05 Indian Ocean Drive

Total Page:16

File Type:pdf, Size:1020Kb

05 Indian Ocean Drive FACT SHEET Fact sheet Indian Ocean Ocean Drive drive 4-5 DAYS 4-5 days Horrocks Northampton Mullewa Yalgoo GERALDTON Greenough Mingenew I000 Morawa KM ROUND TRIP Dongara APPROX. Paynes Find Three Springs Perenjori Eneabba Carnamah Coorow Leeman Buntine Green Head Wubin Watheroo Dalwallinu Jurien Bay Badgingarra Kalannie Pithara Miling Cervantes Beacon Bindi Ballidu Bindi Cataby Moora Walebing Bencubbin Wongan Cadoux Koorda INDIAN New Hills Lancelin Norcia Kununoppin OCEAN Trayning Dowerin Gingin Wyalkatchem Nungarin Guilderton Goomalling Bindoon Yanchep Muchea Toodyay Kellerberrin Joondalup NORTHAM PERTH Mundaring York Quairading FREMANTLE Karragullen Beverley © RACWA Copyright 2011 © RACWA Copyright 2011 Armadale Rockingham Brookton Corrigin IfIf you’reyou’re keenkeen toto take your time time and and Suggestedcoastal town ofitinery Cervantes and one of Australia’s most unique landscapes, the Pinnacles Desert. experience everything everything Western Western Day 1 » Perth to Cervantes 202km The road into the Pinnacles is sealed, and there Australia’s CoralCoral Coast has to offer, bebe Travellingis a car park north within along walking the Indian distance Ocean Drive of the sure to include the Indian Ocean Drive in (continue north from Wanneroo Road), the first leg sure to include the Indian Ocean Drive golden limestone structures, which stand up to your holiday itinerary. The route officially fromthree Perth and to a Dongarahalf metres takes tall. you After through exploring the coastal the openedin your holiday in September itinerary. 2010 The and route includes townpinnacles, of Cervantes head andto the one Desert of Australia’s Discovery most Centreunique someofficially of the openedmost iconic in September experiences 2010 on landscapes,to learn more the Pinnaclesabout these Desert. distinctive The road formations. into the PinnaclesAfter visiting is sealed, the andPinnacles there is Desert, a car park head within to Lake offerand includes in Australia’s some Coral of the Coast, most from iconic the walkingThetis distance(located of off the Hansen golden Baylimestone Road) structures, to marvel uniqueexperiences Pinnacles on offer Desert in inAustralia’s Cervantes, Coral whichat some stand of upthe to earth’s three and oldest a half living metres fossils, tall. After the skyCoast, diving from and the sea unique lion charters Pinnacles in JurienDesert exploringstromatolites the pinnacles, and strombalites. head to the EnjoyDesert a Discovery leisurely Bay, to the Central Greenough Historic Centrestroll onto learnthe nearby more about 1.3 kilometre these distinctive walk trail. Visit in Cervantes, sky diving and sea lion Settlement and the recently revitalised formations.the Indian After Ocean visiting Rock the Lobster Pinnacles Factory Desert, for head an informative Lobster Shack tour to learn about the Geraldtoncharters in foreshore. Jurien Bay, to the Central to Lake Thetis (located off Hansen Bay Road) to more recent history of cray-fishing in Cervantes. Greenough Historic Settlement and the marvel at some of the earth’s oldest living fossils, the SUGGESTED ITINERARY stromatolitesDAY 2 Cervantes and strombalites. to Dongara Enjoy a 160km leisurely stroll recently revitalised Geraldton foreshore. DAY 1 Perth to Cervantes 202km onContinue the nearby your 1.3 journeykilometre north walk trail. along Visit the the Indian Lobster Travelling north along the Indian Ocean Drive ShackOcean for Drive, an informative stopping tour along to learn the aboutway at the the more (continue north from Wanneroo Road), the first recentMolah history Hill Lookout, of cray-fishing which in offers Cervantes. uninterrupted Overnight leg from Perth to Dongara takes you through the atviews RAC Cervantesof native bushHoliday land Park. and the ocean. MC2787 RAC members save up to Need maps,Don’t guides, get stranded our entire range. atlases or aon GPS your for next trip.15% off Call RAC Travel on 1300 655 179, go to rac.com.au/holidayguides your journey?Join RAC Roadside Assistance todayor pop into your local RAC Travel Centre call 13 17 03 or visit rac.com.au MRB 723 Fact sheet Indian Ocean drive #05 drive series Highlights » Snorkelling » Art galleries » Fishing » Diving » National parks » Museums » Historical settlements RAC Recommends Inattention affects all drivers, especially in rural WA. Fatalities in the Wheatbelt are 6x higher than that of the WA state average. RAC recommends rest, before driving, stopping regularly, sharing the drive and allowing enough travel time. Day 2 » Cervantes to Dongara 160km through the 11 restored pioneerbuildings on site. Continue your journey north along the Indian As you continue your drivetowards Geraldton, Ocean Drive, stopping along the way at the Molah keep an eye for leaningtrees. Buffeted by prevailing Hill Lookout, which offers uninterrupted views of southerly winds,the trees’ horizontal trunks have Visitor Centres native bush land and the ocean. become something of an icon for the region. Cervantes (08) 9652 7700 Dongara (08) 9927 1404 Interpretive signage along the path to the lookout Day 4 » Geraldton to Perth 420km Geraldton (08) 9921 3999 provides information about the nearby flora and via Indian Ocean Drive, 430km, via Brand Hwy, fauna and an insight into the Indigenous heritage or 575km via inland wildflower trail. Head up of the area. Heading further north towards Jurien to the impressive HMAS Sydney II Memorial. Bay, Grigson’s Lookout is located in the Leseuer Commemorating the lives of 645 sailors who died National Park, which is home to 900 species in World War II. Located on Mt Scott, this emotive of flora. Continue north to Jurien Bay and jump memorial provides panoramic views across Accomodation aboard a sea lion charter or out of a plane and Geraldton and the Indian Ocean. Free walking Visit racparksandresorts.com.au onto the beach! Jurien Bay is the only place in WA tours are offered at 10.30am daily. or contact your nearest RAC where you can land on the beach after skydiving. travel centre to book today. Snorkel and explore the underwater wonderland of the Jurien Bay Marine Park, which is home Optional: Consider taking a scenic flight from to tropical fish, sponges, sea squirts, soft corals, Geraldton to the Houtman Abrolhos Islands where sea lions and dolphins. Explore the caves of the you can enjoy snorkelling and guided walks. The Park Passess Stockyard Gully National Park, which is accessible Houtman Abrolhos Islands feature rich biodiversity only by four wheel drive. Treat yourself to a dinner in wildlife on land and in the surrounding pristine RAC members receive 50% off of freshly caught seafood in Jurien Bay or up the waters. Shipwrecks and coral reefs offer great National Park Passes. Purchase yours today at rac.com.au/parkpasses. road in Dongara. Take a stroll along Dongara’s 1.6 snorkelling and diving and weather conditions are kilometre walk trail of historic buildings. often perfect for surfing and windsurfing. Day 3 » Dongara to Geraldton 66km Head north to the Greenough CentralHistoric Useful tips Settlement and step back in time as you stroll Need a car? Hire a car through Thrifty car rental and save. R16012 rac.com.au/carhire Call 1300 655 179, go to rac.com.au/greatdrives or pop into your local RAC Travel Centre Applecross 6150 6459 » Carousel 6150 6454 » Joondalup 9308 1600 » Mandurah 6150 6456 » Midland 6150 6468 » Morley 6466 2300 » West Perth 9436 4830 .
Recommended publications
  • Federal Priorities for Western Australia April 2013 Keeping Western Australians on the Move
    Federal priorities for Western Australia April 2013 Keeping Western Australians on the move. Federal priorities for Western Australia Western Australia’s rapid population growth coupled with its strongly performing economy is creating significant challenges and pressures for the State and its people. Nowhere is this more obvious than on the State’s road and public transport networks. Kununurra In March 2013 the RAC released its modelling of projected growth in motor vehicle registrations which revealed that an additional one million motorised vehicles could be on Western Australia’s roads by the end of this decade. This growth, combined with significant developments in Derby and around the Perth CBD, is placing increasing strain on an already Great Northern Hwy Broome Fitzroy Crossing over-stretched transport network. Halls Creek The continued prosperity of regional Western Australia, primarily driven by the resources sector, has highlighted that the existing Wickham roads do not support the current Dampier Port Hedland or future resources, Karratha tourism and economic growth, both in terms Exmouth of road safety and Tom Price handling increased Great Northern Highway - Coral Bay traffic volumes. Parabardoo Newman Muchea and Wubin North West Coastal Highway East Bullsbrook Minilya to Barradale The RAC, as the Perth Darwin National Highway representative of Great Eastern Mitchell Freeway extension Ellenbrook more than 750,000 Carnarvon Highway: Bilgoman Tonkin Highway Grade Separations Road Mann Street members, North West Coastal Hwy Mundaring Light Rail PERTH believes that a Denham Airport Rail Link strong argument Goldfields Hwy Fremantle exists for Western Australia to receive Tonkin Highway an increased share Kalbarri Leinster Extension of Federal funding Kwinana 0 20 Rockingham Kilometres for road and public Geraldton transport projects.
    [Show full text]
  • 388 Bus Time Schedule & Line Route
    388 bus time schedule & line map 388 Perth Busport View In Website Mode The 388 bus line (Perth Busport) has 2 routes. For regular weekdays, their operation hours are: (1) Perth Busport: 5:18 AM - 8:41 PM (2) Warwick Stn: 8:53 AM - 9:30 PM Use the Moovit App to ƒnd the closest 388 bus station near you and ƒnd out when is the next 388 bus arriving. Direction: Perth Busport 388 bus Time Schedule 40 stops Perth Busport Route Timetable: VIEW LINE SCHEDULE Sunday 7:36 AM - 5:47 PM Monday 7:36 AM - 5:47 PM Warwick Stn Tuesday 5:18 AM - 8:41 PM Beach Rd After Springvale Dr Wednesday 5:18 AM - 8:41 PM Beach Rd Before Dorchester Av Thursday 5:18 AM - 8:41 PM 621 Beach Road, Warwick Friday 5:18 AM - 8:41 PM Beach Rd After Dorchester Av Saturday 5:57 AM - 5:40 PM Beach Rd After Erindale Rd Beach Rd After Lloyd Dr Beach Road, Warwick 388 bus Info Wanneroo Rd After Beach Rd Direction: Perth Busport Stops: 40 Wanneroo Rd Before Culloton Cr Trip Duration: 35 min 680 Wanneroo Road, Warwick Line Summary: Warwick Stn, Beach Rd After Springvale Dr, Beach Rd Before Dorchester Av, Beach Wanneroo Rd After Culloton Cr Rd After Dorchester Av, Beach Rd After Erindale Rd, 2 Rochester Circle, Balga Beach Rd After Lloyd Dr, Wanneroo Rd After Beach Rd, Wanneroo Rd Before Culloton Cr, Wanneroo Rd Wanneroo Rd Before Camberwell Rd After Culloton Cr, Wanneroo Rd Before Camberwell 608 Wanneroo Road, Balga Rd, Wanneroo Rd Before Reid Hwy, Wanneroo Rd - Stirling Central Shopping Ctr, Wanneroo Rd After Wanneroo Rd Before Reid Hwy Amberley Wy, Wanneroo Rd After Main St, Wanneroo
    [Show full text]
  • Driving in Wa • a Guide to Rest Areas
    DRIVING IN WA • A GUIDE TO REST AREAS Driving in Western Australia A guide to safe stopping places DRIVING IN WA • A GUIDE TO REST AREAS Contents Acknowledgement of Country 1 Securing your load 12 About Us 2 Give Animals a Brake 13 Travelling with pets? 13 Travel Map 2 Driving on remote and unsealed roads 14 Roadside Stopping Places 2 Unsealed Roads 14 Parking bays and rest areas 3 Litter 15 Sharing rest areas 4 Blackwater disposal 5 Useful contacts 16 Changing Places 5 Our Regions 17 Planning a Road Trip? 6 Perth Metropolitan Area 18 Basic road rules 6 Kimberley 20 Multi-lingual Signs 6 Safe overtaking 6 Pilbara 22 Oversize and Overmass Vehicles 7 Mid-West Gascoyne 24 Cyclones, fires and floods - know your risk 8 Wheatbelt 26 Fatigue 10 Goldfields Esperance 28 Manage Fatigue 10 Acknowledgement of Country The Government of Western Australia Rest Areas, Roadhouses and South West 30 Driver Reviver 11 acknowledges the traditional custodians throughout Western Australia Great Southern 32 What to do if you breakdown 11 and their continuing connection to the land, waters and community. Route Maps 34 Towing and securing your load 12 We pay our respects to all members of the Aboriginal communities and Planning to tow a caravan, camper trailer their cultures; and to Elders both past and present. or similar? 12 Disclaimer: The maps contained within this booklet provide approximate times and distances for journeys however, their accuracy cannot be guaranteed. Main Roads reserves the right to update this information at any time without notice. To the extent permitted by law, Main Roads, its employees, agents and contributors are not liable to any person or entity for any loss or damage arising from the use of this information, or in connection with, the accuracy, reliability, currency or completeness of this material.
    [Show full text]
  • Offset Proposal Letter
    Your ref: Government of Western Australia 08/2569, 09/5380-02 Department of Environment and Conservation Our ref: CPS 818/5 Enquiries: Chloe Sykes Phone: 9219 8744 Fax: 9219 8701 Email: [email protected] gov.au Mr Shane Collins Environmental Officer Metropolitan Region Main Roads Western Australia PO Box 6202 EAST PERTH WA 6892 • Dear Mr Collins CPS 818/5 - OFFSET PROPOSAL - INDIAN OCEAN DRIVE OVERTAKING LANES, NORTH OF YANCHEP - AMENDEMENT I refer to your letter dated 18 January 2011, in relation to the Main Roads Western Australia's (MRWA) offset proposal "Indian Ocean Drive (M045) - Road Construction of Northbound and Southbound Overtaking Lanes between 6.3 and 9.2 SLK" (version 2, dated 19 November 2010). The offset proposal was approved by the Department of Environment and Conservation's (DEC) CEO on 30 November 2010 in accordance with conditions 5(a)(ii), 9(c) and Part V of cleahng permit CPS 818/5. The approved offset proposal sought to offset the proposed clearing of 1.023 hectares of native vegetation through the revegetation of 1.91 hectares in two disused roads (an old military road {UCL} and Clover Road {Gnangara-Moore River State Forest}) and a disused gravel pit within Gnangara-Moore River State Forest and a research plot within Yanchep National Park. MRWA is seeking an amended approval letter to change the current requirement for monitoring to occur monthly from September 2011 to August 2014 to monthly monitoring from September-November 2011, March-May 2012 and September-November 2012 only, followed by six-monthly monitoring, with annual reports submitted to DEC in August each year.
    [Show full text]
  • SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget
    SAFER ROADS PROGRAM 2018/19 Draft Region Location Treatment Comment Budget South Coast Highway (Pfeiffer Road Reconstruct, widen, primer seal Completes RTTA co- $750,000 Great Southern to Cheynes Beach Section) and seal. funded project Region Total $750,000 Widen and reconstruct, seal Australind Roelands Link (Raymond Completes staged shoulders to 2.0m, install 1.0m $300,000 Road) project. central median. Widen and reconstruct, seal Pinjarra Williams Road (Dwellingup shoulders to 1.0m, install Completes staged $830,000 West) audible edge line and construct project. westbound passing lane. Staged project, Extend dual carriageway and construction in 2018/19 Bussell Highway/Fairway Drive construct roundabout at Fairway $5,800,000 with completion in Drive. 2019/20. Bussell Highway/Harewoods Road Construct roundabout. $150,000 Staged project. Widen and seal shoulders to South West South Western Highway (Harvey to 2.0m, install 1.0 central median, Region $520,000 Wokalup) improve batter slope and clear zone. South Western Highway/Vittoria Road Construct roundabout. $300,000 Staged project. Caves Road/Yallingup Beach Road Construct roundabout. $100,000 Staged project. Widen and seal shoulders to Pinjarra Williams Road (Dwellingup 1.0m, install barriers at selected $500,000 Staged project. East) locations and improve clear zone. South Western Highway (Yornup to Construct northbound passing $50,000 Staged project. Palgarup) lane. South Western Highway (Yornup to Construct southbound passing $50,000 Staged project. Palgarup) lane. Coalfields Highway/Prinsep Street Construct roundabout. $50,000 Staged project. Widen and reconstruct, seal shoulders, extend east bound Completes RTTA co- Coalfields Highway (Roelands Hill) passing lane, improve site $200,000 funded project.
    [Show full text]
  • Wanneroo Road and Ocean Reef Road Interchange
    MAIN ROADS WESTERN AUSTRALIA PROJECT UPDATE JUNE 2019 Wanneroo Road and Ocean Reef Road Interchange Site establishment and preliminary construction activity has begun on the Wanneroo Road and Ocean Reef Road Interchange following the award of a design Ground-breaking and construction ceremony marks contract. start of project The first sod was turned on 10 going over Ocean Reef Road. • Site investigations to identify March 2019, officially marking the the location of services and The interchange will improve commencement of the $64.8 million commencement of service connectivity in all directions, reduce project, which is jointly funded by the relocations travel times between coastal suburbs Australian ($51.84 million) and State and employment centres such as ($12.96 million) Governments. The • The construction of a new access Wangara and Malaga, and improve road ceremony was led by the Hon. Minister road to Cockman House safety. for Transport Rita Saffioti, along with • Temporary diversion of the shared other dignitaries and project team path adjacent to Cockman House members. First stage of construction Construction of the Wanneroo Road and • Establishment of traffic management Ocean Reef Road Interchange is now Improving safety at one of Perth’s and site facilities underway, with the first stage of works most congested intersections involving: The majority of these works will be Main Roads has awarded a design undertaken from 7am to 7pm, Monday • Demolition of the former BP service and construction contract to WBHO to Saturday. Out of hours works may station site and other redundant Infrastructure Pty Ltd – SRG Civil Pty be required to complete parts of the job buildings.
    [Show full text]
  • Albany Ring Road Planning and Project Development
    Commissioner of Main Roads - continued Estimated Estimated 2017-18 2018-19 2019-20 2020-21 2021-22 Total Cost Expenditure Estimated Budget Forward Forward Forward lo 30-6-18 Expenditure Estimate Estimate Estimate Estimate $'000 $'000 $'000 $'000 $'000 $'000 $'000 WORKS IN PROGRESS Armadale Road - Anstey Road to Tapper Road .................. 145,000 29,060 24,900 48,000 66,210 1,630 100 Bridges Renewal Program Ashton Avenue - Bridge 903 ............................................. 11,000 8,380 8,380 2,620 Coalling Brook - Bridge 24 and Williams River - Bridge 25 ..... 12,000 1,350 1,350 8,700 1,950 Bussell Highway Margaret River Perimeter Road ........................................ 47,583 42,455 27,810 6,000 128 Vasse to Newtown ,,,,.,,,, ................... , ............... , .. ,. .......... 21,211 21,111 851 100 Charles Street Bus Bridge ................................................... 31,626 31,206 3,050 120 100 100 100 Coolgardie-Esperance Highway - Esperance Port Access .... 117,346 116,296 401 500 500 50 Dampier Highway - Balmoral Road to Burrup Peninsula Road (Stages 2-6) - Construct Second Carriageway ........ 108,488 108,103 114 100 100 100 85 Election Commitments Albany Ring Road Planning and Project Development... .. 35,000 1,000 1,000 4,000 15,000 15,000 Armadale Road Bridge North Lake Road Flyover ........... 237,000 2,443 2.443 46,1$45 132,907 52,580 2,525 Sunbury Outer Ring Road - Planning and Pre-construction Activities for Stages 2 and 3 ................... 106,250 2,650 2,650 24,850 18,750 27,500 32,500 Coolgardie-Esperance Highway - Widening, Overlay and Reconstruction ........................................................ 8,000 1,000 1,000 4,00Q 3,000 Great Eastern Highway - Anzac Drive to Gatacre Drive Dualling .........................................................................
    [Show full text]
  • Annual Report 20192020.Pdf
    Contents Beautiful beaches Introduction ............................................. 1 Yanchep Lagoon, Acknowledgement of Country .......................................... 2 part of the City’s 32km A view of the Yellagonga Regional Park of pristine beaches, Welcome and how to read our Annual Report .................. 3 and Scenic Drive within Wanneroo town with their influx of Message from the Mayor .................................................. 5 centre. There are four National and thousands of residents Message from the CEO .................................................... 7 Regional parks/bushlands within the City. Alternative formats This report and tourists who flock to Our vision, values and plans ............................................. 9 soak up the sun. Sustainability .................................................................. 11 The City of Wanneroo is committed to building an inclusive and cohesiveis community available that in celebrates diversity by providing an environment where all people enjoy equal access to The Year in Review ................................ 12 Our Executive Leadership Team .................................... 112 life’s opportunities. alternative formats Highlights and challenges ............................................... 12 Employee performance review process ........................ 114 on request. Important events in the City ............................................ 21 Advocacy ..................................................................... 115 This document is
    [Show full text]
  • Proposed Service Station Lot 1 (No.1351) Wanneroo Road, Tapping Transport Impact Assessment
    Proposed Service Station Lot 1 (No.1351) Wanneroo Road, Tapping Transport Impact Assessment PREPARED FOR: BP Australia Pty Ltd November 2019 Document history and status Date Author Revision Approved by Revision type approved S Maharjan, M r01 B Bordbar 17/04/2019 Draft Rasouli S Maharjan r01a M Rasouli 18/11/2019 Final File name: t19.016.sm.r01a Author: S Maharjan, M Rasouli Project manager: Mohammad Rasouli Client: BP Australia Pty Ltd Project: Lot 1 (No.1351) Wanneroo Road, Proposed Service Station Document revision: r01a Project number: t19.016 Copyright in all drawings, reports, specifications, calculations and other documents provided by the Consultant in connection with the Project shall remain the property of the Consultant. The Client alone shall have a license to use the documents referred to above for the purpose of completing the Project, but the Client shall not use, or make copies of, such documents in connection with any work not included in the Project, unless written approval is obtained from the Consultant or otherwise agreed through a separate contract. TABLE OF CONTENTS 1.0 SUMMARY .................................................................................................................. 1 2.0 INTRODUCTION ....................................................................................................... 2 3.0 EXISTING SITUATION ............................................................................................... 4 3.1 EXISTING SITE USE, ACCESS AND PARKING ...............................................................................................
    [Show full text]
  • Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment
    Main Roads Western Australia Mitchell Freeway Extension - Burns Beach Road to Romeo Road Environmental Impact Assessment May 2014 Abbreviations ASRIS Australian Soil Resource Information ASS Acid Sulfate Soil BoM Bureau of Meteorology CEMP Construction Environmental Management Plan CWG Community Working Group DAA Department of Aboriginal Affairs DAFWA Department of Agriculture and Food Western Australia DEC Department of Environment and Conservation DER Department of Environment Regulation DotE Department of the Environment DoW Department of Water DPaW Department of Parks and Wildlife DRF Declared Rare Flora DSEWPaC Department of Sustainability, Environment, Water, Population and Communities EIA Environmental Impact Assessment EP Act Environmental Protection Act 1986 EPA Environmental Protection Authority EPBC Act Environment Protection and Biodiversity Conservation Act 1999 ESA Environmentally Sensitive Area GHPD Government Heritage Property Disposal GPS Global Positioning System Ha Hectare (100 m x 100 m) HCWA Heritage Council of Western Australia IBRA Interim Biogeographic Regionalisation of Australia LGA Local Government Association Mbgl Metres below ground level MNES Matters of national environmental significance NEPM National Environmental Protection Measure OEPA Office of the Environmental Protection Authority PEC Priority Ecological Community RIWI Act Rights in Water and Irrigation Act 1914 TEC Threatened Ecological Community WCAct Wildlife Conservation Act 1950 WoNS Weeds of National Significance GHD | Report for Main Roads Western
    [Show full text]
  • Two Rocks Yanchep Mindarie Wanneroo Perth 20Km
    Two Rocks Marina • Shops Leemans • BBQ Landing • Cafes Yanchep National Park • Chocolate Drops • Yanchep Inn • Aboriginal Cultural Experience • Caves Club Capricorn • Picnics • Walks • BBQ Yanchep • Fishing Cockatoo Walk Trail Yanchep Lagoon Yanchep Central Shopping Centre Jumanga Olives • Castle Invasion Laser Skirmish and Paintball • Leopard Lodge KAROBORUP RD NORTH Ocean View Tavern Alkimos KINGSBRIDGE BVD Antique Arms & Armour JINDALEE BVD Portofinos at Quinns • Barbagallo Raceway Quinns Rocks • WA Sporting Car Club Mindarie Mi Casa Ocean Keys Shopping Centre 10th Light Marina Horse Trail NEERABUP RD CLARKSON Carramar COOGEE RD TRAIN STATION Golf Course Onyesha Neerabup Spa • The Boat Ale House National Park ROUSSET RD • Indian Ocean Academy Brewing Company Wanneroo Equestrian • Mindarie Marina Hotel Botanic Gardens • MadCat Photography & Mini Golf ROUSSET RD Wanneroo Civic Centre OPPORTUNITY Activity Marina PLAY SPACE • Wanneroo Library & Cultural Centre • Aquamotion Yellagonga Dining Snorkelling • Café Elixir Regional Park • Wanneroo Tavern Wanneroo Central Attraction Whale Watching Shopping Centre Accommodation Surf Spot Wanneroo Cockman House Local Produce Yaberoo Budjara Walk Trail Parkland Cockatoo Walk Trail Wanneroo Markets Paul Conti Wines Wanneroo Civic Centre Perth - Clarkson Train Line Kingsway Ezi-Gro Orchids Perth Sports Complex 0 1 2 3 4 5 Kilometres Kingsway 20km City Shopping Marangaroo Centre Golf Course Hillarys Boat Harbour This map provides an approximate indication of the location of key attractions and amenities
    [Show full text]
  • Regional Roads
    REGIONAL ROADS 2018/19 (Approved Budget) Road Trauma Trust Account - Regional Run Off Road Crashes Great Southern Region Albany Highway (Kojonup to Balgarup Road) Widen and seal shoulders to 2.0m, install line marking, audible edge lines and minor intersection $2,600,000 treatments. South Coast Highway (Albany to Willyung Section and Henry Street to Willyung Road) $130,000 Final seal and install audible edge lines. Total Great Southern Region $2,730,000 South West Region South Western Highway (Ordnance Road to Walpole) $750,000 Widen and seal shoulders to 1.5m, Improve clear zone, install line marking and audible edge lines. South Western Highway (Waroona to Yarloop) Widen and seal shoulders to 2.5m, remove vegetation, install barriers at various locations, install $900,000 600mm centre line and audible edge lines. Pinjarra Williams Road (Dwellingup to Murray Shire Boundary) $2,900,000 Widen and seal shoulders to 2.0m, improve clear zone, install line marking audible edge lines. South Western Highway (Wokalup to Brunswick) Widen and seal shoulders to 2.5m, remove vegetation, install barriers at various locations, install $2,400,000 600mm centre line and audible edge lines. Caves Road (Yallingup to Wildwood Road) $200,000 Widen and seal shoulders to 1.0m and install safety barrier at selected sections. Bussell Highway at Treeton Road (Cowaramup Townsite north) $720,000 Widen and seal shoulders and minor intersection improvement. South Western Highway (Quinninup to Middleton Road) $450,000 Widen and seal shoulders to 1.0m, improve clear zone, install line marking. Total South West Region $8,320,000 Page 1 of 3 2018/19 (Approved Budget) Road Trauma Trust Account - Regional Run Off Road Crashes Mid West - Gascoyne Region Indian Ocean Drive (South of Jurien Bay) $100,000 Widen and seal shoulders to 1.5m, install line marking and audible edge lines.
    [Show full text]