Descriptions of Where Regional and Other Travel Restriction Boundaries Intersect Highways and Roads for Each Region
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014
Metropolitan Regional Local Government Areas: Risky Roads Survey Local Results 2014 Government Areas 2014 Risky Roads Survey Results 2014 Metropolitan Local Government Areas: Risky Roads Survey Results 2014 2014 in those areas. Alarmingly in regions like the Wheatbelt two out of three road deaths were local Executive Summary residents on local roads. While we can all do our part to improve the attitudes of drivers we must also work towards The RAC represents over 800,000 Western Australian members and advocates on their behalf on improving the road environment to meet the needs of road users now and into the future. matters including affordable motoring, environmental sustainability, public transport and safe road The results from the Risky Roads campaign are publicly available at www.rac.com.au/riskyroads use. The RAC represents all road users on the WA Road Safety Council and has strong alliances with local government, Main Roads WA (MRWA) and community road safety organisations. Having a safe road environment is important for all road users because the right infrastructure can be the difference between a fatal crash and a minor collision. Last year on average one person died on WA roads nearly every two days. The RAC’s Risky Roads campaign is WA’s biggest public infrastructure survey and is undertaken to provide a snapshot of community perceptions, insight for road authorities and assist in identifying trends in traffic flow, infrastructure and safety. The 2014 campaign ran during April and May, providing Western Australians’ the opportunity to express their views and nominate sub-standard roads and intersections throughout the state. -
Animal Alert
! Animal Alert Many of the major rural highways areunfenced due to the vast expanse of land, thereforeno barriers are A Guide to present to prevent wild or Main Roads rest areas pastoral animals wandering and roadside amenities across the road. ON MAJOR ROUTES IN WESTERN AUSTRALIA Be alert for animals on the road, particularly dusk and dawn. Watch out for warning signs on the road, different regions have different animals. Slow down and sound your horn if you encounter an animal. MWain Roads estern Australia Don Aitken Centre ,, Waterloo Crescent East Perth WA 6004 Phone138 138 | www.mainroads.wa.gov.au Please be aware that while every effort is made to ensure the currency of the information, data can be altered subsequent to original distribution and can also become quickly out- of-date. Information provided on this publication is also available on the Main Roads website. Please subscribe to the Rest Areas page for any updates. MARCH 2015 Fatigue is a silent killer on Western Australian roads. Planning ahead is crucial to managing fatigue on long A roadside stopping place is an area beside the road road trips. designed to provide a safe place for emergency stopping or special stopping (e.g. rest areas, scenic lookouts, Distances between remote towns can information bays , road train assembly areas). Entry signs indicate what type of roadside stopping place it is. Facilities be vast and in some cases conditions within each vary. can be very hot and dry with limited fuel, water and food available. 24 P Rest area 24 hour Information Parking We want you to enjoy your journey rest area but more importantly we want you to stay safe. -
Contents Visitors
DEBATES – Thursday 24 August 2017 CONTENTS VISITORS ................................................................................................................................................. 2247 Darwin Middle School ............................................................................................................................ 2247 SPEAKER’S STATEMENT ....................................................................................................................... 2247 Daffodil Day ........................................................................................................................................... 2247 ASSEMBLY MEMBERS AND STATUTORY OFFICERS (REMUNERATION AND OTHER ENTITLEMENTS) AMENDMENT BILL ................................................................................................................................... 2247 (Serial 27) .............................................................................................................................................. 2247 CRIMINAL CODE AMENDMENT (DANGEROUS NAVIGATION OF VESSELS) BILL ............................ 2249 (Serial 28) .............................................................................................................................................. 2249 VISITORS ................................................................................................................................................. 2251 SPEAKER’S STATEMENT ...................................................................................................................... -
Shire of Halls Creek Local Planning Strategy Shire Planning of Strategy Halls Creek Local MAY 2016
Shire of Halls Creek Local Planning Strategy Endorsed by the Western Australian Planning Commission May 2016 Disclaimer This is a copy of the Local Planning Strategy at the date of endorsement produced from an electronic version of the Strategy held by the Department of Planning. Whilst all care has been taken to accurately portray the current Strategy provisions, no responsibility shall be taken for any omissions or errors in this documentation. Consultation with the respective Local Government Authority should be made to view a current legal version of the Strategy. Please advise the Department of Planning of any errors or omissions in this document. Department of Planning website: www.planning.wa.gov.au Gordon Stephenson House email: [email protected] 140 William Street Perth WA 6000 tel: 08 6551 9000 fax: 08 6551 9001 Locked Bag 2506 National Relay Service: 13 36 77 Perth WA 6001 infoline: 1800 626 477 Shire of Halls Creek Local Planning Strategy Shire of Halls Creek Creek Halls of Shire Local Strategy Planning MAY 2016 MAY final report MAY 2016 Shire of Halls Creek LOCAL PLANNING STRATEGY final report The Shire of Halls Creek Local Planning Strategy was endorsed by the Western Australian Planning Commission in May 2016. The Strategy was prepared in 2015 prior to the new Planning and Development (Town Planning Schemes) Regulations 2015 being gazetted. It is acknowledged that the Shire will need to address the use of new zones and reserves in a new Local Planning Scheme. Shire of Halls Creek 7 Thomas Street, Halls Creek PO Box 21, Halls Creek WA 6770 (08) 9168 6007 www.hallscreek.wa.gov.au Disclaimer This document has been published by the Shire of Halls Creek. -
BORR Southern Section EPA Updated Referral Spprtng Doc Rev2
Bunbury Outer Ring Road Southern Section Updated Environmental Referral Supporting Document and Additional Information BORR-02-RP-EN-0014 Rev 2 October 2020 EXECUTIVE SUMMARY The Bunbury Outer Ring Road (BORR) is a planned Controlled Access Highway linking the Forrest Highway and Bussell Highway. BORR will be a high standard route for access to the Bunbury Port and facilitate proposed development to the east of the City of Bunbury. BORR provides an effective bypass of Bunbury for inter-regional traffic. The BORR Project comprises three sections: • ‘BORR Northern Section’ – Forrest Highway to Boyanup-Picton Road. • ‘BORR Central Section’ – Boyanup-Picton Road to South Western Highway, an existing four kilometre (km) section which was completed in May 2013, along with a three km extension of Willinge Drive southwards to South Western Highway. • ‘BORR Southern Section’ – South Western Highway (near Bunbury Airport) to Bussell Highway. The Commissioner of Main Roads Western Australia (Main Roads) is proposing to construct and operate the southern section of the BORR Project. Main Roads is referring the BORR Southern Section (the Proposal) to the Environmental Protection Authority (EPA) for a decision on assessment under Section 38 of the Environmental Protection Act 1986 (EP Act). The purpose of this document is to provide information to support the decision on assessment of the Proposal. The Proposal includes the construction and operation of 10.5 km of freeway standard, dual carriageway southwest of South Western Highway (south of Bunbury Airport) to Bussell Highway and a 3 km regional distributor from Bussell Highway at Centenary Road southeast to a grade separated interchange at the western end of Lilydale Road. -
Driving in Wa • a Guide to Rest Areas
DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material. -
SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget
SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget South Coast Highway (Pfeiffer Road Reconstruct, widen, primer seal Completes RTTA co- $750,000 Great Southern to Cheynes Beach Section) and seal. funded project Region Total $750,000 Widen and reconstruct, seal Australind Roelands Link (Raymond Completes staged shoulders to 2.0m, install 1.0m $300,000 Road) project. central median. Widen and reconstruct, seal Pinjarra Williams Road (Dwellingup shoulders to 1.0m, install Completes staged $830,000 West) audible edge line and construct project. westbound passing lane. Staged project, Extend dual carriageway and construction in 2018/19 Bussell Highway/Fairway Drive construct roundabout at Fairway $5,800,000 with completion in Drive. 2019/20. Bussell Highway/Harewoods Road Construct roundabout. $150,000 Staged project. Widen and seal shoulders to South West South Western Highway (Harvey to 2.0m, install 1.0 central median, Region $520,000 Wokalup) improve batter slope and clear zone. South Western Highway/Vittoria Road Construct roundabout. $300,000 Staged project. Caves Road/Yallingup Beach Road Construct roundabout. $100,000 Staged project. Widen and seal shoulders to Pinjarra Williams Road (Dwellingup 1.0m, install barriers at selected $500,000 Staged project. East) locations and improve clear zone. South Western Highway (Yornup to Construct northbound passing $50,000 Staged project. Palgarup) lane. South Western Highway (Yornup to Construct southbound passing $50,000 Staged project. Palgarup) lane. Coalfields Highway/Prinsep Street Construct roundabout. $50,000 Staged project. Widen and reconstruct, seal shoulders, extend east bound Completes RTTA co- Coalfields Highway (Roelands Hill) passing lane, improve site $200,000 funded project. -
Canning Stock Route & Gunbarrel Highway
CANNING STOCK ROUTE & GUNBARREL HIGHWAY Tour & Tag Along Option Pat Mangan Join us on this fully guided 4WD small group adventure tour. Travel as a passenger in one of our 4WD vehicles or use your own 4WD Tag Along vehicle as you join our experienced guides exploring the contrasting and arid outback of Australia. Visit iconic & remote areas such as the Canning Stock Route & Gunbarrel Highway, see Uluru, Durba Springs, 2 night stay at Carnegie Station, Giles Meteorological Station, the “Haunted Well” – Well 37, Len Beadell’s Talawana Track & the Tanami Track - ending your adventure in Alice Springs. 21 Days Dep 15 Jun 2021 DAY 1: Tue 15 Jun ARRIVE AT AYERS ROCK RESORT T (-) Clients to have own travel arrangements to Ayers Rock, Northern Territory. Please check-in by 5:00pm where you will meet your crew and fellow passengers for a tour briefing. Overnight: Ayers Rock Campground • □ DAY 2: Wed 16 Jun AYERS ROCK - GILES 480km T (BLD) Depart this morning at 9:00am and pass by Ayers Rock and take a short walk into Olga Gorge before our journey west along the new Gunbarrel Highway to the WA border and beyond. Visit Lasseter's cave, where this exocentric miner camped after his alleged discovery of a reef of gold. Then on through the Petermann Ranges to WA and Giles. Overnight: Giles • □ DAY 3: Thu 17 Jun GILES – WARBURTON 180km T (BLD) A morning outside viewing of the Meteorological Station. See Beadell’s grader that opened up the network of outback roads in the 1950's and 60's including the infamous Gunbarrel Highway. -
82452 JW.Rdo
Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 Item 9.1.19 WSD Item 9.1.19 H PP TONKIN HS HS HWY SU PICKERING BROOK HS ROE HS TS CANNING HILLS HS HWY MARTIN HS HS SU HS GOSNELLS 5 8 KARRAGULLEN HWY RANFORD HS P SOUTHERN 9 RIVER HS 11 BROOKTON SU 3 ROAD TS 12 H ROLEYSTONE 10 ARMADALE HWY 13 HS ROAD 4 WSD ARMADALE 7 6 FORRESTDALE HS 1 ALBANY 2 ILLAWARRA WESTERN BEDFORDALE HIGHWAY WSD THOMAS ROAD OAKFORD SOUTH WSD KARRAKUP OLDBURY SU Location of the proposed amendment to the MRS for 1161/41 - Parks and Recreation Amendment City of Armadale METROPOLITAN REGION SCHEME LEGEND Proposed: RESERVED LANDS ZONES PARKS AND RECREATION PUBLIC PURPOSES - URBAN Parks and Recreation Amendment 1161/41 DENOTED AS FOLLOWS : 1 R RESTRICTED PUBLIC ACCESS URBAN DEFERRED City of Armadale H HOSPITAL RAILWAYS HS HIGH SCHOOL CENTRAL CITY AREA TS TECHNICAL SCHOOL PORT INSTALLATIONS INDUSTRIAL CP CAR PARK U UNIVERSITY STATE FORESTS SPECIAL INDUSTRIAL CG COMMONWEALTH GOVERNMENT WATER CATCHMENTS SEC STATE ENERGY COMMISSION RURAL SU SPECIAL USES CIVIC AND CULTURAL WSD WATER AUTHORITY OF WA PRIVATE RECREATION P PRISON WATERWAYS RURAL - WATER PROTECTION ROADS : PRIMARY REGIONAL ROADS METROPOLITAN REGION SCHEME BOUNDARY OTHER REGIONAL ROADS armadaleloc.fig N 26 Mar 2009 Produced by Mapping & GeoSpatial Data Branch, Department for Planning and Infrastructure Scale 1:150 000 On behalf of the Western Australian Planning Commission, Perth WA 0 4 Base information supplied by Western Australian Land Information Authority GL248-2007-2 GEOCENTRIC -
Tidal Wave of Construction and 1300 Jobs Heading for South Australia
Tidal wave of construction and 1300 jobs heading for South Australia 11/10/2020 | Corey Wingard MP | More Jobs | Better Services A tidal wave of major construction is heading for South Australia with works starting on more than $1 billion worth of infrastructure projects within the next six months. The building boom kicks off this month and will support more than 1,300 jobs as the Marshall Government continues to build what matters to South Australians. Major construction begins on two of the biggest regional infrastructure projects ever undertaken in this state - the Port Wakeeld Overpass and Highway Duplication and the Joy Baluch AM Bridge Duplication Project. Showcasing a commitment to improving regional roads, next month shoulder sealing works will also begin on the Tod and Birdseye Highways. In metropolitan Adelaide, major construction works will start by the end of the year on the much anticipated upgrade of the intersection of Goodwood, Springbank and Daws Roads, as well as the Main North, Kings and McIntyre Roads Intersection Upgrade. Minister for Infrastructure and Transport Corey Wingard said these important projects will support our economy and deliver jobs at a time when our state needs it most will support our economy and deliver jobs at a time when our state needs it most. “The economic challenges our state is facing at the moment are unprecedented,” Minister Wingard said. “Getting major works started on infrastructure projects across South Australia will help keep the economy ring as we navigate our way through the COVID-19 pandemic. “Creating jobs is critical to our economic recovery and we’re delivering around 1,315 over the next six months in road infrastructure projects alone. -
Annual Report
Annual Report Welcome and Highlights The 2014-15 Annual and Sustainability Report reviews Main Roads’ operational, financial and business performance for the financial year ending 30 June 2015. It showcases our performance against our aspiration to: Provide world class outcomes for our customers through a safe, reliable and sustainable road-based transport system. As part of our commitment to best practice reporting, this report is developed in accordance with the principles of the Global Reporting Initiative. Our report has been structured around the following key areas: A Snapshot of our Year – an overview of our performance and future direction Our Leaders – find out who our eadership team are Our Operational Performance – learn about the service we provide Our Business Activities – find out about the innovative approaches we used to support the delivery of our services Governance – understand how we exercise fairness, transparency and accountability in the management of our business and people Statement of Compliance To the Honourable Dean Nalder MLA BBus, GradDip (AppFin&Inv) Minister for Transport In accordance with section 63 of the Financial Management Act 2006, we hereby submit for your information and presentation to Parliament the Report of Main Roads Western Australia for the 2014-15 financial year ending 30 June 2015. The Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Stephen Troughton Reece Waldock Managing Director of Main Roads Commissioner of Main Roads 20 August 2015 20 August 2015 Main Roads Western Australia Annual Report 2015 1 COMMISSIONER OF MAIN ROADS: Notes to the Financial Statements About Us Our Role We are one of the largest geographically spread road agencies in the world responsible for more than 18,400 kilometres of road spread over 2.5 million square kilometres. -
Western Australia – Permits and Permissions Required to Access Indigenous and Other Lands, Including National Parks
Western Australia – Permits and permissions required to access indigenous and other lands, including national parks General: Quite a number of transit permits for aboriginal lands in WA are able to be issued by the Aboriginal Lands Trust of WA. (N.B.: The Aboriginal Lands Trust has no involvement whatever in the issuing of permits for the Canning Stock Route – for Canning information and Permits see below under the heading of Canning Stock Route). The Trust is a part of the Department of Indigenous Affairs. Applications can be made on-line at www.dia.wa.gov.au and simply follow the prompts. The web site contains a lot of excellent information including maps showing the specific areas and tracks where Permits are required and whether the Trust or a Land Council issues them. The conditions under which permits can be gained via an automated on-line process are also explained. Once you log on to the web site, click on the “Entering Aboriginal Land” button on the left side of the Home Page and read all of the information under the nominated four (4) headings BEFORE applying on-line. The maps showing the tracks and whether DIA or a Land Council, etc., issues them can be found under the “Travel Information” heading. About half way down that page is a map of WA showing the Land Council areas; simply click on the area you want to visit. The Trust can be contacted at: The Permits Officer, Aboriginal Lands Trust, PO Box 7770, Cloisters Square, Perth, WA 6850. Telephone (08) 9235 8000 or Fax (08) 9235 8088.