Directions to Our Altoona, PA Facility

Total Page:16

File Type:pdf, Size:1020Kb

Directions to Our Altoona, PA Facility Directions to Our Altoona, PA Facility Exit From Interstate 80 Exit 161 Exit 161 158 • Follow Route 220 South Bellefonte (It immediately becomes 4 lanes) Milesburg • Approaching State College merge into the lane for 220 South and 322 West • Continue on as the road turns into 2 lanes over Skytop Mount. • At the bottom of Skytop follow the ramp State College for 220 South Port Matilda • Continue south to Bald Eagle • Turn left onto Interstate 99 I-99 Construction Bald Eagle • Travel 21 miles south to Altoona 21 Miles South to Altoona From Interstate 80 Exit 158 North • Follow ALT Route 220 South to Bald Eagle • Turn left onto Interstate 99 EMS • Travel 21 miles south to Altoona 50th S Note: This is t. a Residential Area From PA Turnpike I-76 and I-70 ve. • Follow Exit 145 to the toll booth A • Leaving the toll booth turn left on to Kissel Business Route 220 ve.. A • Follow Business 220 a short distance to the Railroad Sixth entrance to I-99 (on the left) Sheetz Road Plank • Get into the right lane and follow the ramp Logan Valley for I-99 North Mall • Continue on I-99 for 31 miles to Altoona. 58th S Exit 31 treet s Lane On Interstate 99 in Altoona Good’ Exit 31 • Take Exit 31 (Coming from the north turn right at the end of the ramp - Coming from the south turn left at the end of the ramp) Get into the left lane 31 Miles North to Altoona • At the bottom of the hill turn left onto Good’s Lane • Follow Good’s Lane as it turns right and becomes 58th Street. • Continue on 58th Street across 6th Avenue and over a railroad crossing into a Exit residential area 145 • Turn right onto Kissel Avenue Pennsylvania Turnpike • Follow Kissel Avenue to the EMS Bedford Facility on 50th Street. From the West (Pittsburgh) on US 22 Route 764 E M S • Follow US Route 22 down the mountain and 50th St. • Follow Exit sign “Route 764 and US 22 East” US 22 East ve. • Follow the second exit ramp marked Route A “764 North” Altoona Via 6th Avenue. Kissel Route 764 58th S • Follow Sixth Avenue (Route 764) for 3.6 Miles North to the intersection at 58th Street - Turn Left. t. Sheetz • Turn right onto Kissel Avenue Railroad • Follow Kissel Avenue to the EMS Facility on 50th Street. Sixth Ave...
Recommended publications
  • Route 30 Corridor Implementation Plan
    Draft for Discussion Purposes Only Route 30 Corridor Implementation Plan Village of New Lenox | January 11, 2013 New Lenox Route 30 Corridor Implementation Plan Existing Conditions Synthesis Report Table of Contents Section 00: Introduction i Section 01: Past Plans & Studies 01 Section 02: Community Outreach 03 Section 03: Existing Land Use & Development 16 Section 04: Current Zoning & Regulatory Controls 19 Section 05: Transportation & Mobility 22 Section 06: Character Zones, Streetscape, & Urban Design 25 Section 07: Issues & Opportunities 29 Introduction This Synthesis Report presents the existing physical condi- Predominately a commercial corridor dating back to before tions, identifies the issues and opportunities, and summarizes Regional Setting World War II, Route 30 has long served as a center for retail Corridor Planning Process the first steps of the planning process for the New Lenox U.S. The Village of New Lenox is located approximately 40 miles and office activity. Today, the corridor boasts approximately The planning process for this study entails six different steps. Route 30 Corridor Implementation Plan. Since there has al- southwest of downtown Chicago. It is a predominantly resi- 90 businesses. A relatively high automobile traffic volume on This report contains documentation for steps one through ready been a Route 30 Corridor Revitalization Plan developed dential suburban community of approximately 25,000 people, Route 30 helps accommodate and attract a range of com- three. for the Village back in 2006, this interim report is not meant and its municipal boundaries encompass approximately 16 mercial activity. The Study Area is adjacent to the New Lenox Step 1: Project Initiation – the “kick-off ” for the project to be an exhaustive inventory of all the conditions and issues, square miles.
    [Show full text]
  • Introduction
    INTRODUCTION The Transportation Element of the Centre Planning Agency (CRPA), and the County Comprehensive Plan is an Susquehanna Economic Development assessment of the transportation facilities in Association Council of Governments the County. These facilities include not just (SEDA-COG). These organizations work the road network, but all forms of alongside the Pennsylvania Department of transportation including transit, rail, airports Transportation (PENNDOT) to identify and and bike and pedestrian facilities. It is prioritize transportation improvement important to consider the transportation projects in Centre County. network as an integrated multi-modal system. The existing conditions of the TRANSPORTATION GOAL AND transportation network are described in this OBJECTIVES initial section of the Transportation Element The goal of the Transportation Element is: (Part 1). The Transportation Element will be “To provide a multi-modal transportation completed in the future after completion of system, which includes air, bicycle, the Travel Demand Model Analysis and highway, pedestrian, public transportation, Long Range Transportation Plan for Centre and rail facilities to maximize the efficient, County. safe, economical and convenient movement of people and goods while minimizing the Significant growth of residential, office and adverse impact the system will have on industrial development has occurred in the natural and cultural resources, as well as County – especially in the Centre Region people.” area where Penn State University has served as a magnet for development. This ROAD NETWORK growth is forecasted to continue. As a Pennsylvania is in a strategic position with result, the need to identify transportation important interstate roadways traversing the facilities that will accommodate this growth state and serving national and international is a key part of the comprehensive planning trade routes.
    [Show full text]
  • The Comprehensive Plan Background Studies for the US 220/Future I-99
    TThhee CCoommpprreehheennssiivvee PPllaann BBaacckkggrroouunndd SSttuuddiieess ffoorr tthhee UUSS 222200//FFuuttuurree II--9999 PPllaannnniinngg AArreeaa Jersey Shore Borough, Piatt Township, Porter Township, Woodward Township Lycoming County, PA Technical Background Studies No. 1 – Community Development Profile Introduction The development of an effective comprehensive plan requires an understanding of the issues and trends that impact a community’s ability to sustain a “good quality of life” for its residents. During the early stages of plan development, coordination has been undertaken with many individuals and organizations in order to develop an understanding of what are perceived to be important issues that will impact the community and its development and growth in the future. This Community Development Profile summarizes where the community has been, where it is today, and where it may be going in the future based on known data sources. It includes past trend information (historic), current trend information (today), and projections (future), where appropriate and available from existing data sources. Key Community Development Issues Through consultation with the Planning Advisory Team (PAT) and interviews with key persons within the planning area and throughout the county, the important issues that could potentially impact the community in terms of social and economic conditions were identified. While many of the issues of importance relate to the county or region as shown in the adjacent highlight box, there were several issues noted by the I-99 Planning Advisory Team as being of particular importance within this I-99 planning area: þ Exodus of Younger Generation with Increasing Elderly Population – This is a concern because as an area ages the social fabric of the community becomes less stable.
    [Show full text]
  • November 14, 2020 TO: the Honorable Tom Wolf Governor Commonwealth of Pennsylvania FROM
    OFFICE OF THE DIRECTOR DATE: November 14, 2020 TO: The Honorable Tom Wolf Governor Commonwealth of Pennsylvania FROM: Randy Padfield Director, PA Emergency Management Agency TIME PERIOD: This report covers the period 0600 hours, November 13, 2020 through 0600 hours, November 14, 2020. STATUS REPORT: (as of 0600 hours) THREAT STATUS: National Terrorism Advisory System: There are no current alerts. Commonwealth Response Coordination Center (CRCC) Status: Supporting the “Heroin and Opioid Disaster Emergency Declaration” Activated in support of the COVID-19 Outbreak, the following agencies are activated: Department of Aging Department of Community and Economic Development Department of Drug and Alcohol Programs Department of Education Department of General Services Department of Health Department of Human Services Department of Military and Veterans Affairs FEMA FEMA SEPLO PA BEOC & VAL Department of Health Operations Center (DOC): Activated in support of the COVID-19 Outbreak – Conducting public health and medical coordination County EOC Activations: Adams - Level III monitoring for COVID-19 Bedford – Enhanced watch for COVID-19 Berks – Enhanced watch for COVID-19 Blair - Enhanced watch for COVID-19 Bradford - Enhanced watch for COVID-19 Cambria – Full activation for COVID-19 Centre – Enhanced watch for COVID-19 Clinton - Enhanced watch for COVID–19 Cumberland - Full activation for COVID-19 Delaware – Partial activation for COVID-19 Erie – Partial activation for COVID-19 Forest - Partial activation for COVID-19 Franklin - Enhanced watch
    [Show full text]
  • Draft 2021 LRTP
    DRAFT SEDA‐COG Metropolitan Planning Organization (MPO) LONG RANGE TRANSPORTATION PLAN The Draft Long Range Transportation Plan includes regional overview information and the MPO region’s long range vision for prioritizing transportation investments. This copy of the draft plan is available as part of a 30‐day comment period beginning on May 24, 2021, and ending on June 22, 2021. The public comment period provides the public an opportunity to provide feedback on all facets of the Long Range Transportation Plan before its adoption. The plan can be reviewed online at: http://www.seda‐cog.org/departments/transportation/long‐range‐plan. Written and electronic comments may be submitted via email, SEDA‐COG web portal, fax, or Postal Service by 4:00 p.m. on Tuesday, June 22, 2021. Email comments may be submitted to lrtp@seda‐cog.org or through the web portal at http://www.seda‐cog.org/departments/transportation/transportation‐comments Comments may be faxed to 570‐524‐9190 Please address all written comments to: Mr. Don Kiel SEDA‐COG MPO 201 Furnace Road Lewisburg, PA 17837 If you would like to provide comments or discuss the draft plan in person, a Virtual Public Meeting will be held during the public comment period as follows: Date: June 3, 2021 Time: 7:00 p.m. to 8:00 p.m. Location: The content of this Notice is available in alternative formats and other languages upon request by contacting the SEDA‐COG MPO at 570‐524‐4491, or by written correspondence directed to the MPO at 201 Furnace Road, Lewisburg, PA 17837, or by email at jsaylor@seda‐cog.org.
    [Show full text]
  • Alkaline Addition Problems at the Skytop/Interstate-99 Site, Central Pennsylvania1
    ALKALINE ADDITION PROBLEMS AT THE SKYTOP/INTERSTATE-99 SITE, CENTRAL PENNSYLVANIA1 Arthur W. Rose and Hubert L. Barnes2 Abstract. In 2002-3, approximately 8x105 m3 of pyrite-bearing Bald Eagle sandstone and Reedsville shale were removed from a large road cut through Bald Eagle Ridge near State College, PA. The rock contained an average of about 4.5% pyrite as veins and fine veinlet networks across 200 m of road cut. Smaller amounts of ZnS and other heavy metal sulfides accompany the pyrite. The rock was placed in 9 nearby locations, including large waste piles and several valley fills, two ‘buttresses” and a lane elevation along about 0.8 km of hillside that was threatening to slide into the road. During excavation of the cut, pyrite was recognized as a potential problem and considerable lime was added as layers to the various piles. Despite the lime addition, highly acidic seeps emerged from the piles and fills, with pH 2.0 to 2.7, Fe 90-1500 mg/L, and acidities as high as 18,000 mg/L (as CaCO3). These results clearly show that addition of lime and other alkaline materials as layers is not effective. In experiments to test remediation methods, Bauxsol slurry was sprayed onto part of the buttress area but failed to prevent continuing acid seepages. Inspection trenches showed little penetration of the Bauxsol, and demonstrated the presence of the added lime as impermeable lime layers within the buttress. Bucket tests of mixtures of alkaline circulating fluidized-bed ash with pyritic rocks, when well mixed, gave alkaline effluents.
    [Show full text]
  • Interstate 80 Corridor Memorandum of Understanding (Mou) Between Local and Regional Agencies and the California Department of T
    INTERSTATE 80 CORRIDOR MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN LOCAL AND REGIONAL AGENCIES AND THE CALIFORNIA DEPARTMENT OF TRANSPORTATION (CALTRANS) FOR INTEGRATED CORRIDOR MOBILITY STRATEGIES IN ALAMEDA AND CONTRA COSTA COUNTIES This MOU is a compilation of the goals, policies, and procedures intended to be followed by the parties working together in a coordinated manner to enhance traffic operations along the Interstate 80 (I-80) corridor in Alameda and Contra Costa Counties. This MOU is intended to identify the overall commitment and responsibilities regarding ownership, operations, and maintenance of the various equipments installed as part of the I-80 Integrated Corridor Mobility (ICM) Project. 1 Table of Contents I. BACKGROUND .................................................................................... 3 II. DEFINITION AND EXPLANATION OF TERMS ................................... 5 III. PROJECT DESCRIPTION AND PURPOSE OF MOU ......................... 7 IV. PROJECT GOALS & OBJECTIVES .................................................... 9 V. OPERATIONS STRATEGIES AND PRINCIPLES ............................. 10 VI. EQUIPMENT OWNERSHIP & MAINTENANCE ................................. 15 VII. PROJECT DEVELOPMENT PRINCIPLES ........................................ 15 VIII. COSTS & FUNDING ........................................................................... 21 IX. FUTURE MOU MODIFICATIONS ...................................................... 22 ATTACHMENTS ATTACHMENT A ATTACHMENT B ATTACHMENT C 2 I. BACKGROUND Interstate
    [Show full text]
  • Federal Register/Vol. 65, No. 233/Monday, December 4, 2000
    Federal Register / Vol. 65, No. 233 / Monday, December 4, 2000 / Notices 75771 2 departures. No more than one slot DEPARTMENT OF TRANSPORTATION In notice document 00±29918 exemption time may be selected in any appearing in the issue of Wednesday, hour. In this round each carrier may Federal Aviation Administration November 22, 2000, under select one slot exemption time in each SUPPLEMENTARY INFORMATION, in the first RTCA Future Flight Data Collection hour without regard to whether a slot is column, in the fifteenth line, the date Committee available in that hour. the FAA will approve or disapprove the application, in whole or part, no later d. In the second and third rounds, Pursuant to section 10(a)(2) of the than should read ``March 15, 2001''. only carriers providing service to small Federal Advisory Committee Act (Pub. hub and nonhub airports may L. 92±463, 5 U.S.C., Appendix 2), notice FOR FURTHER INFORMATION CONTACT: participate. Each carrier may select up is hereby given for the Future Flight Patrick Vaught, Program Manager, FAA/ to 2 slot exemption times, one arrival Data Collection Committee meeting to Airports District Office, 100 West Cross and one departure in each round. No be held January 11, 2000, starting at 9 Street, Suite B, Jackson, MS 39208± carrier may select more than 4 a.m. This meeting will be held at RTCA, 2307, 601±664±9885. exemption slot times in rounds 2 and 3. 1140 Connecticut Avenue, NW., Suite Issued in Jackson, Mississippi on 1020, Washington, DC, 20036. November 24, 2000. e. Beginning with the fourth round, The agenda will include: (1) Welcome all eligible carriers may participate.
    [Show full text]
  • An Overall Pian for the Development and Preservation of the City of Mooha, Pennsylvania
    An Overall Pian for the Development and Preservation of the City of Mooha, Pennsylvania Prepzred Under the Direction of the City of Altoona Comprehensive Plan Steering Committee and Staff of the City of Altoona Depaitmsnt of Planning and Development Adopted by Resolution or' Altoona City CounciI on August 9, 2gOo. Cornm u n it4 Plann i r ia Cons u I t a nt [Jrban Research and Devetoprneilt Corporation Bothle hem, Penns y lva tiia CONTENTS Introduction .................................................................... 1 Great Things Are Happening ................................................... 1 AltoonaWithintheRegion .................................................... 2 I Altoona’sRichHeritage ....................................................... 3 I How This Plan Was Developed ................................................. 4 1 c Initial Public Input ................................................................ 5 Community-Wide Survey ..................................................... 5 Neighborhood Workshops ..................................................... 6 I Results of Focus Group Interviews .............................................. 9 Mission Statement .......................................................... 11 Direction: The Major Goals of this Plan ......................................... 11 I Relationships Between the Components of this Plan ............................... 13 I Land Use and Housing Plan ....................................................... 15 L Economic Development and Downtown Plan
    [Show full text]
  • Chapter Four
    CHAPTER FOUR EXISTING TRANSPORTATION SYSTEM INVENTORY WITH NEEDS ASSESSMENT ANALYSIS This Chapter of the WATS Long Range Transportation Plan provides a description of the existing multi-modal transportation system in Lycoming County encompassing highways and bridges, public transportation, airports, railroads and bike / pedestrian facilities. There are no waterway or inland ports located in the County. An inventory of current transportation assets by transportation mode will be provided, including a current physical condition and operational performance needs assessment. This data driven inventory and assessment is important to properly address transportation asset management needs and to improve operational performance of the overall system in terms of public safety, security, efficiency and cost effective movement of people and goods. HIGHWAY SYSTEM Highway Designations / Classification System According to the PennDOT Bureau of Planning and Research, there are 1,995.18 linear miles of publicly owned roadways throughout Lycoming County. PennDOT owns 716.59 linear miles, (35%) of public roadways in Lycoming County. In addition, there are 1,258.86 miles, (63%) of locally-owned roadways owned by 52 different local municipalities included on the PennDOT Liquid Fuels System. Other agencies own the remainder of roads in the County. Lycoming County government only owns two roads which are County Farm Road at the Lysock View county complex housing the Department of Public Safety (911 center), Pre- Release and county farm and an entrance road to the White Deer Recreation Complex. There are federal designations and classifications established for highway systems in the nation as noted in the following sections. Road Functional Classification System The Federal Highway Administration, PennDOT and Metropolitan & Rural Planning Organizations cooperatively establish and update maps that delineate various road classifications which group roadways into a hierarchy based on the type of highway service provided.
    [Show full text]
  • Bay Area Freeway Service Patrol
    BAY AREA FREEWAY SERVICE PATROL IMPLEMENTATION PLAN July 2021 Updated August 2020 SERVICE START END WEEKEND TOW TRUCKS Annual Total Hours (4 BEAT ID COUNTY ROUTE BEAT LIMITS MILEAGE WEEKDAY AM WEEKDAY MID WEEKDAY PM TRUCKS NOTES DATE DATE Sat & Sun REQUIRED** Hours years)* REQUIRED ALA 980 Interstate 580 to Interstate 880 2.03 ALA 24 Interstate 580 to Contra Costa County Line 4.39 7/1/21 6/30/25 06:00-10:00 15:00-19:00 f 1 CC 24 Contra Costa County Line to Oak Hill Road 6.25 2 1 6120 24480 CC/ALA 13 State Route 24 to Redwood Road(on call) 4.23 d ALA 80 Powell Street to Central Ave. 8.59 7/1/21 6/30/25 06:00-10:00 10:00-15:00 15:00-19:00 12:30-19:00 a, c, e, f 2 ALA/CC 580 Interstate 80 to Western Drive/Point Molate (no mid-day,weekend coverage) 6.01 2 1 8015 32060 ALA 880 7th Street to Interstate 238 10.55 7/1/21 6/30/25 06:00-10:00 10:00-15:00 15:00-19:00 a, f 4 ALA 238 Interstate 880 to Interstate 580 2.11 2 5360 21440 SM 101 State Route 92 to San Francisco City Limit 14.10 7/1/21 6/30/25 06:00-10:00 10:00-15:00 15:00-19:00 2 1 7400 29600 a, f, d 6 SM 92 Highway 101 to Foster City Blvd. (on call) 1.40 8 SCL 101 Bailey Ave to Ellis Street 23.90 7/1/21 6/30/25 06:00-10:00 15:00-19:00 3 1 8160 32640 f 12 CC 80 Central Ave to Cummings Skyway 8.39 7/1/21 6/30/25 06:00-10:00 10:00 - 15:00 15:00-19:00 2 5360 21440 a, b SCL 880 State Route 237 to Interstate 280 8.42 19 SCL 17 Interstate 280 to State Route 85 4.60 7/1/21 6/30/25 06:00-10:00 10:00-15:00 15:00-19:00 2 1 7400 29600 a SCL 237 Interstate 880 to Maude Ave.
    [Show full text]
  • Big Springs; C.N
    NH-80-2(113) Colorado Line – Big Springs; C.N. 61658 NH-80-2(104) Big Springs West Crossover; 61566A PROJECT INFORMATION FACT SHEET December 2017 NH-80-2(100) Big Springs West; 61566 NH-80-2(113) Colorado Line – Big Springs; C.N. 61658 NH-80-2(104) Big Springs West Crossover; 61566A ACCOMMODATION OF TRAFFIC: The proposed projects NH-80-2(100) Big Springs West; 61566 would be constructed under traffic with lane closures controlled with approved temporary traffic control devices and practices; however, two low volume ramps (I-80 LOCATION: The proposed Colorado Line – Big Springs doweled concrete pavement on a foundation course, eastbound to I-76 westbound and I-76 eastbound to I-80 and Big Springs West Crossover projects would repair and constructing temporary crossovers. Additional westbound) would be closed to traffic during construction pavement and construct a temporary crossover to work would include shoulder, guardrail, and culvert of the Big Springs West project. A designated detour would accommodate reconstruction work at the Big Springs work, lighting and Intelligent Transportation Systems be provided utilizing I-80 and the Big Springs Interchange West interchange. Improvements made during the (ITS) Dynamic Message Signs (DMS) work, and (Exit 107), where travelers can exit and re-enter the Colorado Line – Big Springs project would be limited to removal and replacement of existing bridges with interstate to their destinations. It is anticipated that the the eastbound lanes only. The proposed Big Springs new structures, as needed. ramps would be closed for the entire length of construction West Crossover would be constructed at the Colorado/ TRAFFIC VOLUMES: for the Big Springs West project.
    [Show full text]