A Guide to Main Roads Rest Areas and Roadside Amenities

Total Page:16

File Type:pdf, Size:1020Kb

A Guide to Main Roads Rest Areas and Roadside Amenities ! Animal Alert Many of the major rural highways areunfenced due to the vast expanse of land, thereforeno barriers are A Guide to present to prevent wild or Main Roads rest areas pastoral animals wandering and roadside amenities across the road. ON MAJOR ROUTES IN WESTERN AUSTRALIA Be alert for animals on the road, particularly dusk and dawn. Watch out for warning signs on the road, different regions have different animals. Slow down and sound your horn if you encounter an animal. MWain Roads estern Australia Don Aitken Centre ,, Waterloo Crescent East Perth WA 6004 Phone138 138 | www.mainroads.wa.gov.au Please be aware that while every effort is made to ensure the currency of the information, data can be altered subsequent to original distribution and can also become quickly out- of-date. Information provided on this publication is also available on the Main Roads website. Please subscribe to the Rest Areas page for any updates. MARCH 2015 Fatigue is a silent killer on Western Australian roads. Planning ahead is crucial to managing fatigue on long A roadside stopping place is an area beside the road road trips. designed to provide a safe place for emergency stopping or special stopping (e.g. rest areas, scenic lookouts, Distances between remote towns can information bays , road train assembly areas). Entry signs indicate what type of roadside stopping place it is. Facilities be vast and in some cases conditions within each vary. can be very hot and dry with limited fuel, water and food available. 24 P Rest area 24 hour Information Parking We want you to enjoy your journey rest area but more importantly we want you to stay safe. Manage Fatigue Ara est rea is a type of stopping place which provides Look out for warning signs and make sure you know what additional facilities that may not be available at short term to do if you feel fatigued. parking spots or information bays. This guide provides Early danger signs of fatigue include: information onra est reas only, however we encourage Wandering or disconnected thoughts drivers to stop and rest at any of the roadside stopping Missing a gear, road sign or exit places available. Slowing unintentionally Signs showing relevant facilities that may be available Braking too late in a stopping place or rest area: If you: Are yawning Are blinking more than usual Are having trouble keeping your head up Ef6uent Facility for Toilets Shelter Picnic Information dump people with area Notice your eyes closing for a moment or going out of site disability focus Forget driving the last few kilometres Blackwater may only be disposed of in rest areas displaying the ef6uent dump point signor be taken to the nearest town and disposed of at a dumpsite . Waste should not be dumped into river water catchments or any of the toilets Have a break or coffee provided in rest areas. Swap drivers if possible Stop Have a short sleep 24 Hour Rest Areas 24h our r est a reas are not intended for camping and stopping isNOT to exceed more than 24 consecutive Maps Disclaimer hours. The maps contained within this Rest Area Guide provide approximate times and distances for journeys and their accuracy cannot be guaranteed. It is recommended that users exercise their own skill and care with respect to their travel plans. Main Roads, its employees and agents accept no legal liability whatsoever arising from or in 1 connection with the accuracy, reliability, currency or completeness of the material. 2 This guide lists the rest areas and amenities provided by Western Australia's (WA) road system covers vast distances Main Roads on 17 major routes to enable you to manage through some of the most remote and uninhabited regions fatigue whilst travelling. The maps in this guide are not to of the world. Conditions can vary, from cyclones and scale and should only be used as a supplement to other 6ooding in the north to bush 5res in the wooded regions of sources of route information. the east and south-west of the country. Planning for your trip is important and the following information may assist in Map symbols planning a safe journey. Road Roadhouse Organisation Phone Website Call for Town R Rest area maintained by others Main Roads 138 138 www.mainroads.wa.gov.au General road R Rest area Western Australia enquiries, touring maps, rest area maps, N North point animals on the road 138 486 Heavy vehicle queries, sharing the road with trucks Emergency 000 Emergency, life- Check traf5c, weather and road conditions before threatening situations you leave Bureau of 1300 659 210 www.bom.gov.au Weather, cyclone Meteorology advice Pack extra food, water and fuel in case of (BoM) emergency or breakdown, especially when rest Caravan Industry 9358 5622 www.caravanwa.com.au Travel tips, towing guide, stops are limited Association (CIA) caravan park information Give your itinerary to someone in case of an Department 133 337 www.dfes.wa.gov.au Natural disasters, bush emergency of Fire and 5re, 6ood and cyclone Emergency w.arnings S tandard Services (DFES) emergency warning If you have a mobile phone check your coverage signal en-route to your destination 1800 709 355 Fire ban information Download useful travel apps Department 9219 9000 www.dpaw.wa.gov.au Park brochures and If you have a two way radio, tune in to Channel 40 of Parks and guides Wildlife (DPaW) for road user communication Of5ce of 9323 4688 www.ors.wa.gov.au Road safety advice Road Safety Police 131 444 www.police.wa.gov.au Non-emergency 24 hour Police assistance Royal 131 703 www.rac.com.au Emergency Check roads for incidents Automobile Club Roadside Assistance, affecting your journey (RAC) WA touring information COFFEE FOR DRIVER Western 9483 1111 www.westernaustralia.com Information and maps follow us on Twitter Australian Visitor on exploring Western Centres Australia twitter.com/wa_roads Look out for these signs. Stop, stretch and enjoy WA Local 9213 2000 www.walga.asn.au Local shires and twitter.com/perth_traf5c a free tea or coffee. Government council directory Association (WALGA) 3 4 Be 5re aware. Ensure all 5replaces or barbeques are put Reference Map out before you leave. MAP PAGE Perth to Geraldton (via Indian Ocean Drive 7 01 and Brand Highway) Perth to Geraldton (via Great Northern Highway 9 02 and Brand Highway) Kununurra 03 Geraldton to Port Hedland 11 N 7 (via North West Coastal Highway) KIMBERLEY Perth to Mt Magnet 13 Derby REGION 04 (via Great Northern Highway) 6 Mt Magnet to Port Hedland 15 6 05 (via Great Northern Highway) WA/NT BORDER WA/NT Port Hedland Port Hedland to Kununurra 17 06 (via Great Northern Highway) Derby to Kununurra 19 PILBARA REGION 07 (via Gibb River Road) 3 Perth to Augusta 21 08 (via Forrest Highway and Bussell Highway) Bunbury to Collie (via South Western Highway 23 5 09 and Coalelds Highway) Carnarvon Bunbury to Albany 25 MID WEST - GASCOYNE 10 REGION (via South Western Highway) 3 GOLDFIELDS-ESPERANCE REGION Perth to Albany 27 11 (via Albany Highway) 17 Mt Magnet 17 Albany to Esperance 29 Geraldton BORDER WA/SA 12 (via South Coast Highway) 4 2 Perth to Esperance (via Brookton Highway 31 WHEATBELT Kalgoorlie / Boulder 13 REGION Eucla and South Coast Highway) 1 14 16 Norseman Perth to Kalgoorlie 33 Perth 14 (via Great Eastern Highway) 13 15 Bunbury 9 15 Kalgoorlie to Esperance (via Goldelds 35 8 Collie Highway and Coolgardie Esperance Highway) 11 12 Esperance 10 Norseman to Eucla Augusta 37 GREAT SOUTHERN 16 Albany REGION (via Eyre Highway) SOUTH WEST REGION Geraldton Kalgoorlie/Boulder 39 17 (via Mt Magnet and Goldelds Highway) 5 6 MAP PERTH TO KALGOORLIE 6hr 41min DISTANCE GUIDE 14 VIA GREAT EASTERN HIGHWAY 592km PERTH 00 PERTH 35min 34km Mundaring 34 8min 12km Mundaring FORSYTHS MILL 46 FORSYTHS MILL R R The Lakes 3min 5km The Lakes Bakers Hill 51 CLACKLINE R 14min 22km R EADINE Bakers Hill 73 Northam 6min 7km Grass Valley CLACKLINE R 80 Meenaar (4km) 3min 3km Meckering 83 R EADINE 12min 14km CUNDERDIN R Northam 97 12min 13km Grass Valley 110 Tammin 4min 7km Meenaar (4km) 117 GREAT EASTERN HIGHWAY Kellerberrin 10min 15km Meckering 132 Baandee 16min 24km CUNDERDIN R 156 Hines Hill 16min 23km Tammin 179 Merredin 17min 23km Kellerberrin 202 Burracoppin 16min 25km Baandee 227 Walgoolan 7min 11km Carrabin Hines Hill 238 R BODALLIN 13min 21km Merredin 259 14min 23km Moorine Rock Burracoppin 282 5min 8km Southern Cross Walgoolan 290 7min 11km Carrabin 301 11min 18km Yellowdine 319 R BODALLIN 17min 27km Moorine Rock 346 14min 22km R Southern Cross 368 20min 32km Yellowdine 400 21min 35km R 435 R 24min 40km R 475 R 13min 21km 496 R Bullabulling 29min 48km Coolgardie Bullabulling 544 6min 9km N Coolgardie 553 29min 39km KALGOORLIE 592 33 KALGOORLIE 34.
Recommended publications
  • Animal Alert
    ! Animal Alert Many of the major rural highways areunfenced due to the vast expanse of land, thereforeno barriers are A Guide to present to prevent wild or Main Roads rest areas pastoral animals wandering and roadside amenities across the road. ON MAJOR ROUTES IN WESTERN AUSTRALIA Be alert for animals on the road, particularly dusk and dawn. Watch out for warning signs on the road, different regions have different animals. Slow down and sound your horn if you encounter an animal. MWain Roads estern Australia Don Aitken Centre ,, Waterloo Crescent East Perth WA 6004 Phone138 138 | www.mainroads.wa.gov.au Please be aware that while every effort is made to ensure the currency of the information, data can be altered subsequent to original distribution and can also become quickly out- of-date. Information provided on this publication is also available on the Main Roads website. Please subscribe to the Rest Areas page for any updates. MARCH 2015 Fatigue is a silent killer on Western Australian roads. Planning ahead is crucial to managing fatigue on long A roadside stopping place is an area beside the road road trips. designed to provide a safe place for emergency stopping or special stopping (e.g. rest areas, scenic lookouts, Distances between remote towns can information bays , road train assembly areas). Entry signs indicate what type of roadside stopping place it is. Facilities be vast and in some cases conditions within each vary. can be very hot and dry with limited fuel, water and food available. 24 P Rest area 24 hour Information Parking We want you to enjoy your journey rest area but more importantly we want you to stay safe.
    [Show full text]
  • Federal Priorities for Western Australia April 2013 Keeping Western Australians on the Move
    Federal priorities for Western Australia April 2013 Keeping Western Australians on the move. Federal priorities for Western Australia Western Australia’s rapid population growth coupled with its strongly performing economy is creating significant challenges and pressures for the State and its people. Nowhere is this more obvious than on the State’s road and public transport networks. Kununurra In March 2013 the RAC released its modelling of projected growth in motor vehicle registrations which revealed that an additional one million motorised vehicles could be on Western Australia’s roads by the end of this decade. This growth, combined with significant developments in Derby and around the Perth CBD, is placing increasing strain on an already Great Northern Hwy Broome Fitzroy Crossing over-stretched transport network. Halls Creek The continued prosperity of regional Western Australia, primarily driven by the resources sector, has highlighted that the existing Wickham roads do not support the current Dampier Port Hedland or future resources, Karratha tourism and economic growth, both in terms Exmouth of road safety and Tom Price handling increased Great Northern Highway - Coral Bay traffic volumes. Parabardoo Newman Muchea and Wubin North West Coastal Highway East Bullsbrook Minilya to Barradale The RAC, as the Perth Darwin National Highway representative of Great Eastern Mitchell Freeway extension Ellenbrook more than 750,000 Carnarvon Highway: Bilgoman Tonkin Highway Grade Separations Road Mann Street members, North West Coastal Hwy Mundaring Light Rail PERTH believes that a Denham Airport Rail Link strong argument Goldfields Hwy Fremantle exists for Western Australia to receive Tonkin Highway an increased share Kalbarri Leinster Extension of Federal funding Kwinana 0 20 Rockingham Kilometres for road and public Geraldton transport projects.
    [Show full text]
  • BORR Southern Section EPA Updated Referral Spprtng Doc Rev2
    Bunbury Outer Ring Road Southern Section Updated Environmental Referral Supporting Document and Additional Information BORR-02-RP-EN-0014 Rev 2 October 2020 EXECUTIVE SUMMARY The Bunbury Outer Ring Road (BORR) is a planned Controlled Access Highway linking the Forrest Highway and Bussell Highway. BORR will be a high standard route for access to the Bunbury Port and facilitate proposed development to the east of the City of Bunbury. BORR provides an effective bypass of Bunbury for inter-regional traffic. The BORR Project comprises three sections: • ‘BORR Northern Section’ – Forrest Highway to Boyanup-Picton Road. • ‘BORR Central Section’ – Boyanup-Picton Road to South Western Highway, an existing four kilometre (km) section which was completed in May 2013, along with a three km extension of Willinge Drive southwards to South Western Highway. • ‘BORR Southern Section’ – South Western Highway (near Bunbury Airport) to Bussell Highway. The Commissioner of Main Roads Western Australia (Main Roads) is proposing to construct and operate the southern section of the BORR Project. Main Roads is referring the BORR Southern Section (the Proposal) to the Environmental Protection Authority (EPA) for a decision on assessment under Section 38 of the Environmental Protection Act 1986 (EP Act). The purpose of this document is to provide information to support the decision on assessment of the Proposal. The Proposal includes the construction and operation of 10.5 km of freeway standard, dual carriageway southwest of South Western Highway (south of Bunbury Airport) to Bussell Highway and a 3 km regional distributor from Bussell Highway at Centenary Road southeast to a grade separated interchange at the western end of Lilydale Road.
    [Show full text]
  • Driving in Wa • a Guide to Rest Areas
    DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material.
    [Show full text]
  • 2021 2021Course Guide Course Guide Exmouth
    2021 2021COURSE GUIDE COURSE GUIDE EXMOUTH CARNARVON GERALDTON BATAVIA COAST MARITIME INSTITUTE Contents TECHNOLOGY PARK IT ALL STARTS HERE 2 MOORA At Central Regional TAFE we’ll help you find your career, find your calling, find your start. KALGOORLIE MERREDIN LET’S GET THE FACTS 4 NORTHAM Why choose Vocational Education & Training? LEARN BY DOING 5 Simulated workplace learning HELPING YOU SUCCEED 6 Contact us Student Services 1800 672 700 JOBS & SKILLS CENTRES 7 [email protected] We can make it easier! centralregionaltafe.wa.edu.au WHERE ARE YOU HEADING? 8 VETDSS, PAIS, Pre-Apprenticeship, Apprenticeship/ Traineeship, University Pathways, Qualifications Batavia Coast Kalgoorlie Maritime Institute 34 Cheetham St 133 Separation Point Cl Kalgoorlie WA 6430 GET STRAIGHT INTO IT 10 Geraldton WA 6530 Pre-apprenticeships, Apprenticeships & Traineeships Merredin Carnarvon 42 Throssell Rd FOR ALL YOUR TRAINING NEEDS 11 14 Camel Ln Merredin WA 6415 Workforce solutions Carnarvon WA 6701 Moora Exmouth 242 Berkshire Valley Rd MAKING TRAINING AFFORDABLE 12 Ningaloo Centre Moora WA 6510 Don’t put your future on hold Cnr Murat Rd & Truscott Cres Northam Exmouth WA 6707 GET SKILLS READY 13 LOT 1 Hutt St There’s never been a better time to get into training Geraldton Northam WA 6401 173 – 175 Fitzgerald St Technology Park Geraldton WA 6530 STUDY OPTIONS FOR ALL 14 Cnr Deepdale Rd & What study mode suits you? Arthur Rd Geraldton WA 6532 THE NEXT STEP 15 How to enrol CRTAFE acknowledges the Aboriginal peoples of the Midwest, Gascoyne, Wheatbelt and Goldfields regions as traditional custodians COURSE INDEX 67 of the lands and waters.
    [Show full text]
  • SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget
    SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget South Coast Highway (Pfeiffer Road Reconstruct, widen, primer seal Completes RTTA co- $750,000 Great Southern to Cheynes Beach Section) and seal. funded project Region Total $750,000 Widen and reconstruct, seal Australind Roelands Link (Raymond Completes staged shoulders to 2.0m, install 1.0m $300,000 Road) project. central median. Widen and reconstruct, seal Pinjarra Williams Road (Dwellingup shoulders to 1.0m, install Completes staged $830,000 West) audible edge line and construct project. westbound passing lane. Staged project, Extend dual carriageway and construction in 2018/19 Bussell Highway/Fairway Drive construct roundabout at Fairway $5,800,000 with completion in Drive. 2019/20. Bussell Highway/Harewoods Road Construct roundabout. $150,000 Staged project. Widen and seal shoulders to South West South Western Highway (Harvey to 2.0m, install 1.0 central median, Region $520,000 Wokalup) improve batter slope and clear zone. South Western Highway/Vittoria Road Construct roundabout. $300,000 Staged project. Caves Road/Yallingup Beach Road Construct roundabout. $100,000 Staged project. Widen and seal shoulders to Pinjarra Williams Road (Dwellingup 1.0m, install barriers at selected $500,000 Staged project. East) locations and improve clear zone. South Western Highway (Yornup to Construct northbound passing $50,000 Staged project. Palgarup) lane. South Western Highway (Yornup to Construct southbound passing $50,000 Staged project. Palgarup) lane. Coalfields Highway/Prinsep Street Construct roundabout. $50,000 Staged project. Widen and reconstruct, seal shoulders, extend east bound Completes RTTA co- Coalfields Highway (Roelands Hill) passing lane, improve site $200,000 funded project.
    [Show full text]
  • Australian Exchange (Kalgoorlie) 2017
    Australian Exchange (Kalgoorlie) 2017 Erena Hosford—RMIP Wairarapa We are all visitors to this time, this place. We are just passing through. Our purpose here is to observe, to learn, to grow, to love… and then we return home. – Australian Aboriginal Proverb The super pit In July 2017 I was lucky enough to be given the opportunity to be placed in rural Western Australia for two weeks of my 5th year medical training. I was placed at Kalgoorlie Hospital in the city of Kalgoorlie-Boulder, which is in the goldfields 595km inland from Perth. The town has a population of over 32,000 people and was founded in 1893 during the gold rush. The largest employer in the area is the ‘Super pit’, an open cut gold mine, which is over 3 km long. The evening my fellow RMIP classmate and I landed in Kalgoorlie we were greeted at the airport by staff from the medical school who took us to our accommodation. There we met some of the Australian rural medical students. They had just started their mid year break but were still happy to take us out for dinner and show us around the town. The next day we started at the hospital. Kalgoorlie Hospital has an incredibly large catchment area, with some patients having travelled over 900km to attend clinics. While in Kalgoorlie I was on the Paediatric and General Medicine teams. I found the medicine there to be really interesting. There were many indigenous Australian patients, as well as a surprisingly large amount of New Zealanders (who move to Kalgoorlie to work in the mines).
    [Show full text]
  • Tidal Wave of Construction and 1300 Jobs Heading for South Australia
    Tidal wave of construction and 1300 jobs heading for South Australia 11/10/2020 | Corey Wingard MP | More Jobs | Better Services A tidal wave of major construction is heading for South Australia with works starting on more than $1 billion worth of infrastructure projects within the next six months. The building boom kicks off this month and will support more than 1,300 jobs as the Marshall Government continues to build what matters to South Australians. Major construction begins on two of the biggest regional infrastructure projects ever undertaken in this state - the Port Wakeeld Overpass and Highway Duplication and the Joy Baluch AM Bridge Duplication Project. Showcasing a commitment to improving regional roads, next month shoulder sealing works will also begin on the Tod and Birdseye Highways. In metropolitan Adelaide, major construction works will start by the end of the year on the much anticipated upgrade of the intersection of Goodwood, Springbank and Daws Roads, as well as the Main North, Kings and McIntyre Roads Intersection Upgrade. Minister for Infrastructure and Transport Corey Wingard said these important projects will support our economy and deliver jobs at a time when our state needs it most will support our economy and deliver jobs at a time when our state needs it most. “The economic challenges our state is facing at the moment are unprecedented,” Minister Wingard said. “Getting major works started on infrastructure projects across South Australia will help keep the economy ring as we navigate our way through the COVID-19 pandemic. “Creating jobs is critical to our economic recovery and we’re delivering around 1,315 over the next six months in road infrastructure projects alone.
    [Show full text]
  • Annual Report
    Annual Report Welcome and Highlights The 2014-15 Annual and Sustainability Report reviews Main Roads’ operational, financial and business performance for the financial year ending 30 June 2015. It showcases our performance against our aspiration to: Provide world class outcomes for our customers through a safe, reliable and sustainable road-based transport system. As part of our commitment to best practice reporting, this report is developed in accordance with the principles of the Global Reporting Initiative. Our report has been structured around the following key areas: A Snapshot of our Year – an overview of our performance and future direction Our Leaders – find out who our eadership team are Our Operational Performance – learn about the service we provide Our Business Activities – find out about the innovative approaches we used to support the delivery of our services Governance – understand how we exercise fairness, transparency and accountability in the management of our business and people Statement of Compliance To the Honourable Dean Nalder MLA BBus, GradDip (AppFin&Inv) Minister for Transport In accordance with section 63 of the Financial Management Act 2006, we hereby submit for your information and presentation to Parliament the Report of Main Roads Western Australia for the 2014-15 financial year ending 30 June 2015. The Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Stephen Troughton Reece Waldock Managing Director of Main Roads Commissioner of Main Roads 20 August 2015 20 August 2015 Main Roads Western Australia Annual Report 2015 1 COMMISSIONER OF MAIN ROADS: Notes to the Financial Statements About Us Our Role We are one of the largest geographically spread road agencies in the world responsible for more than 18,400 kilometres of road spread over 2.5 million square kilometres.
    [Show full text]
  • A History of CLOVERDALE the Suburb Name Cloverdale Originates Bees
    A history of CLOVERDALE The suburb name Cloverdale originates bees. Enjoy the elbow room of the For tens of thousands of years, the area now known as Belmont was inhabited by from ‘Cloverdale Estate’, a subdivision country while close to the city. the Noongar Whadjuk People. They knew the Swan River as the Derbal Yerrigan, in the area advertised for sale in 1910. and the strong connection with Noongar Boodja (Noongar land) remains significant At Cloverdale Park fruits will grow to Cloverdale was officially recognised as to Aboriginal people today. perfection. The rich loam will produce a suburb in 1954. great crops of vegetables, and Perth’s 1829 Marks the beginning of the 1974 Belmont Forum Shopping It might surprise current residents, but market is only, three-quarters of an Swan River Colony with the arrival Centre begins trading when Cloverdale was first subdivided it hour away. of the Parmelia, carrying Governor was advertised in the Perth newspapers James Stirling and the first settlers 1978 Belmont Plaza erected next to This new estate is within comfortable the Belmont Forum Shopping Centre as a small farmer’s dream: drive of the city, and the blocks range 1899 First elections for the new Belmont 1979 Belmont becomes a City and Grow your own fruit and vegetables, from five to nine and a half acres. Road Board (an early form of Council) the Council moved offices from Great have your own pigs, poultry, cows, and 1910 Cloverdale Park and Cloverdale Eastern Highway to Wright Street, Estate subdivided. Originally marketed Cloverdale as ideal for small farms 1986 The Belmont Sports and 1950 Cloverdale officially becomes a Recreation Club opened.
    [Show full text]
  • Main Roads Western Australia Report for Eyre Highway Upgrade • Balladonia East and Heartbreak Ridge Sections Flora and Fauna Assessment
    Main Roads Western Australia Report for Eyre Highway Upgrade • Balladonia East and Heartbreak Ridge Sections Flora and Fauna Assessment January 2007 Contents Executive Summary 1 1. Introduction 4 1.1 Background 4 1.2 Project Area 4 1.3 Previous Reports 5 1.4 Scope of this Report 5 2. Desktop Investigation 6 2.1 Climate 6 2.2 Geology, Soils and Landforms 6 2.3 Reserves 7 2.4 Wetlands and Rivers 7 2.5 Water Management Areas 7 2.6 Environmentally Sensitive Areas 8 2.7 Existing Vegetation 8 2.8 Fauna 13 3. Field Survey 18 3.1 Methodology 18 3.2 Vegetation 18 3.3 Flora 24 3.4 Fauna 28 4. Impacts on vegetation, flora and fauna 30 5. Statutory Requirements 31 5.1 Statutory Requirements 31 5.2 Clearing of Native Vegetation 31 6. Referrals 35 6.1 Commonwealth Government 35 6.2 Western Australian Government 35 7. Conclusions and Recommendations 36 8. Limitations 38 61/18363/64224 Eyre Highway Upgrade • Balladonia East and Heartbreak Ridge Sections ii Flora and Fauna Assessment 9. References 39 Table Index Table 1 Conservation codes and descriptions for the DEC’s Declared Rare and Priority flora species. 10 Table 2 Significant flora present in the Heartbreak Ridge and Balladonia East Sections, as recorded by the DEC’s Rare Flora Databases 11 Table 3 Environmental Protection And Biodiversity Conservation Act 1999 Categories 15 Table 4 Western Australian Wildlife Conservation Act 1950 Codes 15 Table 5 Western Australian Department of Environment and Conservation Priority Fauna Codes (Species not listed under the Conservation Act, but for which there is some concern).
    [Show full text]
  • Lots 6 & 7 Great Eastern Highway, Midvale
    Proposed Service Station Lots 6 & 7 Great Eastern Highway, Midvale Transport Impact Assessment PREPARED FOR: Gazebo Management Pty Ltd December 2020 Document history and status Date Author Revision Approved by Revision type approved Waihin Tun r01 R White 9/11/2020 Draft Waihin Tun r01a R White 10/11/2020 Final Waihin Tun r01b R White 02/12/2020 Revised Final File name: t20.279.wt.r01b Author: Waihin Tun Project manager: Behnam Bordbar Client: Gazebo Management Pty Ltd Project: Lots 6 & 7 Great Eastern Highway, Midvale Document revision: r01b Project number: t20.279 Copyright in all drawings, reports, specifications, calculations and other documents provided by the Consultant in connection with the Project shall remain the property of the Consultant. The Client alone shall have a license to use the documents referred to above for the purpose of completing the Project, but the Client shall not use, or make copies of, such documents in connection with any work not included in the Project, unless written approval is obtained from the Consultant or otherwise agreed through a separate contract. t20.279.wt.r01b Page 1 TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................... 5 2.0 DEVELOPMENT PROPOSAL ............................................................................. 7 2.1 PROPOSED ACCESS FOR ALL MODES ......................................................................................................... 7 3.0 EXISTING SITUATION ......................................................................................
    [Show full text]