2021-2024 Interstate Management TIP Project Narrative
Total Page:16
File Type:pdf, Size:1020Kb
Date: 5/6/20 11:19AM Page 1 of 6 Interstate TIP - Highway & Bridge Projects Carbon PennDOT Project Id: 87648 Project Administrator: PennDOT Title: I-80 Rehabilitation Improvement Type: Resurface State Route: 80 Municipality: East Side (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Actual Construction Bid Date: 7/26/18 Estimated Construction Bid Date: 7/26/18 Location: I-80 Eastbound from one mile west of Exit 292 through Butler, Dennison and Foster Townships and White Haven Borough in Luzerne County. I-80 from Luzerne County to the Monroe County Line through East Side Borough and Kidder Township in Carbon County. Project Description: This project involves concrete preservation on Interstate 80 Eastbound from one mile west of Exit 292, SR 309 to Exit 292, SR 309 and from the Roadside Rest to the Luzerne/Carbon County Line in Butler, Dennison and Foster Townships, White Haven Borough in Luzerne County. Highway rehabilitation includes the crack/break and seating of existing concrete and bituminous overlay northbound and southbound on I-80 from the White Haven bridge to the Monroe County Line and milling and resurfacing or crack/break and seating the existing concrete of SR 8004 (Hickory Run State Park) located in Kidder Township and East Side Borough, Carbon County. Approximately 26.4 miles. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $12961 $0 $0 $0 $0 $0 State: $0 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $12,961 $0 $0 $0 $0 $0 Total FFY 2019-2030 Cost $12,961 PennDOT Project Id: 99552 Project Administrator: PennDOT Title: I-80 White Haven Bridges Improvement Type: Bridge Improvement State Route: 80 Municipality: East Side (BORO) Air Quality Status: Exempt from Regional Conformity Analysis Actual Construction Bid Date: Estimated Construction Bid Date: 1/23/25 Location: I-80 over SR 1005, Lehigh River, and Reading Blue Mountain and Northern Railroad, Carbon County. Project Description: This project involves the rehabilitation or replacement of the bridges carrying I-80 over SR 1005, Lehigh River, and Reading Blue Mountain and Northern Railroad in East Side Borough, Carbon County. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $0 $0 $0 $0 State: $4500 $1500 $3001 $2900 $18784 $25000 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $4,500 $1,500 $3,001 $2,900 $18,784 $25,000 Total FFY 2019-2030 Cost $55,685 Monroe PennDOT Project Id: 57921 Project Administrator: PennDOT Title: I-80/Exit 308 Realignment Improvement Type: Interchange Improvement State Route: 80 Municipality: East Stroudsburg (BORO) Air Quality Status: Significant: Included in regional conformity analysis Actual Construction Bid Date: Estimated Construction Bid Date: 8/20/20 Location: I-80/SR2017 Interchange in East Stroudsburg Borough, Monroe County. Project Description: The reconstruction of the Exit 308 Interchange of Interstate 80 includes ramps upgrades via acceleration and deceleration roadway lengthening and the replacement of the bridge carrying SR 2017 (Prospect Street) over I-80. The dual bridges carrying I-80 over Lincoln Avenue/Forge Road and an active railroad track will also be replaced to accommodate future widening of I-80 to six lanes. SR 2017 (Prospect Street) to be widened with the addition of turning lanes and the installation of new traffic signals. Project design also includes construction of two roundabouts, one at I-80 and SR 2017 (Prospect Street) interchange, and second on the eastern side of I-80 at Green Tree Drive. Project lies within the Borough of East Stroudsburg, Monroe County. Date: 5/6/20 11:19AM Page 2 of 6 Interstate TIP - Highway & Bridge Projects Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $72000 $7371 $1202 $0 State: $846 $1284 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $846 $1,284 $72,000 $7,371 $1,202 $0 Total FFY 2019-2030 Cost $82,703 PennDOT Project Id: 76357 Project Administrator: PennDOT Title: I-80 Reconstruction-Monroe Improvement Type: Reconstruct State Route: 80 Municipality: Stroud (TWP) Air Quality Status: Significant: Included in regional conformity analysis Actual Construction Bid Date: Estimated Construction Bid Date: 10/6/22 Location: I-80 west of Exit 303 (Ninth Street) in Stroud Township through Stroudsburg Borough to east of Exit 307 (Park Avenue / Broad Street in East Stroudsburg Borough, Monroe County. Project Description: The I-80 Reconstruction Project includes 3.5 miles of full roadway reconstruction, widening, and interchange reconfiguration from just west of the 303 interchange to east of exit 307 and the Brodhead Creek bridge in Stroud Township, Stroudsburg Borough and East Stroudsburg Borough, Monroe County. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $4500 $4500 $30440 $119703 State: $0 $0 $500 $500 $3382 $191 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $0 $0 $5,000 $5,000 $33,822 $119,894 Total FFY 2019-2030 Cost $163,716 PennDOT Project Id: 111081 Project Administrator: PennDOT Title: I-380 from I-80 to SR 940 Improvement Type: Resurface State Route: 380 Municipality: Tunkhannock (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Actual Construction Bid Date: 7/12/18 Estimated Construction Bid Date: 7/12/18 Location: "Winter Distress 2018 Interstate Needs" I-380 (NB and SB) full width mill and overlay from I-80 to SR 940 in Tunkhannock and Tobyhanna Twps, Monroe County. Project Description: "Winter Distress 2018 Interstate Needs" I-380 (NB and SB) full width mill and overlay from I-80 to SR 940 in Tunkhannock and Tobyhanna Twps, Monroe County. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $0 $0 $0 $0 State: $145 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $145 $0 $0 $0 $0 $0 Total FFY 2019-2030 Cost $145 PennDOT Project Id: 111084 Project Administrator: PennDOT Title: I-80 WB from I-380 to SR 115 Improvement Type: Resurface State Route: 80 Municipality: Tobyhanna (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Actual Construction Bid Date: 6/21/18 Estimated Construction Bid Date: 6/21/18 Location: "Winter Distress 2018 Interstate Needs" I-80 (WB) includes micro-surfacing, section of full width milling and resurfacing and the remainder as centerline and edge line repairs from I-380 to SR 115 in Tobyhanna and Tunkhannock Twps., Monroe County. Project Description: "Winter Distress 2018 Interstate Needs" I-80 (WB) includes micro-surfacing, section of full width milling and resurfacing and the remainder as centerline and edge line repairs from I-380 to SR 115 in Tobyhanna and Tunkhannock Twps., Monroe County. Date: 5/6/20 11:19AM Page 3 of 6 Interstate TIP - Highway & Bridge Projects Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $0 $0 $0 $0 State: $390 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $390 $0 $0 $0 $0 $0 Total FFY 2019-2030 Cost $390 PennDOT Project Id: 111532 Project Administrator: PennDOT Title: I-80 Advance Traffic Study and Analysis Improvement Type: Transportation Study State Route: 80 Municipality: East Stroudsburg (BORO) Air Quality Status: AQ Conformity Does Not Apply Actual Construction Bid Date: Estimated Construction Bid Date: Location: I-80 from Exit 308 to NJ toll plaza, Exit 293 to Exit 302 & SR 611 from Exit 303 to N 10th Street , Tunkhannock, Jackson, Pocono, Hamilton, Stroud, & Smithfield Townships and East Stroudsburg, Delaware Water Gap, & Stroudsburg Boroughs, Monroe County Project Description: Traffic study and analysis to identify interchanges and corridors with safety, congestion and mobility concerns along Interstate 80 from Exit 308 to NJ toll plaza, Exit 292 (I-380 int.) to Exit 303 (State Route 33 int.) & SR 611 from Exit 303 to N 10th Street in Tunkhannock, Jackson, Pocono, Hamilton, Stroud, & Smithfield Townships and East Stroudsburg, Delaware Water Gap, & Stroudsburg Boroughs, Monroe County. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $0 $0 $0 $0 State: $1850 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $1,850 $0 $0 $0 $0 $0 Total FFY 2019-2030 Cost $1,850 PennDOT Project Id: 112292 Project Administrator: PennDOT Title: SR 380 Tobyhanna Ramps and I/C Improvement Type: Interchange Improvement State Route: 380 Municipality: Coolbaugh (TWP) Air Quality Status: Significant: Included in regional conformity analysis Actual Construction Bid Date: Estimated Construction Bid Date: 4/22/21 Location: Between Milepost 8 and Milepost 9 on Interstate 380, Coolbaugh Township, Monroe County Project Description: Interchange restoration of Tobyhanna Ramps with Interstate 380 including the acceleration and deceleration lanes between Milepost 8 and Milepost 9 on Interstate 380 in Coolbaugh Township, Monroe County. Project Costs(In Thousands) Phase Fund 2019 2020 2021 2022 2023 - 2026 2027 - 2030 Federal: $0 $0 $0 $0 $0 $0 State: $250 $0 $0 $0 $0 $0 Local/Other: $0 $0 $0 $0 $0 $0 Period Totals: $250 $0 $0 $0 $0 $0 Total FFY 2019-2030 Cost $250 Pike PennDOT Project Id: 76860 Project Administrator: PennDOT Title: Pike I-84 I4R E34 - MP 40 Improvement Type: Reconstruct State Route: 84 Municipality: Blooming Grove (TWP) Air Quality Status: Exempt from Regional Conformity Analysis Actual Construction Bid Date: 10/1/15 Estimated Construction Bid Date: 10/1/15 Location: Pike County, Exit 34 to mile marker 40, State Route 84. Project Description: Reconstruction of I-84 from exit 34 to mile marker 40 in Blooming Grove and Dingman Townships, Pike County.