Melbourne Airport Rail Project Update 2020 Connecting Melbourne Airport to our Rail network Project Update 2020 Introduction The Melbourne The Australian and Victorian This document provides an governments are committed update on key elements of the Airport Rail project to delivering a rail service that project, including: connects people from the airport will deliver rail to to where they need to go — — the Melbourne Airport be that work, home or Victoria’s Rail route and how it will the airport for the major regional centres. connect into the existing rail network very first time That’s why we are connecting — benefits and travel times in Victoria. Melbourne Airport Rail into the Metro Tunnel, — construction timeframes providing passengers with — work undertaken to date Building Melbourne Airport Rail a 10-minute turn-up-and- will be a massive job working go service from Melbourne — next steps. in a complex rail environment. Airport and an under 30-minute The project will deliver continuous journey into the significant benefits including CBD, connecting seamlessly supporting up to 8000 jobs into the existing metropolitan during construction and putting and regional network. Melbourne on par with other cities in Australia and across the world that have airport rail services. 2 Melbourne Airport Rail – Project Update 2020 Background The Melbourne Airport Rail project Melbourne Airport Rail is a transformational public transport project connecting Melbourne Airport with a rail service for the first time. The Australian and Victorian governments have committed $5 billion each to deliver Sunshine Route Melbourne Airport Rail, which will run from Melbourne’s CBD to Melbourne Airport via Sunshine. After detailed consideration of several options, the Rail Projects Victoria (RPV) is Sunshine Route was selected for delivering Melbourne Airport Rail a number of reasons including: and is responsible for development of the project reference design, — superior connections to site investigations, stakeholder more areas of Melbourne engagement, planning approvals through its integration and procurement, through with the Metro Tunnel to construction delivery and project commissioning. — superior connections to RPV is part of the Major Transport regional Victoria through Infrastructure Authority (MTIA) a Sunshine interchange which was established to oversee major transport infrastructure — earlier deliverability projects in Victoria. at a lower cost. Melbourne Airport Rail – Project Update 2020 3 Melbourne Airport Rail through the Metro Tunnel The Metro Tunnel will be completed prior to Melbourne Airport Rail. The Metro Tunnel will create a new end-to-end rail line from Sunbury in the west to Cranbourne and Pakenham in the south-east, with high capacity trains and five new underground stations. The Metro Tunnel creates capacity for an extra 500,000 train passengers across the network in peak periods every week. 4 Melbourne Airport Rail – Project Update 2020 Route update Building on the 2018 decision to operate Melbourne Airport Rail via Sunshine, RPV has undertaken technical, operational and economic analysis to determine a route that delivers the best solution for the majority of Victorians and visitors to the state. The Victorian Government has identified the following key elements as the optimal foundations for the project. 1 2 Melbourne Airport Rail There will be a new premium services will run via Sunshine station at Melbourne Airport Station directly through the new Metro Tunnel Melbourne Airport To Bendigo Sunbury Sunshine Arden Parkville To Ballarat State Library CBD To Geelong Town Hall Legend Caulfield Melbourne Airport Rail New stations Anzac Pakenham Sunbury, Cranbourne and To Gippsland Pakenham lines (Metro Tunnel) Cranbourne Regional connections Melbourne Airport Rail – Project Update 2020 5 Connectivity Melbourne Airport Rail services will maximise airport connectivity to Victoria’s metropolitan and regional rail networks. Better connections To the CBD and suburbs To the regions To employment Connecting to the Metro Tunnel and growth areas and innovation hubs provides better access to Passengers on the Geelong, and Priority Precincts Melbourne's CBD and suburbs, Ballarat and Bendigo lines, as Melbourne Airport Rail’s giving passengers more choice well as from the growth areas integration with the Metro Tunnel about how they travel. to Melbourne's west around provides enhanced connectivity Melton and Wyndham, will be for airport passengers to key Thirty stations will have direct able to switch between regional health, research and education, access to Melbourne Airport and airport services at Sunshine. development and employment without changing trains, Gippsland and the south-eastern precincts at Arden, Dandenong, with most other passengers growth corridors of Casey and Monash, Parkville, Sunshine only needing to change once. Cardinia will also connect directly and Werribee. to the airport via the Cranbourne Town Hall and State Library and Pakenham lines and the stations provide direct links to Metro Tunnel. Flinders Street and Melbourne Central stations and to Swanston Street trams — the heart of Melbourne's tram network. Western growth areas — Melton and Wyndham Major Melbourne Airport Rail services regional will connect passengers to... cities Geelong Bendigo Ballarat All metropolitan rail lines 6 Melbourne Airport Rail – Project Update 2020 Gippsland and South-eastern growth corridor — Casey and Cardinia The centre of Melbourne at the new Town Hall and State Library The Arden underground Urban Renewal stations Precinct All stops along the metropolitan rail network’s busiest lines — the Cranbourne and Pakenham lines Melbourne’s world- renowned health, research and education precinct St Kilda Road’s at Parkville employment and business hub — with 33,000 jobs and 17,000 residents located within 800 metres of the new Anzac Station Melbourne Airport Rail – Project Update 2020 7 Project delivery Using the Metro Tunnel enables the earliest possible delivery of Melbourne Airport Rail. Melbourne Airport Rail Impacts during construction Maintaining continuity services will operate via the on both the existing rail and minimising disruption Metro Tunnel from 2029*. network and communities in is achieved for both regional proximity of the rail corridor and metropolitan services, as the There will be no need for a will be reduced when compared volume of works on the busiest new class of rolling stock to with alternative options. and most complex section of operate Melbourne Airport Rail tracks is significantly reduced. services. The new fleet of High Environmental impacts Capacity Metro Trains using the associated with delivery such Metro Tunnel, and associated as noise, dust and vibration are stabling and maintenance lessened due to the condensed facilities, will be integrated construction footprint with Melbourne Airport of the project. Rail operations. * Subject to relevant Victorian and Federal planning, environmental and other government approvals. 8 Melbourne Airport Rail – Project Update 2020 Value for money The Victorian and Australian governments have signed a joint agreement to build Melbourne Airport Rail and committed $5 billion each in funding. Detailed planning and Industry engagement will inform development work is currently the optimal contract packaging underway which will inform more approach. The final project detailed cost estimates. budget will be confirmed once all major contracts are awarded. The proposed project scope includes the following Construction is well underway key elements: on the Metro Tunnel. Running Melbourne Airport Rail services through the Metro Tunnel is an — A new premium station effective way of maximising at Melbourne Airport the benefits of this existing infrastructure investment. — New tracks and elevated structures between Melbourne Airport and Albion — Track reconfiguration including new tracks and structures to separate lines between Albion and Sunshine stations. Melbourne Airport Rail – Project Update 2020 9 Legend ~2 hour travel time 22 minute travel time via Sunshine to/from via Metro Tunnel to/from 2 New stations hrs Melbourne Airport 18 minute travel time 22 Melbourne Airport Seymour via Metro Tunnel to/from Pedestrian connections between 18 Melbourne Airport Bendigo Arden Precinct the Metro Tunnel and City Loop Arden Urban Renewal Precinct Footscray Precinct Craigieburn Existing network stations Bendigo with a focus on technology, life Healthcare, education and sciences, health and education training National Employment and Mernda Innovation Clusters (NEICs) Melbourne Upfield Regional lines Sunbury Airport Melbourne Airport Rail 24 minute travel time South Morang Sunbury, Cranbourne & Watergardens via Metro Tunnel to/from 24 Melbourne Airport Pakenham lines (Metro Tunnel) Existing network 11 minute travel time Parkville Precinct via Metro Tunnel to/from Employment and business 11 Area activities Melbourne Airport activity centred around medical, Hurstbridge research and tertiary education Sunshine Precinct Healthcare, manufacturing, education and training Healthcare Residential Manufacturing Retail Clifton Hill Footscray Arden Parkville 27 minute travel time via Metro Tunnel to/from Ballarat 27 Melbourne Airport Tertiary Employment Training Research Melton Sunshine Melbourne Central/ State Library Precinct education & Business North Flagstaff State Library Shopping, education, connection Melbourne to City Loop services at Melbourne Central ~90 minute travel time via Sunshine to/from 90 Melbourne Airport Parliament Southern
Recommended publications
  • Taking Britain Further Heathrow’S Plan for Connecting the UK to Growth
    VOLUME 1 Taking Britain further Heathrow’s plan for connecting the UK to growth #BritainsHeathrow Disclaimer This document has been prepared by Heathrow Airport Limited solely in response to an invitation from the Airports Commission. It should not be used for any other purpose or in any other context and Heathrow Airport Limited accepts no responsibility for its use in that regard Contents Volume 1 - Technical submission Contents ........................................................................................................................ 3 Foreword ....................................................................................................................... 8 Executive Summary ................................................................................................... 11 Connecting for growth ................................................................................................................... 12 Listening to what our stakeholders say ........................................................................................... 18 Our vision for a world-class hub airport ........................................................................................... 20 Connecting all of the UK ................................................................................................................ 24 Building a sustainable Heathrow ..................................................................................................... 29 The deliverable solution .................................................................................................................
    [Show full text]
  • January 2021 Published by the Australian Timetable Association
    TABLE TALK AUSTRALASIAN TIMETABLE NEWS RRP $4.95 No. 341, January 2021 Published by the Australian Timetable Association RAIL & TRAM NEWS Mount Isa line On Wednesday, 30 December, an Aurizon freight train Service capacity tracker hauling fertiliser derailed east of Charters Towers on the Mount Isa line. A workforce of 50 personnel TransLink has released a “service capacity tracker” on worked to repair the line from 31 December to 5 their website (www.translink.com.au) in the form of a January. Despite the completion of repairs, heavy dashboard. After selecting a service from the prompts, rainfall has further delayed the return of both rail traffic. the dashboard provides a forecast of available space onboard the train, tram, bus or ferry service based on According to a report in local newspaper, The North “historical data and forecast changes in travel West Star, the cause was believed to be a very behaviour” for any of the next seven days. localised extreme weather event impacting the track infrastructure, although Queensland Rail has Limitations include that the dashboard provides data in confirmed that there has been no extreme weather 15-minute increments (i.e.: if there is more than one activity being registered on any official weather station bus within a 15-minute period, the data is averaged nearby. across those services), and no data is available for services between 23:00 and 05:00. One example is As of 8 January, the Inlander rail service continues to provided below (shows forecast capacity for 15 be replaced by road coaches, where conditions are December from Fortitide Valley station).
    [Show full text]
  • The Role of Accessibility in Passengers' Choice of Airports
    JOINT TRANSPORT RESEARCH CENTRE Discussion Paper No. 2008-14 August 2008 The Role of Accessibility in Passengers' Choice of Airports Marco KOUWENHOVEN Significance The Hague, Netherlands JOINT TRANSPORT RESEARCH CENTRE Discussion Paper No. 2008-14 Prepared for the Round Table of 2-3 October 2008 on Airline Competition, Systems of Airports and Intermodal Connections The Role of Accessibility in Passengers' Choice of Airports Marco KOUWENHOVEN Significance The Hague Netherlands August 2008 The views expressed in this paper are those of the authors and do not necessarily represent positions of Significance, the OECD or the International Transport Forum. TABLE OF CONTENTS 1. INTRODUCTION ........................................................................................................ 5 1.1. Growth of regional airports .............................................................................. 5 1.2. Implications for policy makers ......................................................................... 6 1.3. Objective of this paper ..................................................................................... 7 2. DEFINITIONS OF ACCESSIBILITY ........................................................................... 8 3. ACCESS MODE CHOICE .......................................................................................... 9 3.1. Observed access mode shares ....................................................................... 9 3.2. Factors influencing access mode choice behaviour .....................................
    [Show full text]
  • 2018 19 BP3 Service Delivery
    Victorian Budget 18/19 GETTING THINGS DONE Service Delivery Budget Paper No. 3 Presented by Tim Pallas MP, Treasurer of the State of Victoria The Secretary © State of Victoria 2018 Department of Treasury and Finance (Department of Treasury and Finance) 1 Treasury Place Melbourne, Victoria, 3002 Australia Tel: +61 3 9651 5111 Fax: +61 3 9651 2062 Website: budget.vic.gov.au You are free to re use this work under a Creative Commons Attribution 4.0 licence, provided you Authorised by the Victorian Government credit the State of Victoria (Department of Treasury 1 Treasury Place, Melbourne, 3002 and Finance) as author, indicate if changes were made and comply with the other licence terms. Printed by Doculink, Port Melbourne The licence does not apply to any branding, Printed on recycled paper including Government logos. This publication makes reference to the 2018 19 Copyright queries may be directed to Budget paper set which includes: [email protected]. Budget Paper No. 1 Treasurer’s Speech Budget Paper No. 2 Strategy and Outlook ISSN 2204 9185 (print) Budget Paper No. 3 Service Delivery ISSN 2204 9177 (online) Budget Paper No. 4 State Capital Program Published May 2018 Budget Paper No. 5 Statement of Finances (incorporating Quarterly Financial Report No. 3) Service Delivery 2018-19 Presented by Tim Pallas MP Treasurer of the State of Victoria for the information of Honourable Members Budget Paper No. 3 TABLE OF CONTENTS Chapter 1 – Output, asset investment, savings and revenue initiatives ....................... 1 Whole of Government – Aboriginal Affairs .................................................................... 3 Whole of Government – Child information Sharing Reforms .......................................
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Outline of Opening Presentation
    PART B SUBMISSION – RAIL PROJECTS VICTORIA OUTLINE OF OPENING PRESENTATION Introduction 1 This outline has been prepared in respect of RPV’s opening presentation to the Advisory Committee. 2 It should be read in conjunction with RPV’s Part A Submission1 and adopts the defined terminology contained therein. RPV and its Role in Delivering the Project 3 RPV is an administrative office within the Department of Transport. 4 It is responsible for obtaining the applicable statutory approvals for the full Project and for the delivery of Stage 1. Arrangements for the delivery of Stage 2 are subject to Government decision-making. Upon the completion of the construction and commissioning of Stage 1, V/Line will become responsible for the ongoing operation and maintenance of the train services and infrastructure delivered by Stage 1. The Structure of RPV’s Case 5 It is the task of RPV to assist the Advisory Committee in preparing a report in response to its Terms of Reference and to provide such information as required. To this end the Advisory Committee has a substantial amount of information before it, including the Greater Geelong Planning Scheme, the exhibited material, and the material produced for the hearing. The Advisory Committee has also conducted an accompanied inspection of the subject land and the Maddingly facility as a useful comparison for Stage 1. It is not intended that all of this background will be reproduced or dealt with exhaustively for the opening presentation. 6 Rather, it is to be noted that RPV’s case before the Advisory Committee comprises the following parts: 1 Filed in accordance with the Advisory Committee’s directions on 28 January 2020.
    [Show full text]
  • Breaking New Ground 2017 Annual Report
    BREAKING NEW GROUND 2017 Annual Report Comprehensive Annual Financial Report for the Year Ended December 31, 2017. Our Mission Meet the critical transportation infrastructure needs of the bi-state region’s people, businesses, and visitors by providing the highest-quality and most efficient transportation and port commerce facilities and services to move people and goods within the region, provide access to the nation and the world, and promote the region’s economic development. Our mission is simple: to keep the region moving. 2 THE PORT AUTHORITY OF NY & NJ TABLE OF CONTENTS I ntroductory Section 2 Origins of The Port Authority of New York and New Jersey 3 Letter of Transmittal to the Governors 4 Board of Commissioners 5 Leadership of the Port Authority Our Core Business Imperatives 9 Investment 10 Safety and Security 11 Integrity 12 Diversity and Inclusion 13 Sustainability and Resiliency Major Milestones By Business Line 15 2017 at a Glance 16 Aviation 20 Tunnels, Bridges & Terminals 24 Port of New York and New Jersey 28 Port Authority Trans-Hudson Corporation (PATH) 30 World Trade Center Financial Section 32 Chief Financial Officer’s Letter of Transmittal to the Board of Commissioners 35 Index to Financial Section Corporate Information Section 126 Selected Statistical, Demographic, and Economic Data 127 Top 20 Salaried Staff as of December 31, 2017 The Port Authority of New York and New Jersey Comprehensive Annual Financial Report for the Year Ended December 31, 2017 Prepared by the Marketing and Comptroller’s departments of The Port Authority of New York and New Jersey 4 World Trade Center, 150 Greenwich Street, 23rd Floor, New York, NY 10007 www.panynj.gov BREAKING NEW GrounD 1 The Port District includes the cities of New York and Yonkers in New York State; the cities of Newark, Jersey City, Bayonne, Hoboken, and Elizabeth in the State of New Jersey; and more than 200 other municipalities, including all or part of 17 counties, in the two states.
    [Show full text]
  • Will the $50B Suburban Rail Loop Shape the Melbourne We Want?
    WILL THE $50B SUBURBAN RAIL LOOP SHAPE THE MELBOURNE WE WANT? ARTICLE BY TERRY RAWNSLEY SGS PRINCIPAL AND PARTNER 1 © SGS Economics and Planning Pty Ltd 2018 All due care has been taken when preparing this article. However, SGS and its associated consultants are not liable to any person or entity for any damage or loss that has occurred, or may occur, in relation to that person or entity taking or not taking action in respect of any representation, statement, opinion or advice referred to herein. SGS Economics and Planning Pty Ltd ACN 007 437 729 www.sgsep.com.au Offices in Canberra, Hobart, Melbourne, Sydney 01 INTRODUCTION WILL THE $50 BILLION PROPOSED SUBURBAN RAIL LOOP HELP SHAPE THE MELBOURNE WE WANT? In late August 2018, Victorian Premier Daniel Andrews proposed a $50 billion suburban rail loop connecting all major rail lines from east to west via Melbourne Airport. Due for completion in 2050, theSuburban Rail Loop will connect every major Melbourne railway line – proposed stops include Werribee, Sunshine, Melbourne Airport, Broadmeadows, Fawkner, Reservoir, Bundoora, Heidelberg, Doncaster, Box Hill, Burwood, Glen Waverley, Monash, Clayton and Cheltenham. Heralded as the biggest public transport project in Australian history by the state government, the massive project aims to respond to Melbourne’s groaning road and rail system and will potentially be the most extensive rail system in Australian history. The first round of strategic planning for the Suburban Rail Loop was put together by Development Victoria with detailed engineering plans and a business case yet to be completed. In this article, we explore what makes a city-shaping project and whether the suburban rail loop has the potential to transform Melbourne into the city we want.
    [Show full text]
  • Budget Paper No. 4 State Capital Program Summarises the Capital Projects the Government Will Be Undertaking in 2019-20 and Future Years
    State Capital Program 2019-20 Presented by Tim Pallas MP Treasurer of the State of Victoria for the information of Honourable Members Budget Paper No. 4 TABLE OF CONTENTS Chapter 1 – State capital program 2019-20 ................................................................. 1 Delivering infrastructure to benefit all Victorians .......................................................... 1 Reforms to meet demand ............................................................................................... 6 Enhancing assurance processes and delivery capability ................................................ 7 Delivering the right skills for the job ............................................................................... 7 Overview of the state capital program ........................................................................... 8 Public private partnerships ........................................................................................... 13 Coverage of Budget Paper No. 4 ................................................................................... 18 General government capital program .......................................................................... 19 Public non-financial corporations capital program ...................................................... 22 Chapter 2 – General government capital program 2019-20 ....................................... 25 Department of Education and Training ........................................................................ 25 Department of Environment, Land,
    [Show full text]
  • Avalon Airport Rail Link
    AVALON AIRPORT RAIL LINK Planning study findings and public exhibition Introduction Avalon Airport Rail Link is a proposed rail link connecting Avalon Airport with Melbourne and Geelong. The rail link will help support Avalon to become Victoria’s second international passenger airport, ensuring that Victoria remains competitive into the future. Study purpose Reservation of the rail link corridor The rail link design has been developed to between the Melbourne – Geelong accurately define the proposed corridor. This planning study is being undertaken rail line and Avalon Airport is being to identify and protect a reservation for implemented by amendment to the Bridge structures will provide rail- a future rail link to the airport. Greater Geelong Planning Scheme to over-road grade separations at Old introduce a Public Acquisition Overlay. Melbourne Road, Princes Freeway and Beach Road. No permanent Background waterways will be crossed but the design would accommodate areas of Situated 20 km north-east of the City Project need temporary ponding after heavy rain, of Geelong and 55 km south-west of The rail link is part of an integrated using culverts or other infrastructure. Melbourne, Avalon Airport is a fully plan to ensure that Victoria is well operational commercial airline facility positioned in the future to cater for The rail link will terminate at a station to with an operating domestic airline the expected growth in air travel. be constructed adjacent to the existing terminal and a runway capable of passenger terminal area of the airport. receiving aircraft up to A380. With the The Victorian Government is planning support of government, the private for a population of more than 10 million operator Avalon Airport Australia Pty people by 2051, including 7.8 million Transport services Ltd is working to secure an international people in Greater Melbourne.
    [Show full text]
  • Australasian Railway Association Skills Capabilty Study
    AUSTRALASIAN RAILWAY ASSOCIATION SKILLS CAPABILTY STUDY SKILLS CRISIS: A CALL TO ACTION NOVEMBER 2018 FOREWORD We are living through a renaissance of investment in rail. Projects such as Cross River Rail in Brisbane, Inland Rail, Sydney and Melbourne Metros, the Level Crossing Replacement Program, the Metronet project in Perth, rail extensions in South Australia, expansion of rail lines in the Pilbara, and numerous light rail projects in cities across the country, are heralding this renaissance. New Zealand too, is experiencing a deepening focus on rail. But this hasn’t always been the case. Rail investment stagnation, stop-start funding cycles and short term cost cutting have been a feature of the Australian rail sector since the 1980s. And one of the consequences has been the collapse in investment in training and skills development of the people to build our infrastructure and to operate and maintain first class rail services. This is a clear case of market failure. ARA commissioned this Report to undertake a workforce capability analysis based on planned and forecast rail infrastructure development in Australia and New Zealand over the next 10 years, with implications for a range of rail industry skills across construction, manufacturing, operations and maintenance. And to determine strategies to address them. The term supply and demand is well understood in the marketplace. However, as to rail skills in the current investment environment, it is a case of ‘demand and no supply.’ This is the crisis that this Report seeks to address. We welcome the massive investment in all aspects of rail now underway. This is crucial for our economic growth and improving amenity in our cities and regions.
    [Show full text]
  • TTF Rapid Buses, Road & Rail (Melbourne Airport)
    RAPID BUSES, ROAD AND RAIL GROUND TRANSPORT SOLUTIONS TO MEET MELBOURNE AIRPORT’S PASSENGER GROWTH TO 2050 JULY 2013 Membership of Tourism & Transport Forum Tourism & Transport Forum (TTF) is a national, member-funded CEO forum, advocating the public policy interests of 200 leading corporations and institutions in the Australian tourism, transport, aviation and investment sectors For further information please contact: Justin Wastnage | Director, Aviation Policy | [email protected] Martin Gray | Policy Officer |[email protected] Contents EXECUTIVE SUMMARY ............................................................................................... 4 Ensuring transport choice for Melbourne Airport ................................................................ 4 SUMMARY OF RECOMMENDATIONS ....................................................................... 6 List of figures ........................................................................................................................................................... 6 MELBOURNE AIRPORT – THE NEXT 30 YEARS ............................................................ 7 Forecast demand .................................................................................................................... 7 ACCESSING MELBOURNE AIRPORT .......................................................................... 8 Internal airport transport ......................................................................................................... 8 Broader road network ............................................................................................................