86 Chalkshire Road, Butlers Cross, Ellesborough Response to Lead Local Flood Authority’S Comments

Total Page:16

File Type:pdf, Size:1020Kb

86 Chalkshire Road, Butlers Cross, Ellesborough Response to Lead Local Flood Authority’S Comments 86 Chalkshire Road, Butlers Cross, Ellesborough Response to Lead Local Flood Authority’s Comments 1.0 Introduction 1.1 This note has been prepared by Glanville Consultants on behalf of St John Homes (Thames Valley) in response to Buckinghamshire Council’s comments, in its capacity as Lead Local Flood Authority, received in relation to the Drainage Statement produced by Glanville (ref. 003_8210376_AQ_Drainage_Statement_(Issue_3)) submitted to discharge Condition 16 attached to planning permission ref. 20/07667/FUL, which requires the approval of a surface water drainage scheme for the proposed residential development at 86 Chalkshire Road, Butlers Cross, Ellesborough, Buckinghamshire, HP17 0TJ. 1.2 The comments were provided by Amy Fowler, the Sustainable Drainage Officer at Buckinghamshire Council, dated 2 July 2021. A copy of the consultation response can be found at Appendix A. 1.3 The following sections of this note deal with each of the comments made by Buckinghamshire Council in relation to surface water drainage. The key issues are summarised as follows: • Details of the winter ground water monitoring; • Floatation calculations for all sub-surface SuDS/drainage components; • Updated calculations including: o infiltration co-efficient base and side for the cellular storage to be set to 0.0mm/hr. o an urban creep allowance of 10%. • Updated drainage layout; • Construction drawings for all SuDS and drainage components; and • Updated maintenance plan for all SuDS and drainage components, including: o maintenance tasks and frequencies. o details of maintenance responsibility. o details of how the full drainage system will be accessed for maintenance. 2.0 Comments & Responses 2.1 Each of Buckinghamshire Council’s specific comments in their consultation response are detailed in bold italic text and a response provided beneath. Groundwater Monitoring Details Section 2.11 of the Drainage Statement outlines that groundwater monitoring has been undertaken on site and that groundwater was encountered at a minimum depth of 0.90m below ground level (bgl). The LLFA are not however in receipt of this groundwater monitoring data/report and it is requested that this information is provided in support of the application. Ref: 005_8210376_AQ_Drainage_Technical_Note 1 Issue 2: 23 July 2021 2.2 Ground Investigation Services (Southern) Ltd carried out groundwater monitoring in January 2020 and March 2021 and the results confirm maximum groundwater levels of 0.96m (January 2020) and 1.62m (March 2021) below ground level. Monitoring data supplied by Ground Investigation Services (Southern) Ltd is provided in Appendix B. Floatation Calculations Whilst site-specific groundwater levels have been identified, the applicant has not provided floatation calculations for all sub-surface assets. Floatation calculations must be provided for all sub-surface components. These should be based upon the worst case scenario of groundwater assumed to be at surface level or based on the shallowest groundwater levels encountered on site (0.90m bgl) over the winter period. This information is required to ensure the functionality of the system is maintained during a high groundwater event. 2.3 Due to the high groundwater levels encountered, all storage features will be lined with an impermeable membrane to prevent groundwater ingress. Floatation calculations have therefore been undertaken for the attenuation crates. These are included in Appendix C and demonstrate that the attenuation crate structure proposed has a factor of safety against floatation greater than 1.2, and therefore will not become buoyant in the event of high groundwater. These calculations have been undertaken using the highest groundwater level encountered during the groundwater investigations (0.96m bgl). It should be noted that floatation calculations have been undertaken based on the amended drainage strategy as described in the following sections. Calculations Calculations have been provided to demonstrate that the system has been designed to accommodate all storm events up to and including the 1 in 100 year storm event +40% climate change allowance without flooding. The LLFA would however like to query why the cellular storage has been assigned infiltration rate values for the infiltration ‘co-efficient base’ and ‘infiltration co-efficient side’. This is an attenuation component and should be designed to show no infiltration. The calculations must be updated to reflect an attenuation tank rather than a soakaway. The applicant should be aware that the calculations must also be updated to be inclusive of an urban creep allowance of 10% to take account of any future increases in impermeable areas within the site. This includes areas such as patios, conservatories and small extensions (Section 24.7.2, CIRIA SuDS Manual, 2015). Please note that following any changes to be required storage volume of the attenuation tank, all relevant documents/drawings must be updated accordingly. The updated calculations must demonstrate that the proposed drainage system can contain up to the 1 in 30 storm event without flooding. Any onsite flooding between the 1 in 30 and the 1 in 100 plus 40% climate change storm event should be safely contained on site. These calculations must include details of critical storm durations and demonstrate how the proposed system as a whole will function during different storm events. If any flooding occurs for the 1 in 100 year plus 40% climate change event, then we require details of where this flooding will occur and the volume of the flooding. Ref: 005_8210376_AQ_Drainage_Technical_Note 2 Issue 2: 23 July 2021 2.4 Section 3 of the previous Drainage Statement indicates that the proposed development site will involve a total impermeable area of 441m2. An additional 17m2 of impermeable area has been included in the calculations associated with the proposed timber bike sheds and paving flags established between the dwellings. In addition, a 10% allowance for urban creep has been included in response to Buckinghamshire Council’s comments, resulting in a total impermeable area of 504m2. 2.5 The geo-cellular storage tank will be used to attenuate surface water flows with suitable outflow control. For the purposes of modelling, Polypipe Permavoid system PVPP150 (708mm x 354mm x 150mm deep) with 95% void ratio has been used to size the storage tank. 2.6 As shown in paragraph 2.5 of the previous Drainage Statement, the closest watercourse to the site is a ditch located approximately 200m to the east of the site. Attenuated outflows from the storage tank will be intercepted and conveyed through an underground pipe towards the ditch. The applicant has rights to drain across the land which lies between the application site and the ditch, so this outfall route is deliverable. 2.7 Attenuated outflow rates from the geo-cellular storage tank would be restricted to the minimum value of 2l/s for the total impermeable area of the site, as well as all rainfall events up to 1 in 100 year with an appropriate allowance for climate change, in accordance with Buckinghamshire Council’s requirements. 2.8 The base of the storage tank has been established 1.15m below ground level. The geo- cellular storage tank has been designed to be 0.75m deep, i.e. 5 No. Permavoid (PVPP150) units. Infiltration coefficients for the base and side of the crates have been removed. 2.9 The hydraulic calculations included in Appendix D demonstrate that the geo-cellular storage tank with base area of 27.0m2 (i.e. 25.5m long x 1.06m wide) and 0.75m deep will be able to accommodate surface water run-off from all rainfall events up to and including the 1 in 100 year event, including a 40% increase in rainfall intensity as allowance for the potential effects of climate change, without flooding from surface water. As confirmed in paragraph 2.4 of this report, a 10% addition for urban creep has been included within the proposed impermeable areas, making a total of 0.051ha. The attenuation storage was shown to reach a maximum flood depth of 0.734m and a maximum volume of approximately 18.8m3 associated with the critical storm duration of 60 min Winter storm. 2.10 The design utilises a Hydro-Brake vortex flow control to attenuate surface water run-off from the proposed residential development. To achieve the required outflow rates, as well as reduced the blockage risk, the unit selected has a 70mm orifice size (MD-SHE-0070- 2000-0800-2000), but as it is located within a chamber with a sump, this dimension is not likely to give rise to any undue maintenance burden. 2.11 MicroDrainage shows a maximum outflow rate of 2.0l/s for the 1:100 year+40%CC rainfall event. Therefore, run-off from the site has been limited to the target run-off rate of 2.0l/s for all return periods up to the 100 year design rainstorm plus 40% climate change. Ref: 005_8210376_AQ_Drainage_Technical_Note 3 Issue 2: 23 July 2021 2.12 Additional storage will be provided within the permeable pavement sub-base layer, but the attenuation storage potential of this sub-base layer has not been quantified or included in the hydraulic calculations. As such, a conservative approach has been followed when preparing the drainage strategy and sizing the storage devices. 2.13 The calculations demonstrate that the development of the site will not increase flow rates off-site, and therefore the risk of flooding from surface water will not increase as a consequence of the development proposals. The introduction of a positive drainage system will result in betterment with improvements to the surface water flood risk situation within the site and in the surrounding area, by directing flows more effectively to a downstream watercourse at restricted rates. Drainage Layout It is not clear why a 5m buffer distance has been provided between the building foundations and the attenuation tank; the applicant should provide clarification regarding this.
Recommended publications
  • HS2 Draft Environmental Statement Buckinghamshire Councils
    HS2 Draft ES: response of the Buckinghamshire Councils HS2 DRAFT ENVIRONMENTAL STATEMENT Buckinghamshire Councils response part 3 CFA 10 Dunsmore, Wendover and Halton The area is within the Chilterns AONB – a nationally recognised and protected landscape. We feel, however, that the draft ES does not fully recognise this and suggests poor and inadequate mitigation. There are serious concerns about the impact of the maintenance loop on this community area; a concern compounded by the fact that no noise assessment has been carried out. There is also serious concern about the disruption that will be caused by HGV traffic in the area, particularly with regards to the use of some of the narrower, more rural roads. The impact of construction and operation on the setting of grade II* listed buildings within Wendover are not adequately assessed – particularly in the case of St Mary’s church, an active place of worship within 200m of the green tunnel portal. Comments on Part B: Description of the proposed scheme 2.2.2 We are concerned about impact of the maintenance loop on the wider landscape. There is very little information on the visual appearance and operation of the maintenance loop given. 2.2.5 Further, the HS2 route and maintenance loop will be on an embankment in this area increasing its visibility. We are concerned about the impact of this in particular since the draft ES suggests that Risborough Road over bridge would rise to 15m. Appropriate assessment of the visual impact and mitigation is crucial but currently not included in the draft ES.
    [Show full text]
  • (Prohibition of Waiting, Loading and Stopping) and (On-Street Parking Places) Order 2021 (Amendment No 1) Order 202*
    The Buckinghamshire Council (Prohibition of Waiting, Loading and Stopping) and (On-Street Parking Places) Order 2021 (Amendment No 1) Order 202* Notice is hereby given that Buckinghamshire Council proposes to make the above-named Order under the Road Traffic Regulation Act 1984. The effect of the Order is to introduce Road Name Scheme Restrictions Access to Old Burnham Beeches / • No Waiting At Any Time. Telephone Exchange Farnham Common off Kingsway ALAN WAY Langley Park Area • No Waiting At Any Time. ALDERBOURNE LANE Black Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. ASTON HILL CHIVERY Wendover Woods • 4 Wheel Pavement Parking. Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. AVENUE DRIVE Langley Park Area • No Stopping On Main Carriageway. BEDFORD DRIVE Burnham Beeches / • No Stopping At Any Time On Verge Farnham Common Or Footway. • No Stopping On Main Carriageway. BEECHES ROAD Burnham Beeches / • No Waiting At Any Time. Farnham Common • Permit Holders Only FC1. BELLSWOOD LANE Langley Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. BILLET LANE Langley Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. BLACK PARK ROAD Black Park Area & • No Stopping At Any Time On Verge Langley Park Area Or Footway No. Stopping On Main Carriageway. • Restricted Parking Zone No Waiting At Any Time No Loading At Any Time. BLACKPOND LANE Burnham Beeches / • No Waiting At Any Time. Farnham Common • Permit Holders Only FC1. BLINCO LANE Langley Park Area • No Waiting At Any Time.
    [Show full text]
  • Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 10 | Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 10 I Dunsmore, Wendover and Halton High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/10 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10 I Contents Contents Draft Volume 2: Community Forum Area Report – Dunsmore, Wendover and Halton/No 10 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2
    [Show full text]
  • Cover Plus Blank
    HALLMARK THE LACEY GREEN & LOOSLEY ROW MAGAZINE School visit to Whipsnade Zoo – collage by students of St John’s School AUGUST 2008 NUMBER 207 ESTABLISHED 1970 PDF created with pdfFactory trial version www.pdffactory.com HALLMARK THE LACEY GREEN & LOOSLEY ROW MAGAZINE AUTUMN 2008 Hallmark is published quarterly by the Lacey Green & Loosley Row Millennium Hall Management Committee, although opinions expressed in comment or contribution do not necessarily represent the collective view of that committee. Our aim is to mirror the mark that the Village Hall makes upon our community, to publish the activities of all Village organisations, and to provide a forum so that the rights, the wrongs, the well-being of village life can be aired. News from all the Village clubs, societies, church and school, stories of local interest and entries for the Village Diary are always welcome. In addition, any suggestions for improving Hallmark. VILLAGE HALL MANAGEMENT COMMITTEE Clive Hodghton (Chair), Rachel Panter (Vice-Chair), Paula Oxford (Secretary), Yvonne Axe (Treasurer), Karen Hodghton (Booking Sec.), Jill Baker, Stella Boll, Jane Brown, Ginnie Brudenell, Cathryn Davies, Carole Knight, Betty Tyler & Norman Tyler VILLAGE HALL BOOKINGS ( Clive or Karen on 01844 274254 (answering service) EDITOR * Norman Tyler (assisted by Mike Piercy), 5 Woodfield, Lacey Green, Bucks HP27 OQQ (2/3rds down Woodfield, on the left) ( 01844 344606 (with answering service & fax) Email [email protected] ADVERTISING MANAGER * Chris Baker, "Woodpeckers", Kiln Lane, Lacey Green, Bucks HP27 OPT (past the pond on the left) ( 01844 275442 The Winter Hallmark will be published in November - closing date for copy is October 17th From the Editor(s) If you would like to join Mike through Paul Rogerson, our County & District Councillor, Piercy and I in the editing of which provide us with various other subjects of reading Hallmark, which introduces matter, from which I choose which are suitable to enter you to many interesting into Hallmark as far as space allows.
    [Show full text]
  • Aylesbury Vale Strategic Flood Risk Assessment
    Aylesbury Vale District Council Level 1 Strategic Flood Risk Assessment Final Report May 2017 This page has intentionally been left blank 2016s3990 - Aylesbury SFRA Level 1 (FINAL) v3.0 i JBA Project Manager Anna Beasley 8a Castle Street Wallingford Oxfordshire OX10 8DL Revision History Revision Ref / Date Issued Amendments Issued to Charlotte Stevens / David Draft Report v1 / May 2016 Broadley (AVDC) Minor amendments and Charlotte Stevens / David Draft Report v2 / July 2016 updates from revised site Broadley (AVDC) assessment Amendments following Charlotte Stevens / David Final Report / October 2016 comments from steering Broadley (AVDC) group Additional amendments Charlotte Stevens / David Final Report v2 / March 2017 following comments from Broadley (AVDC) IDB and BCC Addendum added covering Charlotte Stevens / David Final Report v3 / May 2017 additional sites Broadley (AVDC) Contract This report describes work commissioned by Peter Williams, on behalf of Aylesbury Vale District Council, by email dated 18th February 2016. Aylesbury Vale District Council’s representative for the contract was Charlotte Stevens of Forward Plans and Community Fulfilment. Ian Ringer, Rebecca Price and Georgina Latus of JBA Consulting carried out this work. Prepared by .................................................. Rebecca Price BSc MSc Assistant Analyst, ....................................................................... Georgina Latus BSc Assistant Analyst, ....................................................................... Ian Ringer BSc MSc MCIWEM C.WEM Chartered Senior Analyst Reviewed by ................................................. Anna Beasley BSc MSc CEnv MCIWEM C.WEM Principal Analyst Purpose This document has been prepared as a Final Report for Aylesbury Vale District Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared.
    [Show full text]
  • Elly's , Index to !(Elly's
    INDEX TO !(ELLY'S , BUCKINGIIAl\ISIIIRE DIREOTORY. ----.---- PAGE PAGE I PAGE PAGE Abbots Aston 276 Buckland Common, see Datchet ••••..••.••....••.• 317 Great King-'s Hm, see Allkhampstead 272 Bnckland 302 Datchet Mead, see Datchet 317 Hug'henden 3i2 • Addington ••......••••.... 272 Burners Holt, see 'Vater Datchet St. Helen's, see Great King'shill, see Prest- AdstOCK .•••....••u •••••••• 272 Stratford..•......•••••.. 401 Datchet ..••••••••.••••• 317 wood...•..•••.•••...••.• 375 A~mondeshm. see Amrshm 273 Bullington End, see Han- Dean-North, see Hugh- Great Linford 350 Akeley•...••.•••..•••.•••• 272 slope ........•., .••••.. '" 335 enden ••••..••....•..•••. 342 Great l\Iarlow ......•••••• 354 Amersham 273 Burcot, see Wing- 407 Denham 318 Great ~Jissenden 363 AmershamHill,seeWycomb 419 Burcott, see Bierton 289 Denham, see Quainton 378 Great Penn's !fead, see Ankerwycke, sl'eWraysbry 415 Burnbam." 302 Denner Hill, see Prestwood 375 Wycombe 417 ArngTove, see Boarstall., .• 292 Bnrnbam Beeches·seeBurn- Dinton...•..••••.•......•• 318 Great Seabrook, see Iving- Ascott, see Wing 407 ham 302 Ditton, see Stoke Poges 389 hoe 3i5 Ash Furlong, see Olney ..•• 371 Bnrnham-East, see Burn- Doddershall, see Quainton 378 Great Wolston ........•••• 411 Ashendon•.••.•....••.••••• 275 ham.•••••..•••.••••.••••• 302 Dorney 319 Green Hig-hland, see Ashl.'ridg-e, see Chesham 308 Burston, see Aston Abbotts 276 DorneyWood,see Burnham 303 :l\Ionks Risborough ...... 365 Ashley Green 275 Bury End, see Amersham.. 271 Dorton 319 Green Valley, see Astwood 277 Askett,seeMonksRisboro'
    [Show full text]
  • September 2021, Issue
    Ellesborough Magazine Covering Butlers Cross, Dunsmore, North Lee and Terrick September 2021 Issue 174 ANTI-LITTER CAMPAIGN Helen Holman has been working with local village and school children in an anti-litter campaign. A competition was held for the children to produce posters to advertise the campaign and this was judged by John Hambly, a previous chair of the Parish Council, helped by Debra Panikkar, the current chair of the Parish Council, and Judith Harper, a local artist. Their posters, and of course the winning ones, were displayed outside the Parish Hall on Thursday the 22nd of July. (See article page 7) 2 Chairman’s Letter Thank you to Paul and the committee in The magazine is working closely with the preparing and distributing the magazine this Parish Council to see how best to fit in with quarter. their communications initiative. Their first news letter is included in the edition Also special thanks to Steph our advertising manager. I am not sure how she has Richard Jennings managed to do such a fantastic job while [email protected] running the farm shop combined with her family commitments. Annabelle MacWhannell has stepped forward to take on the role. Welcome Annabelle. Front Cover: Photo by Rob Alexander A Note from the Editor I hope you will find something of interest in Ellesborough Magazine, in a previous this edition of the magazine. We have incarnation, put together by Tony Young. included articles on a variety of topics together with reports on local events and We hope that the updating of the Parish activities.
    [Show full text]
  • WY Progress Sheets 2001-02 1Of5 03/07/2001 HIGH WYCOMBE PROGRESS SHEETS 2001/02
    HIGH WYCOMBE PROGRESS SHEETS 2001/02 Ref Site Scheme Proposed Comments Cost Code 2001/02 £'000s date LAFIS to Expected Year end Manager Project Works G/LS/01/1 Various sites - to be determined Safety Cameras & related initiatives H5P/SQ 30 3.64 30 IM TM 4 new sites agreed with Police. 3 in WY. Site meeting to agree exact locations - 07/01 G/LS/01/2 Various sites - to be determined Speed Dynamic Signs - pilot scheme H5N/LK 25 0 25 IM TM Equipment options being assessed. Awaiting TRL report. A4155 Little Marlow Road/Sheepridge Lane [25] [25] C/LS/00/6 Roundabout H5N/DF 0 JMJ AO Draft Design complete. Waiting for Stats Info and S Audit Comments. junction, Well End 25 25 A404/A4155 Westhorpe interchange approach Central Hatching to prevent overtaking (with maintenance To be developed in conjunction with AO maintenance scheme. Proposals to be developed by C/LS/00/7 H5N/FA [15] 0 [15] MPB AO from Bourne End & to Bourne End scheme) 08/01 C/LS/00/8 C100 Wycombe Road j/w Bobmore Lane, Marlow Possible junction improvement H5Q/AC [10] 0 [10] DGL AO To be investigated in conjunction with Safer Routes to School scheme (C/AS/01/22) - 09/01 Review signing & lining on southern section between Clay C/LS/00/9 B482 Stokenchurch to Marlow Road H5P/CU [20] 0 [20] JMJ AO Investigated but on hold until maintenance scheme. 07/01 Lane and Marlow Route review to include i) possible roundabout at j/w Four C/LS/01/2 A4128 Cryers Hill and Great Kingshill Ashes Road; ii) traffic calming; iii) pedestrian crossing H5N/KG 50 0 50 DGL H Brief issued to Highways Engineering (Hyder) - 04/01.
    [Show full text]
  • Wycombe Strategic Flood Risk Assessment (SFRA) Level 1 Update
    Wycombe District Council Strategic Flood Risk Assessment (SFRA) Level 1 Update November 2014 Document Control Sheet BPP 04 F8 Version 16; October 2013 Project: SFRA Level 1 Update Client: Wycombe District Council Project No: B1279843 Document title: SFRA Level 1 Update Ref. No: B1279843 – SFRA - 003 Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL Susan Gilfrin Michael Symons David Cobby Ruth Farrar Huw Williams Huw Williams NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 1 May 2014 Document status Draft for Client Review REVISION NAME NAME NAME 02 Susan Gilfrin Huw Williams Huw Williams Ruth Farrar Michael Symons David Cobby NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 17 Sep 2014 Document status Revised Draft for Client Review REVISION NAME NAME NAME 03 Susan Gilfrin Michael Symons Michael Symons Ruth Farrar NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 14 Nov 2014 Document status FINAL Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”).
    [Show full text]
  • 94 Chalkshire Road – FPA– January 2021 1
    Design and Access Statement (Planning) Project: Proposed Extension of Dwelling along with Redevelopment of Garage, 94 Chalkshire Road, Butler’s Cross, Aylsebury HP17 0TJ On behalf of: Mrs & Mrs D Close 94 Chalkshire Road, Butler’s Cross, Aylsebury HP17 0TJ Design and Access Statement 94 Chalkshire Road – FPA– January 2021 1 Preamble: This report is the property of Create Architecture Ltd along with accredited authors as listed and remains confidential to the Client designated in the report. The report is protected under the Terms and Conditions of the Copyright Act 1956 and infringement by reproduction, publishing or broadcasting of the report is forbidden without prior written consent from the authors. Create Architecture Ltd along with all authors certifies that the report and the works associated with it have been carried out with due care and diligence, and to its best belief and knowledge based on the information available. Thus any reliance placed on the advice and/or details given in the report should be considered in view of the information available and/or accessible at the time of writing. CREATE Architecture Ltd 2021 Issue log: Rev A – 15.01.2021 – FPA Design and Access Statement 94 Chalkshire Road – FPA– January 2021 2 Contents: 1.0 Introduction 2.0 Policy 3.0 Site and Context 4.0 Use 5.0 Amount 6.0 Layout 7.0 Scale 8.0 Landscaping 9.0 Appearance & Design Strategy 10.0 Access statement Appendix 1: Existing Photographs Appendix 2: Drawings Design and Access Statement 94 Chalkshire Road – FPA– January 2021 3 1.0 Introduction This Design and Access Statement is prepared by Create Architecture Ltd on behalf of Mr & Mrs D Close.
    [Show full text]
  • Senior School Shaping Confident, Independent Thinkers from the Head
    Senior School Shaping confident, independent thinkers From the Head My favourite parts of ACS Hillingdon? The true diversity of our students, and the friendliness and warmth that you find within this fascinating group of young people. Our school has pupils from over 40 countries, with local British students making up our second largest cohort. This experience gives our pupils a real advantage in understanding and adapting to the ever-changing world around them. The size of our school also helps create a truly personal experience. We are large enough to offer an excellent range of subjects and programmes, yet small enough to ensure all our pupils are known as individuals, and supported and guided to achieve personal success. Our curriculum offers exciting opportunities for learning in many different ways, from the academic rigour of the International Baccalaureate (IB) Diploma, to the IT skills required to master robotics coding. We balance this intellectual agility with strong student participation in local and international sports, the visual and performing arts, and outreach projects that build character and leadership. Our graduates attend the university of their choice, anywhere in the world – with over 50% of our last two graduating classes selecting UK universities. They leave us as genuinely interesting and well-balanced individuals who are ready to make their mark on the world. Martin Hall, Head of School ISI Report – Key findings Pupils’ attitudes to learning: Excellent The pupils’ personal development throughout the school: Excellent The welfare, health and safety and the quality of pastoral care for pupils’ throughout the school: Excellent 02 www.acs-schools.com 03 Ready, for a changing world Whether you know us a little, a lot, or not at all, there are certain qualities our current students and parents have come to expect that enable us to stand out.
    [Show full text]
  • (Completions, Under Construction and Not Yet Started) Net Housing
    Appendix 8 – Housing Monitoring (Completions, Under Construction and Not Yet Started) Net Housing Completions 2013-2016 Total net dwellings completed in 2013/14 Net Planning Reference Address dwellings number completed The Irish Club 1 Station Road High Wycombe 10/06436/FUL Buckinghamshire HP13 6AD 13 09/07387/FUL Ridge Service Station, Chinnor Road, Bledlow Ridge 3 Phoenix Booker Common High Wycombe Buckinghamshire 10/05789/FUL HP12 4QS 1 Heavens Lea Hawks Hill Bourne End Buckinghamshire SL8 10/07368/FUL 5JL 1 Kinloch Hedsor Road Bourne End Buckinghamshire SL8 11/07444/FUL 5DH 0 Bellfield County Middle School Garratts Way High 09/05892/OUT Wycombe Buckinghamshire HP13 5SW 43 215 Hughenden Road High Wycombe Buckinghamshire 11/06176/FUL HP13 5PG -1 109 Hughenden Avenue High Wycombe Buckinghamshire 12/07000/FUL HP13 5SS 1 43 Partridge Way High Wycombe Buckinghamshire HP13 13/06055/FUL 5JX 0 Land At 18 And Rear Of 10-16 Abbey Road Bourne End 11/07119/REN Buckinghamshire SL8 5NZ 1 11/06626/FUL The Studio The Drive Bourne End Buckinghamshire SL8 5RE 1 49 Oakland Way Flackwell Heath Buckinghamshire HP10 11/07846/FUL 9DD 1 Land Rear Of 18 Abbey Road Bourne End Buckinghamshire 12/06383/FUL SL8 5NZ 1 Hatches Farm Hatches Lane Great Kingshill 09/06509/FUL Buckinghamshire HP15 6DS 1 Land Adjacent The Harrow Public House Warrendene Road 10/06852/FUL Hughenden Valley Buckinghamshire HP14 4LX 1 Kings Acre Spurlands End Road Great Kingshill 11/05326/FUL Buckinghamshire HP15 6JA 0 Land At Rear Of Holly Acre & Mardleigh Stag Lane Great 12/06300/FUL Kingshill
    [Show full text]