46391-001: Ha Noi and Ho Chi Minh City Power Grid Development
Total Page:16
File Type:pdf, Size:1020Kb
Internal Resettlement Monitoring Report Stage of the document: Draft Project/loan number: 3161 VIE Period: July-December 2018 April 2019 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by the Hanoi Power Corporation (EVN HANOI) for the Asian Development Bank (ADB). 1 ACRONYMS AND ABBREVIATIONS ADB - Asian Development Bank AHs - affected households APs - affected persons CP - compensation plan CPC - Commune People’s Committee DCC - District Compensation Committee DDR - Due Diligence Report DMS - detailed measurement survey DPC - District Peoples Committee EA - executing agency GOV - Government of Viet Nam IA - implementing agency IOL - inventory of losses km - kilometer kV - kilovolt LURC - land use right certificate m² - square meter NPT - National Power Transmission Corporation PIB - Public Information Brochure PIC - Project Implementation Consultants PPC - Provincial People’s Committee RCS - replacement cost study ROW - right-of-way RP - Resettlement plan SES - socioeconomic survey SPS - Safeguard Policy Statements TA - technical assistance TL - transmission line VND - Vietnam Dong (Vietnamese Currency) 2 This internal resettlement monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 3 I. General information of the project 1. Project objectives 1. The Project provides for a sector project under Asian Development Bank (ADB) fund to strengthen the capacity and reliability of the power infrastructure in Ha Noi and Ho Chi Minh City through the rehabilitation and development of the 220 kilovolt (kV) and 110 kV transmission system and associated substations to supply their medium voltage (MV) distribution system. The Project will also strengthen the institutional capacities of EVN Hanoi (EVNHANOI) and EVN Ho Chi Minh City (EVNHCMC), which are responsible for the power supply in their respective areas. Additionally, the project includes a smart grid component under Clean Technology Funding (CTF). 2. Impact and Outcome. The impact will be increased capacity and reliable supply of electricity to EVNHN and EVNHCMC customers contributing to Viet Nam's economic development. Its outcome will be increased capacity and reduced losses in the 220 kV and 110 kV networks for the two cities. 3. Outputs. The outputs of the project will be (i) four core substation and transmission line subprojects in Hanoi; (ii) four core substation and transmission line subprojects in Ho Chi Minh City; (iii) Distribution Automation System (DAS) Advanced Metering Infrastructure (AMI) and SCADA Upgrade CTF projects in Hanoi; (iv) DAS and Low Loss Conductor (LLC) CTF projects in Ho Chi Minh City; (v) up to 20 non-core substation and transmission line subprojects in Hanoi, and (vi) nine non-core substation and transmission line subprojects in Ho Chi Minh City. 2. Project components 4. The Project will be implemented as a sector loan. EVN Hanoi has proposed four core subprojects and 20 noncore subprojects (Table 1). The Project was prepared since 2013 with four (04) core subprojects. To date, the status of social safeguard document preparation for the Project is as follows: Table 1. List of Subprojects and Status of Social Safeguard Document Preparation No Subproject RP/DDR Updated RP Construction 1 Core subprojects New development of Noi Bai Airport 1.1 110kV Substation and associated 110 kV RP Done Operating line Rehabilitation of E1.7 Son Tay 110 kV 1.2 DDR - done Operating Substation Consolidated Rehabilitation and upgrading of E12 Tran DDR - Not 1.3 RP Not yet Hung Dao 110 kV Substation yet Rehabilitation and upgrading of E13 Under 1.4 DDR - done Phuong Liet 110 kV Substation construction 2 None Core 2.1 220 kV Chem-Tay Ho Transmission Line RP Done Operating 4 2.2 110 kV Mo Lao SS and connection line RP DDR - done Operating 110 kV Tay Ho Tay SS and connection 2.3 N/A N/A N/A line Increasing capacity of T2 transformer, Under 2.4 rehabilitation of 110 kV bay- Tia RP Done construction substation E10.4 Installation of new transformer T3, E1.20 2.5 DDR Not required Operating Thanh Xuan 110 kV SS Expansion of E5 110 kV Thuong Dinh 2.6 DDR Not required Operating SS New development of 110 kV Phu Nghia 2.7 RP Done Operating SS and connecting line URP for substation – done Under 2.8 New development of 110 kV Ba Vi SS RP URP for construction connection line - done 110 kV Tay Ho - Yen Phu Underground Under 2.9 DDR Not required Cable Line (UGC) construction RP already New development of 110 kV Phung submitted to 2.10 Not yet due Town SS and connecting line ADB for Not yet reviewing RP already New development of 110 kV Ngoc Hoi submitted to 2.11 Not yet due SS and connecting line ADB for Not yet reviewing Not required uRP because RP was Under 2.12 110 kV Thanh Cong – Thuong Dinh UGC RP prepared construction based on DMS result 110 kV transmission line from 500/220 2.13 RP Done Operating kV Thuong Tin SS to Thanh Oai 2.14 Connecting line to 220 kV Son Tay SS RP Done Operating 110 kV Transmission line from 500 kV 2.15 Thuong Tin SS to E1.34 Quat Dong and N/A N/A Not yet E10.4 Tia substations Under New development of 110 kV Chuong My preparation 2.16 (1x40 MVA) SS and 110 kV Thanh Oai- of local N/A Not yet Chuong My transmission line consultation firm 110 kV Bac An Khanh-Nam An Khanh 2.17 N/A Transmission line N/A Not yet New development of 110 kV Sai Dong 2 2.18 Not required (Industrial park Sai Dong) SS DDR Not yet 2.19 110 kV Connecting line to Sai Dong 2 DDR Not required Not yet Upgrading of E10.7 Thach That 110 kV 2.20 N/A Not yet SS N/A 5 Source: Compiled from prepared DDRs and RPs by the Consultant. 3. Scope of project impacts 5. In accordance with the selection criteria of the Project, the selected subprojects for financing under the Project are classified as Category C or Category B in terms of social safeguards under ADB’s Safeguards Policy Statement (SPS, 2009). As of now, the involuntary resettlement impacts have been identified and their respective social safeguards documents have been prepared for four (04) core subprojects and 15 noncore subprojects (namely: Chem- Tay Ho TL, Mo Lao SS, Thanh Xuan SS; Thuong Dinh SS; Phu Nghia SS; Tia SS; Thuong Tin- Thanh Oai TL; Son Tay TL; Thanh Cong – Thuong Dinh UGC; Tay Ho-Yen Phu UGC; New development of 110 kV Ba Vi SS; New Development 110kV Phung town SS and connection lines, New building 110kV Ngoc Hoi SS and connection line, 110kV UGC to Sai Dong 2 and New building 110kV Sai Dong ss). Additional, the social safeguard document of one subproject is being prepared by the local consultant firm. During this semiannual report, there is one subproject of which the DMS has been started, which is the New Development 110kV Phung town SS and connection line. The scope of impacts of each subproject are as follows: Table 2. Number AHs in each subproject Total Impact Impact Impact permanently Total of on No Subproject on on crop affected AH/organization tree structure area (m2) (tree) I Total 67,299.94 700.00 5.00 64,567.07 543.00 1 New development of 110kV Noi 10,812.70 176 1 0 55 Bai Airport and 110kV line 2 Rehabilitation of 110kV Son Tay 0 0 0 1000 0 Substation E1.7 3 Rehabilitation, upgrading of 110kV E12 Tran Hung Dao 0 0 0 0 0 substation 4 Rehabilitation, upgrading of 110kV Phuong Liet Substation 0 0 0 0 0 E13 5 220kV Chem - Tay Ho 1,182.50 49 0 0 0 transmission line 6 SS Mo Lao and connecting line 3,703 0 0 0 0 110 kV 7 SS 110 kV Tay Ho Tay and N/A N/A N/A N/A N/A connecting line 110 kV 8 Upgrading of transformer T2, renovation of 110 kV Tia - E10.4 4,062 8 0 3,937 0 SS 9 Installation of new transformer T3, 110 kV Thanh Xuan - E1.20 775 1 0 0 0 SS 6 10 Extension of Thuong Dinh - E5 2,705.60 1 1 0 0 SS 11 New development of 110 kV Phu Nghia SS and 110 kV 2,916 86 0 4,241.69 54 connecting line 12 New development of 110 kV Ba 11,309.90 153 0 Vi SS 7951.6 319 13 UGC 110 kV Tay Ho - Yen Phụ 0 0 0 0 0 14 New development of 110 kV Phung Town SS and connecting 4,160.28 71 0 4,160.28 0 line 15 New development of 110 kV 2,725 18 0 5,028.5 0 Ngoc Hoi SS and connecting line 16 UGC 110 kV Thanh Cong – 6,988.50 3 3 0 0 Thuong Dinh 17 Transmission line 110 kV from SS 500/220 kV Thuong Tin to 5,396 74 0 0 0 Thanh Oai 18 Connecting line to SS 220 kV 4527.5 59 0 38,248 115 Son Tay 19 Transmission line 110 kV from SS 500 kV Thuong Tin to SS N/A N/A N/A N/A N/A E1.34 Quat Dong and to SS E10.4 Tia 20 New development of 110 kV Chuong My (1x40 MVA) SS and N/A N/A N/A N/A N/A transmission line 110 kV Thanh Oai - Chuong My 21 Transmission line 110 kV Bac N/A N/A N/A N/A N/A An Khanh - Nam An Khanh 22 New development of 110 kV Sai Dong 2 SS (Industrial park Sai 6.035,96 1 0 0 0 Dong) 23 Connecting line 110 kV to Sai 0 0 0 0 0 Dong 2 24 Upgrading of 110 kV E10.7- N/A N/A N/A N/A N/A Thach That SS Source: Compiled from the DMS of CARB and land hand over certificate 6.