with anti-wear properties and friction reduction capabilities reduces both the wear and the RCF. However, a friction coefficient in the wheel tread and the top of the rail below 0.3 can cause slippage and a long braking distance. To reduce the degree of utilised friction to a value close to 0.35 from dry conditions with a value of 0.55, and thereby reduce the wear, a product known as top-of-rail friction modifier (TOR-FM) was developed in North America and presented in 2003 at the heavy haul conference. The TOR-FM manufacturers claim that their products provide a fixed range of friction coefficients (μ) and Kalker’s reduction factors in the wheel-rail interface. Kalker’s reduction factor considers the tendency of creepage between the rail and wheel as a function of the friction forces at lower creepage levels. Field and laboratory tests in the USA, Canada and China have determined the benefits of using friction control products, which include the reduction of RCF, wear, corrugation, bogie hunting, noise, and fuel consumption without any side effects. In contrast, researchers at Luleå University of Technology (LTU) have found that such products in certain conditions give unacceptably low friction that can cause long braking distances and slippage. Initial measurements, before the starting of the present research, performed using a wayside TOR-FM system on the Iron Ore Line (IOL – “Malmbanan” in Swedish) could not show any benefits of implementing such systems. Trafikverket is considering the implementation of the TOR-FM technology on the IOL. Directly implementing such technology can be inappropriate and expensive, because the reliability of a TOR- FM system has never been assessed for the conditions of the IOL. The IOL is the northernmost railway line in Sweden and is experiencing the problem of RCF, especially on its curves. This railway line is a single track and is mainly utilised by the ore freight trains operated by the Swedish mining company LKAB. The freight trains run by LKAB have an axle load of 30 tonnes, which is the heaviest in Europe. At present LKAB is planning to increase the axle load of their heavy haul trains to 32.5 tonnes, which will increase the RCF and wear issues. iii The present research investigated the effects of TOR-FMs using computer-based simulations, laboratory tests and field tests. The results from all the tests and simulations were used to calculate the life cycle cost of wayside and on-board systems. The simulation results have shown that by reducing the friction, the RCF can be reduced. This reduction in the RCF is greater on narrow curves than on larger curves as the friction force decrease with an increase in the curve radius. Curves with a radius larger than 1,000 m are not prone to RCF. The damage index method used in the simulation has also shown that on circular curves with a radius smaller than 300 m, the so-called “magic wear” rate can be achieved. Magic wear means that the wear rate due to normal operation is equal to the crack generation rate. The field results obtained using a handheld tribometer have shown that by using a TOR-FM, both the wear and the friction coefficients can be reduced. The content of the TOR-FM can have a significant effect on the carry distance and, generally, non-drying FMs have a longer carry distance. Excessive use of TOR-FM may only cause unacceptably low friction and a high operational cost and result in an insignificant increase in the carry distance. In addition, it was also concluded that in the case of the wayside system during extreme winters, the equipment could have maintenance issues and thus a high operational cost. The on-board system is an economical alternative to the wayside system, as it has lower operation and maintenance costs. The results have also shown that snow and ice formation in the winter act as a lubricant. However, further investigations are needed to provide knowledge of the efficiency of such natural lubricants and their retention on the rail. The present research has taken the IOL as a case study, but the results will be applicable all over the world. KEYWORDS: friction modifier, heavy haul, Iron Ore Line, Malmbanan, magic wear, railway, rolling contact fatigue (RCF), top-of-rail (TOR) lubrication, wear. iv SAMMANFATTNING Järnvägen är ett ekonomiskt och miljövänligt transportsätt för långa avstånd och tunga laster. Operatörernas krav ökar med ökad konkurrens på marknaden. Därför finns det för närvarande en efterfrågan på mer spårkapacitet. På kort sikt förväntas den befintliga järnvägen leverera den ökade kapaciteten. För att uppnå ökad kapacitet utan att införa dubbelspår måste axelbelastningen eller antalet tåg (årlig bruttoton) ökas, vilket minskar spårens livslängd och därmed ökar underhållskostnaderna. För att öka skenornas livslängd utan att behöva minska axelbelastningen och hastigheten måste man antingen öka slitstyrkan och spricktåligheten på skenorna eller minska friktionskrafterna mellan skenorna och hjulen eller införa så kallade “third bodies” med goda anti-sprick och slitageegenskaper. Friktionskrafterna är beroende av flera variabler, till exempel “third bodies” i hjul-järnvägsgränssnitt, tågdynamik, hjulprofil etc.
Recommended publications
  • Report on Railway Accident with Freight Car Set That Rolled Uncontrolledly from Alnabru to Sydhavna on 24 March 2010
    Issued March 2011 REPORT JB 2011/03 REPORT ON RAILWAY ACCIDENT WITH FREIGHT CAR SET THAT ROLLED UNCONTROLLEDLY FROM ALNABRU TO SYDHAVNA ON 24 MARCH 2010 Accident Investigation Board Norway • P.O. Box 213, N-2001 Lillestrøm, Norway • Phone: + 47 63 89 63 00 • Fax: + 47 63 89 63 01 www.aibn.no • [email protected] This report has been translated into English and published by the AIBN to facilitate access by international readers. As accurate as the translation might be, the original Norwegian text takes precedence as the report of reference. The Accident Investigation Board has compiled this report for the sole purpose of improving railway safety. The object of any investigation is to identify faults or discrepancies which may endanger railway safety, whether or not these are causal factors in the accident, and to make safety recommendations. It is not the Board’s task to apportion blame or liability. Use of this report for any other purpose than for railway safety should be avoided. Photos: AIBN and Ruter As Accident Investigation Board Norway Page 2 TABLE OF CONTENTS NOTIFICATION OF THE ACCIDENT ............................................................................................. 4 SUMMARY ......................................................................................................................................... 4 1. INFORMATION ABOUT THE ACCIDENT ..................................................................... 6 1.1 Chain of events ...................................................................................................................
    [Show full text]
  • Calculated Estimation of Railway Wheels Equivalent Conicity Influence on Critical Speed of Railway Passenger Car
    MATEC Web of Conferences 157, 03006 (2018) https://doi.org/10.1051/matecconf/201815703006 MMS 2017 Calculated estimation of railway wheels equivalent conicity influence on critical speed of railway passenger car Juraj Gerlici1,*, Rostyslav Domin2, Ganna Cherniak2, Tomáš Lack1 1University of Žilina, Faculty of Mechanical Engineering, Department of Transport and Handling Machines, 010 26 Žilina, Slovak Republic 2Volodymyr Dahl East Ukrainian National University, Department of Rail Transport, 93400 Sewerodonetsk, Ukraine Abstract. The article presents the results of determining the equivalent conicity characterizing the geometric interaction of wheels and rails on 1520 mm track. The cases of interactions of rails and wheelsets, wheels of which have different profiles, are considered. The computer model of the motion speed of the passenger car is developed. According to the results of computer simulation, critical speeds for the bogie moving through the tracks of indented gauge are received. Based on the results of the simulation analysis, the significant dependence of the value of the equivalent conicity on the critical speed is confirmed. The necessity of considering the limit values of equivalent conicity in tests of high-speed rolling stock is emphasized. Keywords: railway wheels, equivalent conicity, critical speed, passenger vehicle 1 Introduction The increase of speed of passenger trains up to 160-200 km/h brings new technological level on the Ukrainian railways. Cars of high-speed trains must fully comply with international requirements, both in the level of comfort, and in terms of safety. In this regard, the task of ensuring the stability of motion of the high-speed rolling stock must be resolved as a matter of priority.
    [Show full text]
  • 1976 Technical Documentation Locomotive Truck Hunting M.Pdf
    TECHNICAL DOCUMENTATION LOCOMOTIVE TRUCK HUNTING MODEL V. K. Garg OHO G. C. Martin P. W. Hartmann J. G. Tolomei mnnnn irnational Government-Industry 04 - Locomotives ch Program on Track Train Dynamics R-219 TE C H N IC A L DOCUMENTATION rnn nnn LOCOMOTIVE TRUCK HUNTING MODEL V. K. Garg G. C. Martin P. W. Hartmann a a J. G. Tolomei dD 11 TT|[inr i3^1 i i H§ic§ An International Government-Industry Research Program on Track Train Dynamics Chairman L. A. Peterson J. L. Cann Director Vice President Office of Rail Safety Research Steering Operation and Maintenance Federal Railroad Administration Canadian National Railways G. E. Reed Vice Chairman Director Committee W. J. Harris, Jr. Railroad Sales Vice President AMCAR Division Research and Test Department ACF Industries Association of American Railroads D. V. Sartore or the E. F. Lind Chief Engineer Design Project Director-Phase I Burlington Northern, Inc. Track Train Dynamics Southern Pacific Transportation Co. P. S. Settle Tack Tain President M. D. Armstrong Railway Maintenance Corporation Chairman Transportation Development Agency W. W. Simpson Dynamics Canadian Ministry of Transport Vice President Engineering W. S. Autrey Southern Railway System Chief Engineer Atchison, Topeka & Santa Fe Railway Co. W. S. Smith Vice President and M. W. Beilis Director of Transportation Manager General Mills, Inc. Locomotive Engineering General Electric Company J. B. Stauffer Director M. Ephraim Transportation Test Center Chief Engineer Federal Railroad Administration Electro Motive Division General Motors Corporation R. D. Spence (Chairman) J. G. German President Vice President ConRail Engineering Missouri Pacific Co. L. S. Crane (Chairman) President and Chief W.
    [Show full text]
  • General Technology Strategy
    General technology strategy 1 Contents Foreword 3 Introduction 4 Strategy process 5 The National Rail Administration business strategy 6 Requirements and performance targets 7 Technological trends and development features 9 Framework conditions for choosing technology 14 General technology strategy 20 Firm links with the National Rail Administration’s focus areas 22 Contact us 23 2 Foreword Anita Skauge Executive Director, Strategic Planning Jernbaneverket, the Norwegian National Rail Administration, is currently facing major technological challenges in conjunction with choosing the technical systems and facilities of tomorrow. This applies both when carrying out renewals and in the construction of new infrastructure. The challenges imply a need for a general technology strategy that clarifies goals and guides for technological choices. In this context, the central approaches to problems may include: • The choice of the technological platforms of the future and performance requirements for central facilities and systems • Management of the ageing stock of facilities, in terms of maintenance, prioritisation and pace of renewal • International standardisation and requirements for interoperability • Accelerating development and use of ICT-based railway engineering facilities and systems The strategy has been drawn up primarily for internal use, and shall be used mainly as a basis for investigations and principal plans where alternative technological choices and solutions are to be evaluated, and in the procurement of technical systems and facilities. We assume that the strategy can also be useful in other contexts, such as in conjunction with technical discussions with railway undertakings, suppliers and railway administrations. Anita Skauge Executive Director, Strategic Planning Introduction Technology strategy is a broad term, for signalling systems, energy supply and and initially it was necessary to limit and KVIKT (Kjørevei [Eng: track], Informasjon prioritise in order to make the scope [Eng: information], Kommunikasjon manageable.
    [Show full text]
  • List of Numeric Codes for Railway Companies (RICS Code) Contact : [email protected] Reference : Code Short
    List of numeric codes for railway companies (RICS Code) contact : [email protected] reference : http://www.uic.org/rics code short name full name country request date allocation date modified date of begin validity of end validity recent Freight Passenger Infra- structure Holding Integrated Other url 0006 StL Holland Stena Line Holland BV NL 01/07/2004 01/07/2004 x http://www.stenaline.nl/ferry/ 0010 VR VR-Yhtymä Oy FI 30/06/1999 30/06/1999 x http://www.vr.fi/ 0012 TRFSA Transfesa ES 30/06/1999 30/06/1999 04/10/2016 x http://www.transfesa.com/ 0013 OSJD OSJD PL 12/07/2000 12/07/2000 x http://osjd.org/ 0014 CWL Compagnie des Wagons-Lits FR 30/06/1999 30/06/1999 x http://www.cwl-services.com/ 0015 RMF Rail Manche Finance GB 30/06/1999 30/06/1999 x http://www.rmf.co.uk/ 0016 RD RAILDATA CH 30/06/1999 30/06/1999 x http://www.raildata.coop/ 0017 ENS European Night Services Ltd GB 30/06/1999 30/06/1999 x 0018 THI Factory THI Factory SA BE 06/05/2005 06/05/2005 01/12/2014 x http://www.thalys.com/ 0019 Eurostar I Eurostar International Limited GB 30/06/1999 30/06/1999 x http://www.eurostar.com/ 0020 OAO RZD Joint Stock Company 'Russian Railways' RU 30/06/1999 30/06/1999 x http://rzd.ru/ 0021 BC Belarusian Railways BY 11/09/2003 24/11/2004 x http://www.rw.by/ 0022 UZ Ukrainski Zaliznytsi UA 15/01/2004 15/01/2004 x http://uz.gov.ua/ 0023 CFM Calea Ferată din Moldova MD 30/06/1999 30/06/1999 x http://railway.md/ 0024 LG AB 'Lietuvos geležinkeliai' LT 28/09/2004 24/11/2004 x http://www.litrail.lt/ 0025 LDZ Latvijas dzelzceļš LV 19/10/2004 24/11/2004 x http://www.ldz.lv/ 0026 EVR Aktsiaselts Eesti Raudtee EE 30/06/1999 30/06/1999 x http://www.evr.ee/ 0027 KTZ Kazakhstan Temir Zholy KZ 17/05/2004 17/05/2004 x http://www.railway.ge/ 0028 GR Sakartvelos Rkinigza GE 30/06/1999 30/06/1999 x http://railway.ge/ 0029 UTI Uzbekistan Temir Yullari UZ 17/05/2004 17/05/2004 x http://www.uzrailway.uz/ 0030 ZC Railways of D.P.R.K.
    [Show full text]
  • Field and Analytical Investigation of a 3D Dynamic Train-Track Interaction Model at Critical Speeds
    The Pennsylvania State University The Graduate School Department of Civil and Environmental Engineering FIELD AND ANALYTICAL INVESTIGATION OF A 3D DYNAMIC TRAIN-TRACK INTERACTION MODEL AT CRITICAL SPEEDS A Dissertation in Civil Engineering by Yin Gao 2016 Yin Gao Submitted in Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy August 2016 ii The dissertation of Yin Gao was reviewed and approved* by the following: Hai Huang Associate Professor of Rail Transportation Engineering Dissertation Adviser Co-chair of Committee Shelley Marie Stoffels Professor of Civil Engineering Co-chair of Committee Tong Qiu Associate Professor of Civil and Environmental Engineering Jamal Rostami Associate Professor of Energy and Mineral Engineering Patrick Fox Professor of Civil and Environmental Engineering Department Head of Civil and Environmental Engineering *Signatures are on file in the Graduate School iii ABSTRACT Railroad transportation, especially high-speed passenger rail, has been developing at sensational speed, creating the needs to evaluate the track safety and predict the potential hazards for railroad operation. As train speed increases, the responses of the train and track substructure present larger dynamic behavior, which raises problems in passenger comfort, operational safety and track structures. With the boom of modeling and computing techniques, numerical simulation becomes a more feasible, safe and effective tool to identify the problems in railroad engineering. In this dissertation, a self-developed three-dimensional train-track interaction model is formulated, validated and implemented to predict the potential risks and explore the mechanisms of rail track problems. The developed 3D dynamic track-subgrade interaction model includes a train model, 2D discrete support track model and 3D computation-efficient finite element (FE) soil subgrade model.
    [Show full text]
  • Jernbanestatistikk 2002
    JBV_Statistikkreport 1-2.zg 12.06.03 15:33 Side 1 Jernbanestatistikk 2002 1 JBV_Statistikkreport 1-2.zg 12.06.03 15:33 Side 2 Innhold Contents Forord 1 Preface 1 Sammenstilling av nøkkeltall 2002 2 Summary of key figures 2002 2 Det nordiske jernbanenettet 3 The Nordic rail network 3 Nøkkeltall infrastruktur i de nordiske land 3 Nordic railways – key figures 3 Baneprioriteter 4 Line priority 4 Nøkkeltall for det statlige jernbanenettet 5 Key figures for Norway's public rail network 5 Trafikk 6 Traffic 6 Togmengde/togtetthet (person- og godstog) 6 Train density (passenger and freight traffic) 6 Totalt antall tog pr. døgn i Oslo-området 7 Total number of trains per day in Greater Oslo area 7 Persontrafikk 8 Passenger traffic 8 Antall reiser med tog (1000) 8 Passenger journeys (1000) 8 Antall personkilometer (mill.) 9 Passenger-kilometres (million) 9 Totalt antall persontog pr. døgn i Oslo-området 9 Total number of passenger trains per day in Greater Oslo area 9 Reisetid og reiseavstander mellom større byer 10 Journey time and travelling distance between major cities 10 Avstandstabell langs jernbane (km) 10 Distance by rail (km) 10 Raskeste tog på strekningen (tt:mm) 10 Fastest train on route (hh:mm) 10 Reisehastighet for raskeste tog på strekningen, avstand Average speed of fastest train on each route based on regnet langs vei (km/h) 11 road distance (km/h) 11 Utvikling i reisetid for persontog 1960 – 2002 11 Passenger train journey times, 1960–2002 11 Godstrafikk 12 Freight traffic 12 Antall tonn transportert med tog (1000) 12 Tonnes transported by rail (1000) 12 Antall tonnkilometer (mill.) 13 Tonne-kilometres (million) 13 Bruttotonnkilometer pr.
    [Show full text]
  • Håndbok for KOSTRA- Rapportering 2006
    70 Statistisk sentralbyrås håndbøker Returadresse: Statistisk sentralbyrå B NO-2225 Kongsvinger Statistisk sentralbyrå Håndbok for KOSTRA- Oslo: Postboks 8131 Dep rapportering 2006 NO-0033 Oslo Telefon: 21 09 00 00 Telefaks: 21 09 49 73 Oppslagshefte til hjelp ved Kongsvinger: filuttrekk for KOSTRA- NO-2225 Kongsvinger Telefon: 62 88 50 00 rapportering, regnskap Telefaks: 62 88 50 30 Oktober 2006 E-post: [email protected] Internett: www.ssb.no Statistisk sentralbyrå Statistics Norway Forord KOSTRA prosjektet (KOmmune-STat-RApportering) ble iverksatt av Kommunaldepartementet i 1994 som en oppfølging av Stortingsmelding nr. 23 (1992-93) "Om forholdet mellom staten og kommunene". Prosjektperioden ble avsluttet 1.7.2002, og KOSTRA er nå i fullskala drift. KOSTRAs siktemål er tosidig: • Å frambringe relevant, pålitelig og sammenlignbar styringsinformasjon om kommunenes prioriteringer, produktivitet og dekningsgrader. • Å samordne og effektivisere rutinene og løsningene for utveksling av data, slik at statlige og kommunale myndigheter sikres rask og enkel tilgang til data. Rapporteringshåndboken skal være et hjelpemiddel for å sikre at datautvekslingen mellom kommunene og staten blir mest mulig effektiv, slik at begge parter raskere får tilgang til aktuelle data. Det er åttende året en slik rapporteringshåndbok lages. De statlige myndigheter henter inn både tjenestedata og økonomidata. Tjenestedataene skal i størst mulig grad innhentes fra offentlige registre og i lokale forvaltningssystemer ute på tjenestestedene. Tjenestedataene kobles sammen med
    [Show full text]
  • Jernbanestatistikk 2004
    Jernbanestatistikk 2004 1 Innhold Contents Forord 3 Preface 3 Sammenstillig av nøkkeltall 2004 4 Summary of key figures 2004 4 Det nordiske jernbanenettet 5 The Nordic railway network 5 Nøkkeltall infrastruktur i de nordiske land 5 Nordic railways – key figures 5 Baneprioriteter 6 Line priority 6 Nøkkeltall for det statlige jernbanenettet 7 Key figures for Norway’s public rail network 7 Trafikk 8 Traffic 8 Togmengde/togtetthet (person- og godstog) 8 Train density (passenger and freight traffic) 8 Totalt antall tog pr. døgn i Oslo-området 9 Total number of trains per day in Greater Oslo area 9 Persontrafikk 10 Passenger traffic 10 Antall reiser med tog (1000) 10 Passenger journeys (1000) 10 Antall personkilometer (mill.) 11 Passenger-kilometres (million) 11 Totalt antall persontog pr. døgn i Oslo-området 11 Total number of passenger trains per day in Reisetid og reiseavstander mellom større byer 12 Greater Oslo area 11 Avstandstabell langs jernbane (km) 12 Journey time and travelling distance between major cities 12 Raskeste tog på strekningen (tt:mm) 12 Distance by rail (km) 12 Reisehastighet for raskeste tog på strekningen, Fastest train on route (hh:mm) 12 avstand regnet langs vei (km/h) 13 Average speed of fastest train on each route Utvikling i reisetid for persontog 1960 - 2004 13 based on road distance (km/h) 13 Godstrafikk 14 Passenger train journey times, 1960–2004 13 Antall tonn transportert med tog (1000) 14 Freight traffic 14 Antall tonnkilometer (mill.) 15 Tonnes transported by rail (1000) 14 Punktlighet i toggangen 16 Tonne-kilometres (million) 15 Punktlighet i toggangen 2004 16 Train punctuality 16 Utvikling i punktlighet 1993 - 2004 18 Train punctuality 2004 16 Uønskede hendelser 19 Punctuality trends 1993–2004 18 Driftsulykker 19 Incidents 19 Sammenstilling av ulykker 2004 19 Accident 19 Driftsulykker ved togframføring 1993 - 2004 19 Accidents in 2004 19 Dyrepåkjørsler 20 Train-related accidents 1993–2004 19 Dyrepåkjørsler 1997-2004 20 Animal fatalities 20 Dyrepåkjørsler etter art i 2004 20 Animal fatalities 1997-2004 20 Antall elgpåkjørsler pr.
    [Show full text]
  • Høringsliste Jernbane Virksomhet Adresse Postnr/Sted E-Post Org
    Høringsliste jernbane Virksomhet Adresse Postnr/Sted E-post Org. nummer Arbeidstilsynet Postboks 4720 Torgarden 7468 TRONDHEIM [email protected] 974761211 Bane NOR SF Postboks 4350 2308 HAMAR [email protected] 917082308 Bergens Elektriske Sporvei Postboks 812 Sentrum 5807 BERGEN [email protected] 990512469 Boreal Bane AS Postboks 3448 Havstad 7425 TRONDHEIM [email protected] 954653137 Borregaard AS Postboks 162 1701 SARPSBORG [email protected] 895623032 Bybanen AS Kokstadflaten 59 5257 KOKSTAD [email protected] 977511402 CargoNet AS Postboks 1800 Sentrum 0048 OSLO [email protected] 983606598 Direktoratet for samfunnssikkerhet og beredskap (DSB) Postboks 2014 3103 TØNSBERG [email protected] 974760983 Etterretningstjenesten Postboks 193 Alnabru bedriftssenter 0614 OSLO 974789221 Flytoget AS Postboks 19 Sentrum 0101 OSLO [email protected] 965694404 Go-Ahead Norge AS v/Yngve Kloster Jernbanetorget 1 0154 OSLO [email protected] 917132577 Green Cargo AB Box 39 17111 Solna, Sverige [email protected] Grenland Rail AS Bølevegen 202 3713 SKIEN [email protected] 988703680 Hector Rail AB Svärdvägen 27 18233 DANDERYD [email protected] Hellik Teigen AS Postboks 2 3301 HOKKSUND [email protected] 941538576 Jernbanedirektoratet Postboks 16 Sentrum 0101 OSLO [email protected] 916810962 Jernbanevirksomhetenes sikkerhetsforening Postboks 7052 Majorstuen 0306 OSLO [email protected] 818315392 Keolis Norge AS Kokstad depot, Kokstadflaten 59 5257 KOKSTAD [email protected] 993050377 LKAB Malmtrafik AB 98186
    [Show full text]
  • For Precise Evaluation of Wheel-Rail Contact Mechanics and Dynamics [Doctoral Thesis]", in Mechanical Engineering
    Accurate Wheel-rail Dynamic Measurement using a Scaled Roller Rig Karan Kothari Thesis submitted to the faculty of the Virginia Polytechnic Institute and State University in partial fulfillment of the requirements for the degree of Masters of Science In Mechanical Engineering Mehdi Ahmadian, Chair Steve C Southward Reza Mirzaeifar June 19, 2018 Blacksburg, VA Keywords: scaled roller rig, dynamic measurements, wheel-rail contact, traction forces, angle of attack, third-body layer, wheel wear Accurate Wheel-rail Dynamic Measurement using a Scaled Roller Rig Karan Kothari Abstract (academic) The primary purpose of this study is to perform accurate dynamic measurements on a scaled roller rig designed and constructed by Virginia Tech and the Federal Railroad Administration (VT-FRA Roller Rig). The study also aims at determining the effect of naturally generated third-body layer deposits (because of the wear of the wheel and/or roller) on creep or traction forces. The wheel- rail contact forces, also referred to as traction forces, are critical for all aspects of rail dynamics. These forces are quite complex and they have been the subject of several decades of research, both in experiments and modeling. The primary intent of the VT-FRA Roller Rig is to provide an experimental environment for more accurate testing and evaluation of some of the models currently in existence, as well as evaluate new hypothesis and theories that cannot be verified on other roller rigs available worldwide. The Rig consists of a wheel and roller in a vertical configuration that allows for closely replicating the boundary conditions of railroad wheel-rail contact via actively controlling all the wheel-rail interface degrees of freedom: angle of attack, cant angle, normal load and lateral displacement, including flanging.
    [Show full text]
  • Norges Statsbaner AS
    BASE PROSPECTUS 21 August 2006 Norges Statsbaner AS (Incorporated with limited liability under the laws of Norway) i750,000,000 Euro Medium Term Note Programme Application has been made to the Luxembourg Commission de Surveillance du Secteur Financier (the ‘‘CSSF’’), which is the Luxembourg competent authority for the purposes of Directive 2003/71/EC (the ‘‘Prospectus Directive’’) and the Luxembourg Act dated 10 July 2005 on prospectuses for securities (the ‘‘Luxembourg Law’’), to approve this document as a base prospectus issued in compliance with the Prospectus Directive and the Luxembourg Law for the purpose of giving information with regard to the issue of notes (‘‘Notes’’) issued under this k750,000,000 Euro Medium Term Note Programme (the ‘‘Programme’’) described in this Base Prospectus during the period of twelve months after the date hereof. Application has been made for Notes issued under the Programme to be admitted to listing on the of¢cial list and to trading on the regulated market (Bourse de Luxembourg) of the Luxembourg Stock Exchange (the ‘‘Market’’). The Market is a regulated market for the purposes of Directive 2004/39/EC on markets in ¢nancial instruments. The Programme also permits Notes to be issued on the basis that they will not be admitted to listing, trading and/or quotation by any listing authority, stock exchange and/or quotation system or to be admitted to listing, trading and/or quotation by such other or further listing authorities, stock exchanges and/or quotation systems as may be agreed with Norges Statsbaner AS. This Base Prospectus constitutes a Base Prospectus for the purposes of Article 5.4 of the Prospectus Directive.
    [Show full text]