Mitigating Negative Impacts on Fish Populations in Regulated Rivers. Experiences from River Basin Management and Cross-Border Co

Total Page:16

File Type:pdf, Size:1020Kb

Mitigating Negative Impacts on Fish Populations in Regulated Rivers. Experiences from River Basin Management and Cross-Border Co Atle Rustadbakken TVÅ LÄNDER – ÉN ELV Mitigating negative impacts on fish (TLÉE) populations in regulated rivers. 2017-2020 Experiences from river basin management and cross-border collaboration FIThydro workshop in Stockholm 4-5 June 2018 Hydropower installations in Hedmark county Norway produces in average (1981-2010) 136 TWh from 1648 hydropower installations per year. Hedmark produces in average (1981-2010) 2.7 TWh from 42 hydropower installations per year. In Norway 17 % of the hydropower installations generates 90 % of the power production In Hedmark 29 % of the hydropower installations generates 90 % of the power production Source: Vannkraftdatabase from www.nve.no Dagens huvudsakliga lekområde Kraftverk LEKVANDRANDE LAX UTE I VÄNERN LAX (Klarälven) (#9) SMOLT (#8) LEKANDE LAX YNGEL (#1) ROM Spawning migration today The landlocked salmon’s historical spawning aereas in Norway are no longer available because of the Höljes dam (#9) Kraftverk About 30 km of the available water is today considered as running water suitable for (#9) spawning The spawners are transported upstream by truck and released upstram Edsforsen (#8) (#8) Spawners of salmon and trout are beeing caught in a trap below Forshaga (#1) (#1) Major fishery for salmon at Sandkilfossen Foto Trysil kommune Foto: Umeå flottningsförenings arkiv, Folkrörelsearkivet, Umeå. https://www.youtube.com/watch?v=p508N83Lorg Klarälven – Sweden’s latest and oldest long-lasting timber floating river (ca 1750 – 1991) • At most in 1957 an timber amount equivalent to 27 000 trucks with trailers! • Closed in 1991 Höljes Hydroelectric Power Station • Torsby Municipality, Värmland County • Opening in 1962 • Owned and operated by Fortum • Embankment dam in Klarälven/Trysilelva • Hydraulic head 88 m • 2 Francis turbines • Installed capacity 130 MW • Annual generation 530 GWh • Maximum capacity flow is 170 m3/s Hydropower in Klarälven Source: Fortum info Source: Fortum info Höljes dam Creates periodically a dry river reach in Klarälven between the dam and the tunnel outlet. River above dam converted to lake -> fish species composition totally changed Most of the migrating smolt and kelt never reaches Vänern alive (#9) (#8) (#1) Smolt survival (Salmon) 100% 80% 2009*: 16% 60% 2013**: 29% (%) 40% vandringsframgång 20% 150 km, 8 Krv 0% Kumulativ Kraftverk/sträcka * Norrgård et al. 2013, ** Bergman & Norrgård 2015 (inom ”Vänerlaxens Fria Gång”) Keltöverlevnad (lax) 100% 90% (%) 80% 70% 60% 70 km, 8 krv 50% 40% vandringsframgång 1930: 10% 30% 1960: 5% 20% 2013/14*: 2% Kumulativ 10% 2 0% % Edsforsen Skoga Krakerud Forshult Skymnäs Munkfors Deje Forshaga Kraftverk * Nyqvist et al. 2016 (inom ”Vänerlaxens Fria Gång”) The EU Water Framework Directive is a new tool in our toolbox. The Directive aims for 'good status' for all ground and surface waters (rivers, lakes, transitional waters, and coastal waters) in the EU. Good status = Good ecological status and + good chemical status OK NOT OK Status Vann-nett per 29.8.2017 • 311-237-R Femundselva Galtsjøen - samløp Sølna Poor – Klarälv salmon missing • 311-330-R Femundselva Sølnas utløp - Elvbrua Poor – Klarälv salmon missing • 311-173-R Femundselva Elvbrua – Sennsjøen Poor – Klarälv salmon missing • 311-178-R Trysilelva Sennsjøen – Enger Poor – Klarälv salmon missing • 311-43-R Trysilelva Engerneset – Jordet Poor – Klarälv salmon missing • 311-76-R Trysilelva Jordet – Innbygda Poor – Klarälv salmon missing • 311-249-R Trysilelva Innbygda-Sagnfossen Poor – Klarälv salmon missing • 311-80-R Trysilelva lower part HMWB Poor – Klarälv salmon missing The goals for the Interreg project TLÉE 2017-2020 Övergripande syften Kraftverk Good ecological status enligt Ramdirektivet för vatten (2000/60/EG), favourable conservation status enligt Art- och habitatdirektivet (92/43/EEG), samt att fulfill the swedeish and norwegian envireonmental measures plans. Levande landsbygd (ökad och hållbar fisketurism i sjö och älv) (#9) 1. Ökning av lekbeståndet till 50 % av det beräknade lekbeståndsmålet. Konkret: Alla åtgärder som genomförs i projektet ska bidra till att lekbeståndet inom 5-10 år ökar från dagens ca 500-1000 vilda laxar till att 5-6000 leklaxar årligen fångas och transporteras från Forshaga till uppströms belägna lekområden. 2. Återetablering av lax på norsk sida (#8) 3. Att inleda åtgärder som bevarar och påbörjar återuppbyggnaden av övriga skyddsvärda arter och livsmiljöer i och längs älvdalen. 4. Etablera en avsiktsförklaring på hög politisk nivå mellan Norge och Sverige, som säkrar en enhetlig, varaktig och gränsöverskridande förvaltningspraxis av älvresursen. Detta för att på sikt möta vattendirektivets mål om god ekologisk status i vattendraget. (#1) Hydropower installations Sagnfossen Lutufallet Höljes Edsforsen Skoga Krakerud Forshult Skymnäs Munkfors Deje Forshaga WP 1 Increased catch and survival for the up- and downstream migrating fish at the hydropower installations, and environmental adaptes water flow control. WP-task 1:1. Increased catch (and transport) of salmon and trout at Forshaga power station. The power station/fish trap in Forshaga – a bottleneck! Lax-telemetri: Vänern – Forshaga 2012 18% • Mycket vatten i älven • Mycket spillvatten Laxtelemetri: Vänern – Forshaga 2013 78% • Lite vann i älven • Lite spillvann WP-task 1:2. Increased survival on downstream migrating fish at Edsforsens power station. WP-task 1:3. High survival on downstream migrating fish at Sagnfossen and Lutufallets power stations in Norge. Sagnfossen power statin, the upermost power station in the system α-avledare Norconsult 2017 Dubbel β-avledare Norconsult 2017 Inverterad dubbel β-avledare Norconsult 2017 Salmon ladder in Clackamas River Solutions excists! (USA) WP-task 1:4. Environmental adapted water spill plan to reduce loss of biodiversity Figure 4.2 The building block methodology – the construction of a flow regime for ecosystem maintenance by combining building blocks (Acreman, 2007). WP 2 Biotope/habitat restauration, reintroduction and population monitoring. WP-task 2:1. Restore river biotopes impacted negatively by earlier timber floating. (ffa i huvudfåran Vingäng – Höljes) WP-task 2:2. Compensation stocking plan/program of salmon in the river and reintroduction of salmon with use of eggs, fry, smolts and/or adult Klärelvslaks (mainly in Norway). WP-task 2:3. Monitoring of Salmon and Trout populations (telemetry, boat el.fishing, smolt traps mm). WP 3 Genetics and cost/benefit WP-task 3:1. Reduce genetic loss in the analysis salmon and trout populations of Klarälven and Gullspångsälvens WP-task 3:2. Cost/benefit analysis /Ecosystem services Frågor? Spørsmål? Questions? [email protected] Thanks! Foto Trysil kommune.
Recommended publications
  • Measurement of Log Volume Under Bark
    SDC´s instructions for timber measurement MEASUREMENT OF LOG VOLUME UNDER BARK 1 December 2014 The instructions may be applied from 1 January 2014 in accordance with a decision by the SDC Board. The date of introduction is decided by each measuring company. SDC´s instructions for timber measurement – Log volume under bark Contents 1 Introduction ...................................................................................................................... 3 1.1 SDC´s instructions for timber measurement – timber measurement legislation .......................... 3 1.2 Area of application of this document ........................................................................................... 3 1.3 Commercial measurement of log volume .................................................................................... 4 1.4 Basic requirements for measurement ........................................................................................... 5 2 Log length and diameter .................................................................................................. 5 2.1 Log length .................................................................................................................................... 5 2.2 Log diameter ................................................................................................................................ 6 2.2.1 Measurement directions, diameter deduction and measurement units ................................ 6 2.2.2 Correction for bulges ..........................................................................................................
    [Show full text]
  • WPD Mangsliberget Wind Turbine Industrial Project - Consultation
    WPD Mangsliberget Wind Turbine Industrial Project - Consultation WPD is exploring the possibility of constructing a large wind turbine industrial power project with a maximum of 34 wind turbines of 3 to 5 MW with a total height of 250m in the area around Mangslidberget in Torsby municipality, Värmland Province. The project area is located about 20 km west of Ambjörby and Likenäs and about 40 km north of Torsby. The land is mainly owned by Bergvik forest and by some private landowners, and the area is partly characterized by modern forestry. Image of a footprint for a single turbine comparable to what is planned for Mangsliberget. The project is run by a project company that is part of the wpd group and is owned by wpd europe GmbH. The development work is conducted through wpd Scandinavia AB, also a subsidiary of wpd europe GmbH. Wpd in Sweden is currently working on the design and development of a number of wind power projects, including the land-based projects Aldermyrberget, Broboberget, Lannaberget, Stöllsäterberget, Råliden and Tomasliden, as well as the offshore project Storgrundet. Expected example of typical visibility of a turbine at Mangsliberget. WPD intends to apply for permit under the Environmental Code for the wind farm with associated roads and electrical equipment at the Environmental Testing Delegation (MPD) in Örebro County, which handles permit issues located in Värmland County. WPD refers to seeking permission to establish the wind farm within a specified project area but without fixed coordinates for the wind power plants. The document Vindkraftspark Mangslid - Samrådshandling (Wind farm Mangslid - consultation document) forms a basis for consultation and describes the project at an early stage.
    [Show full text]
  • Listing of Transboundary
    List of transboundary cases Planned activities subject to the UNECE Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Made available to the public as agreed by the Meeting of the Parties to the Espoo Convention at its fifth session, 20–23 June 2011 The information below has been gathered from a variety of sources, as indicated. The information is unofficial and is likely inaccurate as well as incomplete, but provides an indication of planned activities subject to the Convention Key: Affected Party (besides Parties of origin in joint proceedings): º did not participate º º requested participation Source: ISO 2-character country codes used. Party Year Project type / classification RED YELLOW GREEN Uncertain Uncertain, perhaps Uncertain reported as underway in the indicated year range PRODUCED JULY 2011. Party of origin Affected Party Project name, Proponent Year Project type Major Competent Status of Classification, Source Joint (besides Parties Change Authority project Appendix of origin in joint Amended proceedings) Armenia Azerbaijan; new nuclear power plant on the 2010 nuclear power Notification 2 b correspondence Georgia; Iran; Armenia Nuclear Power Plant plant sent Turkey Site near Metsamor Town, Armavir Marz No Austria Czech Republic A5 North: Poysbrunn- 2006 motorway Austrian pending 7 a 1 questionnaire 2006 Drasenhofen (Mikulov, CZ), (9 Ministry of CZ, km) By ASFINAG (Federal transport http://doku.cac.at/je200 motorway company) (BMVIT) 6_eit_casestudies.pdf No Austria Slovakia General Danube
    [Show full text]
  • The Use of Economic Instruments
    TemaNord 2014:549 TemaNord Ved Stranden 18 DK-1061 Copenhagen K www.norden.org The Use of Economic Instruments In Nordic Environmental Policy 2010–2013 The Use of Economic Instruments The Working Group on Environment and Economy of the Nordic Council of Ministers publishes regular reports on the use of economic instruments in Nordic environmental policy. This report is part of that series and has two parts. Part 1 presents an overview of the use of economic instruments in Nordic environmental policy, with a focus on policy changes over the period 2010–2013. Part 2 develops a framework for assessing the political possibilities of reforming environmentally harmful subsidies, and applies this framework to three cases relevant in the Nordic context. The report was prepared by Copenhagen Economics, GreenStream Network and Environice. The authors of the report are Hrafnhildur Bragadóttir, Carl von Utfall Danielsson, Roland Magnusson, Sampo Seppänen, Amanda Stefansdotter and David Sundén. TemaNord 2014:549 ISBN 978-92-893-2824-1 ISBN 978-92-893-2825-8 (EPUB) ISSN 0908-6692 TN2014549 omslag 4.indd 1 21-08-2014 10:31:03 The Use of Economic Instruments In Nordic Environmental Policy 2010–2013 Hrafnhildur Bragadóttir, Carl von Utfall Danielsson, Roland Magnusson, Sampo Seppänen, Amanda Stefansdotter and David Sundén TemaNord 2014:549 The Use of Economic Instruments In Nordic Environmental Policy 2010–2013 Hrafnhildur Bragadóttir, Carl von Utfall Danielsson, Roland Magnusson, Sampo Seppänen, Amanda Stefansdotter and David Sundén ISBN 978-92-893-2824-1 ISBN 978-92-893-2825-8 (EPUB) http://dx.doi.org/10.6027/TN2014-549 TemaNord 2014:549 ISSN 0908-6692 © Nordic Council of Ministers 2014 Layout: Hanne Lebech Cover photo: iStock fotos and Colourbox Print: Rosendahls-Schultz Grafisk Copies: 200 Printed in Denmark This publication has been published with financial support by the Nordic Council of Ministers.
    [Show full text]
  • The Realm of the Forest Finns the Seven Croft Trail Is a 7.9 Km Long Hiking Trail in the Border Country Between Sweden and Norway
    The Seven Croft Trail – a hike through Finnskogen in Hedmark and Värmland Price: SEK 20 torsby.se From the mid-1300s until 1809, what is now Finland formed the eastern half of the kingdom of Sweden. The Savolax region in central Finland was inhabited by forest Finns practising slash-and-burn cultivation techniques. In the 1500s and 1600s, many of them migrated to the forest landscape in mid Sweden and parts of eastern Norway. The reasons for this included overpopulation and a lack of forest areas to cultivate. The State encouraged this method of culti- vation and offered several years’ tax exemption to stimulate settle- ment. Today, Finnskogen (literally, “Forest of the Finns”) is the name of the area on both sides of the Swedish/Norwegian border where many of these Finns settled. Seven crofts, two countries; the realm of the forest Finns The Seven Croft Trail is a 7.9 km long hiking trail in the border country between Sweden and Norway. Lekvattnet in Torsby municipality and Varaldskogen in Kongsvinger municipality meet here. As the name implies, the trail leads past seven crofts, all with forest Finn origins. Here you can find everything from the ruins of Valli croft to Ritamäki, which is perhaps the best preserved forest Finn croft in the whole of Finnskogen. The route takes you through a cross-section of Finnskogen’s natural and cultural land- scapes. The trail generally follows old forest and wagon paths. There are two natural starting points for the Seven Croft Trail: On the Swedish side from the car park at Lomsen lake.
    [Show full text]
  • Mätning Av Stocks Volym Under Bark
    Measurement of Log Volume Under Bark Swedish Regulations for Timber Measurement Version 2021-04-01 Measurement of Log Volume Under Bark Swedish Regulations for Timber Measurement 1 April 2021 Contents 1 INTRODUCTION ............................................................................................. 3 1.1 Swedish regulations for timber measurement – timber measurement legislation .... 3 1.2 Area of application for these regulations ......................................................................... 3 1.3 Measurement units for log volume ................................................................................... 4 1.4 Basic requirements for measurement – delivery check .................................................. 5 2 LOG LENGTH AND DIAMETER ....................................................................... 5 2.1 Log length ............................................................................................................................. 5 2.2 Log diameter ......................................................................................................................... 6 2.2.1 Measurement directions, diameter deduction, and measurement units ........................... 6 2.2.2 Adjustment for bulges ................................................................................................................ 7 2.2.3 Diameter measurement of logs with open or closed forks .................................................. 8 2.3 Manually assessed deduction for bark – bark functions ...............................................
    [Show full text]
  • Self-Evaluation of the Värmland Region, Sweden
    Supporting the Contribution of Higher Education Institutions to Regional Development Self-evaluation of the Värmland region, Sweden 18th of January 2006 TietoEnator VINNOVA Karlstad University County Administrative Board of Värmland Region Värmland Ministry of Education and Culture Metso Paper Municipality of Karlstad Supporting the Contribution of Higher Education Institutions to regional Development Self-evaluation of the Värmland Region, Sweden Supporting the Contribution of Higher Education Institutions to Regional Development Content FIGURES…………………………………………………………………………………………….4 TABLES…………………….……………………………………………………………………….4 DIAGRAMS………………………………………………………………………………………….5 ACRONYMES.……………………………………………………………………………………….5 AGENCIES ETC .…………………………………………………………………………………….6 APPENDICIES..……………………………………………………………………………………...6 SUMMARY………………………………………………………………………………………….7 0INTRODUCTION............................................................................................................................ 12 0.1 The OECD Project......................................................................................... 12 0.2 The Värmland Region and its relation with Norway....................................... 12 0.3 Karlstad University........................................................................................ 12 0.4 The history of Karlstad University ................................................................. 13 0.5 Vision 2015 ................................................................................................... 13
    [Show full text]
  • Electronic Business: Implementation and Effects
    ELECTRONIC BUSINESS: IMPLEMENTATION AND EFFECTS Odd Fredriksson E-Business, also called digital business, has an increasingly recurring role in daily transaction facilitation in marketing channels and dyadic trading rela- tionships. These developments imply that the findings of this thesis are more relevant than ever. Managers in various positions need to deeply understand ELECTRONIC BUSINESS the mutual interrelations between marketing and IT use conditions. IMPLEMENTATION AND EFFECTS The thesis aims at answering two research questions: RQ 1: What are the conditions influencing e-Business system implementation processes? RQ 2: What e-Business-enabled performance effects result from e-Business system use, and how does the use of e-Business systems affect dyadic per- formance? The thesis comprises five case studies focusing on different e-Business forms in four Swedish marketing channel contexts. The five empirical studies were conducted in different contexts (B2B, B2G and B2C), exploring different lev- els of analysis, and span across a 20-year period, from 1988 to 2008. A literature review was conducted after the five case studies were published. Knowledge and findings identified from mainly the relationship view and information systems literature were synthesised and applied to the five publi- Fredriksson Odd cations in retrospective. The overall conclusion drawn from this thesis is the crucial importance of hu- man success conditions. The degree of commitment and pro-active actions of human beings – individually and collectively among all stakeholders involved – and their competencies decisively influence the degree to which the e- Business implementation and diffusion process will be successful, and in turn the business value outcomes that can be attained.
    [Show full text]
  • Företagsräkningen 1972. Del 2:3 = the 1972 Census Of
    INLEDNING TILL Företagsräkningen 1972 / Statistiska centralbyrån. – Stockholm : Statistiska centralbyrån, 1975. – (Sveriges officiella statistik). Täckningsår: 1972. Engelsk parallelltitel: The 1972 census of enterprises. Företagsräkningen 1972 består av flera delar, delarnas undertitlar: Del 1. Basdata för företag och myndigheter fördelade efter näringsgren, storlek, samhälssektor, ägarkategori och juridisk form. Part 1. Basic data for enterprises and government departments distributed by major division, institutional sector, type of ownership and legal organization. Del 2 (tre band) Basdata för företag och myndigheters verksamhetsställen fördelade efter näringsgren, storlek, region och ägarkategori. 2:1 Verksamhetsställen totalt och fördelade på riksområden, län och A-regioner. 2:2 Verksamhetsställen fördelade på kommuner; A–M-län 2:3 Verksamhetsställen fördelade på kommuner; N–BD-län Part 2. Basic data for local units of enterprises and government agencises, disstributed by industry (SNI, 1, 2, 3-digit level), size, region and type of ownership. Del 3 Sysselsättnings-, resultat- och kapitaldata för företag inom den affärsdrivande sektorn fördelade efter näringsgren, storlek, ägarkategori och juridisk form. Part 3. Data on employees, profits and capital for enterprises in the business sector distribute by industri, size, type of ownership and legal organization. Del 4 Sysselsättnings- och omsättningsdata för verksamhetsställen inom den affärsdrivande sektorn fördelade eftter näringsgren, storlek och region. Part 4. Data of employees and turnover for local units of enterprises in the business sector distributed by industry, size and region. Appendix Lagstiftning, Klassificeringsstandard, Insamlade data, Blankettförteckning, Blankettexempel. Appendix Föregångare: 1951 års företagsräkning / Kommerskollegium. – Stockholm : Statistiska centralbyrån, 1955. – (Sveriges officiella statistik). Täckningsår: 1951. Engelsk parallelltitel: The 1951 census of production, distribution and services. 1931 års företagsräkning / verkställd av Kommerskollegium, Stockholm 1935.
    [Show full text]
  • Signatories to This European Manifesto
    See the European Manifesto in English, French, Italian, Portuguese and Spanish THE LIST OF SIGNATORIES OF THE EUROPEAN MANIFESTO in support of an European Citizens' Initiative (ECI) for a regulation of EMF exposure, which truly protects public health [Updated in January 2018]: Amongst the signatories to this European Manifesto there are scientists, researchers and experts, as well as professional bodies and associations and representatives of civil society organizations (from health advocates, consumers, neighbours, environmentalists, ecologists, trade unions, parents of students, people with central sensitization syndromes -electro-hypersensitivity, multiple chemical sensitivity, chronic fatigue, fibromyalgia, etc.-, brain tumour patients, concerned citizens and activists associations working in the field of electromagnetic pollution) coming from 26 countries (Argentina, Australia, Austria, Belgium, Brazil, Canada, Denmark, Finland, France, Germany, India, Ireland, Italy, Macedonia, Netherlands, Panama, Poland, Portugal, UK, Russia, South Africa, Slovakia, Spain, Sweden, Switzerland and USA). The first signatories / scientists, researchers and experts • Prof. Enrique Navarro Camba, Ph.D., MSc.; Department of Applied Physics, University of Valencia – Valencia, Spain. • Prof. Jaume Segura García, Ph.D.; Department of Applied Physics, University of Valencia – Valencia, Spain. • Manuel Portolés, Ph.D.; Cell Biology and Pathology Unit, Research Center, University Hospital La Fe – Valencia, Spain. • Prof. Ceferino Maestu Unturbe, Ph.D.; Director of the Bioelectromagnetism Laboratory of the Centre for Biomedical Technology (CTB), Polytechnic University of Madrid (UPM). Director of the Leganés Project (LEGACONRAD) a real time RF-EMF monitoring in a wide urban area through self-developed technology. President of the Spanish Society of Central Sensitivity Syndrome (SESSEC) – Pozuelo de Alarcón, Madrid, Spain. • Prof. Darío Acuña Castroviejo, Professor of Physiology; Biomedical Research Center, University of Granada – Granada, Andalucía, Spain.
    [Show full text]
  • “Bioeconomy Is the Economy of the Future” PAGES 24-25
    Annual Report for 2018 paper province “we want a bubbling and free innovation climate” PAGE 4 “bioeconomy is the economy of the future” PAGES 24-25 development - networking - innovation - meeting places - marketing CONTENT CHAIRMAN’S STATEMENT Pages 10-21 Eleven pages of projects “We have a unique opportunity The projects are some of Paper Province’s most important activities. On eleven fully filled pages, we tell to contribute to the solution” about what happened to them in 2018. What they all have in common is that they support the transition was another tion the world over is demanding that we from residual materials from the forest. The to the fossil-free society. The Wood year of climate find solutions to one of our time’s greatest latter has a particular symbolic value since Region test bed in Sysslebäck changes and challenges, climate change. above all the globally strong and growing (photo at left) is a key resource in 2018greater sustainability in focus. It was the aerospace industry is often highlighted as Bioinno. Article on page 17. year that pictures were spread around the When then are these solutions? Well, that particularly problematic from a sustainability world of Greta Thunberg on a school strike, question has no simple answer of course, perspective. In Grums, a new factory for the followed by young people filled with activism and above all there is not just one answer. production of prefabricated elements made and faith in their ability to have an influence. But I am convinced that we in Paper Province of laminated wood has just been started The speed with which a global call to action have a unique opportunity to contribute in up that contributes to more sustainable can arise is almost dizzying, which affects quite many ways to the future solution.
    [Show full text]
  • Kommun Invest Green Bonds Impact Report
    Kommun invest Green Bonds Impact Report December 2020 367,577 This report in brief Increase in number of people supplied by water and wastewater facilities, p.e. (Total number of p.e. affected by Report on 416 Swedish local government investment projects financed the investments, not the share financed) by Kommun invest Green Bonds as of year-end 2020. At 31 December 2020, Kommun invest had disbursed a total of SEK 51.9 (40.3) billion, equivalent to USD 6.3/EUR 5.2 billion, in Green Loans Annual greenhouse gas (GHG) emissions to investment projects aligned with our Green Bond Framework. This report presents the expected impacts of these projects, the tCO governance process to verify and select them and the impact reporting 642,875 2 methodology we apply. Unless otherwise indicated, the reported impact is Scope 1 and 2 according to the Greenhouse Gas Protocol. Impact is reported for the aggregated portfolio of eligible assets as 604,532 tCO2 38,343 tCO2 of 31 December 2020. avoided annual emissions3 reduced annual emissions4 163 14.6 tCO2 per SEK mn tonnes per year Impact Reduced nitrogen (relevant to 85 % of Green emissions from water and Loan disbursements) wastewater facilities 51.9 Energy savings in green buildings SEK bn 43.6 SEK bn TWh 3.1 GWh Annual renewable 49.4 energy generation, Whereof avoided incl. rooftop solar cells energy use3 on buildings GREEN LOANS GREEN BONDS 41.8 GWh Green Loan Ratio1: Green Bond Ratio2: Whereof reduced energy use4 11.7 % 8.9 % 7.7 GWh 111.5 GWh Energy savings from 1) Total amount of Green Loans divided by total loan portfolio.
    [Show full text]