SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget

Total Page:16

File Type:pdf, Size:1020Kb

SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget South Coast Highway (Pfeiffer Road Reconstruct, widen, primer seal Completes RTTA co- $750,000 Great Southern to Cheynes Beach Section) and seal. funded project Region Total $750,000 Widen and reconstruct, seal Australind Roelands Link (Raymond Completes staged shoulders to 2.0m, install 1.0m $300,000 Road) project. central median. Widen and reconstruct, seal Pinjarra Williams Road (Dwellingup shoulders to 1.0m, install Completes staged $830,000 West) audible edge line and construct project. westbound passing lane. Staged project, Extend dual carriageway and construction in 2018/19 Bussell Highway/Fairway Drive construct roundabout at Fairway $5,800,000 with completion in Drive. 2019/20. Bussell Highway/Harewoods Road Construct roundabout. $150,000 Staged project. Widen and seal shoulders to South West South Western Highway (Harvey to 2.0m, install 1.0 central median, Region $520,000 Wokalup) improve batter slope and clear zone. South Western Highway/Vittoria Road Construct roundabout. $300,000 Staged project. Caves Road/Yallingup Beach Road Construct roundabout. $100,000 Staged project. Widen and seal shoulders to Pinjarra Williams Road (Dwellingup 1.0m, install barriers at selected $500,000 Staged project. East) locations and improve clear zone. South Western Highway (Yornup to Construct northbound passing $50,000 Staged project. Palgarup) lane. South Western Highway (Yornup to Construct southbound passing $50,000 Staged project. Palgarup) lane. Coalfields Highway/Prinsep Street Construct roundabout. $50,000 Staged project. Widen and reconstruct, seal shoulders, extend east bound Completes RTTA co- Coalfields Highway (Roelands Hill) passing lane, improve site $200,000 funded project. distance and modify west bound merge lane. Widen and seal shoulders to 2.0m, install 1.0m central South Western Highway (Cookernup) $100,000 Staged project. median and construct northbound passing lane. Widen and seal shoulders to South Western Highway (Harvey 2.0m, install 1.0m central $100,000 Staged project. North) median and construct southbound passing lane. Total $9,050,000 Widen and seal shoulders to Indian Ocean Drive 1.5m, install line marking and $1,500,000 audible edge lines. Widen and seal shoulders to Minilya Exmouth Road (North and Mid-West 1.0m, install audible edge lines $67,000 Staged project. South of Burkett Road) Gascoyne and clear vegetation. Widen and seal shoulders to Brand Highway (North of Cataby Staged project. 2.0m and install audible edge $4,300,000 Road) Construction in 2018/19. lines. Total $5,867,000 Widen and seal shoulders to Staged project. Victoria Highway (East of Kununurra) 1.0m, install line marking and $2,000,000 Kimberley Region Construction in 2018/19. audible edge lines. Total $2,000,000 Widen and seal shoulders to 1.0m, rehabilitate carriageway, Wheatbelt Region York-Merredin Road improve cross sections, install $530,000 line marking and audible edge lines. Construct northbound passing Albany Highway (Marradong Road) $100,000 lane. Road realignment and widening, Collie-Lake King Road (Bowelling including upgrade to intersection $3,500,000 Curves) with Bowelling-Duranillin Road. Great Eastern Highway (Various Widen and seal shoulders to $3,500,000 sections) 1.0m and install edge lines. Total $7,630,000 Mitchell Freeway, Kwinana Freeway Metropolitan Install safety barriers. $200,000 and State Highways Region Total $200,000 Sub Total (Safer Roads Projects funded by State Capital Funds) $25,497,000 BRIDGE IMPROVEMENT PROGRAM 2018/19 Draft Region Location Treatment Comment Budget Albany Highway (Arthur River, Bridge Replace reinforced concrete $3,000,000 Wheatbelt Region No.34) overlay and upgrade guard rail. Total $3,000,000 Total - Safer Roads Program $28,497,000 .
Recommended publications
  • Metro Region
    Roads Under Main Roads Control - Metro Region (Indicative and Subject to Changes) Road Name (Name On Road or Main Roads Route Name Road or Route Start Terminus LG Start LG End Signs) Route_End_Terminus Airport Dr Airport Dr Tonkin Hwy Belmont To Near Searle Rd (900m) Belmont Welshpool Rd & Shepperton Albany Hwy Albany Hwy Victoria Park Chester Pass Rotary Albany Rd Albany Hwy & South Western Beeliar Dr * (North Lake Road Armadale Rd Armadale Rd Armadale Cockburn Hwy Once Bridge Is Completed) Beach St (Victoria Quay Beach St Link Queen Victoria St Fremantle Beach St Fremantle Access) Bridge St Guildford Rd North Rd Bassendean Market St Bassendean Albany Hwy 3k Nth Of Brookton Hwy Brookton Hwy Armadale Williams St Brookton Armadale Canning Hwy Canning Hwy Causeway Flyover Victoria Park Queen Victoria St (H31) Fremantle Causeway Albany Hwy Adelaide Tce Perth Shepperton Rd - Start Dual Victoria Park Charles St Wanneroo Rd Newcastle St Perth Wiluna St Vincent Rockingham Rd / Hampton Cockburn Rd Cockburn Rd Fremantle Russell Rd West Cockburn Road Sth Fremantle West Coast Hwy / Port Beach Curtin Av Walter Place Fremantle Claremont Crescent Cottesloe Rd East Pde Guildford Rd East Pde Perth Whatley Cr & Guildford Rd Perth East St Great Eastern Hwy James St Swan Great Eastern Hwy Swan Mandurah Rd & Stakehill Rd Ennis Av Melville Mandurah Hwy Patterson Rd Rockingham Rockingham West Garratt Rd Bridge Nth Garratt Rd Bridge Sth Garratt Rd Bridge Garratt Rd Bridge Bayswater Belmont Abutment Abutment Gnangara Rd Ocean Reef Upper Swan Hwy Ocean Reef &
    [Show full text]
  • Federal Priorities for Western Australia April 2013 Keeping Western Australians on the Move
    Federal priorities for Western Australia April 2013 Keeping Western Australians on the move. Federal priorities for Western Australia Western Australia’s rapid population growth coupled with its strongly performing economy is creating significant challenges and pressures for the State and its people. Nowhere is this more obvious than on the State’s road and public transport networks. Kununurra In March 2013 the RAC released its modelling of projected growth in motor vehicle registrations which revealed that an additional one million motorised vehicles could be on Western Australia’s roads by the end of this decade. This growth, combined with significant developments in Derby and around the Perth CBD, is placing increasing strain on an already Great Northern Hwy Broome Fitzroy Crossing over-stretched transport network. Halls Creek The continued prosperity of regional Western Australia, primarily driven by the resources sector, has highlighted that the existing Wickham roads do not support the current Dampier Port Hedland or future resources, Karratha tourism and economic growth, both in terms Exmouth of road safety and Tom Price handling increased Great Northern Highway - Coral Bay traffic volumes. Parabardoo Newman Muchea and Wubin North West Coastal Highway East Bullsbrook Minilya to Barradale The RAC, as the Perth Darwin National Highway representative of Great Eastern Mitchell Freeway extension Ellenbrook more than 750,000 Carnarvon Highway: Bilgoman Tonkin Highway Grade Separations Road Mann Street members, North West Coastal Hwy Mundaring Light Rail PERTH believes that a Denham Airport Rail Link strong argument Goldfields Hwy Fremantle exists for Western Australia to receive Tonkin Highway an increased share Kalbarri Leinster Extension of Federal funding Kwinana 0 20 Rockingham Kilometres for road and public Geraldton transport projects.
    [Show full text]
  • Regional Roads Risking Lives
    Tuesday 13 October 2015 Regional roads risking lives RAC has today released its 12 month Risky Roads campaign scorecard, revealing that work still needs to be done on some of WA’s most dangerous regional roads. RAC General Manager Corporate Affairs, Will Golsby, said the scorecard looked at the progress made on the roads that were nominated by the community as the State’s riskiest roads 12 months ago. “We acknowledge and welcome the construction underway on some of the regional roads identified, but we’re extremely concerned that that work on the rest has not commenced,” Mr Golsby said. Last year, the WA community nominated 70 percent of the State’s riskiest roads to be in regional WA, including Bussell Highway in Capel, Toodyay Road from Red Hill to Toodyay, Great Eastern Highway from Coolgardie to Southern Cross, Great Northern Highway in Bindi-Bindi, Bruce Rock-Merredin Road in Merredin, South Western Highway in Manjimup, Indian Ocean Drive in Lancelin and Coalfields Highway in Collie. The 12 month scorecard reveals that Bussell Highway in Capel remains unchanged with poor road quality and a lack of overtaking opportunities, Bruce Rock-Merredin Road in Merredin needs improvement of its poor road quality and width, and Indian Ocean Drive in Lancelin is in desperate need of construction to improve the quality of its road and provide better overtaking opportunities. “These results highlight the need for the State Government to deliver more funding, but the current State Budget only confirms a reduction in spending. “This is on top of the huge backlog in road maintenance which was identified in 2009 by the Auditor General, and estimated to be $800 million.
    [Show full text]
  • BORR Southern Section EPA Updated Referral Spprtng Doc Rev2
    Bunbury Outer Ring Road Southern Section Updated Environmental Referral Supporting Document and Additional Information BORR-02-RP-EN-0014 Rev 2 October 2020 EXECUTIVE SUMMARY The Bunbury Outer Ring Road (BORR) is a planned Controlled Access Highway linking the Forrest Highway and Bussell Highway. BORR will be a high standard route for access to the Bunbury Port and facilitate proposed development to the east of the City of Bunbury. BORR provides an effective bypass of Bunbury for inter-regional traffic. The BORR Project comprises three sections: • ‘BORR Northern Section’ – Forrest Highway to Boyanup-Picton Road. • ‘BORR Central Section’ – Boyanup-Picton Road to South Western Highway, an existing four kilometre (km) section which was completed in May 2013, along with a three km extension of Willinge Drive southwards to South Western Highway. • ‘BORR Southern Section’ – South Western Highway (near Bunbury Airport) to Bussell Highway. The Commissioner of Main Roads Western Australia (Main Roads) is proposing to construct and operate the southern section of the BORR Project. Main Roads is referring the BORR Southern Section (the Proposal) to the Environmental Protection Authority (EPA) for a decision on assessment under Section 38 of the Environmental Protection Act 1986 (EP Act). The purpose of this document is to provide information to support the decision on assessment of the Proposal. The Proposal includes the construction and operation of 10.5 km of freeway standard, dual carriageway southwest of South Western Highway (south of Bunbury Airport) to Bussell Highway and a 3 km regional distributor from Bussell Highway at Centenary Road southeast to a grade separated interchange at the western end of Lilydale Road.
    [Show full text]
  • Driving in Wa • a Guide to Rest Areas
    DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material.
    [Show full text]
  • Annual Report
    Annual Report Welcome and Highlights The 2014-15 Annual and Sustainability Report reviews Main Roads’ operational, financial and business performance for the financial year ending 30 June 2015. It showcases our performance against our aspiration to: Provide world class outcomes for our customers through a safe, reliable and sustainable road-based transport system. As part of our commitment to best practice reporting, this report is developed in accordance with the principles of the Global Reporting Initiative. Our report has been structured around the following key areas: A Snapshot of our Year – an overview of our performance and future direction Our Leaders – find out who our eadership team are Our Operational Performance – learn about the service we provide Our Business Activities – find out about the innovative approaches we used to support the delivery of our services Governance – understand how we exercise fairness, transparency and accountability in the management of our business and people Statement of Compliance To the Honourable Dean Nalder MLA BBus, GradDip (AppFin&Inv) Minister for Transport In accordance with section 63 of the Financial Management Act 2006, we hereby submit for your information and presentation to Parliament the Report of Main Roads Western Australia for the 2014-15 financial year ending 30 June 2015. The Report has been prepared in accordance with the provisions of the Financial Management Act 2006. Stephen Troughton Reece Waldock Managing Director of Main Roads Commissioner of Main Roads 20 August 2015 20 August 2015 Main Roads Western Australia Annual Report 2015 1 COMMISSIONER OF MAIN ROADS: Notes to the Financial Statements About Us Our Role We are one of the largest geographically spread road agencies in the world responsible for more than 18,400 kilometres of road spread over 2.5 million square kilometres.
    [Show full text]
  • A Guide to Main Roads Rest Areas and Roadside Amenities
    ! Animal Alert Many of the major rural highways areunfenced due to the vast expanse of land, thereforeno barriers are A Guide to present to prevent wild or Main Roads rest areas pastoral animals wandering and roadside amenities across the road. ON MAJOR ROUTES IN WESTERN AUSTRALIA Be alert for animals on the road, particularly dusk and dawn. Watch out for warning signs on the road, different regions have different animals. Slow down and sound your horn if you encounter an animal. MWain Roads estern Australia Don Aitken Centre ,, Waterloo Crescent East Perth WA 6004 Phone138 138 | www.mainroads.wa.gov.au Please be aware that while every effort is made to ensure the currency of the information, data can be altered subsequent to original distribution and can also become quickly out- of-date. Information provided on this publication is also available on the Main Roads website. Please subscribe to the Rest Areas page for any updates. MARCH 2015 Fatigue is a silent killer on Western Australian roads. Planning ahead is crucial to managing fatigue on long A roadside stopping place is an area beside the road road trips. designed to provide a safe place for emergency stopping or special stopping (e.g. rest areas, scenic lookouts, Distances between remote towns can information bays , road train assembly areas). Entry signs indicate what type of roadside stopping place it is. Facilities be vast and in some cases conditions within each vary. can be very hot and dry with limited fuel, water and food available. 24 P Rest area 24 hour Information Parking We want you to enjoy your journey rest area but more importantly we want you to stay safe.
    [Show full text]
  • Annual Report 20192020.Pdf
    Contents Beautiful beaches Introduction ............................................. 1 Yanchep Lagoon, Acknowledgement of Country .......................................... 2 part of the City’s 32km A view of the Yellagonga Regional Park of pristine beaches, Welcome and how to read our Annual Report .................. 3 and Scenic Drive within Wanneroo town with their influx of Message from the Mayor .................................................. 5 centre. There are four National and thousands of residents Message from the CEO .................................................... 7 Regional parks/bushlands within the City. Alternative formats This report and tourists who flock to Our vision, values and plans ............................................. 9 soak up the sun. Sustainability .................................................................. 11 The City of Wanneroo is committed to building an inclusive and cohesiveis community available that in celebrates diversity by providing an environment where all people enjoy equal access to The Year in Review ................................ 12 Our Executive Leadership Team .................................... 112 life’s opportunities. alternative formats Highlights and challenges ............................................... 12 Employee performance review process ........................ 114 on request. Important events in the City ............................................ 21 Advocacy ..................................................................... 115 This document is
    [Show full text]
  • Cotton Weediness
    TECHNICAL BULLETIN NO. 305 THE POTENTIAL WEEDINESS OF TRANSGENIC COTTON IN NORTHERN AUSTRALIA Agdex 151/607 $8.80 (GST included) ISBN 0 7245 4700 2 EVALUATION OF THE POTENTIAL WEEDINESS OF TRANSGENIC COTTON IN NORTHERN AUSTRALIA A REPORT PREPARED FOR CONSIDERATION BY THE OFFICE OF THE GENE TECHNOLOGY REGULATOR NOVEMBER 2002 By ROWENA EASTICK Weeds Agronomist DISCLAMER While all care has been taken to ensure that information contained in this Technical Bulletin is true and correct at the time of publication, changes in circumstances after the time of publication may impact on the accuracy of its information. The Northern Territory of Australia gives no warranty or assurance, and makes no representation as to the accuracy of any information or advice contained in this Technical Bulletin, or that it is suitable for your intended use. You should not rely upon information in this publication for the purpose of making any serious, business or investment decisions without obtaining independent and/or professional advice in relation to your particular situation. The Northern Territory of Australia disclaims any liability or responsibility or duty of care towards any person for loss or damage caused by any use of or reliance on the information contained in this publication. ii ACKNOWLEDGEMENTS The author wishes to thank Stephen Yeates, Greg Constable, Colin Martin, Gary Fitt, and Danny Llewellyn for their professional guidance and Warren Muller and Mark Hearnden for statistical advice. The technical support from Matt Bolam, Nick Hartley, Heather Emmerson, Greg Aldrich, Uwe Pufke, Erica Eastick, Tony Postle, Ryan Berlowitz, Graham Schultz and the farm staff at Katherine Research Station and Frank Wise Institute, Kununurra, is appreciated.
    [Show full text]
  • Trip Report: Victoria River District
    Trip report: Victoria River District Micha Jackson and Amanda Lilleyman 31st July – 4th August 2020 The Victoria River District is one of the most lovely and most accessible birding spots in the Top End, situated about 500km south of Darwin on the Victoria Highway, which eventually ends up in northeastern WA. We scheduled our trip to arrive at the Katherine Poo Ponds on Friday afternoon, hoping for views of the first-ever Citrine Wagtail in the Northern Territory. There we met up with Katherine local birder- extraordinaire Marc Gardner, who had found the bird the previous weekend. We were also met by a group of local Darwin birders, Katherine locals, some visiting birdwatchers from interstate and some very keen twitchers that drove up from Alice Springs. So, there we were, scopes and bins lined up against the fence of the poo ponds scanning for a wagtail. But as goes with twitching, we did not find the wagtail. We dipped. Instead we were treated to an assortment of waterbirds using the sewage works, and also some interesting bush birds just behind us, including a Grey Fantail (a dry season migrant in low numbers in the Top End), Arafura Fantail, Shining Flycatcher, Leaden Flycatcher, Paperbark Flycatcher, Willie Wagtail and awesome views of a Collared Sparrowhawk (ebird list: https://ebird.org/checklist/S71972922). We counted all birds at the site until it was dark and then decided on dinner at the Golf Club before retiring to our camp at Shady Lane on Gorge Road. The next morning, we were up early to meet Marc and others to search for Crested Shrike-tit on the Central Arnhem Highway, and we had great success with one stunning individual (northern subspecies lifer for Amanda).
    [Show full text]
  • Mitchell Freeway Stage 1
    1 2 National Engineering Landmark Mitchell Freeway Stage 1 Contents 1. Appendix A : Plaque Nomination Form 2. Letter of Agreement – Main Roads Department, Western Australia 3. Appendix B : Plaquing Nomination Assessment Form 4. Appendix C : Assessment of Significance 5. Appendix D : Biographies of Key Individuals 6. Attachments 1. Map of Freeway site 2. Progress photographs of sites and of completed structures 3 Mitchell Freeway National Engineering Landmark Nomination Appendix A Plaque Nomination Form Name of Work : Mitchell Freeway Stage 1 Nominate for : National Engineering Landmark Location : City of Perth , Western Australia, between 31 57’ 47” S, 115 50’ 49”E and 31 56’ 37” S, 115 50’ 56” E. Owner: Main Roads Department, Western Australia PO Box 6202, East Perth, WA 6892 Nominating Body : Engineering Heritage Panel, Engineers Australia, WA Division ( Signed )……………… D Young For Nominating Body Date ………………. This plaquing nomination is supported and is recommended for approval. ( Signed) ……………… D Young Chair, WA Division Engineering Heritage Panel Date ……………… 4 Appendix B : Plaquing Nomination Assessment Form 1. BASIC DATA Item Name : Mitchell Freeway Stage 1 Location : Stage 1 of the Mitchell Freeway, Perth, Western Australia, extends from the north abutment of the Narrows Bridge to the Hamilton Interchange in West Perth. Local Government City of Perth Area Owner Main Roads Department, Western Australia Current Use: The roads and bridges of the Mitchell Freeway are used by approximately 85,000 northbound vehicles per week day, allowing traffic between Perth’s southern and northern suburbs to bypass the CBD and also permitting access from the CBD to various metropolitan suburbs. Designer The Narrows Interchange was designed by the Main Roads department staff.
    [Show full text]
  • Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment
    Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment May 2014 Abbreviations ASRIS Australian Soil Resource Information ASS Acid Sulfate Soil BoM Bureau of Meteorology CEMP Construction Environmental Management Plan CWG Community Working Group DAA Department of Aboriginal Affairs DAFWA Department of Agriculture and Food Western Australia DEC Department of Environment and Conservation DER Department of Environment Regulation DotE Department of the Environment DoW Department of Water DPaW Department of Parks and Wildlife DRF Declared Rare Flora DSEWPaC Department of Sustainability, Environment, Water, Population and Communities EIA Environmental Impact Assessment EP Act Environmental Protection Act 1986 EPA Environmental Protection Authority EPBC Act Environment Protection and Biodiversity Conservation Act 1999 ESA Environmentally Sensitive Area GHPD Government Heritage Property Disposal GPS Global Positioning System Ha Hectare (100 m x 100 m) HCWA Heritage Council of Western Australia IBRA Interim Biogeographic Regionalisation of Australia LGA Local Government Association Mbgl Metres below ground level MNES Matters of national environmental significance NEPM National Environmental Protection Measure OEPA Office of the Environmental Protection Authority PEC Priority Ecological Community RIWI Act Rights in Water and Irrigation Act 1914 TEC Threatened Ecological Community WCAct Wildlife Conservation Act 1950 WoNS Weeds of National Significance GHD | Report for Main Roads Western
    [Show full text]