Tng 55 Oct 1970
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Walschaerts Valve-Gear 2 Return Cranks with Steel Screws & Nuts
This pack contains the following parts: - Walschaerts Valve-Gear 2 Return Cranks with steel screws & nuts. 2 Expansion links with bushes & This kit contains parts to construct 2BA nuts. a set of Walschaerts type valve- 2 Lifting arms with grub screws & Allen key. gear as used on ROUNDHOUSE 2 Lifting links. locomotives. It is of a simplified 4 M2 steel screws & nuts. design, which does not use a 6 5BA steel washers. combination lever and is intended 2 Radius rods. for use with the ROUNDHOUSE 2 Weigh shaft brackets 1 Weigh shaft. Cylinder set. 2 Starlock washers 2 Roll pins. NOTE:- Frames, Cylinders, 6 Short crank pins. Coupling Rods, Connecting Rods, 2 Plain crank pins Axles and Outside Cranks are not included with this set of parts. 1 Push Rod Connector, Screw & Starlock. 1 Stainless Steel spring & Long Crank Pin. 1 Reversing lever handle. 1 Reversing lever base. 3 M2 screws and nuts. 2 M3 mounting screws. 1 Steel push rod & quicklink connector. Roundhouse Engineering Co. Ltd 2 Eccentric rods. Units 6 to 9, Churchill Business Park, Churchill Road, Wheatley, Doncaster. DN1 2TF. England. Tel 01302 328035 Fax 01302 761312 Email: [email protected] www.roundhouse-eng.com 1 Walschaerts Valve-Gear Part Number WVG Assembly of Walschaerts type valve-gear 1). Radius Rod. 2). Lifting Link. 3). Lifting Arm. Diagram4). Expansion showing Linkgeneral Bush. arrangement 5). Weigh of Walschaerts Shaft Bracket valve (Penguin). gear. NOTE:- Frames, Coupling rods, connecting rods and outside cranks are not included6). Weigh with this Shaft. set of 7). parts. Starlock Washer. 8). 2BA Nut. -
Appendix: Statistical Information
Appendix: Statistical Information Table A.1 Order in which the main works were built. Table A.2 Railway companies and trade unions who were parties to Industrial Court Award No. 728 of 8 July 1922 Table A.3 Railway companies amalgamated to form the four main-line companies in 1923 Table A.4 London Midland and Scottish Railway Company statistics, 1924 Table A.5 London and North-Eastern Railway Company statistics, 1930 Table A.6 Total expenditure by the four main-line companies on locomotive repairs and partial renewals, total mileage and cost per mile, 1928-47 Table A.7 Total expenditure on carriage and wagon repairs and partial renewals by each of the four main-line companies, 1928 and 1947 Table A.8 Locomotive output, 1947 Table A.9 Repair output of subsidiary locomotive works, 1947 Table A. 10 Carriage and wagon output, 1949 Table A.ll Passenger journeys originating, 1948 Table A.12 Freight train traffic originating, 1948 TableA.13 Design offices involved in post-nationalisation BR Standard locomotive design Table A.14 Building of the first BR Standard locomotives, 1954 Table A.15 BR stock levels, 1948-M Table A.16 BREL statistics, 1979 Table A. 17 Total output of BREL workshops, year ending 31 December 1981 Table A. 18 Unit cost of BREL new builds, 1977 and 1981 Table A.19 Maintenance costs per unit, 1981 Table A.20 Staff employed in BR Engineering and in BREL, 1982 Table A.21 BR traffic, 1980 Table A.22 BR financial results, 1980 Table A.23 Changes in method of BR freight movement, 1970-81 Table A.24 Analysis of BR freight carryings, -
Paterson Points NEWSLETTER of the RAIL MOTOR SOCIETY INCORPORATED
Paterson Points NEWSLETTER OF THE RAIL MOTOR SOCIETY INCORPORATED FEBRUARY 2014 Patron ~ Rear Admiral Peter Sinclair AC Inside... ~ Society News ~ Tour Reports ~ Operations Diary ~ AGM Saturday 22 March Clear of the main line, the CPHs stabled for the night adjacent to Gilgandra’s loading bank. Photo: James Brook PRINT POST APPROVED PP100003904 Society News Operations Report Annual General Meeting ~ Bruce Agland, Operations Manager Members are advised that this important meeting will be held on Saturday 22nd March commencing at 1000hrs, the Operations for 2014 formal meeting notice and associated forms are included 4 January Dungog (CPH), Archer with this newsletter. 14-15 January Junee (402), ARTC Election of Five Board Members 19 January Nowra (620), ARHS In accordance with the new Constitution, five of those 25 January Tamworth (620), Maitland Rotary members of the Board elected at the AGM in 2013 will 15-16 February Metro Freight Lines (620), retire but will be eligible for re-election should they decide Epping Model Railway Club to nominate again. 8 March Metro (620), Private Charter 4-6 April Orange (620), Travelscene Membership Renewals 12-13 April Steamfest, (TBC), The Rail Motor Society Members are advised that your membership subscription for 14-15 April Binnaway (402), ARHS Queensland 2014 that was due on 1st January is now OVERDUE. 3 May Denman (620), Kalverla Unfinancial members are not eligible to vote at the Annual 3 May Denman (CPH), Ede General Meeting and proxy forms will not be validated if you 17-18 May Gulgong (CPH), Scott are unfinancial before the start of the meeting. -
Download Download
ARMAMENTS FIRMS, THE STATE PROCUREMENT SYSTEM, AND THE NAVAL INDUSTRIAL COMPLEX IN EDWARDIAN BRITAIN Professor Roger Lloyd-Jones History Department, Sheffield Hallam University Dr. Myrddin John Lewis History Department, Sheffield Hallam University This article examines the relationship between Britain’s armament firms and the state’s procurement system, presenting a case for a Naval Industrial Complex (NIC) in the years immediately before the Great War. It argues that in Edwardian Britain a nuanced set of institutional networks were established between the Admiralty and a small elite group of armament manufacturers. The NIC demonstrates the close collaboration between the armament firms supplying the Admiralty and between the Admiralty and an elite group of private contractors. This article concludes that the NIC did not lead to profiteering by contactors, and they did supply the warships and naval ordnance that enabled Britain to out build Germany in the naval race. This paper examines the relationship in Britain between the armaments industry and the military institutions of the state during the years preceding the Great War, when there were intensifying international tensions, and concerns over Britain’s defense capabilities. Through an assessment of the War Office (WO) and Admiralty procurement system, we apply John Kenneth Galbraith’s theory that businesses may establish institutional networks as “countervailing powers” to mediate business-state relations and, thus, we challenge the proposition that the state acted as a “monopsonist,” dominating contractual relations with private armaments firms.’ We argue that during the years prior to the war, Britain’s Naval Industrial Complex (MC) involved a strengthening collaboration between the British Admiralty and the big armament firms. -
The Aviation Consumer April 2010
April 2010 Volume XL Number 4 The consumer resource for pilots and aircraft owners Legend Amphib Respectable performance, good build quality and just crazy fun … page 22 Plastic trumps paper … page 4 JPI’s new monitors… page 8 Actually, it’s even worse than it looks… page 18 4 TABLET EFBs 11 KNEEBOARD ROUNDUP 18 AUTOPILOT NIGHTMARE It’s a tough call to pick a true For a place to write and keep a In case you haven’t noticed, winner, but ChartCase is it pen, we like Sporty’s Classic. the AP market is just a mess 8 JPI’S NEW 730/830 14 BARGAIN RETRACTS 24 USED AIRCRAFT GUIDE: Sophisticated new monitors That’s all of them these days. Practicality and durability are are ideal for tight panels The Arrow is a top pick why the Piper Archer endures FIRST WORD EDITOR Paul Bertorelli Blue Screen of Death in the Cockpit Maybe I emit some kind of weird electromagnetic field, but it seems if there’s MANAGING EDITOR a way to get a computer to crash, I’ll find it. Back in my dot.com, tech-writer Jeff Van West days people loved to have me beta test software because I’d break it within five minutes. I’ve even found bugs in MFDs weeks before certification. CONTRIBUTING EDITORS This knack held right into our EFB trials that you’ll see on page four. We Jeb Burnside had started up the engine and I was having trouble getting the device to Jonathan Doolittle respond correctly. Simple solution: reboot. -
Crha Ews Report
crha ews Report P.O. BOX 22. STATION "B" MONTREAL 2. QUEBEC NUMBER 132 ---------~- *** -~~. -'--.:.. - ---...,- ~ =-- Where was the above 'photo taken? The scene shows a Canadian Northern Railway train hauled by locomotive 222, later No. 1283, class H-6-c. The engine, built by Montreal Locomotive Works in 1907 was sold by Canadian National Railways in May 1942 for service on the Commonwealth Railways of Australia. A locomot ive of the same class has been preserved by the City of Barrie, Ontario (#1531). Can anyone identify the location or circumstan ces of the photograph ? J • • ...'" o::;) r C.R.H.A. News Report Page 55 MORE INFORMATION ABOUT "WADDON" The drawing reproduced on the opposite page is the product of the skilled hand of our mem M. U. operation for ber Mr. John Sanders, a former British Railways fireman, and now a resident of Montreal. It CRHA No. 114 depicts one of the London, Bri f.hton & South Coast Railway's 'Terrier" tank locomotives, of the type which has been donated Word has been received r~ently to the Association as recorded that CRHA 1114 is being equipped in the March issue of the News for M. U. operation. Although Report. most of the requixed equipment has been completed, M.U. service will Also, we have received add not commence before May 26. CRHA itional information about the #114 will be the "A" unit of a locomotive from Mr. R.F. Corley, pair, the "B" unit of which has in that contrary to the state already been selected but Wilch at ment made in the March issue, the moment has been assigned no the locomotive was not immediat number. -
What Were the Investment Dilemmas of the LNER in the Inter-War Years and Did They Successfully Overcome Them?
What were the investment dilemmas of the LNER in the inter-war years and did they successfully overcome them? William Wilson MA TPM September 2020 CONTENTS 1. Sources and Acknowledgements 2 2. Introduction 3 3. Overview of the Railway Companies between the Wars 4 4. Diminishing Earnings Power 6 5. LNER Financial Position 8 6. LNER Investment Performance 10 7. Electrification 28 8. London Transport Area 32 9. LNER Locomotive Investment 33 10. Concluding Remarks 48 11. Appendices 52 Appendix 1: Decline of LNER passenger business Appendix 2: Accounting Appendix 3: Appraisal Appendix 4: Grimsby No.3 Fish Dock Appendix 5: Key Members of the CME’s Department in 1937/38 12. References and Notes 57 1. Sources and Acknowledgements This paper is an enlarged version of an article published in the March 2019 edition of the Journal of the Railway & Canal Historical Society. Considerable use was made of the railway records in The National Archives at Kew: the primary source of original LNER documentation. Information was obtained from Hansard, the National Records of Scotland, University of Glasgow Archives Services, National Railway Museum (NRM) and Great Eastern Railway Society (GERS). Use was made of contemporary issues of The Railway Magazine, Railway Gazette (NRM), The Economist, LNER Magazine 1927--1947 (GERS) and The Engineer. A literature review was undertaken of relevant university thesis and articles in academic journals: together with articles, papers and books written by historians and commentators on the group railway companies. 2 The -
NEWCASTLE UNIVERSITY Thesis Submitted Towards Phd in History
NEWCASTLE UNIVERSITY Thesis submitted towards PhD in History An examination of the decline of shipbuilding on the North-East Coast of England and the West of Scotland during the interwar period, 1920–1939 W. Paxton October 2017 i CONTENTS Page Copyright, declaration, and dedication .................................................................................. v Abstract ................................................................................................................................. vi Acknowledgements .............................................................................................................. vii List of Diagrams ................................................................................................................. viii List of Tables ......................................................................................................................... x List of Maps ....................................................................................................................... xiii List of Photographs ............................................................................................................. xiii List of Illustrations .............................................................................................................. xiv Appendices ........................................................................................................................... xv Abbreviations ..................................................................................................................... -
Eastern Railway
2.1.1 पूव रेलवे EASTERN RAILWAY 20192019----2020 के िलए पƗरसंपिēयĪ कƙ खरीद , िनमाϕण और बदलाव Assets-Acquisition, Construction and Replacement for 2019-20 (Figures in thousand of Rupees)(आंकड़े हजार Đ . मĞ) पूंजी पूंजी िनिध मूआिन िविन संिन रारेसंको जोड़ िववरण Particulars Capital CF DRF. DF SF RRSK TOTAL 11 (a ) New Lines (Construction) 70,70,00 .. .. .. .. .. 70,70,00 14 G Gauge Conversion 2,00,00 .. .. .. .. .. 2,00,00 15 ह Doubling 9,80,95 .. .. .. .. .. 9,80,95 16 - G Traffic Facilities-Yard 21,22,84 .. 90,25 13,22,19 .. 29,97,50 65,32,78 G ^ G Remodelling & Others 17 Computerisation 3,51,00 .. 12,41,30 62,00 .. .. 16,54,30 21 Rolling Stock 30,24,90 .. .. 7,66 .. 37,56,01 67,88,57 22 * 4 - Leased Assets - Payment of 518,12,69 205,67,31 .. .. .. .. 723,80,00 Capital Component 29 E G - Road Safety Works-Level .. .. .. .. .. 38,60,00 38,60,00 Crossings. 30 E G -/ Road Safety Works-Road .. .. .. .. .. 113,06,79 113,06,79 Over/Under Bridges. 31 Track Renewals .. .. .. .. .. 587,20,77 587,20,77 32 G Bridge Works .. .. .. .. .. 69,69,90 69,69,90 33 G Signalling and .. .. .. .. .. 83,25,97 83,25,97 Telecommunication 36 ^ G - G Other Electrical Works excl 1,34,17 .. 4,38,47 2,62,72 .. 5,08,29 13,43,65 K TRD 37 G G Traction Distribution Works 16,00,00 .. .. .. .. 110,59,55 126,59,55 41 U Machinery & Plant 5,16,94 . -
Camden Railway Station a Reminder of Incessant Government Under-Funding of the Nsw Rail System
CAMDEN RAILWAY STATION A REMINDER OF INCESSANT GOVERNMENT UNDER-FUNDING OF THE NSW RAIL SYSTEM These notes relate only to the history of the passenger facilities at the Camden terminus. The history of the branch line has already been published. Alan Smith, a long-time member of the Australian Railway Historical Society and a frequent volunteer at its Resource Centre, won the competition to choose the cover photo for these notes. It seems strange that Alan chose a photograph not of the terminus but of an intermediate station, Kenny Hill. Why? Alan considered that this was the “iconic image of the challenges that existed in the day-to-day operation of the Camden line”. Specifically, the photograph shows the absence of priority given to passengers when the train crew had to decide whether to convey people or freight. It should be of no surprise that people lost out. Bob Merchant took this undated photograph on a day when the steam locomotive simply could not succeed in climbing the gradient. In the composition of the train were two milk pots. They were next to the engine. There was no question of reversing the train to Narellan, shunting and then proceeding with the only the passenger car. Why not? Because the milk pots had to be attached to No. 32 Express Goods or there would be serious trouble for the train crew if the Camden milk did not accompany the other milk vans from Bowral and Menangle on the train. What! Passengers are voters. Not so much in 1963 when the line closed. -
Types and Characteristics of Locomotives Dr. Ahmed A. Khalil Steam Locomotives - Operating Principle
Types and Characteristics of Locomotives Dr. Ahmed A. Khalil Steam Locomotives - Operating Principle: The wheel is connected to the rod by a crank. The rod is connected to the piston rod of the steam cylinder., thereby converting the reciprocating motion of the piston rod generated by steam power into wheel rotation. - Main Parts of a steam locomotive: 1. Tender — Container holding both water for the boiler and combustible fuel such as wood, coal or oil for the fire box. 2. Cab — Compartment from which the engineer and fireman can control the engine and tend the firebox. 3. Whistle — Steam powered whistle, located on top of the boiler and used as a signalling and warning device. 4. Reach rod — Rod linking the reversing actuator in the cab (often a 'johnson bar') to the valve gear. 5. Safety valve — Pressure relief valve to stop the boiler exceeding the operating limit. 6. Generator — Steam powered electric generator to power pumps, head lights etc, on later locomotives. 7. Sand box/Sand dome — Holds sand that can be deposited on the rails to improve traction, especially in wet or icy conditions. 8. Throttle Lever — Controls the opening of the regulator/throttle valve thereby controlling the supply of steam to the cylinders. 9. Steam dome — Collects the steam at the top of the boiler so that it can be fed to the engine via the regulator/throttle valve. 10. Air pump — Provides air pressure for operating the brakes (train air brake system). 11. Smoke box — Collects the hot gas that have passed from the firebox and through the boiler tubes. -
O-Steam-Price-List-Mar2017.Pdf
Part # Description Package Price ======== ================================================== ========= ========== O SCALE STEAM CATALOG PARTS LIST 2 Springs, driver leaf........................ Pkg. 2 $6.25 3 Floor, cab and wood grained deck............. Ea. $14.50 4 Beam, end, front pilot w/coupler pocket...... Ea. $8.00 5 Beam, end, rear pilot w/carry iron.......... Ea. $8.00 6 Bearings, valve rocker....................... Pkg.2 $6.50 8 Coupler pockets, 3-level, for link & pin..... Pkg. 2 $5.75 9 Backhead w/fire door base.................... Ea. $9.00 10 Fire door, working........................... Ea. $7.75 11 Journal, 3/32" bore.......................... Pkg. 4. $5.75 12 Coupler pockets, small, S.F. Street Railway.. Pkg.2 $5.25 13 Brakes, engine............................... Pkg.2 $7.00 14 Smokebox, 22"OD, w/working door.............. Ea. $13.00 15 Drawbar, rear link & pin..................... Ea. $5.00 16 Handles, firedoor............................ Pkg.2. $5.00 17 Shelf, oil can, backhead..................... Ea. $5.75 18 Gauge, backhead, steam pressure.............. Ea. $5.50 19 Lubricator, triple-feed, w/bracket, Seibert.. Ea. $7.50 20 Tri-cock drain w/3 valves, backhead.......... Ea. $5.75 21 Tri-cock valves, backhead, (pl. 48461)....... Pkg. 3 $5.50 23 Throttle, nonworking......................... Ea. $6.75 23.1 Throttle, non working, plastic............... Ea. $5.50 24 Pop-off, pressure, spring & arm.............. Ea. $6.00 25 Levers, reverse/brake, working............... Kit. $7.50 26 Tri-cock drain, less valves.................. Ea. $5.75 27 Seat boxes w/backs........................... Pkg.2 $7.50 28 Injector w/piping, Penberthy,................ Pkg.2 $6.75 29 Oiler, small hand, N/S....................... Pkg.2 $6.00 32 Retainers, journal........................... Pkg.