W, DALTON. STEAM BOILER SUPERHEATER, APPLICATION EILET FIEB, 20, L912

Total Page:16

File Type:pdf, Size:1020Kb

W, DALTON. STEAM BOILER SUPERHEATER, APPLICATION EILET FIEB, 20, L912 W, DALTON. STEAM BOILER SUPERHEATER, APPLICATION EILET FIEB, 20, l912, NAVNESS 4. W. DALTON. STEAM BOILER SUPERHEATER, APPLICATI0N FILEID FEB. 20, 1912. 1,031,693. Patented July 9, 1912, 2 sHEETS-S HEET NVENTOR ????? V- ?? ?? ?? " | UNITED STATES PATENT OFFICE. WILLIATI DALTON, or SCHENECTADY, NEW YORK, sTEAM-BOILEER SUPERREGATER. få,031693. Specification of Letters Patet, Patented July 9, 1912. Application filed February 20, 1912. Serial No. 678,835. To all whom it may concern I of the location of the superheating elements, Be it known that I, WILLIAM DALTON, of as smoke box and fire tube superheaters. Schenectady, in the county of Schenectady Each of these classes is necessarily open to and State of New York, have invented a certain practical objections, the smoke box 60 certain new and useful Improvement in t?? e not being capable of developing a suf Steam-Boiler Superheaters, of which im ficiently high degree of superheat to be provement the following is a specification. fully effective, and, further, involving a My invention relates to superheaters for material extension and obstruction of the steam boilers of the locomotive type, and smoke box, and the fire tube type requiring. 85 0 more particularly to those having a com the use of flues of materially greater than bustion chamber in the waist of the boiler, ordinary diameter, and superheating pipes and its object, is to provide a superheating of great length, and obstructing the passage appliance which shall be readily applicable of the gases through the superheating tubes. iniboilers of such character, without modifi A comparatively shall number of locomo-. 70 5 cation of the standard form and dimensions tives have also been fitted with superheaters of the boiler shell and tubes, and in which which are located in a compartment inter a sufficient area of heating surface to insure posed between the rear steam generatinga. a high degree of superheat shall be pro section, and the front water heating section. id with a substantial reduction in the of a boiler, said compartment constituting 75 20 length of superheater pipes, as compared an intermediate combustion chamber in with prior constructions. ... front of the tubes. The improvement claimed is hereinafter The special purpose of my invention is to fully set forth. - construct a superheating appliance, which In the accompanying drawings: Figure 1 shall be exempt from the objections above 80 25 is a vertical longitudinal central section stated, and in which the heat of the gases of - through the rear portion of a locomotive combustion shall be utilized as fully as prac boiler, illustrating an embodiment of my in ticable by presenting the superheating ele vention; Fig. 2, a vertical transverse section through the same, on the line aa of Fig. 1, thements firebox to their to actionthe tubes. in their A passagereduction from of 85 30 the left hand half thereof showing the volume of the space occupied by the super Superheating pipes in section on the line b b heating elements is also designed to be of Fig. 1; Fig. 3, a plan view, partly in sec effected. tion, and on an enlarged scale, of the header, In the practice of my invention, I locate detached; and, Fig. 4, a section, on a fur the superheating appliance within the com 90 ther enlarged scale, through the header and bustion chamber, at the front of the firebox, superheater pipe connections, instead of in the smokebox or the fire tubes, My invention is herein exemplified as ap or in front of the fire tubes, as in prior prac plied in a locomotive boiler of one of the tice, thereby utilizing the higher heat of the present standard types, having an outside products of combustion in their direct pas 95 40 firebox, 1, connected to a waist, 2, through sage from the firebox to and through the which a plurality of fire tubes, 3, extend combustion chamber, and correspondingly from a flue sheet, 4, at the front end of a reducing the aggregate length of the pipes. combustion chamber, 5; formed in the waist through which the steam traverses while be-, of the boiler, to a smoke box (not shown) at ing Subjected to the superheating action of 00 45 the forward end of the waist. The inside the products of combustion. In order to fire box, 6, which adjoins, and communicates admit of the convenient connection of the directly with, the combustion chamber, is steam supply and delivery conduits of the provided, at bottom, with a grate, 7, of any superheater, the volume of the combustion suitable and preferred construction, and a chamber, 5, is increased by the interposition 105 50. firing opening, 8, (one or more) controlled of a transverse bridge wall, 9, of fire brick, by a door in the usual manner, is formed in between the front of the grate, 7, and the its rear end. v. front water wall of the firebox, said bridge Prior practice in locomotive boiler super wall being Supported on a bearer, 9", se heaters has, so far as my knowledge and in cured as its ends to the mud ring of the fire 55 formation extend, embodied practically only box. A transverse header, 10, which is a two classes, known respectively, by reason substantial metallic casing, of segmental 1,031,698 form, is supported in the space between the holes in the partition, 10, and nuts, 15. bridge wall and the front water wall of the Tight joints are insured by ball or spherical firebox, said header being divided by a lon faced joint rings, 13, formed or fixed on the itudinal partition, 10, which is perforated ends of the superheater pipes, and fitting in y a plurality of bolt holes, into a saturated correspondingly shaped recesses in the 70 steam compartment, 10, and a superheated yokes and the header. In order to protect steam compartment, 10°. The partition, 10, the rear return bend elbows, 13, and the is rearwardly inclined from the middle to connections of the superheater pipes to the the ends of the leader, so that the saturated header, from the direct action of the high steam compartment is of gradually increas heat of the gases passing over the top of the 75 0. ing transverse sectional area from its mid bridge wall, a segmental shield plate, 17, of dle to its ends, and the superheated steam. fire clay or other suitable refractory mate compartment is of gradually diminishing rial, is connected to the bridge wall, a short transverse sectional area from its middle to distance below its top, and projects for- : 15 each of its ends, as clearly shown in Fig. 3. Wardly, therefrom, above the superheater 80 T. Saturated steam supply nozzles or connect pipes, 13. ing members, 10, extend downwardly from . The high efficiency and value in the gen the header, 10, adjacent to its ends, said noz eration of steam, of the heating surface pre zles communicating with the saturated sented in a combustion chamber which ad 20 steam supply compartment; 10, and a sui joins and directly communicates with the 85 . perheate steam delivery nozzle or connect : firebox of a locomotive boiler, as compared ing member, 10, extends downwardly from with the heating surface of the tubes, is well the middle of the header, said nozzle com-: and universally recognized by those famill municating with the superheated steam com iar with the operation of boilers of this : 25 partment, 10°. Elbows, 10 and 10º, árecon type, and these combustion chambers are 90 nected to the nozzles, 10' and 10, respec now being applied to a considerable extent tively, for the attachment of saturated Steam in railroad service. supply pipes, leading from the dome || II believe myself to be the first who has other suitable portion of the steam spage. rendered the advantage of the combustion the boiler, ?????’ of a superheated steamide chamber available for the superheating of 95 SO livery pipe leading to the cylinders of the steam, by locating within it, a superheating appliance of such construction as does not islocomotive, controlled respectively. by an outside Said throttle ???????? valve of involve the perforation of the water space any suitable and preferred construction, lo or the use of tubes of larger diameter than cated in any convenient position adjacent to those of boilers working saturated steam, i00 35 the cylinders. The lower end of the com and in which a substantial reduction of the bustión chamber space containing the header length of the pipes within which the steam is closed by a bottom plate 5, which may be is superheated, is effected, without impair fitted with a discharge. hopper, 11 (one or ment of the capacity of the appliance to af 40 more) for the removal of any cinders that ford as high a degree of superheat as ex- 105 may accumulate, on the bottom plate. It perience has demonstrated to be advisable. will be obvious that if preferred the com fdo not therefore consider my invention to partment, 10, of the header may be used as be limited to the specific embodiment herein the saturated steam compartment, and the selected for illustration, and desire to in 45 compartment 10, as the superheated steam clude within it such structural modifications 110 ... compartment, the supply and delivery pipes. as embody its spirit and essential character ', being connected accordingly. listic features, and as rhey be within the or A plurality of ????????lly extending dinary skill of a mecanie familiar with lo: loops orireturn bends of superheater pipes, comotive construction and operation. 50 i3, disposed side by side in substantially ra I claim as: my invention, and desire to se 115 dial planes of the boiler, is located in the cure by Letters Patent:-.
Recommended publications
  • Steam Locomotive Firebox Explosion on the Gettysburg Railroad Near Gardners, Pennsylvania
    Steam Locomotive Firebox Explosion on the Gettysburg Railroad near Gardners, Pennsylvania Leadership ViTS Meeting 6 September 2005 Bryan O’Connor, Chief Office of Safety and Mission Assurance Accident Timeline Place: Gettysburg Railroad near Gardners, PA Accident Date: June 16, 1995 Gettysburg 1278 @ Gettysburg Oct 1988 The Accident: • Steam locomotive 1278 with six passenger cars had completed two excursions and was preparing for a third and final excursion for the day. • During slow climb up moderate grade, the boiler exploded, seriously burning the engineer and two firemen. • . (2) Events Associated with Proximate Cause • Operators began climb with too little water in boiler • Water-level continued to drop and by the time the locomotive had crested the grade the crownsheet of boiler was not covered by water and failed due to thermal overstress. • Failure of crownsheet opened boiler to the firebox (atmosphere) and the water in boiler flashed into high pressure steam. • Steam exploded through firebox door into the locomotive cab, seriously burning the engineer (third degree burns over 65% of body) and two firemen. (3) Events Associated with Proximate Cause Approx. 175 psi This figure is exaggerated to show low water conditions, in locomotive 1278 the lowest gage cock was 3.25 inches above the highest point of the crownsheet and the water glass was 3.125 inches above the highest point of the crownsheet (4) Contributing Factors • Prior to operation the feed pump gauge had been removed. • Preparing to ascend grade first fireman shut off the feed pump to the boiler because a leaking check valve between the feed-pump and the boiler could potentially cause slippage on driving wheels.
    [Show full text]
  • Module BESTT MS1
    Module BESTT MS1 Marine Steam Boiler Types, Construction and Maintenance. Aim This unit introduces learners to the wide variety of fuels which may be encountered in steam launches and small steam ships operating on inland waterways or sheltered coastal waters. The range of types of boilers is explained. In each case, the benefits of each fuel type or boiler type are explored. The reasons for caution when conducting external work on old boilers are explained. INTRODUCTION Boiler types considered Horizontal Fire Tube boilers (including locomotive type) Vertical Fire Tube boilers Horizontal Drum Water Tube boilers Vertical Drum Water Tube boilers Single coil (or Flash) boilers Construction, design and general arrangements Heat transfer Cleaning Considerations for boiler choice and design Options for materials and insulations Boiler cladding materials The sheer variety of boiler types used in marine applications is wider than anything we will encounter for railway locomotives or in road steam applications. Although fire tube boilers from earliest days have been the norm for railway locomotives, water tube boilers could also very occasionally be found in locomotives. The well-known Sentinel shunters had water tube boilers a little bigger but otherwise similar to the company’s steam wagon boilers, and Sir Nigel Gresley on the LNER experimented with a ‘Yarrow’ type boiler but dropped the idea and fitted Britain’s only 4-6-4 express engine with a traditional loco boiler. For shipping, various forms of the classic marine multi-furnace fire tube ‘Scotch’ boiler was a norm to the last, and vertical fire tube types were a standard for small steam launches, but alongside these a huge range of highly efficient water tube types was under constant development resulting in many different configurations.
    [Show full text]
  • 88 Series 2 Boiler Manual
    88 Water & steam boilers – Series 2 for use with Gas, Light Oil, & Gas/Light Oil – Fired Burners Boiler Manual • Installation • Maintenance • Startup • Parts For additional information, refer to . Burner specifi cation and data sheets for burners pre-tested with model 88 boilers This manual must only be used by a qualifi ed INSTALLER Consider piping and installation when determining heating installer/service technician. Read all boiler location. instructions before installing. Follow all in- Any claims for damage or shortage in shipment must be structions in proper order. Failure to comply fi led immediately against the transportation company could result in severe personal injury, death by the consignee. or substantial property damage. USER . This manual is for use only by your qualifi ed heating When calling or writing about the boiler— installer/service technician. Boiler and burner must be Please have the boiler model number from the installed by a qualifi ed service technician. We recom- boiler rating label and the CP number from mend regular service by a qualifi ed service technician, the boiler jacket. at least annually. Part No. 550-100-068/1018 Weil-McLain 88 Water and steam boilers — Series 2 — for Gas, Light Oil, & Gas/Light Oil-Fired Burners Read before proceeding Hazard Definitions The following defined terms are used throughout this manual to bring attention to the presence of hazards of various risk levels, or to important information concern- ing the life of the product. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage if ignored. Indicates presence of hazards that can cause severe personal injury, death or substantial property damage if ignored.
    [Show full text]
  • Hurst Boiler & Welding Company, Inc
    Hurst Boiler & Welding Company, Inc. P.O. Drawer 530 - Highway 319 North Coolidge, Georgia 31738 877-99HURST – Toll Free 229-346-3545 – Local 229-346-3874 – Fax www.hurstboiler.com SERIES 45 STEAM BOILER (8.5- 813 HP, STEAM 15 psig) SAMPLE SPECIFICATIONS The following sample specifications are provided by Hurst Boiler & Welding Co., Inc. to assist you in meeting your customer's specific needs and application. The sample specifications are typically utilized as the base template for the complete boiler specification. Contact your local Hurst Boiler & Welding Co., Inc. authorized representative for information on special insurance requirements, special code requirements, optional equipment, or general assistance in completing the specification. 1.0 – General Boiler Specifications 1.1 - The Steam Boiler shall be Hurst Boiler & Welding Co., Inc. Series 45, hp designed for 15 psig. The maximum operating pressure shall be psig and the minimum operating pressure shall be psig. 1.2 - The boiler shall have a maximum output of Btu/hr, or horsepower when fired with oil and/or natural gas, Btu/cu-ft. Electrical power available shall be Volt Phase Cycle. 2.0 – Boiler Design 2.1 - The boiler shall be a three-pass wetback horizontal firebox type boiler with four (4) square feet of fireside heating surface per rated boiler horsepower. Furnace volume shall not be less than cubic feet. It shall be mounted on a heavy steel frame with integral forced draft burner and burner controls. The complete packaged boiler approved as a unit by Underwriters Laboratories and shall bear the UL label. 2.2 - The boiler shall be completely preassembled and tested at the factory.
    [Show full text]
  • Steam Power Plant
    www.getmyuni.com Steam Power Plant A power plant is assembly of systems or subsystems to generate electricity, i.e., power with economy and requirements. The power plant itself must be useful economically and environmental friendly to the society. The present book is oriented to conventional as well as non-conventional energy generation. While the stress is on energy efficient system regards conventional power systems viz., to increase the system conversion efficiency the supreme goal is to develop, design, and manufacturer the non-conventional power generating systems in coming decades preferably after 2050 AD which are conducive to society as well as having feasible energy conversion efficiency and non-friendly to pollution, keeping in view the pollution act. The subject as a whole can be also stated as modern power plants for power viz electricity generation in 21st century. The word modern means pertaining to time. At present due to energy crisis the first goal is to conserve energy for future while the second step is todevelop alternative energy systems including direct energy conversion devices, with the devotion, dedication and determination remembering the phrase, “Delve and Delve Again till wade into”. CLASSIFICATION OF POWER PLANTS Power Plant 1. Conventional - Steam Engines Power Plants - S team Turbine Power Plants - Diesel Power Plants - Gas Turbine Power Plants - Hydro-Electric Power Plants - Nuclear Power Plants Thermoelectric Generator 2. Non-conventional Thermoelectric generator Fuel-cells Power Plants Photovoltaic solar cells Power S ystem MHD Power Plants Fussion Reactor N PP Power S y stem Biogas, Biomass Energy Power sy stem Geothermal Energy Wind Energy Power System Ocean Thermal energy conversion (OTEC) Wave and Tidal Wave Energ y Plantation Scheme A power plant may be defined as a machine or assembly of equipment that generates and delivers a flow of mechanical or electrical energy.
    [Show full text]
  • Steam Locomotive Firebox Explosion on the Gettysburg Railroad Near Gardners, Pennsylvania June 16, 1995
    PB96-917008 NTSB/SIR-96/05 NATIONAL TRANSPORTATION SAFETY BOARD WASHINGTON, DC 20594 SPECIAL INVESTIGATION REPORT STEAM LOCOMOTIVE FIREBOX EXPLOSION ON THE GETTYSBURG RAILROAD NEAR GARDNERS, PENNSYLVANIA JUNE 16, 1995 . Illlr 6768 Abstract: On June 16, 1995, the firebox crownsheet of Gettysburg Passenger Services, Inc., steam locomotive 1278 failed while the locomotive was pulling a six-car excursion train about 15 mph near Gardners, Pennsylvania. The failure resulted in an instantaneous release (explosion) of steam through the firebox door and into the locomotive cab, seriously burning the engineer and the two firemen. This accident illustrates the hazards that are always present in the operation of steam locomotives. The Safety Board is concerned that these hazards may be becoming more significant because Federal regulatory controls are outdated and because expertise in operating and maintaining steam locomotives is diminishing steadily. As a result of its investigation, the National Transportation Safety Board issued safety recommendations to the Federal Railroad Administration, the National Board of Boiler and Pressure Vessel Inspectors, and the Tourist Railway Association, Inc. The National Transportation Safety Board is an independent Federal agency dedicated to promoting aviation, railroad, highway, marine, pipeline, and hazardous materials safety. Established in 1967, the agency is mandated by Congress through the Independent Safety Board Act of 1974 to investigate transportation accidents, determine the probable causes of the accidents, issue safety recommendations, study transportation safety issues, and evaluate the safety effectiveness of government agencies involved in transportation. The Safety Board makes public its actions and decisions through accident reports, safety studies, special investigation reports, safety recommendations, and statistical reviews.
    [Show full text]
  • Firebox Design and Its Relation to Boiler Performance
    ry C5-4 / FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE BY CHARLES M. CLARK AND JAMES HERRON WESTBAY THESIS FOR THE DEGREE OF BACHELOR OF SCIENCE IN RAILWAY MECHANICAL ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY OF ILLINOIS 1917 UNIVERSITY OF ILLINOIS 7 THIS IS TO CERTIFY THAT THE THESIS PREPARED UNDER MY SUPERVISION BY C HARLES M, . CLARK AND JAMES HERRON JffESTBAY . ENTITLED FIRgBOX DSSICT,,^ IS APPROVED BY ME AS FULFILLING THIS PART OF THE REQUIREMENTS FOR THE DEGREE OF MSHELGR.^ ..SC^EEC^^ Instructor in Charge Approved : HEAD OF DEPARTMENT OF RAILWAY ENGINEERING . 3 FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE. Contents Page Introduction ------------------- 1 Purpose ------------------ 2 Part I. Theory of Combustion Definition -------------- - 2 The Combustion Process and Heat Distribution 2 Summary ------------------ 11 Part II. Heat Transmission in Locomotive Fireboxes Radiation ------------------ 1 Conduction ----------------- 14 Convection ----------------- 15 Graphical Representation of Heat Transfer - 19 Summary ------------------ 20 Part III. Heat Distribution and Firebox Efficiency Discussion of Articles by Mr. Anthony - - - - 21 Summary -------------------25 Part IV. Test Results and their Analysis The Brick Arch - Coatesville Tests ----- 27 The Brick Arch - P. R. R. Tests -------29 Grate Area - P. R. R. Tests -------- 34 Combustion Chamber - P. R. R. Tests ----- 36 Summary ------------------- Part V. General Conclusion - -- -- - -- -- -- 41 Acknowledgements -------------- 43 Digitized by the Internet Archive in 2013 http://archive.org/details/fireboxdesignitsOOclar . FIREBOX DESIGN AND ITS RELATION TO BOILER PERFORMANCE Introduction . The performance of a locomotive boiler is dependent to a very large extent upon the design of its firebox. A great deal of experimental work has been done in an effort to determine what steps should be taken to improve boiler performance and to increase boiler efficiency.
    [Show full text]
  • Interactive Centre for Science and Technology in Łódź
    Interactive Centre for Science and Technology in Łódź Detailed guidelines for the detailed designs of exhibits, exhibition arrangement and equipment DRAFT Address of the construction work: ul. Targowa 1/3 i ul. Tuwima 46, 54/58, Łódź, woj. łódzkie działki ewidencyjne nr: 180/46 i 180/47 - w obrębie S-6 Common Procurement Vocabulary (CPV): 32322000-6 Multimedia equipment 32321300-2 Audio-visual materials 79930000-2 Specialty design services 79822500-7 Graphic design services 72212783-1 Content management software development services 72212520-1 Multimedia software development services 71314100-3 Electrical services 51110000-6 Installation services of electrical equipment 39154000-6 Exhibition equipment 39150000-8 Miscellaneous furniture and equipment 32417000-9 Multimedia networks 31611000-2 Wiring sets 31500000-1 Lighting equipment and electric lamps 48780000-9 System, storage and content management software package 79950000-8 Exhibition, fair and congress organisation services 92110000-5 Motion picture and video tape production and related services 92312000-1 Artistic services Name and address of the Investor: EC1 Miasto Kultury ul. Targowa 1/3, 90-022 Łódź Address for correspondence: ul. Tymienieckiego 5 90-365 Łódź, woj. łódzkie Prepared by: DELTA. Stanisław Pochwała, ul. Kuźnicy Kołłątajowskiej 16/10, 31-234 Kraków 1 Kraków, luty 2013 Prepared by: DELTA. Stanisław Pochwała, 31-234 Kraków, ul. Kuźnicy Kołłątajowskiej 16/10, office: 31-060 Kraków, ul. Św. Wawrzyńca 15 The team - key personnel: arch. Łukasz Bigas, Maciej Pociecha, Tomasz Borsukiewicz, Karolina Kiryjczuk, Paweł Kotlarz, Mirosław Kołodziej, Maria Łukasiewicz-Rudkowska, Paweł Osmenda, arch. Małgorzata Pasek, Piotr Skindzier, Rafał Sworst, Bartłomiej Świerz, Stanisław Pochwała - Project Manager Legal basis of issue: - Order and guidelines of the Investor: EC1 Miasto Kultury, ul.
    [Show full text]
  • API Recommended Practice 538 Industrial Fired Boilers for General Refinery and Petrochemical Service
    API Recommended Practice 538 Industrial Fired Boilers for General Refinery and Petrochemical Service FIRST EDITION | OCTOBER 2015 | 348 PAGES | $305.00 | PRODUCT NO. C53801 This recommended practice (RP) specifies requirements For ordering information: and gives recommendations for design, operation, Online: www.api.org/pubs maintenance, and troubleshooting considerations for industrial fired boilers used in refineries and chemical Phone: 1-800-854-7179 plants. It covers waterside control, combustion control, (Toll-free in the U.S. and Canada) burner management systems (BMSs), feedwater preparation, steam purity, emissions, etc. (+1) 303-397-7056 This RP does not apply to fire tube boilers, gas turbine (Local and International) exhaust boilers, or fluidized bed boilers. Fax: (+1) 303-397-2740 This RP does not cover boiler mechanical construction. Purchaser or owner shall specify codes such as ASME, ISO, etc. API members receive a 30% discount where applicable. This RP does not cover forced circulation boilers. www.api.org Contents Page 1 Scope . 1 2 Normative References . 1 3 Terms, Definitions, Acronyms, and Abbreviations . 3 3.1 Terms and Definitions . 3 3.2 Acronyms and Abbreviations . 18 4 Boilers—Equipment Overview. 20 4.1 General Considerations . 20 4.2 Operations . 23 4.3 Boiler Configurations . 29 4.4 Fuels Fired in Industrial Steam Boilers. 41 4.5 Igniter Management System . 41 4.6 Burner Management Systems . 43 4.7 Boiler Feedwater Preparation . 45 4.8 Boiler Water Quality and Internal Chemical Treatment. 45 4.9 Steam Purity. 45 4.10 Boiler Performance . 46 5 Water Tube Boiler Components. 49 5.1 Pressure Parts—Superheaters/Attemperators .
    [Show full text]
  • LOCOMOTIVE NO. 40 Built by the AMERICAN LOCOMOTIVE COMPANY at Their Dunkirk (N.Y.) Works in August 1920, No. 40 Has Had a Long A
    The Valley Railroad Company 1 Railroad Avenue, PO Box 452, Essex, CT 06426 Phone: 860-767-0103 fax: 860-767-0104 LOCOMOTIVE NO. 40 Built by the AMERICAN LOCOMOTIVE COMPANY at their Dunkirk (N.Y.) works in August 1920, No. 40 has had a long and interesting career. It was one of an order for three identical units constructed for The Portland, Astoria & Pacific Railroad to haul train loads of logs and lumber. Unfortunately, the PA&P was never completed so the locomotives sat idle until they were sold to other railroads. No. 101 (our locomotive) was sold to the Minarets & Western Railway for similar service. When that railroad could not pay it’s debts, the locomotive was given to the Southern Pacific Railroad, which sold it to a used locomotive dealer which in turn sold it to The Aberdeen & Rockfish Railroad in North Carolina as their N0.40. On the A&R it pulled freight and passenger trains until about 1950 when it was retired and stored in their engine house. Here it remained until it was discovered by an employee of the Valley Railroad. It was purchased in 1977 and loaded onto flat cars for it’s trip to Essex and a new career pulling trainloads of tourists for the Essex Steam Train & Riverboat. No.40 is one of less than 200 steam locomotives in the United States which remain in operable condition. It burns about 2 tons of low sulfur coal for fuel each day and evaporates about 6000 gallons of water pulling a 400 ton train a total of 50 miles.
    [Show full text]
  • The Thermo-Mechanical Behavior of the Steam Locomotive Boiler Firebox: an Overall View Ing
    The Thermo-Mechanical Behavior of the Steam Locomotive Boiler Firebox: An Overall View Ing. Livio Dante Porta Edited: Hugh Odom, P.E. & Davidson Ward Foreword: Ing. Shaun T. McMahon About the Coalition for Sustainable Rail The Coalition for Sustainable Rail (CSR) is dedicated to advancement of modern steam technologies, research and development of biofuels, and educational outreach. CSR is a 501c(3) nonprofit working in collaboration with the University of Minnesota to advance the state of the art in these areas. A scientific and educational organization, CSR’s mission is to advance biofuel research and production; to research and develop sustainable railroad locomotives; to promulgate associated sustainable technologies; and to support and conduct non-partisan educational and informational activities to increase awareness of its mission. About CSR’s White Paper Program Working in conjunction with the University of Minnesota (U of M), the Porta Family Foundation, and other not- for-profit rail and biomass research organizations, CSR’s White Paper Program brings works pertinent to biofuel, modern steam locomotive and transportation research into the public discourse. Cover Image - An image of the crown sheet of a mainline, U.S. steam locomotive taken during routine maintenance. ©2015 This paper is covered by the Creative Commons “Attribution-No Derivs-NonCommercial” license (see http://creativecommons.org). It may be reproduced in its entirety as long as the Coalition for Sustainable Rail is credited, a link to CSR’s website is provided and no charge is imposed. The paper may not be reproduced in part or in altered form, or if a fee is charged.
    [Show full text]
  • Patented Nov. 9, 1909. 5 SHEETS-SHEET
    E, FEIGHTNER SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909. 939,237. Patented Nov. 9, 1909. 5 SHEETS-SHEET , S N N N N N N N S. I, E, FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, 939,237. APPLICATION FILED MAR. 27, 1909, Patented Nov. 9, 1909. 5 SPEEES-SHEET 2, rare - AEREw. 3. GRAHA c. PT-LRApHERS, WASH:NGT8, 9. L. E. FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909. Patented Nov, 9, 1909. 5 SHEETS-SBEET 3. ife-as OSDEDAPT R RTRea statees Nassetts SSSR'sIIT saaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa. I I I I I I If ES III 72%22a-2.FIUUUUUI o/eveeczz L. E. FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, APPLICATION FILED MAR, 27, 1909, 939,237. Patented NOW, 9, 1909. 5 SHEETS-SHEET 4. S Ya N 7.A7 2-1se 2.Y 5 Ya. - S. 5 2 QS s 3 ()V Wa S. y s Sn , ; c. ( ra - M - ---1 ; S3v. - l S.A O A Lality N All 3 IN I, E, FEIGHTNER, SUPERHEATER FOR LOCOMOTIVE BOILERS, 939,237. APPLICATION FILED MAR, 27, 1909, Patented NOW, 9, 1909. 5 SBEES-SEET 5. o4-2-242. e éezzo G (72%ze, 42. 9 Cov//evacu- a22-22 a1 6-2-2, 42 UNITED STATES FATENT OFFICE. LEWIS E. FEIGHTNER, OF LIVIA, OHIO, ASSIGNOR TO LIVIA LOCOMOTIVE & MACHINE CoMPANY, OF LIMIA, OHIO, A CORPORATION OF OHIO. SUPERHEATER FOR LOCOMOTIVE-BOILERS. 9:39,23. Specification of Letters Patent. Patented Nov. 9, 1909. Application filed March 27, 1909, Serial No. 486,074, To all whom it may concern.
    [Show full text]