Press Release

Total Page:16

File Type:pdf, Size:1020Kb

Press Release English Section Listed below are the designated areas for the planned maintenance work as for April and May, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 09.00 am to 11.30 am Wayleave clearing works for Low voltage 1 Kampong Batang Mitus, Tutong A part of Kampong Batang Mitus, Tutong 23th April 2018 01.30 pm to 04.30 pm overhead lines Tuesday 09.00 am to 11.30 am Wayleave clearing works for Low voltage 2 Kampong Batang Mitus, Tutong A part of Kampong Batang Mitus, Tutong 24th April 2018 01.30 pm to 04.30 pm overhead lines Wednesday 08.30 am to 11.30 am Maintenance works for Low voltage overhead A part of Kampong Penabai and 3 Kampong Penabai, Tutong 25th April 2018 02.00 pm to 04.30 pm lines Spg 397 Kampong Penabai, Tutong Thursday 08.30 am to 11.30 am Maintenance works for Low voltage overhead A part of Kampong Penabai and 4 Kampong Penabai, Tutong 26th April 2018 02.00 pm to 04.30 pm lines Spg 397 Kampong Penabai, Tutong Saturday Maintenance works for Low voltage overhead A part of Kampong Pengasing, Sengkarai and Spg 38 Jln 5 08.30 am to 11.30 am Kampong Pengasing, Sengkarai Tutong 28th April 2018 lines Pengasing, Tutong Saturday Maintenance works for Low voltage overhead A part of Kampong Petani and 6 02.00 pm to 04.30 pm Kampong Petani, Tutong 28th April 2018 lines Spg 14 Kampong Petani , Tutong Monday 08.30 am to 11.30 am Maintenance works for Low voltage overhead A part of Jln Pengasing, Sengkarai and Spg 28 Jln Pengasing, 7 Kampong Pengasing, Sengkarai Tutong 30th April 2018 01.30 pm to 04.30 pm lines Tutong Tuesday 08.30 am to 11.30 am Maintenance works for Low voltage overhead A part of Jln Pengasing, Sengkarai and Spg 28 Jln Pengasing, 8 Kampong Pengasing, Sengkarai Tutong 01st May 2018 01.30 pm to 04.30 pm lines Tutong Wednesday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 9 Kampong Penabai, Tutong A part of Kampong Penabai, Tutong 02nd May 2018 01.30 pm to 04.30 pm lines Page 1 Thursday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 10 Kampong Penabai, Tutong A part of Kampong Penabai, Tutong 03rd May 2018 01.30 pm to 04.30 pm lines Monday 08.30 am to 11.30 am Kampong Kiudang and Mungkom, Maintenance works for Low voltage overhead 11 A part of Kampong Kiudang and Kampong Mungkom , Tutong 07th May 2018 01.30 pm to 04.30 pm Tutong lines Tuesday 08.30 am to 11.30 am Kampong Kiudang and Mungkom, Maintenance works for Low voltage overhead 12 A part of Kampong Kiudang and Kampong Mungkom , Tutong 08th May 2018 01.30 pm to 04.30 pm Tutong lines Wednesday 08.30 am to 11.30 am Kampong Kiudang and Mungkom, Maintenance works for Low voltage overhead 13 A part of Kampong Kiudang and Kampong Mungkom , Tutong 09th May 2018 02.30 pm to 04.30 pm Tutong lines Saturday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 14 Kampong Melaboi Kampong Melaboi, Mukim Ukong, Tutong 12th May 2018 lines Saturday Maintenance works for Low voltage overhead 15 02.00 pm to 04.00 pm Kampong Bebuloh, Tutong A part of Kampong Bebuloh,Tutong 12th May 2018 lines Monday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 16 Kampong Sg Damit, Tutong A part of Kampong Sg Damit, Tutong 14th May 2018 01.30 pm to 04.30 pm lines Tuesday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 17 Kampong Sg Damit, Tutong Jln Bukit Guayan, Sg Damit, Kampong Tutong 15th May 2018 01.30 pm to 04.30 pm lines Wednesday 08.30 am to 11.30 am Maintenance works for Low voltage overhead 18 Kampong Sg Damit, Tutong Jln Bukit Guayan, Sg Damit, Kampong Tutong 16th May 2018 01.30 pm to 04.30 pm lines Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan April dan Mei , 2018: Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Kawasan Yang Terjejas Gangguan Bekalan Elektrik 09.00 pagi hingga 11.30 pagi Isnin 01.30 petang hingga Sebahagian Kampong Batang Mitus,Tutong 1 Kampong Batang Mitus, Tutong Pembersihan laluan kawat atas voltan rendah 23hb.April 2018 04.30 petang 09.00 pagi hingga 11.30 pagi Selesa 01.30 petang hingga Sebahagian Kampong Batang Mitus,Tutong 2 Kampong Batang Mitus, Tutong Pembersihan laluan kawat atas voltan rendah 24hb. April 2018 04.30 petang Rabu 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan Sebahagian Kampong Penabai dan 3 Kampong Penabai, Tutong 25hb. April 2018 02.00 petang hingga 04.30 petang rendah Spg 397 Kampong Penabai, Tutong Khamis 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan Sebahagian Kampong Penabai dan 4 Kampong Penabai, Tutong 26hb. April 2018 02.00 petang hingga 04.30 petang rendah Spg 397 Kampong Penabai, Tutong Sabtu Penyelenggaraan rangkaian kawat atas voltan Sebahagian Kampong Pengasing, Sengkarai dan Spg 38 Jln 5 08.30 pagi hingga 11.30 pagi Kampong Pengasing, Sengkarai Tutong 28hb. April 2018 rendah Pengasing, Tutong Sabtu Penyelenggaraan rangkaian kawat atas voltan Sebahagian Kampong Petani dan 6 02.00 petang hingga 04.30 pm Kampong Petani, Tutong 28hb. April 2018 rendah Spg 14 Kampong Petani , Tutong Isnin 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan Sebahagian Jln Pengasing, Sengkarai dan Spg 28 Jln 7 Kampong Pengasing, Sengkarai Tutong 30hb. April 2018 01.30 petang hingga 04.30 petang rendah Pengasing, Tutong Selasa 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan Sebahagian Jln Pengasing, Sengkarai dan Spg 28 Jln 8 Kampong Pengasing, Sengkarai Tutong 01hb. Mei 2018 01.30 petang hingga 04.30 petang rendah Pengasing, Tutong Rabu 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan 9 Kampong Penabai, Tutong Sebahagian Kampong Penabai, Tutong 02hb. Mei 2018 01.30 petang hingga 04.30 petang rendah Page 3 Khamis 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan 10 Kampong Penabai, Tutong Sebahagian Kampong Penabai, Tutong 03hb Mei 2018 01.30 petang hingga 04.30 petang rendah Isnin 08.30 pagi hingga 11.30 pagi Kampong Kiudang dan Mungkom, Penyelenggaraan rangkaian kawat atas voltan 11 Sebahagian Kampong Kiudang dan Kampong Mungkom, Tutong 07hb Mei 2018 01.30 petang hingga 04.30 petang Tutong rendah Selasa 08.30 pagi hingga 11.30 pagi Kampong Kiudang dan Mungkom, Penyelenggaraan rangkaian kawat atas voltan 12 Sebahagian Kampong Kiudang dan Kampong Mungkom, Tutong 08hb Mei 2018 01.30 petang hingga 04.30 pm Tutong rendah Rabu 08.30 pagi hingga 11.30 pagi Kampong Kiudang dan Mungkom, Penyelenggaraan rangkaian kawat atas voltan 13 Sebahagian Kampong Kiudang dan Kampong Mungkom, Tutong 09hb Mei 2018 02.30 petang hingga 04.30 petang Tutong rendah Sabtu 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan 14 Kampong Melaboi Kampong Melaboi, Mukim Ukong, Tutong 12hb Mei 2018 rendah Sabtu Penyelenggaraan rangkaian kawat atas voltan 15 02.00 petang hingga 04.00 petang Kampong Bebuloh, Tutong Sebahagian Kampong Bebuloh,Tutong 12hb Mei 2018 rendah Isnin 08.30 petang hingga 11.30 petang Penyelenggaraan rangkaian kawat atas voltan 16 Kampong Sg Damit, Tutong Sebahagian Kampong Sg Damit, Tutong 14hb Mei 2018 01.30 petang hingga 04.30 petang rendah Selesa 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan 17 Kampong Sg Damit, Tutong Jln Bukit Guayan, Sg Damit, Kampong Tutong 15hb Mei 2018 01.30 petang hingga 04.30 petang rendah Rabu 08.30 pagi hingga 11.30 pagi Penyelenggaraan rangkaian kawat atas voltan 18 Kampong Sg Damit, Tutong Jln Bukit Guayan, Sg Damit, Kampong Tutong 16hb Mei 2018 01.30 petang hingga 04.30 petang rendah Page 4.
Recommended publications
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • Tutong Agricultural Extension Unit
    TUTONG AGRICULTURAL EXTENSION UNIT Tutong Agricultural Extension is the main communication center for farmers and the department subject matter specialists for effective transfer of knowledge and technology as well as providing advisory services and monitor farmers’ progress and activities. The unit also responsible for delivering support services and facilitating the distribution of Agriculture and Agrifood Incentive Scheme (SIPA) especially to small and medium enterprise farmers who undertake crops, livestock and poultry farm in Tutong District. Unit Functions: 1. Delivering advisory services and transfer agricultural technologies 2. As SIPA distribution centre for small and medium enterprise farmers 3. Processing the application and registration of Paddy Buy Back Scheme to farmers 4. Monitoring farm development of Agricultural Development Areas (ADAs) 5. Data collection for national agricultural production statistic 6. Monitoring farm produce safety program and sampling of crops commodities for pesticide residue analysis 7. Member for technical committee for monitoring and accreditation Brunei Good Agricultural Practices (Brunei GAP) 8. Monitoring and evaluating the requirement foreign labour for of agricultural activities Address: Pejabat Unit Pengembangan Pertanian Daerah Tutong Kampong Bukit Bendera, Tutong TA1141 Negara Brunei Darussalam Agriculture and Agrifood Incentive Scheme (SIPA) Distribution Centre Address Stesen Pengembangan Pertanian Tutong, Kg. Birau, Jalan Kuala Abang , Tutong TE2143 Negara Brunei Darussalam Business hours: Monday to Thursday: 8.00 – 11.00 am Saturday : Closed List Of Services Provided Bil Type of Services Form Price TPOR ($) (Working Days) Registration Application For Paddy Subsidised Price 1. 1.00 2 Scheme 2. Buy Back For Paddy Subsidised Price Scheme Free 5 3. Application for Wild Boar Control Services 1.00 14 4.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Senarai Kilang Dan Pembuat Makanan Yang Telah Mendapat Sijil Halal
    SENARAI KILANG DAN PEMBUAT MAKANAN YANG TELAH MENDAPAT SIJIL HALAL DAERAH NO KILANG / PEMBUAT MAKANAN Belait 1. Ferre Cake House Block 4B, 100:5 Kompleks Perindusterian Jalan Setia Diraja, Kuala Belait. Negara Brunei Darussalam No Senarai 1 ponge Cake 2 ed Bean B skuit 3 ed Bean Mini Bun 4 utter Mini Bun 5 uger Bun 6 ot Dog Bun 7 ta Bread 8 offee Meal Bread 9 andwich Loaf 10 Keropok Lekor 11 urry Puff Pastry 12 Curry Puff Filling 13 onut 14 oty B oy/ R oti Boy 15 Noty Boy/ Roti Boy Topping 16 eropok Lekor kering 17 os K eropok Lekor 18 heese Bun Jumlah Produk : 18 2. Perusahaan Shida Dan Keluarga Block 4, B2 Light Industry, Kuala Belait KA 1931 Negara Brunei Darussalam No Senarai 1 Mee Kuning 2 Kolo Mee 3 Kuew Tiau 4 Tauhu Jumlah Produk : 4 Hak Milik Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam 26 August, 2014 Page 1 of 47 DAERAH NO KILANG / PEMBUAT MAKANAN 3. Syarikat Hajah Saibah Haji Hassan Dan Anak-Anak Block 4 No B6 Kompleks Perindustrian Pekan Belait,Kuala Belait Negara Brunei Darussalam No Senarai 1 Mee Kuning 2 Kuew Teow 3 Kolo Mee Jumlah Produk : 3 4. Syarikat Hajah Saibah Haji Hassan Dan Anak-Anak Block 4B No 6 Tingkat Bawah,Kompleks Perindustrian Pekan Belait,Kuala Belait, Negara Brunei Darussalam No Senarai 1 Karipap Ayam 2 Karipap Daging 3 Karipap Sayur 4 Popia Ayam 5 Popia Daging 6 Popia Sayur 7 Samosa Ayam 8 Samosa Daging 9 Samosa Sayur 10 Onde Onde 11 Pulut Panggang Udang 12 Pulut Panggang Daging 13 Kelupis Kosong Jumlah Produk : 13 Brunei-Muara Hak Milik Bahagian Kawalan Makanan Halal, Jabatan Hal Ehwal Syariah, Kementerian Hal Ehwal Ugama, Negara Brunei Darussalam 26 August, 2014 Page 2 of 47 DAERAH NO KILANG / PEMBUAT MAKANAN 1.
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Memo22
    English Section Listed below are the designated areas for the planned maintenance work as for September and October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday Maintenance works for low voltage overhead 1 18th Sept 2018 8.30 am to 04.30 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. A part of kampong Kuala Ungar and surrounding area. Tuesday Hj Hassbolah Building, 2 18th Sept 2018 8.30 am to 04.30 pm Kg Petani, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani. Wednesday Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal and A part 3 19th Sept 2018 8.30 am to 04.30 pm Mukim Tanjong Maya, Tutong Maintenance works for Distribution Transformer. of Kg sg Damit and surrounding areas Saturday Kampong Biong, 4 22th Sept 2018 8.30 am to 04.30 pm Mukim Lamunin, Tutong Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding area Monday 5 24th Sept 2018 8.30 am to 04.30 pm Kampong Long Mayan, Mukim Ukong , Tutong Maintenance works for Distribution Transformer. A part of Kampong Long Mayan and surrounding area Monday Kampong Merimbun, 6 24th Sept 2018 8.30 am to 04.30 pm Mukim Rambai, Tutong Maintenance works for Distribution Transformer. A part of Kampong Merimbun and surrounding area Kampong Lubuk Ubar, Monday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 7 24th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines.
    [Show full text]
  • SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
    SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2021 25 Jun 2024 COMPANY Tel No: Fax: 8977362, No 30 Simpang 766 No 30 Simpang 766 8767838 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0224/2021 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 7 Jul 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2019 6 ABU FAMILY'S ENTERPRISE KPN-5759 I KA01, B01, M03, abufamilysenterprises@gmail.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Memo14 19
    English Section Listed below are the designated areas for the planned maintenance work as for July , 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 1 01st July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area. Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Monday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Tanah Burok, Jln Penanjong and surrounding 2 01st July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. area. Tuesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 3 02nd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area. Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Tuesday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Tanah Burok, Jln Penanjong and surrounding 4 02nd July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. area. Wedesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 5 03rd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam
    IJASOS- International E-Journal of Advances in Social Sciences, Vol. I, Issue 1, 2015 THE VITALITY AND REVITALISATION OF MINORITY LANGUAGES: THE CASE OF DUSUN IN BRUNEI DARUSSALAM Hjh. Dyg. Fatimah binti Hj Awg. Chuchu1*, Najib Noorashid2 1Dr., Universiti Brunei Darussalam, Brunei Darussalam, [email protected] 2 Mr., Radio Televisyen Brunei, Brunei Darussalam, [email protected] *Corresponding author Abstract Language extinction or language death is a sociolinguistic phenomenon that is often discussed among linguists or speakers in general (Crystal, 2000; Aitchison, 2001; Dalby, 2003; Fishman, 2002; 2007; Mufwene, 2004; Nelson, 2007). Due to rapid globalisation, the effect of ‘superstratum and substratum’ languages is inevitable (Crystal, 2003), particularly with regard to the languages of ethnic minorities; those in Brunei Darussalam are no exception (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are susceptible to becoming endangered due to urbanisation, the educational system, migration and other factors; all of these factors lead to language shift and, consequently, to extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah Chuchu & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous ethnic groups in Brunei under the Citizenship Status Laws 1961 of the Constitution of Negari Brunei 1959, the Dusun ethnic group are alleged to have and practise their own code of dialect. In Brunei Darussalam, all dialects and languages spoken by indigenous ethnic groups are regarded as minority languages, except for Brunei Malay.
    [Show full text]
  • PMW 22 20 Tutong District (Autosaved)
    English Section Listed below are the designated areas for the planned maintenance work as for August and September 2020: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Benutan dan Kampong Thursday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 1 Keranching, Replacement of ovehead line 20th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Kampong Kiudang and Jalan Thursday 8.00 am to 04.00 pm Installation of the "Pole Mounted" on the A part of Jalan Kampong Kiudang and overall 2 Piasan, Mukim Kiudang and Mukim 20th August 2020 Electric pole Jalan Piasan Lamunin Kampong Benutan dan Kampong Monday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 3 Keranching, Replacement of ovehead line 24th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Monday 8.00 am to 04.00 pm Kampong Panchong, Installation of the "Pole Mounted" on the A part of Kampong Panchong and Jalan Sulap 4 24th August 2020 Mukim Lamunin Electric pole Samat Monday 8.30 am to 11.30 am Kampong Maraburong, 5 Replacement of ovehead line Overall Small Road Kampong Maraburong 24th August 2020 1.30 pm to 4.30 pm Mukim Keriam Kampong Benutan dan Kampong Tuesday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 6 Keranching, Replacement of ovehead line 25th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Tuesday 8.00 am to 04.00 pm Kampong Ukong, Installation of the "Pole Mounted" on the A part of Jalan Bang Pangan dan Jalan Penapar 7 25th August 2020 Mukim Ukong Electric pole Ukong Tuesday 8.30 am
    [Show full text]