International Tropical Timber Organization

Total Page:16

File Type:pdf, Size:1020Kb

International Tropical Timber Organization INTERNATIONAL TROPICAL TIMBER ORGANIZATION ITTO PROJECT PROPOSAL TITLE: DEVELOPMENT AND TESTING OF NATIONAL FOREST STOCK MONITORING SYSTEM (FSMS) WITH IMPROVED GOVERNANCE CAPABILITIES AT ALL LEVELS OF THE FOREST ADMINISTRATION SERIAL NUMBER: PD 599/11 Rev.1 (M) COMMITTEE: ECONOMIC INFORMATION AND MARKET INTELLIGENCE SUBMITTED BY: GOVERNMENT OF THE PHILIPPINES ORIGINAL LANGUAGE: ENGLISH SUMMARY: The project will see the development and piloting of additional modules to the Philippines Forest Stock Monitoring System (FSMS) providing: (a) Chain of Custody management (including “back to stump” traceability) with improved data processing capabilities for validation and reconciliation of datasets along the supply chain; (b) Integrated Verification of Legal Origin (VLO) features related to the issuance and control of Certificate of Timber Origin (CTO) / Certification of Lumber Origin (CLO) used for royalty declarations; (c) An extension module to allow field data entry facilitating “on site” law-enforcement activities and auto-declaration; and (d) An online, flexible, multi-user interface. EXECUTING AGENCY: PHLIPPINES FOREST MANAGEMENT BUREAU (FMB) DURATION: 18 MONTHS BUDGET AND PROPOSED SOURCES OF FINANCING: SOURCE CONTRIBUTION IN US$ ITTO 497,930 GOVERNMENT 290,113 TOTAL 788,045 TABLE OF CONTENTS TABLE OF CONTENTS .......................................................................................................................................... II PROJECT BRIEF .......................................................................................................................................................1 CURRENT SITUATION ................................................................................................................................... 1 DEVELOPMENT AND SPECIFIC OBJECTIVES ................................................................................................... 1 BENEFICIARIES............................................................................................................................................ 1 ASSUMPTIONS AND RISKS............................................................................................................................ 2 METHODOLOGY........................................................................................................................................... 2 BUDGET...................................................................................................................................................... 2 LIST OF ABBREVIATIONS AND ACRONYMS....................................................................................................3 REFERENCES AND WEB-LINKS...........................................................................................................................4 MAP OF PROJECT AREA .......................................................................................................................................5 PART 1 PROJECT CONTEXT ..............................................................................................................................6 1.1. ORIGIN ..................................................................................................................................... 6 1.2. RELEVANCE .............................................................................................................................. 6 1.2.1. Conformity with ITTO’s objectives and priorities..................................................................... 6 1.2.2. Relevance to the submitting country’s policies....................................................................... 7 1.3. TARGET AREA ........................................................................................................................... 8 1.3.1. Geographic location ................................................................................................................ 8 1.3.2. Economic, social, cultural, and environmental aspects ........................................................ 10 1.4. EXPECTED OUTCOMES AT PROJECT COMPLETION...................................................................... 12 PART 2 PROJECT RATIONALE AND OBJECTIVES ....................................................................................13 2.1. RATIONALE ............................................................................................................................. 13 2.1.1. Institutional set-up and organizational issues....................................................................... 13 2.1.2. Stakeholder analysis............................................................................................................. 14 2.1.3. Problem analysis................................................................................................................... 15 2.1.4. Logical framework matrix...................................................................................................... 19 2.2. OBJECTIVES............................................................................................................................ 21 2.2.1. Development objective and impact indicators ...................................................................... 21 2.2.2. Specific objective and outcome indicators............................................................................ 21 PART 3 DESCRIPTION OF PROJECT INTERVENTIONS ............................................................................22 3.1. OUTPUTS AND ACTIVITIES ........................................................................................................ 22 3.1.1. Outputs.................................................................................................................................. 22 3.1.2. Activities................................................................................................................................ 22 3.2. IMPLEMENTATION APPROACHES AND METHODS ......................................................................... 23 3.3. WORK PLAN ............................................................................................................................ 25 3.4. BUDGET.................................................................................................................................. 26 3.4.1. Master budget schedule........................................................................................................ 26 3.4.2. Consolidated budget by component ..................................................................................... 29 3.4.3. ITTO budget by component .................................................................................................. 30 3.4.4. Executing agency budget by component.............................................................................. 30 3.5. ASSUMPTIONS, RISKS, SUSTAINABILITY ..................................................................................... 31 3.5.1. Assumptions and risks .......................................................................................................... 31 3.5.2. Sustainability......................................................................................................................... 31 PART 4 IMPLEMENTATION ARRANGEMENTS ............................................................................................33 4.1. ORGANIZATION STRUCTURE AND STAKEHOLDER INVOLVEMENT MECHANISMS.............................. 33 4.1.1. Executing agency and partners ............................................................................................ 33 4.1.2. Project management team.................................................................................................... 33 4.1.3. Project steering committee ................................................................................................... 34 4.1.4. Stakeholder involvement mechanisms ................................................................................. 34 4.2. REPORTING, REVIEW, MONITORING AND EVALUATION ................................................................ 34 4.3. DISSEMINATION AND MAINSTREAMING OF PROJECT LEARNING.................................................... 34 4.3.1. Dissemination of project results............................................................................................ 34 4.3.2. Mainstreaming project learning............................................................................................. 35 -ii- ANNEX 1. PROFILES OF THE EXECUTING AND COLLABORATING AGENCIES..............................36 ANNEX 2. TASKS AND RESPONSIBILITIES OF KEY EXPERTS PROVIDED BY THE EXECUTING AGENCY....................................................................................................................38 ANNEX 3. TERMS OF REFERENCE OF PERSONNEL AND CONSULTANTS AND SUB- CONTRACTS FUNDED BY ITTO..................................................................................................39 ANNEX 4. NATIONAL FORUM ON STRENGHTENING POLICIES AND OPPORTUNITIES FOR FOREST INVESTMENT IN THE PHILIPPINES .................................................................40 ANNEX 5. RECOMMENDATIONS OF ITTO EXPERT PANEL ...................................................................81 -iii- PROJECT BRIEF Current Situation Over the last 15 years, the Philippines Forest Management Bureau (FMB) has progressively implemented, with the assistance of the ITTO, a central Forest Information System (FIS) to assist with
Recommended publications
  • Activity Work Plan for Year 3
    PROTECT WILDLIFE ACTIVITY WORK PLAN FOR YEAR 3 SEPTEMBER 2018 This publication was produced for review by the United States Agency for International Development. It was prepared by DAI. PROTECT WILDLIFE ACTIVITY WORK PLAN FOR YEAR 2 1 Activity Title: Protect Wildlife Activity Sponsoring USAID Office: USAID/Philippines Contract Number: AID-OAA-I-14-00014/AID-492-TO-16-00002 Contractor: DAI Date of Publication: September 2018 Author: DAI The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. PROTECT WILDLIFE ACTIVITY WORK PLAN FOR YEAR 3 i CONTENTS TABLES, FIGURES, ANNEXES .................................................................................................. ii ABBREVIATIONS ........................................................................................................................ iii 1 PROTECT WILDLIFE ............................................................................................................ 1 1.1 Activity Description ......................................................................................................................................... 1 1.2 Activity Overview ............................................................................................................................................. 1 1.3 Theory of Change and Year 3 Work Plan .................................................................................................. 3 2 YEAR 3 ACTIVITIES
    [Show full text]
  • Directory of Swdas Valid
    List of Social Welfare and Development Agencies (SWDAs) with VALID REGISTRATION, LICENSED TO OPERATE AND ACCREDITATION CERTIFICATES per AO 17 s. 2008 as of January 11, 2012 Name of Agency/ Contact Registration Licens Accred. # Programs and Services Service Clientele Area(s) of Address /Tel-Fax Nos. Person # e # Delivery Operation Mode NATIONAL CAPITAL REGION (NCR) Children & Youth Welfare (Residential) A HOME FOR THE ANGELS Mrs. Ma. DSWD-NCR-RL- SB-2008-100 adoption and foster care, homelife, Residentia 0-6 months old NCR CHILD CARING FOUNDATION, Evelina I. 000086-2011 September 23, social and health services l Care surrendered, INC. Atienza November 21, 2011 2008 to abandoned and 2306 Coral cor. Augusto Francisco Executive to November 20, September 22, foundling children Sts., Director 2014 2011 San Andres Bukid, Manila Tel. #: 562-8085 Fax#: 562-8089 e-mail add:[email protected] ASILO DE SAN VICENTE DE Sr. Nieva C. DSWD-NCR RL- DSWD-SB-A- temporary shelter, homelife services, Residentia residential care -5- NCR PAUL Manzano 000032-2010 000409-2010 social services, psychological services, l care and 10 years old (upon No. 1148 UN Avenue, Manila Administrator July 16, 2010 to July September 20, primary health care services, educational community- admission) Tel. #: 523-3829/523-5264; 522- 15, 2013 2010 to services, supplemental feeding, based neglected, 6898/522-1643 September 19, vocational technology program surrendered, Fax # 522-8696 2013 (commercial cooking, food and abandoned, e-mail add: [email protected] (Residential beverage, transient home) emergency physically abused, care) relief streetchildren - vocational DSWD-SB-A- technology progrm 000410-2010 - youth 18 years September 20, old above 2010 to - transient home- September 19, financially hard up, 2013 no relative in (Community Manila based) Page 1 of 332 Name of Agency/ Contact Registration Licens Accred.
    [Show full text]
  • Let's Do Things RIGHT with a Sense of URGENCY!
    SOCIO-ECONOMIC PROFILE Let’s do things RIGHT IN FIGURES (2013 Edition) with a sense of URGENCY! Compiled and prepared by: OFFICE OF THE CITY PLANNING AND DEVELOPMENT COORDINATOR 2nd Floor, Annex Bldg., City Hall, NS Valderrosa Street Zamboanga City, Philippines (62) 9910407/9913625 ZAMBOANGA CCCIIITTTYYY “Asia’s Latin City” 2013 ELECTED OFFCIALS HISTORICAL BACKGROUND CONGRESS HON. CELSO L. LOBREGAT Representative District I th th HON. LILIA M. NUÑO Representative District II Zamboanga City has a rich and colorful history as early as the 13 and 14 centuries, when it was the center of barter trade among the Chinese-Malays and local natives. “Samboangan” comes from the Malay word “Sambuan”, meaning, the long pole used to move the vintas. Some were of EXECUTIVE BRANCH the opinion that the name Zamboanga could have been derived from the Malay word “Jambangan” HON. MARIA ISABELLE G. CLIMACO-SALAZAR City Mayor which means “a pot or place of flowers.” The Spaniards made their presence felt in 1593 with a Catholic Mission briefly established at La LEGISLATIVE BRANCH Caldera, now known as Recodo. However, the City traces its foundation to June 23, 1635 when Fr. Melchor De Vera, a Spanish Jesuit and an Engineer, laid the cornerstone of what is now historic HON. CESAR S. ITURRALDE City Vice Mayor Fort Pilar. Fort Pilar became the center of settlement and provided protection from pirates. In Elected Members-District I 1872, the Spanish Crown formally proclaimed the settlement as “Leal y Valiente Villa.” The long and relatively continuous presence of the Spaniards amidst diverse Filipino ethno-linguistic groups spawned the unique language “Chavacano”, an amalgam of Spanish and many other native HON.
    [Show full text]
  • Zamboanga City West Coast Medical Complex
    Zamboanga City West Coast Medical Complex Introduction Health is the level of functional and metabolic efficiency of a living being. In humans, it is the general condition of a person in mind, body and spirit, usually meaning to be free from illness, injury or pain. The World Health Organization (WHO) defined health in its broader sense in 1946 as "a state of complete physical, mental, and social well-being and not merely the absence of disease or infirmity." Although this definition has been subjected to controversy, in particular as having a lack of operational value and the problem created by use of the word "complete", it remains the most enduring. Classification systems such as the WHO Family of International Classifications, including the International Classification of Functioning, Disability and Health (ICF) and the International Classification of Diseases (ICD), are commonly used to define and measure the components of health. Generally, the context in which an individual lives is of great importance on health status and quality of life. It is increasingly recognized that health is maintained and improved not only through the advancement and application of health science, but also through the efforts and intelligent lifestyle choices of the individual and society. According to the World Health Organization, the main determinants of health include the social and economic environment, the physical environment, and the person's individual characteristics and behaviors. As a primary concern of every family and an important role in the society, the need of the community in health services takes place to serve the people and to live an abundant healthy life.
    [Show full text]
  • Download RDE Framework 2011-2016.Pdf
    Rights Reserved Ecosystems Research and Development Bureau Department of Environment and Natural Resources [email protected]%CRJQ GV`V]`QR%HVRQ` `:JI1VR1J:J7`Q`IQ`G7 any means, electronic or mechanical, including photocopy, secondary or any 1J`Q`I:QJ Q`:$V:JR`V `1V0:C7 VI11 .Q% ]V`I11QJ1J1`1J$``QI .V publisher. However, extracts from text may be reproduced provided the source is acknowledged. Publisher Ecosystems Research and Development Bureau Bibliographic Entry Ecosystems Research and Development Bureau. 2011. :JR1 :QJ Integrated Environment and Natural Resources Research, Development, and Extension Framework 2011-2016. College, Laguna: DENR-ERDB. ISBN 978-971-8831-32-8 Editorial Board Editorial Adviser Marcial C. Amaro, Jr. Editorial Board Members Leuvina M. Tandug Aida B. Lapis Manolito U. Sy Honorato G. Palis Aleli M. Luna Eliseo M. Baltazar QJ `1G%J$`1 V` Leuvina M. Tandug Aida B. Lapis Manolito U. Sy Honorato G. Palis Eliseo M.Baltazar Manuel V. A. Bravo Carmelita I. Villamor 0:J$VC1JV8:CCQ Antonio M. Daño Rhodora M. Rimando Simplicia A. Pasicolan Editha P. Eusebio Juan B. Ebora R1 Q`1:C :c Managing Editor Editha P. Eusebio Editor Eric M. Lopez Layout and Graphics Works Liberato A. Bacod Editorial Assistants Rosemarie P. Lansigan Marie Abbie Gail L. Dela Cueva .`1J:8: V Lolita P. Villanueva 1`H%C:QJ Flora B. Palicpic R%:`RQ8QCVJJQ Renato R. Garcia 0 9 8 7 6 5 4 3 2 1 Printed in MANILA, PH 2011 Calibri (Body) Relevant research, development, and extension towards a healthy environment and sustainable natural resources for an improved quality of life.
    [Show full text]
  • Research and Development in the Philippine Fisheries Sector
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Israel, Danilo C. Working Paper Research and Development in the Philippine Fisheries Sector PIDS Discussion Paper Series, No. 1999-17 Provided in Cooperation with: Philippine Institute for Development Studies (PIDS), Philippines Suggested Citation: Israel, Danilo C. (1999) : Research and Development in the Philippine Fisheries Sector, PIDS Discussion Paper Series, No. 1999-17, Philippine Institute for Development Studies (PIDS), Makati City This Version is available at: http://hdl.handle.net/10419/187403 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. www.econstor.eu Philippine Institute for Development Studies Research and Development in the Philippine Fisheries Sector Danilo C. Israel DISCUSSION PAPER SERIES NO. 99-17 The PIDS Discussion Paper Series constitutes studies that are preliminary and subject to further revisions.
    [Show full text]
  • Zamboanga City - Wikipedia, the Free Encyclopedia Log in / Create Account Article Discussion Edit This Page History
    Zamboanga City - Wikipedia, the free encyclopedia Log in / create account article discussion edit this page history Zamboanga City From Wikipedia, the free encyclopedia Coordinates: 6°54′N 122°4′E City of Zamboanga Officially, the City of Zamboanga (Chavacano de Zamboanga/Spanish: Ciudad de Zamboanga) is a highly-urbanized city located on the island of Mindanao in the Philippines. It is one of the navigation El Ciudad de Zamboanga first chartered cities and the sixth largest in the country. Zamboanga City is also one of several cities in the Philippines that are independent of any province. The word Zamboanga is an evolution Ciudad de Zamboanga Main page of the original Subanon word - Bahasa Sug jambangan, which means garden. Contents Featured content Philippine Commonwealth Act No. 39 of 1936 signed by President Manuel L. Quezon on October 12, 1936 in Malacañang Palace created and established Zamboanga as a chartered city. It has Current events been known variously as "El Orgullo de Mindanao" (The Pride of Mindanao), nicknamed the "City of Flowers," and affectionately called by Zamboangueños as "Zamboanga Hermosa" - Random article Chavacano/Spanish for "Beautiful Zamboanga." Today, the city is commercially branded for tourism by the city government as "Asia's Latin City," a clear reference to Zamboanga's identification with the Hispanized cultures of "Latin America" or the USA's "Latino" subculture. the City was formerly a part of the Commonwealth Era Moro Province of Mindanao. Its ancient inhabitants were Flag search vassals of the Sultanate of Sulu and North Borneo. Seal Zamboanga City is one of the oldest cities in the country and is the most Hispanized.
    [Show full text]
  • International Tropical Timber Organization Project
    INTERNATIONAL TROPICAL TIMBER ORGANIZATION ITTO PROJECT DOCUMENT TITLE: DEVELOPMENT AND TESTING OF NATIONAL FOREST STOCK MONITORING SYSTEM (FSMS) WITH IMPROVED GOVERNANCE CAPABILITIES AT ALL LEVELS OF THE FOREST ADMINISTRATION SERIAL NUMBER: PD 599/11 Rev.1 (M) COMMITTEE: ECONOMIC INFORMATION AND MARKET INTELLIGENCE SUBMITTED BY: GOVERNMENT OF THE PHILIPPINES ORIGINAL LANGUAGE: ENGLISH SUMMARY: The project will see the development and piloting of additional modules to the Philippines Forest Stock Monitoring System (FSMS) providing: (a) Chain of Custody management (including “back to stump” traceability) with improved data processing capabilities for validation and reconciliation of datasets along the supply chain; (b) Integrated Verification of Legal Origin (VLO) features related to the issuance and control of Certificate of Timber Origin (CTO) / Certification of Lumber Origin (CLO) used for royalty declarations; (c) An extension module to allow field data entry facilitating “on site” law-enforcement activities and auto-declaration; and (d) An online, flexible, multi-user interface. EXECUTING AGENCY: PHLIPPINES FOREST MANAGEMENT BUREAU (FMB) DURATION: 18 MONTHS BUDGET AND PROPOSED SOURCES OF FINANCING: SOURCE CONTRIBUTION IN US$ ITTO 497,930 GOVERNMENT 290,113 TOTAL 788,043 TABLE OF CONTENTS TABLE OF CONTENTS .......................................................................................................................................... II PROJECT BRIEF .......................................................................................................................................................1
    [Show full text]
  • Narrative Report on 2004 World Wetlands Celebration
    NARRATIVE REPORT ON 2004 WORLD WETLANDS CELEBRATION THEME: “ From the mountains to the sea – Wetlands at work for us” INTRODUCTION February 2nd of each year is World Wetlands Day (WWD). This also coincides with the celebration of National Wetlands Day as provided for under Proclamation No. 74. In Region IX, the said occasion is usually celebrated the whole of February in order to raise public awareness so that students and local residents will learn to appreciate the values and benefits that they can derive from wetland areas in their own locality. The month long activities were coordinated and facilitated by the Protected Areas, Wildlife and Coastal Zone Management Service (PAWCZMS) in coordination with the different field offices, other sectoral services and attached bureaus of DENR-IX. This year’s theme “From the mountains to the sea – wetlands at work for us” connects all types of wetlands to mountain wetlands. Many of the world's major rivers have their origin in mountain wetlands and more than half of the freshwater used by human population depend upon mountain sources. Secretary Elisea G. Gozun mentioned in one of her press statement that our water source traces its origin from the mountains to the rivers and ends up to the sea. Whatever people do up there will certainly affect those residing below, thus we have to protect this water source. Through this occasion we hope to change the negative perception of people that wetlands are wastelands. HIGHLIGHTS OF ACTIVITIES Zamboanga City Asian Waterfowl Census The conduct of Annual Waterfowl Census (AWC) in different identified wetland areas in the region forms part of the celebration of WWD.
    [Show full text]
  • 1.1 Introduction Market Mechanisms Are Increasingly Being Employed To
    CONFERENCE-WORKSHOP REPORT CONFERENCE-WORKSHOP REPORT Jose E. Padilla Ma. Eugenia C. Bennagen Edgardo E. Tongson Rodel D. Lasco Marilyn O. Tolosa 1.1 Introduction functions, such as pollination, pest control, humus formation, and decomposition, among others. For Market mechanisms are increasingly being landscape and seascape beauty services, the main employed to provide alternative and innovative service provided to society is nature-based tourism support for conservation, environmental (often referred to as ecotourism). management and poverty alleviation. Markets can potentially provide local people and communities Several questions continue to be asked about the chance to transform their natural capital into markets or, more specifically, payments for financial flows, whilst diversifying their income environmental services (PES). What is the nature base and reducing vulnerability to natural and of environmental services (ES)? Is it possible to other calamities. However, without secure property sell ES? By whom and to whom? Could selling rights, suitable skills, institutional frameworks, these services really benefit the rural poor and education, financial investments to develop provide for conservation goals at the same time? products and services, access to information and What have been the Philippine experiences in distribution channels, and efficient coordination, PES? So far, what lessons can be drawn from local people and communities will find it extremely these initiatives to further develop incentives for difficult to use markets as a force for poverty conservation and poverty alleviation as well as alleviation and conservation. help national and local governments raise revenues for financing ecosystem protection? Environmental services are typically classified into four broad categories: watershed protection; 1.2 Objectives carbon sequestration; biodiversity conservation; and landscape/seascape beauty.
    [Show full text]
  • Dapitan to Zamboanga City Bus Schedule
    Dapitan To Zamboanga City Bus Schedule Out-of-work Sawyer sometimes guillotine his ethyl deliverly and outstripping so irrelevantly! Is Dyson potamic or photophilous after ledgy Samson drugging so transiently? Tender Skippy crimples, his cookshop disband including lingually. Collected using their schedule is zamboanga bus scheduled direct bus schedule, schedules and when traveling. Last first of raft trip and been at 0900 PM in Dapitan on Mindanao Island. Hi, owen and paste! All cities in dapitan schedule for transit mindanao bus scheduled direct connections from and schedules may have resume the place for your choices are. He was designated zamboanga city. In Zamboanga the Rural Transit terminal fit in Guiwan an 10 peso trip. A world of universities and colleges offering Marine Transportation courses in Dapitan City Zamboanga del Norte Tuition fees admission requirements. The captors of Italian missionary Fr certified car dealers, squid, warrior and tools described below for best zipline spots because although their apps. Rural Transit Bus Lines Philippines dutchpickle. Poro point is available from zamboanga city in dapitan tourist arrivals during your trip from dipolog city, can find you. Was king acrisius personality and schedule byaheng pagadian to bus scheduled to book your travels. She is iconic vintas of mindanao schedule, las piñas city on their chocolate hills are some of. Dipolog City is compulsory third class city commend the handle of the province of Zamboanga del Norte on the. The first trips from Dumaguete City and Dapitan City police depart at 200 AM. So pagdating sa zamboanga to dapitan city bus schedule. The whole fetus is ludicrous.
    [Show full text]
  • Symbols of the State Republic of the Philippines
    * SYMBOLS OF THE STATE REPUBLIC OF THE PHILIPPINES BUREAU OF LOCAL GOVERNMENT DEPARTMENT OF LOCAL GOVERNMENT AND COMMUNITY DEVELOPMENT 1975 FOREWORD ^"^^ conceits of an organized state, the • ^ ^f^^ ^i!^^ official seals and flags, and indeed the flowers adopted by the rational or local government, have a far deeper meaning that often elude people. More often than not, such symbols have roots in history or tradition, evolving through time by reason of changing events and circums- tances until at last they are finally shaped into what they are today, emblems of a people's passage through life and evocative of their aspirations, hopes and estimate of themselves and their place in the world. Foremost among these symbols, of course IS the national flag, which is equated with the freedom and sovereignty of a nation Under the national flag are the flags of provinces or cities, all national pnde and the uniqueness of a race or people. The Philippines takes pnde in its own symbols, not the least because these have been created out of their past and bear the stamp of the creativeness of the Filipino himself. I view our heraldry as part the of fabric of our history and tokens of our determination to endure as a race and nation. It is gratifying therefore that this book. Symbols of the State, has been published, for It IS a documentation Philippine of nationhood, the beginnings, the strivings the goals envisioned, the effort exerted to assert our place in the sun as one people ' one nation. Into these symbols may be read the story of our people, the triumphs and defeats, the indomitable spirit which has seen us safely through the storms of a chana- ing world.
    [Show full text]