94 Chalkshire Road – FPA– January 2021 1

Total Page:16

File Type:pdf, Size:1020Kb

94 Chalkshire Road – FPA– January 2021 1 Design and Access Statement (Planning) Project: Proposed Extension of Dwelling along with Redevelopment of Garage, 94 Chalkshire Road, Butler’s Cross, Aylsebury HP17 0TJ On behalf of: Mrs & Mrs D Close 94 Chalkshire Road, Butler’s Cross, Aylsebury HP17 0TJ Design and Access Statement 94 Chalkshire Road – FPA– January 2021 1 Preamble: This report is the property of Create Architecture Ltd along with accredited authors as listed and remains confidential to the Client designated in the report. The report is protected under the Terms and Conditions of the Copyright Act 1956 and infringement by reproduction, publishing or broadcasting of the report is forbidden without prior written consent from the authors. Create Architecture Ltd along with all authors certifies that the report and the works associated with it have been carried out with due care and diligence, and to its best belief and knowledge based on the information available. Thus any reliance placed on the advice and/or details given in the report should be considered in view of the information available and/or accessible at the time of writing. CREATE Architecture Ltd 2021 Issue log: Rev A – 15.01.2021 – FPA Design and Access Statement 94 Chalkshire Road – FPA– January 2021 2 Contents: 1.0 Introduction 2.0 Policy 3.0 Site and Context 4.0 Use 5.0 Amount 6.0 Layout 7.0 Scale 8.0 Landscaping 9.0 Appearance & Design Strategy 10.0 Access statement Appendix 1: Existing Photographs Appendix 2: Drawings Design and Access Statement 94 Chalkshire Road – FPA– January 2021 3 1.0 Introduction This Design and Access Statement is prepared by Create Architecture Ltd on behalf of Mr & Mrs D Close. This statement has been prepared to accompany a full planning application in relation to a proposed extension to the existing dwelling and redevelopment of the garage. The proposed development proposal is to enlarge and modernise the living accommodation of the existing family home. This statement provides an assessment and evaluation of the site’s and existing dwelings physical context, before exploring the design principles and concepts that have been applied to the proposal. It demonstrates how this context, evaluated constraints and opportunities has influenced and shaped the design aspects of a sustainable scheme. In terms of access, this statement sets out the approach to access the dwelling and move around within the dwelling, including discussing regulation and best practice requirements. Heritage and Conservation Area impact is discussed as the existing proposal is located within the conservation area. This statement thereafter draws conclusions on the design and access issues relating to the development. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 4 2.0 Policy National Planning Policy The National Planning Policy Framework (NPPF) is a key material planning consideration, which sets out the Government’s planning policies for England and how these should be applied. It state planning law requires that applications for planning permission be determined in accordance with the development plan, unless material considerations indicate otherwise. Local Planning Policy Wycombe District Local Plan was adopted in August 2019 setting out the long term vision for the District identifying where new development will be created and protecting the special environment given a large area of the district is within the Chilterns Area of Outstanding Natural Beauty and Green Belt. Policy DM30 The Chilterns Area of Outstanding Natural Beauty is relevant to this application, along with the supplemented Policy DM32 Landscape Character and Settlement Patterns. Policy DM 30 requires development with the AONB to Conserve and where possible enhance the natural beauty of the AONB, be appropriate to the economic and social wellbeing of the local communities within the AONB, or to promote the understanding or enjoyment of the AONB and deliver the highest quality design which respects the natural beauty and built heritage and enhancing the sense of place and local character. Development within the AONB must not have significant adverse impact on the natural beauty. The Chilterns AONB is a recognised as a living landscape encompassing a vriety of character areas and a range of settlements. Policy DM 32 requires development to protect and reinforce the positive key characteristics of the receiving landscape and existing settlement patterns. The application dwelling also sits within an area of green belt, meaning the application is to be assessed against further specific Wycombe Local plan Policy’s CP8 Protecting the Green Belt, DM42 Managing development in the Green Belt and DM43 The Replacement or extension of dwellings in the Green Belt (including outbuildings.) Policy CP 8 states the council will protect the Green Belt identified on the policies map from inappropriate development. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 5 Policy DM 42 states Development within the Green Belt is inappropriate, however identifies exceptions which include 1.b.iii. the replacement or extension of dwellings only when they accord with DM43. Policy DM 43 states the extension or replacement of a dwelling will only be considered appropriate development in the Green Belt when it satisfies conditions, which we will discuss later within this document. Condition b. state ‘ the dwelling Is within a built up village shown on the policies map. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 6 3.0 Site Location & Use The proposal relates to the existing dwelling and domestic garage of 94 Chalkshire Road, a dwelling which is located to the north of Butler’s Cross, Aylesbury. The dwelling is occupied by the applicant as their family home. Wider context arial view, showing site location. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 7 Butlers Cross is a hamlet within the Parish of Ellesborough, in Buckinghamshire, England within Wycombe District. It is located in the South of the Parish at the crossroads between the road and from Ellesborough to Little Kimble and the road from Terrick to the Chequers Country House. Site location plan / OS Extract. The Hamlets name refers to the junction of the two roads and historically where the Chequers Country House Staff would of once lived. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 8 Arial view, showing site location and context. A topographical survey of the site including heights of adjacent buildings was under taken in order to allow a good understanding of the existing topography of the site, adjacent areas and context of adjacent buildings and roof scape, to ensure that the proposal sits comfortably within context. This identifies a slight drop from a level 121.5 at the kerb side by approximately 0.9m to the rear garden levels to a level of approximately 120.6, with the existing ground floor level being around level to the drive entranceway at 121.29. The neighbouring dwellings, sit well in context with similar roof heights, with the exception of the more recent dwelling constructed to the South which is a dormer bungalow and therefore has elements over lower eaves and roof levels. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 9 Topographical Survey. Specific Local Planning Policy Butler’s Cross and the application dwelling sit within the Chilterns Area of Outstanding Natural Beauty, as is a large proportion of Wycombe District. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 10 4.0 Use: The application site is an existing dwelling and detached domestic garage in which the applicant and their family live. The proposal is for and extension and refurbishment works of the same, with a planning use of C3 dwelling house. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 11 4.0 Amount: Proposed Accommodation schedule Location: Area (m²) Area (ft²) Volume (m3) Bedrooms Existing Site - Existing House 548 Ground Floor 102.5 1027 First Floor 90 915 4 Existing Garage 37 376 162 Existing Total 229.5 2318 710 4 Proposed Extension 212.76 Proposed Extension GF 43.77 Proposed Extension FF 41.71 1 Converted Garage 37 162 Proposed Total 285 3066 922.76 5 The proposal is for the redevelopment of the existing garage and side extension which links and brings the garage space into the dwelling, forming a modern layout and arrangement. There is an existing large private driveway which is comfortably able to accommodate upto 4no. private cars. Policy DM 43 states the extension or replacement of a dwelling will only be considered appropriate development in the Green Belt when it satisfies one (or more) conditions P.DM43 – 1 a – g. Condition e. states ‘where the volume of the original dwelling is between 240 and 720 cubic metres, the total volume of the resulting building is no more than the volume of the original building plus 50%. The Volume calculation / figures as identified within the accommodation schedule above, identifies the existing dwelling as 710m3 and with the proposed (which now includes the garage / outbuilding, as the proposal joins this to the house and converts this to living space,) as 922.76m3. This meaning an increase of approximately 30%. Design and Access Statement 94 Chalkshire Road – FPA– January 2021 12 5.0 Layout: The layout proposal has been considered against and informed by the constraints and opportunities of the site and context. These include proximity of surrounding buildings / dwellings, heights of the same, existing topography, existing house and garage, all of which have been considered at an early stage within the design process and have influenced the design response. Due to the orientation of the site and adjacent dwellings there are no window to window privacy distances concerns, with the neighbouring properties. neighbouring properties. existing dwelling existing dwelling - 2 storey - 2 storey existing dwellings – 2 & 3 storey Proposed site plan showing context.
Recommended publications
  • HS2 Draft Environmental Statement Buckinghamshire Councils
    HS2 Draft ES: response of the Buckinghamshire Councils HS2 DRAFT ENVIRONMENTAL STATEMENT Buckinghamshire Councils response part 3 CFA 10 Dunsmore, Wendover and Halton The area is within the Chilterns AONB – a nationally recognised and protected landscape. We feel, however, that the draft ES does not fully recognise this and suggests poor and inadequate mitigation. There are serious concerns about the impact of the maintenance loop on this community area; a concern compounded by the fact that no noise assessment has been carried out. There is also serious concern about the disruption that will be caused by HGV traffic in the area, particularly with regards to the use of some of the narrower, more rural roads. The impact of construction and operation on the setting of grade II* listed buildings within Wendover are not adequately assessed – particularly in the case of St Mary’s church, an active place of worship within 200m of the green tunnel portal. Comments on Part B: Description of the proposed scheme 2.2.2 We are concerned about impact of the maintenance loop on the wider landscape. There is very little information on the visual appearance and operation of the maintenance loop given. 2.2.5 Further, the HS2 route and maintenance loop will be on an embankment in this area increasing its visibility. We are concerned about the impact of this in particular since the draft ES suggests that Risborough Road over bridge would rise to 15m. Appropriate assessment of the visual impact and mitigation is crucial but currently not included in the draft ES.
    [Show full text]
  • (Prohibition of Waiting, Loading and Stopping) and (On-Street Parking Places) Order 2021 (Amendment No 1) Order 202*
    The Buckinghamshire Council (Prohibition of Waiting, Loading and Stopping) and (On-Street Parking Places) Order 2021 (Amendment No 1) Order 202* Notice is hereby given that Buckinghamshire Council proposes to make the above-named Order under the Road Traffic Regulation Act 1984. The effect of the Order is to introduce Road Name Scheme Restrictions Access to Old Burnham Beeches / • No Waiting At Any Time. Telephone Exchange Farnham Common off Kingsway ALAN WAY Langley Park Area • No Waiting At Any Time. ALDERBOURNE LANE Black Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. ASTON HILL CHIVERY Wendover Woods • 4 Wheel Pavement Parking. Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. AVENUE DRIVE Langley Park Area • No Stopping On Main Carriageway. BEDFORD DRIVE Burnham Beeches / • No Stopping At Any Time On Verge Farnham Common Or Footway. • No Stopping On Main Carriageway. BEECHES ROAD Burnham Beeches / • No Waiting At Any Time. Farnham Common • Permit Holders Only FC1. BELLSWOOD LANE Langley Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. BILLET LANE Langley Park Area • No Stopping At Any Time On Verge Or Footway. • No Stopping On Main Carriageway. BLACK PARK ROAD Black Park Area & • No Stopping At Any Time On Verge Langley Park Area Or Footway No. Stopping On Main Carriageway. • Restricted Parking Zone No Waiting At Any Time No Loading At Any Time. BLACKPOND LANE Burnham Beeches / • No Waiting At Any Time. Farnham Common • Permit Holders Only FC1. BLINCO LANE Langley Park Area • No Waiting At Any Time.
    [Show full text]
  • Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013
    PHASE ONE DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report 10 | Dunsmore, Wendover and Halton HS2 London-West Midlands May 2013 ENGINE FOR GROWTH DRAFT ENVIRONMENTAL STATEMENT Community Forum Area Report ENGINE FOR GROWTH 10 I Dunsmore, Wendover and Halton High Speed Two (HS2) Limited, 2nd Floor, Eland House, Bressenden Place, London SW1E 5DU Telephone 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk © Crown copyright, 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. To order further copies contact: DfT Publications Tel: 0300 123 1102 Web: www.dft.gov.uk/orderingpublications Product code: ES/10 Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10 I Contents Contents Draft Volume 2: Community Forum Area Report – Dunsmore, Wendover and Halton/No 10 5 Structure of the HS2 draft Environmental Statement 5 Part A: Introduction 6 1 Introduction 7 1.1 Introduction to HS2
    [Show full text]
  • Cover Plus Blank
    HALLMARK THE LACEY GREEN & LOOSLEY ROW MAGAZINE School visit to Whipsnade Zoo – collage by students of St John’s School AUGUST 2008 NUMBER 207 ESTABLISHED 1970 PDF created with pdfFactory trial version www.pdffactory.com HALLMARK THE LACEY GREEN & LOOSLEY ROW MAGAZINE AUTUMN 2008 Hallmark is published quarterly by the Lacey Green & Loosley Row Millennium Hall Management Committee, although opinions expressed in comment or contribution do not necessarily represent the collective view of that committee. Our aim is to mirror the mark that the Village Hall makes upon our community, to publish the activities of all Village organisations, and to provide a forum so that the rights, the wrongs, the well-being of village life can be aired. News from all the Village clubs, societies, church and school, stories of local interest and entries for the Village Diary are always welcome. In addition, any suggestions for improving Hallmark. VILLAGE HALL MANAGEMENT COMMITTEE Clive Hodghton (Chair), Rachel Panter (Vice-Chair), Paula Oxford (Secretary), Yvonne Axe (Treasurer), Karen Hodghton (Booking Sec.), Jill Baker, Stella Boll, Jane Brown, Ginnie Brudenell, Cathryn Davies, Carole Knight, Betty Tyler & Norman Tyler VILLAGE HALL BOOKINGS ( Clive or Karen on 01844 274254 (answering service) EDITOR * Norman Tyler (assisted by Mike Piercy), 5 Woodfield, Lacey Green, Bucks HP27 OQQ (2/3rds down Woodfield, on the left) ( 01844 344606 (with answering service & fax) Email [email protected] ADVERTISING MANAGER * Chris Baker, "Woodpeckers", Kiln Lane, Lacey Green, Bucks HP27 OPT (past the pond on the left) ( 01844 275442 The Winter Hallmark will be published in November - closing date for copy is October 17th From the Editor(s) If you would like to join Mike through Paul Rogerson, our County & District Councillor, Piercy and I in the editing of which provide us with various other subjects of reading Hallmark, which introduces matter, from which I choose which are suitable to enter you to many interesting into Hallmark as far as space allows.
    [Show full text]
  • Aylesbury Vale Strategic Flood Risk Assessment
    Aylesbury Vale District Council Level 1 Strategic Flood Risk Assessment Final Report May 2017 This page has intentionally been left blank 2016s3990 - Aylesbury SFRA Level 1 (FINAL) v3.0 i JBA Project Manager Anna Beasley 8a Castle Street Wallingford Oxfordshire OX10 8DL Revision History Revision Ref / Date Issued Amendments Issued to Charlotte Stevens / David Draft Report v1 / May 2016 Broadley (AVDC) Minor amendments and Charlotte Stevens / David Draft Report v2 / July 2016 updates from revised site Broadley (AVDC) assessment Amendments following Charlotte Stevens / David Final Report / October 2016 comments from steering Broadley (AVDC) group Additional amendments Charlotte Stevens / David Final Report v2 / March 2017 following comments from Broadley (AVDC) IDB and BCC Addendum added covering Charlotte Stevens / David Final Report v3 / May 2017 additional sites Broadley (AVDC) Contract This report describes work commissioned by Peter Williams, on behalf of Aylesbury Vale District Council, by email dated 18th February 2016. Aylesbury Vale District Council’s representative for the contract was Charlotte Stevens of Forward Plans and Community Fulfilment. Ian Ringer, Rebecca Price and Georgina Latus of JBA Consulting carried out this work. Prepared by .................................................. Rebecca Price BSc MSc Assistant Analyst, ....................................................................... Georgina Latus BSc Assistant Analyst, ....................................................................... Ian Ringer BSc MSc MCIWEM C.WEM Chartered Senior Analyst Reviewed by ................................................. Anna Beasley BSc MSc CEnv MCIWEM C.WEM Principal Analyst Purpose This document has been prepared as a Final Report for Aylesbury Vale District Council. JBA Consulting accepts no responsibility or liability for any use that is made of this document other than by the Client for the purposes for which it was originally commissioned and prepared.
    [Show full text]
  • Elly's , Index to !(Elly's
    INDEX TO !(ELLY'S , BUCKINGIIAl\ISIIIRE DIREOTORY. ----.---- PAGE PAGE I PAGE PAGE Abbots Aston 276 Buckland Common, see Datchet ••••..••.••....••.• 317 Great King-'s Hm, see Allkhampstead 272 Bnckland 302 Datchet Mead, see Datchet 317 Hug'henden 3i2 • Addington ••......••••.... 272 Burners Holt, see 'Vater Datchet St. Helen's, see Great King'shill, see Prest- AdstOCK .•••....••u •••••••• 272 Stratford..•......•••••.. 401 Datchet ..••••••••.••••• 317 wood...•..•••.•••...••.• 375 A~mondeshm. see Amrshm 273 Bullington End, see Han- Dean-North, see Hugh- Great Linford 350 Akeley•...••.•••..•••.•••• 272 slope ........•., .••••.. '" 335 enden ••••..••....•..•••. 342 Great l\Iarlow ......•••••• 354 Amersham 273 Burcot, see Wing- 407 Denham 318 Great ~Jissenden 363 AmershamHill,seeWycomb 419 Burcott, see Bierton 289 Denham, see Quainton 378 Great Penn's !fead, see Ankerwycke, sl'eWraysbry 415 Burnbam." 302 Denner Hill, see Prestwood 375 Wycombe 417 ArngTove, see Boarstall., .• 292 Bnrnbam Beeches·seeBurn- Dinton...•..••••.•......•• 318 Great Seabrook, see Iving- Ascott, see Wing 407 ham 302 Ditton, see Stoke Poges 389 hoe 3i5 Ash Furlong, see Olney ..•• 371 Bnrnham-East, see Burn- Doddershall, see Quainton 378 Great Wolston ........•••• 411 Ashendon•.••.•....••.••••• 275 ham.•••••..•••.••••.••••• 302 Dorney 319 Green Hig-hland, see Ashl.'ridg-e, see Chesham 308 Burston, see Aston Abbotts 276 DorneyWood,see Burnham 303 :l\Ionks Risborough ...... 365 Ashley Green 275 Bury End, see Amersham.. 271 Dorton 319 Green Valley, see Astwood 277 Askett,seeMonksRisboro'
    [Show full text]
  • September 2021, Issue
    Ellesborough Magazine Covering Butlers Cross, Dunsmore, North Lee and Terrick September 2021 Issue 174 ANTI-LITTER CAMPAIGN Helen Holman has been working with local village and school children in an anti-litter campaign. A competition was held for the children to produce posters to advertise the campaign and this was judged by John Hambly, a previous chair of the Parish Council, helped by Debra Panikkar, the current chair of the Parish Council, and Judith Harper, a local artist. Their posters, and of course the winning ones, were displayed outside the Parish Hall on Thursday the 22nd of July. (See article page 7) 2 Chairman’s Letter Thank you to Paul and the committee in The magazine is working closely with the preparing and distributing the magazine this Parish Council to see how best to fit in with quarter. their communications initiative. Their first news letter is included in the edition Also special thanks to Steph our advertising manager. I am not sure how she has Richard Jennings managed to do such a fantastic job while [email protected] running the farm shop combined with her family commitments. Annabelle MacWhannell has stepped forward to take on the role. Welcome Annabelle. Front Cover: Photo by Rob Alexander A Note from the Editor I hope you will find something of interest in Ellesborough Magazine, in a previous this edition of the magazine. We have incarnation, put together by Tony Young. included articles on a variety of topics together with reports on local events and We hope that the updating of the Parish activities.
    [Show full text]
  • WY Progress Sheets 2001-02 1Of5 03/07/2001 HIGH WYCOMBE PROGRESS SHEETS 2001/02
    HIGH WYCOMBE PROGRESS SHEETS 2001/02 Ref Site Scheme Proposed Comments Cost Code 2001/02 £'000s date LAFIS to Expected Year end Manager Project Works G/LS/01/1 Various sites - to be determined Safety Cameras & related initiatives H5P/SQ 30 3.64 30 IM TM 4 new sites agreed with Police. 3 in WY. Site meeting to agree exact locations - 07/01 G/LS/01/2 Various sites - to be determined Speed Dynamic Signs - pilot scheme H5N/LK 25 0 25 IM TM Equipment options being assessed. Awaiting TRL report. A4155 Little Marlow Road/Sheepridge Lane [25] [25] C/LS/00/6 Roundabout H5N/DF 0 JMJ AO Draft Design complete. Waiting for Stats Info and S Audit Comments. junction, Well End 25 25 A404/A4155 Westhorpe interchange approach Central Hatching to prevent overtaking (with maintenance To be developed in conjunction with AO maintenance scheme. Proposals to be developed by C/LS/00/7 H5N/FA [15] 0 [15] MPB AO from Bourne End & to Bourne End scheme) 08/01 C/LS/00/8 C100 Wycombe Road j/w Bobmore Lane, Marlow Possible junction improvement H5Q/AC [10] 0 [10] DGL AO To be investigated in conjunction with Safer Routes to School scheme (C/AS/01/22) - 09/01 Review signing & lining on southern section between Clay C/LS/00/9 B482 Stokenchurch to Marlow Road H5P/CU [20] 0 [20] JMJ AO Investigated but on hold until maintenance scheme. 07/01 Lane and Marlow Route review to include i) possible roundabout at j/w Four C/LS/01/2 A4128 Cryers Hill and Great Kingshill Ashes Road; ii) traffic calming; iii) pedestrian crossing H5N/KG 50 0 50 DGL H Brief issued to Highways Engineering (Hyder) - 04/01.
    [Show full text]
  • Wycombe Strategic Flood Risk Assessment (SFRA) Level 1 Update
    Wycombe District Council Strategic Flood Risk Assessment (SFRA) Level 1 Update November 2014 Document Control Sheet BPP 04 F8 Version 16; October 2013 Project: SFRA Level 1 Update Client: Wycombe District Council Project No: B1279843 Document title: SFRA Level 1 Update Ref. No: B1279843 – SFRA - 003 Originated by Checked by Reviewed by NAME NAME NAME ORIGINAL Susan Gilfrin Michael Symons David Cobby Ruth Farrar Huw Williams Huw Williams NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 1 May 2014 Document status Draft for Client Review REVISION NAME NAME NAME 02 Susan Gilfrin Huw Williams Huw Williams Ruth Farrar Michael Symons David Cobby NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 17 Sep 2014 Document status Revised Draft for Client Review REVISION NAME NAME NAME 03 Susan Gilfrin Michael Symons Michael Symons Ruth Farrar NAME INITIALS Approved by As Project Manager I confirm that the David Cobby above document(s) have been subjected to Jacobs’ Check and Review procedure and that I approve them for issue DATE 14 Nov 2014 Document status FINAL Jacobs U.K. Limited This document has been prepared by a division, subsidiary or affiliate of Jacobs U.K. Limited (“Jacobs”) in its professional capacity as consultants in accordance with the terms and conditions of Jacobs’ contract with the commissioning party (the “Client”).
    [Show full text]
  • Senior School Shaping Confident, Independent Thinkers from the Head
    Senior School Shaping confident, independent thinkers From the Head My favourite parts of ACS Hillingdon? The true diversity of our students, and the friendliness and warmth that you find within this fascinating group of young people. Our school has pupils from over 40 countries, with local British students making up our second largest cohort. This experience gives our pupils a real advantage in understanding and adapting to the ever-changing world around them. The size of our school also helps create a truly personal experience. We are large enough to offer an excellent range of subjects and programmes, yet small enough to ensure all our pupils are known as individuals, and supported and guided to achieve personal success. Our curriculum offers exciting opportunities for learning in many different ways, from the academic rigour of the International Baccalaureate (IB) Diploma, to the IT skills required to master robotics coding. We balance this intellectual agility with strong student participation in local and international sports, the visual and performing arts, and outreach projects that build character and leadership. Our graduates attend the university of their choice, anywhere in the world – with over 50% of our last two graduating classes selecting UK universities. They leave us as genuinely interesting and well-balanced individuals who are ready to make their mark on the world. Martin Hall, Head of School ISI Report – Key findings Pupils’ attitudes to learning: Excellent The pupils’ personal development throughout the school: Excellent The welfare, health and safety and the quality of pastoral care for pupils’ throughout the school: Excellent 02 www.acs-schools.com 03 Ready, for a changing world Whether you know us a little, a lot, or not at all, there are certain qualities our current students and parents have come to expect that enable us to stand out.
    [Show full text]
  • (Completions, Under Construction and Not Yet Started) Net Housing
    Appendix 8 – Housing Monitoring (Completions, Under Construction and Not Yet Started) Net Housing Completions 2013-2016 Total net dwellings completed in 2013/14 Net Planning Reference Address dwellings number completed The Irish Club 1 Station Road High Wycombe 10/06436/FUL Buckinghamshire HP13 6AD 13 09/07387/FUL Ridge Service Station, Chinnor Road, Bledlow Ridge 3 Phoenix Booker Common High Wycombe Buckinghamshire 10/05789/FUL HP12 4QS 1 Heavens Lea Hawks Hill Bourne End Buckinghamshire SL8 10/07368/FUL 5JL 1 Kinloch Hedsor Road Bourne End Buckinghamshire SL8 11/07444/FUL 5DH 0 Bellfield County Middle School Garratts Way High 09/05892/OUT Wycombe Buckinghamshire HP13 5SW 43 215 Hughenden Road High Wycombe Buckinghamshire 11/06176/FUL HP13 5PG -1 109 Hughenden Avenue High Wycombe Buckinghamshire 12/07000/FUL HP13 5SS 1 43 Partridge Way High Wycombe Buckinghamshire HP13 13/06055/FUL 5JX 0 Land At 18 And Rear Of 10-16 Abbey Road Bourne End 11/07119/REN Buckinghamshire SL8 5NZ 1 11/06626/FUL The Studio The Drive Bourne End Buckinghamshire SL8 5RE 1 49 Oakland Way Flackwell Heath Buckinghamshire HP10 11/07846/FUL 9DD 1 Land Rear Of 18 Abbey Road Bourne End Buckinghamshire 12/06383/FUL SL8 5NZ 1 Hatches Farm Hatches Lane Great Kingshill 09/06509/FUL Buckinghamshire HP15 6DS 1 Land Adjacent The Harrow Public House Warrendene Road 10/06852/FUL Hughenden Valley Buckinghamshire HP14 4LX 1 Kings Acre Spurlands End Road Great Kingshill 11/05326/FUL Buckinghamshire HP15 6JA 0 Land At Rear Of Holly Acre & Mardleigh Stag Lane Great 12/06300/FUL Kingshill
    [Show full text]
  • Site Allocations and Housing Supply: Assessment of the Housing Land Availability in Wycombe District
    SITE ALLOCATIONS AND HOUSING SUPPLY: ASSESSMENT OF THE HOUSING LAND AVAILABILITY IN WYCOMBE DISTRICT ON BEHALF OF “KEEP BOURNE END GREEN” PREPARED BY: SIMON CARTER NOVEMBER 2017 SITE ALLOCATIONS AND HOUSING SUPPLY ASSESSMENT CONTENTS PAGE 1. Foreword 3 2. Introduction 4 3. Methodology 7 4. Housing Supply 10 5. Office to Residential Windfall 13 6. Small Sites Windfall 19 7. Housing Policy Sites 24 8. The Adopted Development Plan 25 9. Planning Applications Pending Decision 26 10. Green Belt 27 11. Conclusion 28 APPENDICES: Appendix 1 – Delivered Housing Appendix 2 – Deliverable Housing Appendix 3 – Developable Housing Appendix 4 – Student Accommodation Appendix 5 – Windfall Sites Appendix 6 – ‘Prior Approval’ Office to residential Appendix 7 – ‘Full Planning Permission’ Office to residential Appendix 8 – Planning Applications Pending Decision Cover image: Hollands Farm and Bourne End Page 2 of 31 SITE ALLOCATIONS AND HOUSING SUPPLY ASSESSMENT 1. Foreword 1.1. I have undertaken this assessment of site allocations and housing supply upon instruction from and in the context of my involvement with Keep Bourne End Green (KBEG). The principal objectives for the assessment were defined as - • Validate the status of the housing supply in Bourne End and wider Wycombe District (including whether alternate brownfield sites are generally available), and; • Assess whether the release of Green Belt land at Hollands Farm is necessary to meet the unmet housing need. 1.2. I have a professional background founded in information technology with a long (25-year) history specialising in data services and for the past decade delivering data analytics to blue- chip companies. This gives me the necessary experience, expertise and understanding to co- ordinate the KBEG sub-group team in the core tasks required to fulfil the aims of this assessment including defining, collecting and processing data from planning records and site information embedded across a wide body of reports.
    [Show full text]