APPENDIX J – COORDINATION for WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY December 2019

Total Page:16

File Type:pdf, Size:1020Kb

APPENDIX J – COORDINATION for WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY December 2019 APPENDIX J – COORDINATION For WESTMINSTER, EAST GARDEN GROVE FLOOD RISK MANAGEMENT STUDY December 2019 Page intentionally left blank for double-sided printing Appendix J – Coordination Table of Contents 1.0 Notice of Intent (NOI) 2.0 Scoping Letter 3.0 Scoping Distribution List 4.0 Tribal Scoping Distribution List 5.0 Scoping Responses Received 6.0 Draft Report Distribution List 7.0 Notice of Preparation 8.0 Draft Report Public Comments Received 9.0 Public Comment Summary Report 10.0 SHPO Consultation Westminster, East Garden Grove FRM Study December 2019 Appendix J – Coordination Page intentionally left blank for double-sided printing Appendix J – Coordination 1.0 Notice of Intent (NOI) Appendix J – Coordination Page intentionally left blank for double-sided printing Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices 2193 Annual Burden Hours: 1,522.8. prior to Organizational meeting. All Engineers, New England District, Number of Respondents: 30,456. proceedings are open. Evaluation Branch, 696 Virginia Road, Responses Per Response: 1. Concord, MA 01742. Brenda S. Bowen, Average Burden Per Response: 5 FOR FURTHER INFORMATION CONTACT: Ms. Army Federal Register Liaison Officer. Minutes. Catherine Rogers, (978) 318–8231. Frequency: Annually. [FR Doc. 06–319 Filed 1–12–06; 8:45 am] SUPPLEMENTARY INFORMATION: The U.S. SUPPLEMENTARY INFORMATION: BILLING CODE 3710–08–M Army Corps of Engineers is authorized Summary of Information Collection by the various Rivers and Harbor Acts and Water Resources Development Acts Respondents are runners who are DEPARTMENT OF DEFENSE to conduct maintenance dredging of the signing up for the Marine Corps Department of the Army; Corps of Federal navigation channels and Marathon races held by the Marine Engineers anchorage areas in Boston Harbor. Corps Marathon office, Marine Corps A public meeting to solicit comments Base Quantico. The three races are the Availability of the Draft Supplemental has been scheduled for 2 p.m. on Marine Corps Marathon, the Marine Environmental Impact Statement for Tuesday, February 14, 2006, on the Corps Marathon 10k and the Marine the Boston Harbor Inner Harbor second floor of the Black Falcon Cruise Corps Marathon Healthy Kids Fun Run. Maintenance Dredging Project Terminal, One Black Falcon Avenue, The Marine Corps Marathon office Boston, MA. records the data of all runners to AGENCY: Department of the Army; U.S. conduct the races in preparation and Army Corps of Engineers, DOD. Dated: December 30, 2005. execution of the races and to record ACTION: Notice of availability. Curtis L. Thalken, statistical information for sponsors, Colonel, Corps of Engineers, New England SUMMARY: media and for economic impact studies. The U.S. Army Corps of District. Collecting this data of the runners is Engineers, New England District, has [FR Doc. 06–318 Filed 1–12–06; 8:45 am] prepared a Draft Supplemental essential for putting on the races. BILLING CODE 3710–24–M Environmental Impact Statement and Dated: January 9, 2006. State Notice of Project Change (DSEIS/ Patricia L. Toppings, NPC) to maintenance dredge the DEPARTMENT OF DEFENSE Alternate OSD Federal Register Liaison following Federal navigation channels: Officer, Department of Defense. the Main Ship Channel upstream of Department of the Army; Corps of [FR Doc. 06–296 Filed 1–12–06; 8:45 am] Spectacle Island to the Inner Engineers BILLING CODE 5001–06–M Confluence, the upper Reserved Channel, the approach to the Navy Dry Intent To Prepare a Draft Dock, and a portion of the Chelsea River Environmental Impact Statement/ DEPARTMENT OF DEFENSE (previously permitted) in Boston Environmental Impact Report (DEIS/ Harbor, MA. Maintenance dredging of EIR) for the Westminster Watershed Department of the Army the navigation channels landward of Study, Orange County, CA Spectacle Island is needed to remove Board of Visitors, United States AGENCY: Department of the Army, U.S. shoals and restore the Federal Army Corps of Engineers, DOD. Military Academy (USMA) navigation channels to their authorized ACTION: Notice of intent. AGENCY: Department of the Army, DoD. depths. Materials dredged from the ACTION: Notice of open meeting. Federal channels will either be disposed SUMMARY: The purpose of this study is of at the Massachusetts Bay Disposal to evaluate the Westminster watershed SUMMARY: In accordance with Section Site (if the material is suitable for ecosystem and look for multipurpose 10(a)(2) of the Federal Advisory unconfined open water disposal) or, if recommendations for how to more Committee Act (Pub. L. 92–463), the material is not suitable for effectively manage its natural resources. announcement is made of the following unconfined open water disposal, in There is a need for both flood control committee meeting: confined aquatic disposal (CAD) cell(s). improvements as well as ecosystem Name of Committee: Board of Major navigation channel improvements habitat restoration. The study area is Visitors, United States Military (deepening) were made in 1999 through located in western Orange County, CA, Academy. 2001 in the Reserved Channel, the approximately 25 miles southeast of the Date: Wednesday, February 8, 2006. Mystic River, Inner Confluence and the City of Los Angeles. The Westminster Place of Meeting: Veterans Affairs Chelsea River. A final EIS was prepared watershed lies on a flat coastal plain, is Conference room, Room 418, Senate for this previous navigation approximately 90 square miles in area, Russell Building, Washington, DC improvement project in June of 1995 in and is almost entirely urbanized with 20510. which the use of CAD cells in the residential and commercial Start Time of Meeting: Approximately Mystic River, Inner Confluence, and development. There are two main 9 a.m. Chelsea River were investigated. A CAD channel systems that collect runoff from FOR FURTHER INFORMATION CONTACT: cell for the proposed maintenance portions of urbanized areas in the cities Lieutenant Colonel Shaun T. Wurzbach, project will be constructed in the Mystic of Anaheim, Stanton, Cypress, Orange, United States Military Academy, West River and in the Main Ship Channel just Santa Ana, Garden Grove, Westminster, Point, NY 10996–5000, (845) 938–4200. below the Inner Confluence. Fountain Valley, Los Alamitos, Seal SUPPLEMENTARY INFORMATION: Proposed DATES: Submit comments on or before Beach, and Huntington Beach. Agenda: Organizational Meeting of the February 27, 2006. The East Garden Grove-Wintersburg Board of Visitors. Review of the ADDRESSES: If you wish to receive a Channel (EGGW), with its principal Academic, Military and Physical copy of the DSEIS, Executive Summary, tributary, the Ocean View Channel (OV), Programs at the USMA. Sub Committee or provide comments on the DSEIS/ drains into Bolsa Bay. Two retarding meetings on Academics, Military/ NPC, please contact Ms. Catherine basins (Haster and West Street) exist at Physical and Quality of Life to be held Rogers, Ecologist, U.S. Army Corps of the upstream reach of the EGGW 7 VerDate Aug<31>2005 17:26 Jan 12, 2006 Jkt 208001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\13JAN1.SGM 13JAN1 hsrobinson on PROD1PC70 with NOTICES 2194 Federal Register / Vol. 71, No. 9 / Friday, January 13, 2006 / Notices channel. Bolsa Bay includes the Bolsa authorized projects in the interest of flood list will also be established so pertinent Chica Lowlands and Ecological Reserve, control and related purposes.’’ data may be distributed to interested and is a major environmental resource 2. Background. Before development, parties. in southern California. The Bay has the watershed was largely comprised of Dated: January 5, 2006. been designated as an area of national grasses and trees, such as oaks, Alex C. Dornstauder, significance, and is host to a wide cottonwoods and sycamore. Early Colonel, U.S. Army, District Engineer. assemblage of resident and migratory development was primarily agricultural [FR Doc. 06–317 Filed 1–12–06; 8:45 am] waterfowl and marine species including with some residential. As of the early BILLING CODE 3710–KF–M over 30 Federal and/or State listed 1990s, 85 percent of the Westminster sensitive species that utilize the watershed was urbanized. Land use wetlands during all or part of their consists primarily of residential, DEPARTMENT OF EDUCATION annual cycle. commercial, military, light industrial, The Bolsa Chica Flood Control schools and parks, and transportation Submission for OMB Review; Channel (BCFC), with its principal facilities. It is expected that in the next Comment Request tributaries, the Anaheim-Barber City 50 years full development of the Channel and Westminster Channel, remaining agricultural and vacant land AGENCY: Department of Education. drains to Huntington Harbour. The will occur. This future potential SUMMARY: The IC Clearance Official, BCFC Channel drains the western development is not expected to Regulatory Information Management portion of the study area, with a significantly affect the current flood Services, Office of the Chief Information significant portion of property adjacent conditions. Officer invites comments on the to the Seal Beach Naval Weapons 3. Scoping Process. A scoping meeting submission for OMB review as required Station of the U.S. Navy and 1.5 miles is scheduled for January 25, 2006, 6:30– by the Paperwork Reduction Act of runs through and adjacent to the Los 8 p.m., at Garden Grove Civic Center, 1995. Alamitos Armed Forces Training Base. Community Meeting Center, DATES: Interested persons are invited to Aside from the
Recommended publications
  • Title 9: Public Property, Public Works and Building Regulations
    TITLE 9: PUBLIC PROPERTY, PUBLIC WORKS AND BUILDING REGULATIONS Chapter Section Subject Page 9.05 Beaches and Piers 9.05.005 Definitions ................................................................ 01 9.05.010 Lifeguards ................................................................ 02 9.05.015 Beachcombing ......................................................... 02 9.05.020 Beach Closure ......................................................... 02 9.05.025 Encroachments ........................................................ 02 9.05.030 Public Clothing Changes .......................................... 02 9.05.035 Littering (Ord 1538 - 2005) ................................................ 03 9.05.040 Sand Removal ......................................................... 03 9.05.045 Aquatic Activities ...................................................... 03 9.05.050 Athletic Activities at Seal Way .................................. 03 9.05.055 Fires ......................................................................... 03 9.05.060 Smoking on Pier or Beach (Ord 1538 - 2005) ................... 04 9.05.065 Fishing ..................................................................... 04 9.05.070 Climbing, Diving and Jumping .................................. 04 9.05.075 Defacement of Pier .................................................. 04 9.05.080 Removal of Mussels ................................................. 04 9.05.085 Commercial Activities on Beach or Pier ................... 05 9.05.090 Vehicles and Animals ..............................................
    [Show full text]
  • Table of Contents
    Orange County Water District Sunset Gap Monitoring Wells BS13, BS24 and Bolsa Chica Channel Levee Repair Project Prepared By Orange County Water District 18700 Ward Street Fountain Valley, CA 92708 Contact: Daniel Bott December 2017 Table of Contents Section Page SECTION 1.0 INTRODUCTION .............................................................................1 -1 1.1 Purpose of Environmental Review ................................................................. 1-1 1.2 Statutory Authority and Requirements ............................................................1 -1 1.3 Technical Information and Studies ................................................................. 1-2 SECTION 2.0 PROJECT DESCRIPTION ...............................................................2 -1 2.1 Proposed Project............................................................................................ 2-1 2.2 Background ....................................................................................................2 -1 2.3 Well Site Locations .........................................................................................2 -3 2.4 Monitoring Well Construction Activities ...........................................................2 -5 2.5 Monitoring Well Long Term Operation and Maintenance Activities ................. 2-9 2.6 Bolsa Chica Flood Control Levee Repairs .................................................... 2-10 2.7 Bolsa Chica Channel Levee Repair Construction Activities .......................... 2-12 2.8 Permits and Approvals
    [Show full text]
  • Architectural Narrative “Rancho Los Alamitos” by Sally Woodbridge (Original Research by Loretta Berner and Pamela Young)
    Architectural Narrative “Rancho Los Alamitos” by Sally Woodbridge (Original research by Loretta Berner and Pamela Young) The legacies passed from one generation to the next are many and varied. Each reveals some aspect of human endeavor and achievement, but perhaps the most universal and enduring expressions of tastes, attitudes, and circumstances are to be found in the buildings each generation chooses to construct or modify to provide shelter and a place called “home.” Changing needs, lifestyles, and values dictate constantly changing patterns of settlement and building style and use. Multitudes of structures vanish without a trace, to be replaced by a new generation of buildings suited to contemporary taste. However, those structures that do survive for an extended period as archaeological fragments, romantic ruins, or, more rarely, as relatively intact buildings, tell us much about the people who built and used them, and occasionally, about those who preserved these tangible links to our past. On Rancho Los Alamitos mesa the buildings of the earliest inhabitants are gone. The impermanent structures erected by the Tongva, native inhabitants of Puvunga, left little trace beyond holes in the earth for lodge poles and fire pits. The Spaniards and Mexicans who followed built structures of adobe mud—only slightly more permanent than the reed and willow “wickiups” of the Tongva. However, in the case of Rancho Lo Alamitos, and at other rare sites, circumstances have intervened. The adobe walls of the Alamitos Ranch House, which date from the Spanish period, have survived because, layered over the old mud brick walls, generations of ranchers have added their own walls, successive structural modifications, and extensions.
    [Show full text]
  • Cultural Report-UEI
    ❖ APPENDICES ❖ APPENDIX D1 PHASE I CULTURAL RESOURCES INVENTORY PHASE I CULTURAL RESOURCES INVENTORY FOR THE OC LOOP SEGMENTS O, P, AND Q PROJECT ORANGE COUNTY PUBLIC WORKS, ORANGE COUNTY, CALIFORNIA Prepared for: Sarmad Farjo, Principal, PE, ENV SP GHD 320 Goddard Way, Suite 200 Irvine, California 92618 Prepared by: UltraSystems Environmental Inc. 16431 Scientific Way Irvine, CA 92618 August 2021 Key Words: Coyote Creek Channel; Orange County Public Works; City of Buena Park; City of Cerritos; City of La Palma; City of La Mirada; Los Alamitos, Whittier, La Habra, Calif. USGS 7.5’ topo maps; pedestrian survey; negative findings ❖ CULTURAL RESOURCES INVENTORY ❖ PHASE I CULTURAL RESOURCES INVENTORY FOR THE OC LOOP SEGMENTS O, P AND Q PROJECT ORANGE COUNTY PUBLIC WORKS, ORANGE COUNTY, CALIFORNIA Sarmad Farjo, Principal, PE, ENV SP GHD 320 Goddard Way, Suite 200 Irvine, California 92618 Prepared by: Stephen O’Neil, M.A., RPA Megan Black Doukakis, M.A. Lisa Ahn, B.A. UltraSystems Environmental Inc. 16431 Scientific Way Irvine, CA 92618 August 5, 2021 Prepared by: Date: August 5, 2021 Stephen O’Neil, M.A., RPA UltraSystems Environmental Inc. 7034/OC Loop Segments O, P, and Q Project Page i Cultural Resources Inventory August 2021 ❖ TABLE OF CONTENTS ❖ TABLE OF CONTENTS 1.0 Introduction .......................................................................................................................................... 1-1 1.1 Overview .................................................................................................................................................
    [Show full text]
  • 2020-2021 Report Card
    Beach2020-2021 Report Card 1 HEAL THE BAY // 2020–2021 Beach2020-2021 Report Card We would like to acknowledge that Heal the Bay is located on the traditional lands of the Tongva People and pay our respect to elders both past and present. Heal the Bay is an environmental non-profit dedicated to making the coastal waters and watersheds of Greater Los Angeles safe, healthy and clean. To fulfill our mission, we use science, education, community action and advocacy. The Beach Report Card program is funded by grants from: ©2021 Heal the Bay. All Rights Reserved. The fishbones logo is a trademark of Heal the Bay. The Beach Report Card is a service mark of Heal the Bay. We at Heal the Bay believe the public has the right to know the water quality at their beaches. We are proud to provide West Coast residents and visitors with this information in an easy-to-understand format. We hope beachgoers will use this information to make the decisions necessary to protect their health. HEAL THE BAY CONTENTS2020-2021 • SECTION I: WELCOME EXECUTIVE SUMMARY ..................................................................... 5 INTRODUCTION ....................................................................................7 • SECTION II: WEST COAST SUMMARY CALIFORNIA OVERVIEW ..................................................................10 HONOR ROLL ......................................................................................14 BEACH BUMMERS ..............................................................................16 IMPACT OF BEACH TYPE.................................................................19
    [Show full text]
  • Open Space/Recreation/ Conservation Element
    City of Seal Beach Open Space/Recreation/ Conservation Element Open Space/Recreation/Conservation Element Contents Purpose/Background..................................................................................................................................................1 Statutory Requirements...............................................................................................................................................2 Related Plans and Programs.......................................................................................................................................3 Other General Plan Elements...........................................................................................................................3 Local Coastal Program.......................................................................................................................................3 County of Orange General Plan.......................................................................................................................3 Quimby Act .........................................................................................................................................................4 Seal Beach Park Dedication Ordinance...........................................................................................................4 Definitions ....................................................................................................................................................................5 Community
    [Show full text]
  • City of Huntington Beach General Plan Update Program Environmental Impact Report SCH No
    City of Huntington Beach General Plan Update Program Environmental Impact Report SCH No. 2015101032 Volume I—Technical Background Reports May 2017 Lead Agency: City of Huntington Beach 2000 Main Street Huntington Beach, California 92648 Prepared by: 3570 Carmel Mountain Road, Suite 300 San Diego, California 92130 Contents Volume I—Technical Background Reports Aesthetics Technical Background Report Agriculture Technical Background Report Air Quality Technical Background Report Biology Technical Background Report Cultural Technical Background Report Energy Technical Background Report Geology Technical Background Report Greenhouse Gas Emission Technical Background Report Hazards and Hazardous Materials Technical Background Report Hydrology Technical Background Report Land Use Technical Background Report Noise Technical Background Report Population, Housing, and Employment Technical Background Report Public Services Technical Background Report Recreation Technical Background Report Traffic Technical Background Report Utilities Technical Background Report Volume II—Program Environmental Impact Report Volume III—Technical Appendices to the Environmental Impact Report Atkins │ City of Huntington Beach General Plan Update Program EIR Page i May 2017 Aesthetics and Visual Resources This section describes the aesthetics and visual resources within the planning area. The information in this section is based on the existing conditions of the planning area’s scenic vistas, scenic resources, landmarks, scenic corridors, and visual character. ENVIRONMENTAL SETTING Scenic Vistas In general, scenic vistas can be defined as viewpoints that provide expansive views of a highly valued landscape for the public’s benefit. Scenic vistas within the planning area include views of the Pacific Ocean and the Bolsa Chica Ecological Reserve, which covers approximately 1,400 acres. The Pacific Ocean is considered the planning area’s most prominent visual asset.
    [Show full text]
  • Physical Setting
    Physical Setting Dunne and Leopold (1978) define a watershed as an area of land that drains water, sediment, and dissolved materials to a common outlet at some point along a stream channel. The Santa Ana River (SAR) Watershed, depicted in Figure 3-1, drains a 2,650 square-mile area. The watershed is home to over 6 million people and includes the major population centers of parts of Orange, Riverside, and San Bernardino Counties, as well as a sliver of Los Angeles County. The Santa Ana River flows over 100 miles and drains the largest coastal stream system in Southern California. It discharges into the Pacific Ocean at the City of Huntington Beach. The total length of the SAR and its major tributaries is about 700 miles. 1 | W a t e r s h e d S e t t i n g Figure 3-1 Santa Ana Integrated Regional Water Management Region The watershed boundaries nearly match the boundaries of the Santa Ana Regional Water Quality Control Board, an organization with whom the Santa Ana Watershed Project Authority (SAWPA) has worked closely with for many years. In addition, its boundaries match the Integrated Regional Water Management (IRWM) region and the recognized Santa Ana Funding Area, as defined by the Proposition 84 IRWM program. Although there are many sub-watershed planning efforts, One Water One Watershed 2.0 (OWOW) attempts to bring all these efforts, as well as all different jurisdictions in the watershed, into a single watershed-wide vision. Over the years, SAWPA has participated in the development of sub-regional IRWM plans, with the understanding that such plans would be complementary to OWOW.
    [Show full text]
  • Father Jean Alexis Bachelot Letter MS.700
    http://oac.cdlib.org/findaid/ark:/13030/c8x63pdr No online items Finding Aid to the Father Jean Alexis Bachelot Letter MS.700 Finding aid prepared by Holly Rose Larson Autry National Center, Braun Research Library 234 Museum Drive Los Angeles, CA, 90065-5030 323-221-2164 [email protected] 2012 November 9 Finding Aid to the Father Jean MS.700 1 Alexis Bachelot Letter MS.700 Title: Father Jean Alexis Bachelot Letter Identifier/Call Number: MS.700 Contributing Institution: Autry National Center, Braun Research Library Language of Material: English Physical Description: 0.1 linear feet(1 folder) Date: circa 1932 Abstract: This is a photostat of a letter of recommendation for Abel Stearns written in Spanish by Jean Alexis Bachelot, prefect apostolic of the Sandwich Islands (Hawaii), 1836 July 11. A translation and reference from David Burkenroad sent to Librarian Ruth Christensen in 1977 is also included in the collection. Language: English, Spanish. creator: Bachelot, Jean Alexis, Father Scope and Contents This is a photostat of a letter of recommendation for Abel Stearns written in Spanish by Jean Alexis Bachelot, prefect apostolic of the Sandwich Islands (Hawaii), 1836 July 11. A translation and reference from David Burkenroad sent to Librarian Ruth Christensen in 1977 is also included in the collection. Preferred citation Father Jean Alexis Bachelot Letter, circa 1932, Braun Research Library Collection, Autry National Center, Los Angeles; MS.700. Processing history Processed by Library staff after 1981. Finding aid completed by Holly Rose Larson, NHPRC Processing Archivist, 2012 November 9, made possible through grant funding from the National Historical Publications and Records Commissions (NHPRC).
    [Show full text]
  • Seal Beach NWR Final
    U.S. Fish & Wildlife Service Seal Beach National Wildlife Refuge Final Comprehensive Conservation Plan Comprehensive Conservation Plans provide long-term guidance for management deci- sions and set forth goals, objectives, and strategies needed to accomplish refuge purposes and identify the Service’s best estimate of future needs. These plans detail program planning levels that are sometimes substantially above current budget allocations and, as such, are primarily for Service strategic planning and program prioritization purposes. The plans do not constitute a commitment for staffing increases, operational and mainte- nance increases, or funding for future land acquisition. U.S. Fish & Wildlife Service Seal Beach National Wildlife Refuge Final Comprehensive Conservation Plan May 2012 Vision Statement Tidal channels meandering through a sea of cordgrass deliver moisture and nourishment to support a healthy marsh ecosystem. As the quiet calm of the morning is interrupted by the clacking of a light-footed clapper rail, school children and other visitors, standing on the elevated observation deck, point with excitement in the direction of the call hoping for a glimpse of the rare bird. Shorebirds dart from one foraging area to another feasting on what appears to be an endless supply of food hidden within the tidal flats. California least terns fly above the tidal channels searching for small fish to carry back to their nests on NASA Island. A diverse array of marine organisms, from tube worms and sea stars to rays and sharks, and even an occasional green sea turtle, thrive within the tidal channels and open water areas of the Refuge’s diverse marsh complex, while Nelson’s sparrows and other upland birds find food and shelter within the native upland vegetation that borders the marsh.
    [Show full text]
  • The-OC-Plan-2018.Pdf
    Admin Draft July 2017 THE OC PLAN Integrated Regional Water Management for the North and Central Orange County Watershed Management Areas March 2018 The OC Plan Contacts County of Orange Orange County Watersheds Orange County Department of Public Works 2301 N. Glassell Street Orange, California 92865 www.ocwatersheds.com Orange County Water District 18700 Ward Street Fountain Valley, California 92708 (714) 378-8248 www.ocwd.com Orange County Sanitation District 10844 Ellis Avenue Fountain Valley, California 92708 (714) 962-2411 www.ocsd.com March 2018 The OC PLAN for IRWM in North and Central Orange County TABLE OF CONTENTS TABLE OF CONTENTS .................................................................................................................. TOC-1 LIST OF ACRONYMS ...................................................................................................................... AC-1 1 REGIONAL PLANNING, OUTREACH, GOVERNANCE AND COORDINATION........................................ 1-1 1.1 Introduction .................................................................................................................................. 1-1 1.2 History of Integrated Regional Water Management Planning in the North and Central Orange County Watershed Management Areas ...................................................................................... 1-5 1.3 IRWM Plan Development and Governance .................................................................................. 1-7 1.3.1 IRWM Plan Development................................................................................................
    [Show full text]
  • Tours of the Bolsa Chica Ecological Reserve EDUCATOR's GUIDE
    Tours of the Bolsa Chica Ecological Reserve EDUCATOR’S GUIDE Amigos de Bolsa Chica EDUCATOR’S GUIDE TABLE OF CONTENTS Letter to Educators 3 Map of the Bolsa Chica Ecological Reserve 4 Field Trip Information 5 Rules to Protect Our Wildlife and Your Children 6 The Ecology of Bolsa Chica 7 Connecting to the Standards 8 Functions and Values of Wetlands 10 Bolsa Chica as an Ecosystem 11 Salt Marsh Food Chain 12 Bolsa Chica: A Tidal Salt Marsh 13 Productivity Chart 14 Bolsa Chica Through the Changing Seasons Checklist 15 of Animals Commonly Seen at Bolsa Chica Checklist 17 of Fish Common to Bolsa Chica 19 The Birds of Bolsa Chica 21 Connecting to the Standards 22 Checklist of Birds Commonly Seen at Bolsa Chica 24 Pacific Flyway 28 Bird Beaks and Feet Worksheet 29 Bird Beaks and Feet Answers 30 What Are the Shorebirds Eating? 31 Endangered Species of Bolsa Chica 33 Connecting to the Standards 34 Endangered Species Act 35 Endangered Birds of Bolsa Chica 37 The History of Bolsa Chica 39 Connecting to the Standards 40 The History of Bolsa Chica 42 The Restoration of Bolsa Chica 47 Connecting to the Standards 48 Restoration of the Bolsa Chica Wetlands 49 Bolsa Chica 1901 50 Bolsa Chica Lowlands Restoration Project Map 51 How You Can be Involved with Amigos de Bolsa Chica 53 1 Amigos de Bolsa Chica EDUCATOR’S GUIDE 2 Amigos de Bolsa Chica EDUCATOR’S GUIDE Dear Educator, Thank you for booking a tour to visit the Bolsa Chica Wetlands. Once covering several thousand acres, the Bolsa Chica is now approximately 1600 acres of undeveloped wetlands, lowlands and adjacent mesa areas.
    [Show full text]