Flexity Swift

Total Page:16

File Type:pdf, Size:1020Kb

Flexity Swift Manchester, United Kingdom FLEXITY SWIFT Transport for Greater Manchester’s Metrolink system is set to become the UK’s largest tram network by 2016 under its current expansion programme. Bombardier’s FLEXITY Swift LRVs are TfGM’s vehicles of choice for this ambitious project, helping to relieve congestion in the Greater Manchester urban area since the first vehicles began operating almost three years ago. The light rail vehicles have proven an instant success with both passengers and Metrolink. Bombardier won its first order from TfGM in April 2007 At 28.4 m long and 2.65 m wide, the LRVs for Manchester for eight LRVs and has since received option orders for can accommodate more than 200 passengers. Wide 66 additional LRVs in several batches. The most recent double-door entrances ensure rapid passenger flow and order for 20 further vehicles brings the total number of multi-purpose areas provide space for pushchairs and LRVs ordered to date from the consortium for wheelchair users. The vehicles’ ease of maintenance and Manchester up to 94 light rail vehicles. industry-leading reliability ensure unparalleled operational efficiency. The vehicles are based on the BOMBARDIER FLEXITY Swift family of LRVs, which are already in successful As a reliable partner for transport operators in the U.K., revenue service throughout Europe including Cologne Bombardier vehicles are already in successful daily and Bonn (Germany), Stockholm (Sweden) and the revenue service in Blackpool, London-Docklands, Netherlands. London-Croydon and Nottingham. LIGHT RAIL VEHICLES Manchester, United Kingdom 3,670 3,670 3,670 550 NA 1,435 1,800 10,500 1,725 1,975 550 550 NA NA 1,4351,435 1,8001,800 10,50010,500 1,7251,725 1,9751,975 440 28,400 440 440 28,40028,400 H P P P P H H P P P P P P 600 F P P 2,650 P P P P 600 600 F F 2,650 2,650 P P P P P P P P General Data Technical Characteristics Contract award April 2007 Nominal current supply: 750 VDC Type of vehicle BOMBARDIER FLEXITY Energy recuperation Swift HF 3-phase asynchronous motors Model bi-directional 120 kW Motor power Owner Greater Manchester Passenger Air-cooled motor Transport Executive (GMPTE) 2 powered bogies - 1 trailer bogie Quantity 94 • Rubber/metal primary suspension Tram consist 3 modules • Coil spring secondary suspension • Sanders Dimensions and Weight • Anti slip, anti skid system Length of vehicle 32 / 43.4 m Automatic coupling system Height 3.4 m Electrical service brake: regenerative Width 2.3 m Mechanical brake: disk brake Floor height above TOR Magnetic brake: 6 x 66 kN • low-floor entrance 350 mm Air conditioned cab Percentage of low-floor area 100 % Passenger information system Electric double-sliding doors 5 / 7 per side • door clearance height 2,072 mm Performance and Capacity • door clearance width 1,300 mm Maximum speed 80 km/h Electric single-sliding doors 1 per side Medium acceleration (fully loaded) from 0 … 70 km/h 1.08 m/s2 • door clearance height 2,072 mm Deceleration • door clearance width 650 mm • service brake 1.03 m/s2 Aisle width 630 mm • emergency brake 2.54 m/s2 Wheel diameter (new / worn) 580 / 510 mm Maximum gradient 65 ‰ Gauge 1,435 mm Seated passengers (incl. tip up seats) 60 Minimum horizontal curve radius 15 m Standing passengers (4 pass./m2) 146 Minimum vertical curve radius, crest 140 m Multipurpose Areas (for wheel chairs and prams) 2 Minimum vertical curve radius, sag 140 m Car weight (empty) 39.2 / 52.5 t Car weight (loaded) (4 pass./m2) 51.7 / 70.1 t If you no longer require this datasheet, please recycle it responsibly. please recycle this datasheet, no longer require If you in the Netherlands/11171/LRV/10-2012/en Printed Inc. or its subsidiaries. All rights reserved. Bombardier © 2012, Maximum axle load 10.5 t Buffer load 400 kN Bombardier Transportation Hermann Gebauer Straße 5 A-1220 Vienna, Austria Tel +43 1 25 110 760 www.transportation.bombardier.com *Trademark(s) of Bombardier Inc. or its subsidiaries..
Recommended publications
  • Manchester Metrolink Tram System
    Feature New Promise of LRT Systems Manchester Metrolink Tram System William Tyson Introduction to Greater city that could be used by local rail into the city centre either in tunnel or on Manchester services—taking them into the central the street. area—to complete closure and I carried out an appraisal of these options The City of Manchester (pop. 500,000) is replacement of the services by buses. Two and showed that closure of the lines had at the heart of the Greater Manchester options were to convert some heavy rail a negative benefit-to-cost ratio, and that— conurbation comprised of 10 lines to light rail (tram) and extend them at the very least—they should be kept municipalities that is home to 2.5 million people. The municipalities appoint a Passenger Transport Authority (PTA) for the Figure 1 Metrolink Future Network whole area to set policies and the Greater 1 Victoria Manchester Passenger Transport Executive 2 Shudehill 3 Market Street Rochdale Town Centre 4 Mosley Street (GMPTE) to implement them. Buses Newbold Manchester 5 Piccadilly Gardens Drake Street Piccadilly Kingsway Business Park 6 Rochdale provide most public transport. They are 7 St Peter's Square Railway Milnrow Station deregulated and can compete with each 8 G-Max (for Castlefield) Newhey London 9 Cornbrook other and with other modes. There is a 0 Pomona Bury - Exchange Quay local rail network serving Manchester, and = Salford Quays Buckley Wells ~ Anchorage ! Harbour City linking it with the surrounding areas and @ Broadway Shaw and Crompton # Langworthy also other regions of the country. Street $ Tradfford Bar trams vanished from Greater Manchester % Old Trafford Radcliffe ^ Wharfside* & Manchester United* in 1951, but returned in a very different * Imperial War Museum for the North* ( Lowry Centre form in 1992.
    [Show full text]
  • Mobility Solutions for Mandalay, Myanmar Ratul Arora Bombardier
    Mobility solutions for Mandalay, Myanmar Ratul Arora Bombardier Transportation PRIVATE AND CONFIDENTIAL AND PRIVATE © Bombardier Inc. or its subsidiaries. All rights reserved. AllInc.itssubsidiaries.or Bombardier © 1 BOMBARDIER 1 Our Profile TRANSPORTATION 2 Bombardier in Asia Pacific 3 Mandalay’s need 4 Bombardier’s product PRIVATE AND CONFIDENTIAL AND PRIVATE © Bombardier Inc. or its subsidiaries. All rights reserved. AllInc.itssubsidiaries.or Bombardier © 2 Overview Bombardier Transportation Bombardier Aerospace (Fiscal year ended December 31, 2014) (Fiscal year ended December 31, 2014) PRIVATE AND CONFIDENTIAL AND PRIVATE . Revenues: $9.6 billion . Revenues: $10.5 billion . Order backlog1): $32.5 billion . Order backlog1): $36.6 billion © Bombardier Inc. or its subsidiaries. All rights reserved. AllInc.itssubsidiaries.or Bombardier © rights reserved. AllInc.itssubsidiaries.or Bombardier © . Customers in more than 60 countries . Customers in more than 100 countries . Employees1): 39,700 . Employees1): 34,100 . Headquarters in Berlin, Germany . Headquarters in Montréal, Canada 1) As of December 31, 2014 3 3 BOMBARDIER A diversified company Breakdown by revenues* Breakdown by workforce** Transportation Transportation 48% 54% 46% 52% Aerospace Aerospace CONFIDENTIAL AND PRIVATE © Bombardier Inc. or its subsidiaries. All rights reserved. AllInc.itssubsidiaries.or Bombardier © Total Revenues: $20.1 billion 73,800 employees * for fiscal year ended December 31, 2014 4 ** for fiscal year at December 31, 2014 BOMBARDIER TRANSPORTATION Global expertise – local presence North America Europe 16% 67% 23% 66% Asia-Pacific 11% Rest of world1) 9% CONFIDENTIAL AND PRIVATE 6% 2% © Bombardier Inc. or its subsidiaries. All rights reserved. AllInc.itssubsidiaries.or Bombardier © Total BT revenues 2014: 9.6$B Total BT employees2): 39,700 Global Headquarters 80 production/engineering sites & service centres Present in > 60 countries In 28 countries Note: As at December 31, 2014 5 1) Rest of world includes CIS (incl.
    [Show full text]
  • Rail Accident Report
    Rail Accident Report Derailment of a tram at Pomona, Manchester 17 January 2007 Report 09/2008 April 2008 This investigation was carried out in accordance with: l the Railway Safety Directive 2004/49/EC; l the Railways and Transport Safety Act 2003; and l the Railways (Accident Investigation and Reporting) Regulations 2005. © Crown copyright 2008 You may re-use this document/publication (not including departmental or agency logos) free of charge in any format or medium. You must re-use it accurately and not in a misleading context. The material must be acknowledged as Crown copyright and you must give the title of the source publication. Where we have identified any third party copyright material you will need to obtain permission from the copyright holders concerned. This document/publication is also available at www.raib.gov.uk. Any enquiries about this publication should be sent to: RAIB Email: [email protected] The Wharf Telephone: 01332 253300 Stores Road Fax: 01332 253301 Derby UK Website: www.raib.gov.uk DE21 4BA This report is published by the Rail Accident Investigation Branch, Department for Transport. Derailment of a tram at Pomona, Manchester 17 January 2007 Contents Introduction 4 Summary of the report 5 Key facts about the accident 5 Identification of immediate cause, causal and contributory factors and underlying causes 6 Recommendations 6 The Accident 7 Summary of the accident 7 The parties involved 8 Location 9 The tram 9 Events during the accident 9 Events following the accident 10 The Investigation 11 Sources of
    [Show full text]
  • Rolling Stock Orders: Who
    THE INTERNATIONAL LIGHT RAIL MAGAZINE HEADLINES l Toronto’s streetcar advocates fight back l UK’s Midland Metro expansion approved l Democrats propose more US light rail ROLLING STOCK ORDERS: WHO... WHAT... HOW MUCH? Ukrainian tramways under the microscope US streetcar trends: Mixed fleets: How technology Lessons from is helping change over a century 75 America’s attitude of experience to urban rail in Budapest APRIL 2012 No. 892 1937–2012 WWW. LRTA . ORG l WWW. TRAMNEWS . NET £3.80 TAUT_April12_Cover.indd 1 28/2/12 09:20:59 TAUT_April12_UITPad.indd 1 28/2/12 12:38:16 Contents The official journal of the Light Rail Transit Association 128 News 132 APRIL 2012 Vol. 75 No. 892 Toronto light rail supporters fight back; Final approval for www.tramnews.net Midland Metro expansion; Obama’s budget detailed. EDITORIAL Editor: Simon Johnston 132 Rolling stock orders: Boom before bust? Tel: +44 (0)1832 281131 E-mail: [email protected] With packed order books for the big manufacturers over Eaglethorpe Barns, Warmington, Peterborough PE8 6TJ, UK. the next five years, smaller players are increasing their Associate Editor: Tony Streeter market share. Michael Taplin reports. E-mail: [email protected] 135 Ukraine’s road to Euro 2012 Worldwide Editor: Michael Taplin Flat 1, 10 Hope Road, Shanklin, Isle of Wight PO37 6EA, UK. Mike Russell reports on tramway developments and 135 E-mail: [email protected] operations in this former Soviet country. News Editor: John Symons 140 The new environment for streetcars 17 Whitmore Avenue, Werrington, Stoke-on-Trent, Staffs ST9 0LW, UK.
    [Show full text]
  • The Bulletin RAYMOND R
    ERA BULLETIN — APRIL, 2016 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 59, No. 4 April, 2016 The Bulletin RAYMOND R. BERGER, 1941-2016 Published by the Electric by Eric R. Oszustowicz Railroaders’ Association, Incorporated, PO Box On March 1, 2016, Raymond R. Berger corresponded regularly. In addition, the pho- 3323, New York, New York 10163-3323. passed away at age 74. He was an ERA tographic results of his travels were shared member since 1958. Ray will be missed by through countless presentations at which he us all. Ray was on the ERA’s Board of Direc- would educate attendees through meticulous For general inquiries, tors for many years and also served for a narration regarding the transit systems dis- contact us at bulletin@ time as the Chairman of its New York Divi- played. erausa.org. ERA’s website is sion when it was still operationally independ- Ray was a retired transit professional and www.erausa.org. ent. was a respected member of NYCT’s Division To state that Ray performed work for the of Car Equipment. Think of Ray the next time Editorial Staff: ERA is quite an understate- you ride an R-142 or R- Editor-in-Chief: ment. All who perform work 142A since he contributed to Bernard Linder Tri-State News and for the ERA do so on a their basic design. Commuter Rail Editor: strictly volunteer basis. Ray Ray was a religious man. Ronald Yee was an extremely busy indi- He attained secular mem- North American and World vidual with many interests, bership in the Third Order of News Editor: Alexander Ivanoff but he was always available St.
    [Show full text]
  • Manchester Metrolink – Operator Maintainer • the Challenges • Next Steps Metrolink
    Keolis Amey Metrolink Jen McKinney Summary • Manchester Metrolink – Operator Maintainer • The Challenges • Next Steps Metrolink • Keolis Amey Joint Venture - KAM • Keolis international passenger transport business • Amey leading supplier of consulting and infrastructure support services UK and internationally • Involved in 3 JV’s – Metrolink, London Docklands Light Railway, and Wales and Borders • Manchester Metrolink owned by Transport for Greater Manchester (TfGM) • 2017 appointed KAM as Operator and Maintainer of Metrolink - 10 years • The UK’s largest tramway Manchester Metrolink • 7 routes • +800 staff • 93 stops • 2 depots • 120 trams • Trafford Park line (2020) adds 6 more stops (from Pomona to • +37 million passengers a year intu Trafford Park) Metrolink • Opened in 1992 31 km and subsequently expanded • Bombardier M5000 high floor tram, operating as singles or doubles • 750v dc • Two depots - Queens Rd and Trafford • 95km track – mostly double track • Utilises combination of ex heavy rail corridor and on street routes • Ballasted track and street running embedded track • Vignole and grooved rail • OLE – mix of twin and single contact wire The Challenges - Track • Ride Quality – temporary speed restrictions • Rail breaks - Suspended Gauge Corner Restoration Welding OLE – Corporation St – Ferrule Event: Failure of copper ferrule on span wire. This secures the steel wire in a loop at its end to attach to other components. Cause: Lab testing confirmed incorrect grade of copper used for ferrule at installation. Ferrule Impact: 1CC closed for whole day Action: All ferrules inspected, but fatigue is hidden on the inside. Clamps as “belt and braces” trialled. Renewal proposal for further clamps to be Clamp installed. OLE – Weaste – Parafil Rope Event: Failure of parafil rope - insulated supporting rope.
    [Show full text]
  • Tfgm Blank Document Template
    Monitoring and Evaluation Second Report March 2021 1 Table of Contents 1 Executive Summary .................................................................................................... 4 1.1 Introduction ....................................................................................................... 4 1.2 Findings in relation to transport objectives ...................................................... 4 1.3 Findings in relation to economic and social objectives ..................................... 6 1.4 Next steps .......................................................................................................... 7 2 Introduction ................................................................................................................ 8 2.1 Purpose of this report ........................................................................................ 8 2.2 Research questions ............................................................................................ 8 2.3 Structure of this report .................................................................................... 10 3 Achievement of transport-related objectives .......................................................... 11 3.1 Make-up of usage of Phase 3 lines .................................................................. 11 3.2 Attractiveness to car available travellers and modal shift evidence............... 12 3.3 Implications of mode shift evidence ............................................................... 13 3.4 Explanatory factors
    [Show full text]
  • The Covid-19 Funding Gap: the Case for Continuing Support for Urban Public Transport
    Report September 2020 The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport Urban Transport Group Our ref: 23930401 Report September 2020 The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport Prepared by: Prepared for: Steer Urban Transport Group 67 Albion Street Wellington House Leeds LS1 5AA 40-50 Wellington Street Leeds LS1 2DE +44 113 389 6400 www.steergroup.com Our ref: 23930401 Steer has prepared this material for Urban Transport Group. This material may only be used within the context and scope for which Steer has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer shall be deemed to confirm their agreement to indemnify Steer for all loss or damage resulting therefrom. Steer has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. The Covid-19 Funding Gap: The Case for Continuing Support for Urban Public Transport | Report Contents Executive Summary ............................................................................................................. i Overview .............................................................................................................................. i Public Transport Pre-Covid .................................................................................................
    [Show full text]
  • Accessibility in Rail Facilities
    9/7/2017 Accessibility in Rail Facilities Kenneth Shiotani Senior Staff Attorney National Disability Rights Network 820 First Street Suite 740 Washington, DC 20002 (202) 408-9514 x 126 [email protected] September 2017 1 ADA Transportation Provisions Making Transportation Accessible was a major focus of the statutory provisions of the ADA PART B - Actions Applicable to Public Transportation Provided by Public Entities Considered Discriminatory [Subtitle B] SUBPART I - Public Transportation Other Than by Aircraft or Certain Rail Operations [Part I] 42 U.S.C. § 12141 – 12150 Definitions – fixed route and demand responsive, requirements for new, used and remanufactured vehicles, complementary paratransit, requirements in new facilities and alterations of existing facilities and key stations SUBPART II - Public Transportation by Intercity and Commuter Rail [Part II] 42 U.S.C. § 12161- 12165 Detailed requirements for new, used and remanufactured rail cars for commuter and intercity service and requirements for new and altered stations and key stations 2 1 9/7/2017 What Do the DOT ADA Regulations Require? Accessible railcars • Means for wheelchair users to board • Clear path for wheelchair user in railcar • Wheelchair space • Handrails and stanchions that do create barriers for wheelchair users • Public address systems • Between-Car Barriers • Accessible restrooms if restrooms are provided for passengers in commuter cars • Additional mode-specific requirements for thresholds, steps, floor surfaces and lighting 3 What are the different ‘modes’ of passenger rail under the ADA? • Rapid Rail (defined as “Subway-type,” full length, high level boarding) 49 C.F.R. Part 38 Subpart C - NYCTA, Boston T, Chicago “L,” D.C.
    [Show full text]
  • Making the Right Choices: Options for Managing Transport Congestion
    Making the right choices: Options for managing transport congestion A draft report for further consultation and input April 2006 © State of Victoria 2006 This draft report is copyright. No part may be reproduced by any process except in accordance with the provisions of the Copyright Act 1968 (Cwlth), without prior written permission from the Victorian Competition and Efficiency Commission. Cover images reproduced with the permission of the Department of Treasury and Finance, Victoria and VicRoads. ISBN 1-920-92173-7 Disclaimer The views expressed herein are those of the Victorian Competition and Efficiency Commission and do not purport to represent the position of the Victorian Government. The content of this draft report is provided for information purposes only. Neither the Victorian Competition and Efficiency Commission nor the Victorian Government accepts any liability to any person for the information (or the use of such information) which is provided in this draft report or incorporated into it by reference. The information in this draft report is provided on the basis that all persons having access to this draft report undertake responsibility for assessing the relevance and accuracy of its content. Victorian Competition and Efficiency Commission GPO Box 4379 MELBOURNE VICTORIA 3001 AUSTRALIA Telephone: (03) 9651 2211 Facsimile: (03) 9651 2163 www.vcec.vic.gov.au An appropriate citation for this publication is: Victorian Competition and Efficiency Commission 2006, Making the right choices: options for managing transport congestion, draft report, April. About the Victorian Competition and Efficiency Commission The Victorian Competition and Efficiency Commission is the Victorian Government’s principal body advising on business regulation reform and identifying opportunities for improving Victoria’s competitive position.
    [Show full text]
  • Stadt-Umland-Bahnen – Beispiele Aus
    Hartmut Topp topp.plan: Stadt.Verkehr.Moderation TU KAISERSLAUTERN imove Stadt-Umland-Bahnen: Beispiele aus Deutschland & Frankreich Informationsveranstaltung der IHK Nürnberg für Mittelfranken und des IHK-Gremiums Erlangen am 22. Februar 2016 in Erlangen ll topp.plan: Stadt .Verkehr. Moderation itopp.plan Manchester Kiel Hasselt/Maastricht Rostock Den Haag Bondy/Paris Bremen Grenoble Ausbau Nantes Montpellier Straßen-/Stadtbahn Köln/Bonn Chemnitz Kassel Zwickau StadtRegionalBahn Regiotram Stadt-Umland-Bahn Rhein- Erlangen Neckar Saarbahn tram-train Karlsruher Modell Strasbourg Neckar-Alb in Betrieb Mulhouse Salzburg geplant Basel im Ausland Kopenhagen Manchester Kiel Hasselt/Maastricht Rostock Den Haag Bondy/Paris Bremen Grenoble Ausbau Nantes Montpellier Straßen-/Stadtbahn kommen Reims im Vortrag vor Köln/Bonn Chemnitz Kassel Zwickau StadtRegionalBahn Regiotram Stadt-Umland-Bahn Rhein- Erlangen Neckar Saarbahn tram-train Karlsruher Modell Strasbourg Neckar-Alb in Betrieb Mulhouse Salzburg geplant Basel Zürich im Ausland Querschnitte Fahrgastentwicklung 663 km Netzlänge AVG, 2015 ll Institut für Mobilität & Verkehr topp.plan: Stadt .Verkehr. Moderation itopp.plan Erste Strecke 1992: Karlsruhe - Bretten 16.000 x 8 2.000 x 3 x 4,8 x 1,8 x 6,2 AVG, 2015 ll Institut für Mobilität & Verkehr topp.plan: Stadt .Verkehr. Moderation itopp.plan Tramlinien / StUB-Linien ziehen bei gleichem Linienverlauf & gleichem Fahrplantakt deutlich mehr Fahrgäste an als Buslinien . Das ist empirisch mehrfach belegt . Wir nennen das Tram- oder Schienenbonus . Bonus bis etwa 50 %, manchmal mehr . Warum ist das so? Hoher Fahrkomfort Verlässliche Reisezeit ohne Stau Hohe Sitzplatzerwartung Urbanes Image und Prestige Leichte Orientierung ll Institut für Mobilität & Verkehr topp.plan: Stadt .Verkehr. Moderation itopp.plan 1 Multimodal unterwegs 2 Städtebauliche Einbindung 2.1 Fahrwege einer StUB 2.2 Stromversorgung 2.3 Kleine & große Haltestellen 3 Baustellenmanagement 4 Öffentlichkeitsbeteiligung ll Institut für Mobilität & Verkehr topp.plan: Stadt .Verkehr.
    [Show full text]
  • City Mobility Plan Connecting People, Transforming Places
    City Mobility Plan Connecting people, transforming places SCHOOL Draft: 16th January 2020 (amended February 2020) Contents Foreword Part 1 ..................................................................................................................................... 1 The City Mobility Plan ............................................................................................................. 2 1. The Case for Change .......................................................................................................... 3 2. Listening to People ............................................................................................................. 11 3. City Leadership in a Changing World ............................................................................. 13 4. Our City’s Progress ........................................................................................................... 16 5. A three stage vision - 2022, 2025, and 2030 .................................................................. 17 Spatial Vision ............................................................................................................................. 19 Part 2 .................................................................................................................................... 20 6 . Strategic priorities .............................................................................................................. 21 Enhancing Public Transport ...............................................................................................
    [Show full text]