Class 2F Dock Tank Manual.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Walschaerts Valve-Gear 2 Return Cranks with Steel Screws & Nuts
This pack contains the following parts: - Walschaerts Valve-Gear 2 Return Cranks with steel screws & nuts. 2 Expansion links with bushes & This kit contains parts to construct 2BA nuts. a set of Walschaerts type valve- 2 Lifting arms with grub screws & Allen key. gear as used on ROUNDHOUSE 2 Lifting links. locomotives. It is of a simplified 4 M2 steel screws & nuts. design, which does not use a 6 5BA steel washers. combination lever and is intended 2 Radius rods. for use with the ROUNDHOUSE 2 Weigh shaft brackets 1 Weigh shaft. Cylinder set. 2 Starlock washers 2 Roll pins. NOTE:- Frames, Cylinders, 6 Short crank pins. Coupling Rods, Connecting Rods, 2 Plain crank pins Axles and Outside Cranks are not included with this set of parts. 1 Push Rod Connector, Screw & Starlock. 1 Stainless Steel spring & Long Crank Pin. 1 Reversing lever handle. 1 Reversing lever base. 3 M2 screws and nuts. 2 M3 mounting screws. 1 Steel push rod & quicklink connector. Roundhouse Engineering Co. Ltd 2 Eccentric rods. Units 6 to 9, Churchill Business Park, Churchill Road, Wheatley, Doncaster. DN1 2TF. England. Tel 01302 328035 Fax 01302 761312 Email: [email protected] www.roundhouse-eng.com 1 Walschaerts Valve-Gear Part Number WVG Assembly of Walschaerts type valve-gear 1). Radius Rod. 2). Lifting Link. 3). Lifting Arm. Diagram4). Expansion showing Linkgeneral Bush. arrangement 5). Weigh of Walschaerts Shaft Bracket valve (Penguin). gear. NOTE:- Frames, Coupling rods, connecting rods and outside cranks are not included6). Weigh with this Shaft. set of 7). parts. Starlock Washer. 8). 2BA Nut. -
T H E G E N E R a T
Newsletter of THE PALMERSTON NORTH MODEL ENGINEERING CLUB INC Managers of the “MARRINER RESERVE RAILWAY” Please address all correspondence to :- 22b Haydon St, Palmerston North. PRESIDENT SECRETARY TREASURER EDITOR Richard Lockett Stuart Anderson Murray Bold Doug Chambers (06) 323-0948 (06) 357-7794 (06) 355-7000 (06) 354-9379 July 2010 [email protected] [email protected] [email protected] [email protected] No 358 PNMEC Home Page www.pnmec.org.nz Email:- [email protected] TRACK RUNNING T This is held on the FIRST and THIRD Sunday of each month, from 1 pm to 4 pm Summer and 1 pm to 3 pm during the Winter. All club members are welcome to attend and help out with loco coaling, watering and passenger marshalling - none of the tasks being at all H Visiting club members are always welcome at the track, at the monthly meeting, or if just visiting and wishing to make contact with members, please phone one of the above office bearers. E Sender:- PNMEC Place 22b Haydon St, stamp Palmerston North here G E N E This Months Featured Model R A T O R - 2 - explained that unfortunately the chassis is now REPORT on the too heavy to bring in for the members to see. Bruce Geange had the tracks and chassis for June Meeting. his Caterpillar RD8 Another good turn out of members on a cold and wet wintery evening. Richard Lockett gave a very good talk on the setting up of milling machines, the vices to hold the work and setting up the jobs. -
O-Steam-Price-List-Mar2017.Pdf
Part # Description Package Price ======== ================================================== ========= ========== O SCALE STEAM CATALOG PARTS LIST 2 Springs, driver leaf........................ Pkg. 2 $6.25 3 Floor, cab and wood grained deck............. Ea. $14.50 4 Beam, end, front pilot w/coupler pocket...... Ea. $8.00 5 Beam, end, rear pilot w/carry iron.......... Ea. $8.00 6 Bearings, valve rocker....................... Pkg.2 $6.50 8 Coupler pockets, 3-level, for link & pin..... Pkg. 2 $5.75 9 Backhead w/fire door base.................... Ea. $9.00 10 Fire door, working........................... Ea. $7.75 11 Journal, 3/32" bore.......................... Pkg. 4. $5.75 12 Coupler pockets, small, S.F. Street Railway.. Pkg.2 $5.25 13 Brakes, engine............................... Pkg.2 $7.00 14 Smokebox, 22"OD, w/working door.............. Ea. $13.00 15 Drawbar, rear link & pin..................... Ea. $5.00 16 Handles, firedoor............................ Pkg.2. $5.00 17 Shelf, oil can, backhead..................... Ea. $5.75 18 Gauge, backhead, steam pressure.............. Ea. $5.50 19 Lubricator, triple-feed, w/bracket, Seibert.. Ea. $7.50 20 Tri-cock drain w/3 valves, backhead.......... Ea. $5.75 21 Tri-cock valves, backhead, (pl. 48461)....... Pkg. 3 $5.50 23 Throttle, nonworking......................... Ea. $6.75 23.1 Throttle, non working, plastic............... Ea. $5.50 24 Pop-off, pressure, spring & arm.............. Ea. $6.00 25 Levers, reverse/brake, working............... Kit. $7.50 26 Tri-cock drain, less valves.................. Ea. $5.75 27 Seat boxes w/backs........................... Pkg.2 $7.50 28 Injector w/piping, Penberthy,................ Pkg.2 $6.75 29 Oiler, small hand, N/S....................... Pkg.2 $6.00 32 Retainers, journal........................... Pkg. -
Variable Valve Timing Intelligent System.Pdf
VARIABLE VALVE TIMING INTELLIGENT SYSTEM deepaksubudhi456@ gmail.com WHAT IS VVT ? • Variable Valve Timing (VVT) ,is a generic term for an automobile piston engine technology • VVT allows the lift or duration or timing (some or all) of the intake or exhaust valves (or both) to be changed while the engine is in operation • Two stroke engines use a power valve system to get similar results to VVT. HISTORY • The earliest variable valve timing systems came into existence in the nineteenth century on steam engines. Stephenson valve gear, as used on early steam locomotives supported variable cutoff, that is, changes to the time at which the admission of steam to the cylinders is cut off during the power stroke. Early approaches to variable cutoff coupled variations in admission cutoff with variations in exhaust cutoff. Admission and exhaust cutoff were decoupled with the development of the Corliss valve. These were widely used in constant speed variable load stationary engines, with admission cutoff, and therefore torque, mechanically controlled by a centrifugal governor. As poppet valves came into use, simplified valve gear using a camshaft came into use. With such engines, variable cutoff could be achieved with variable profile cams that were shifted along the camshaft by the governor. • The earliest Variable valve timing systems on internal combustion engines were on the Lycoming R-7755 hyper engine, which had cam profiles that were selectable by the pilot. This allowed the pilot to choose full take off and pursuit power or economical cruising speed, depending on what was needed. WHAT IS VVT-i • The VVT-i system is designed to control the intake camshaft with in a range of 50°(of Crankshaft Angle ) to provide valve timing i.e. -
Hielan Lassie’ Built by Ken Neilsen Nearly Fifty Years Ago
Newsletter of THE PALMERSTON NORTH MODEL ENGINEERING CLUB INC Managers of the “MARRINER RESERVE RAILWAY” Please address all correspondence to :- 22b Haydon St, Palmerston North. PRESIDENT SECRETARY TRACK CONVENOR EDITOR Chris Rogers Murray Bold Richard Lockett Doug Chambers May 2005 (06) 356-1759 (06) 355-7000 (06) 323-0948 (06) 354-9379 No 301 PNMEC Home Page www.pnmec.org.nz Email:- [email protected] TRACK RUNNING T This is held on the FIRST and THIRD Sunday of each month, from 1 pm to 4 pm Summer and 1 pm to 3 pm during the Winter. All club members are welcome to attend and help out with loco coaling, watering and passenger marshalling - none of the tasks being at all onerous. H Visiting club members too, are always welcome at the track, at the monthly meeting, or if just visiting and wishing to make contact with members, please phone one of the above office bearers. E Sender:- PNMEC Place 22b Haydon St, stamp Palmerston North here G E N E This Months Featured Model R A T O ‘Hielan Lassie’ built by Ken Neilsen nearly fifty years ago. R - 2 - ANNUAL GENERAL MEETING SUBSCRIPTIONS REPORT. ARE NOW DUE There was a good attendance of members Subscriptions remain at $28.00 for members. braving a cold night. Reports from the Presi- Juniors and Country members $14.00. dent, Auditor, Track Convener and Boiler You can send your sub to: Committee were all read and confirmed. The Treasurer Election of Officers resulted in the follow- PNMEC ing ; C/o 22B Haydon Street, Palmerston North President Chris Rogers or hand it to Barry Parker at the next meeting. -
Full Page Photo
THE LIFE AND TIMES OF A DUKE Martyn J. McGinty AuthorHouse™ UK Ltd. 500 Avebury Boulevard Central Milton Keynes, MK9 2BE www.authorhouse.co.uk Phone: 08001974150 © 2011. Martyn J. McGinty. All rights reserved No part of this book may be reproduced, stored in a retrieval system, or transmitted by any means without the written permission of the author. First published by AuthorHouse 04/25/2011 ISBN: 978-1-4567-7794-4 (sc) ISBN: 978-1-4567-7795-1 (hc) ISBN: 978-1-4567-7796-8 (e) Front Cover Photo: Th e Duke at Didcot (Courtesy P. Treloar) Any people depicted in stock imagery provided by Th inkstock are models, and such images are being used for illustrative purposes only. Certain stock imagery © Th inkstock. Th is book is printed on acid-free paper. Because of the dynamic nature of the Internet, any web addresses or links contained in this book may have changed since publication and may no longer be valid. Th e views expressed in this work are solely those of the author and do not necessarily refl ect the views of the publisher, and the publisher hereby disclaims any responsibility for them. Born out of Tragedy and Riddles, his lineage traceable, unerasable, back through the great houses of Chapelon, Giffard, Stephenson, Belpaire and Watt, the Duke was laid to rust by the sea, a few meagre miles from the mills that shaped the steel that formed the frames that bore the machine that Crewe built. Time passed and the Duke was made well again by kindly strangers. -
DOC57F51BE2C1C3A.Pdf
SPECIALIST PUBLISHERS FREE OF TECHNICAL AND CATALOGUE 23 TEE Our range includes books Publishing Ltd MODELLING BOOKS on the following: One of the UK’s leading specialists book & magazine � BOILERMAKING � CASTING & FOUNDRY WORK stockists. NEW, RARE & OUT OF PRINT titles and � ELECTRIC MOTORS periodicals on a vast range of modelling interests. � GARDEN RAILWAYS � HOROLOGY � HOT AIR ENGINES � IN YOUR WORKSHOP � LATHE WORK � MODEL ENGINEERING � MODEL STEAM LOCOMOTIVES � MODEL STEAM ROAD VEHICLES � SOLDERING, BRAZING AND WELDING � STATIONARY STEAM ENGINES � TOOLMAKING THE MODEL STEAM � AEROMODELLING LOCOMO � CLOCKMAKING PROJECTS FOR YOUR WOR � INDUSTRIAL ARCHAEOLOGY PROJECTSYOUR FOR TIVE � MARINE MODELLING WORKSHOPVol. 1 ed extremely popular and this � : KSHOP vol.1 by graha STANDARD AND NG RAILWAYS Graham Meek A complete treatise on design o Unimat 4 or Compact 5 tch, or Screwcutting Simpli ed Graham’s articles in Engineering in Miniature prov �TRACTORS & STATIONARY ENGINES rst volume brings together thirteen projects A Boring and Facing Head and construction by Martin Evans aximat Lathe The Myford Super 7 Screwcutting Clu Lever Operated Tailstock Attachment for an Emc A Parts Backstop for the Maximat Lathe A Simpli ed Retracting Toolholder for Screwcutting � Emco FB2 Spindle Lock, 4 Tool Turrets WOODWORKING Cams Made Easy for an Emco FB2. A Vernier Scale and Feedscrew Lock for an Emco M m meek Slotting Attachment 100 and 150Mm Micrometer Height Gauges A Handwheel Dial for Myford Series 7 Lathes Milling Arbor and Over-Arm Support FREE POSTAGE OUR BEST SELLERS on all UK orders over £50 TEEing Publish An invaluable range of books T: 01926 614101 teepublishing.co.uk The The Fosse, Fosse Way, LeamingtonOur Spa, CV31 1XN Rare and Out of Print section has books and TEE Publishing Ltd. -
Steam-Engine
CHAPTER IV. .J.1JE MODERN STEAM-ENGINE. "THOSE projects which abridge distance bnve done most for the civiliza ..tion and happiness of our species."-MACAULAY. THE SECOND PERIOD OF APPLIC.ATION-18OO-'4O. STE.AM-LOCOMOTION ON RAILROADS. lNTRODUCTORY.-The commencement of the nineteenth century found the modern steam-engine fully developed in .. :.... �::�£:��r:- ::::. Fro. 40.-The First Railroad-Car, 1S25. a.11 its principal features, and fairly at work in many depart ments of industry. The genius of Worcester, and Morland, and Savery, and Dcsaguliers, had, in the first period of the · STEA�l-LOCOMOTION ON RAILROADS. 145 application of the po,ver of steam to useful ,vork, effected a beginning ,vhich, looked upon from a point of vie,v vvhich · exhibits its importance as the first step to,vard the wonder ful results to-day familiar to every one, appears in its true light, and entitles those great men to even greater honor than has been accorded them. The results actually accom plishecl, ho,vever, were absolutely. insignificant in compari son with those ,vhich marked the period of development just described. Yet even the work of Watt and of his con temporaries ,vas but a 1nere prelude to the marvellous ad vances made in the succeeding period, to which ,ve are now come, and, in · extent and importance, was insignificant in co1nparison ,vith that accomplishecl by tl1eir successors in · the development of all mechanical industries by the appli cation of the steam-engine to the movement of every kind of machine. 'fhe firstof the two periods of application saw the steam engine adapted simply to tl1e elevation of water and t,he drainage of mines ; during the second period it ,vas adapted to every variety of use£ul ,vork, and introduced ,vherever the muscular strength of men and animals, or the power of ,vind and of falling ,vater, ,vl1ich had previously been the only motors, had found application. -
HO-Steam-Price-List-Mar2017.Pdf
Part # Description Package Price ======== ================================================== ========= ========== HO SCALE STEAM CATALOG PARTS LIST 44 Springs, coil, .075" dia. x .165" long, Pkg. 12 $6.50 journal, for trucks & draft gear............. 78 Caps, delrin crank pins...................... Pkg. 4 $5.00 107 Screw, gear box retainer, for KTM gear boxes, Pkg. 2 $6.00 4x1.8mm thread, 5.8mm overall................ 108 Washers, .180 ID, .300 OD, .020 thick........ Pkg. 12 $6.50 118 Bearings, oilite,.125 ID, .187 OD, flanged... Pkg. 4 $6.50 119 Washers, .110 ID, .190 OD, .018 thick........ Pkg. 12 $6.50 120 Washer, .125 ID, .237 OD, .008 thick, plastic Pkg. 12 $6.50 123 Washers, .163 ID,.317 OD,.011 thick,PLASTIC.. Pkg. 12 $6.50 124 Washers, .160 ID, .248 OD, .020 thick........ Pkg. 12 $6.50 125 Washers,.160 ID,.248 OD,.020 thick,plastic... Pkg. 12 $6.50 126 Motor mount, multi-use for smaller can Ea. $6.00 motors, HO................................... 128 Washers, .160 ID, .275 OD, .030 thick........ Pkg. 12 $6.50 129 Washers, .161 ID, .237 OD, .020 thick........ Pkg. 12 $6.50 130 Washers, .077 ID, .241 OD, .020 thick........ Pkg. 12 $6.50 131 Crank pin screws, small head,4.2x 1.8mm...... Pkg. 4 $6.75 132 Crank pin screws; large head,4.5 x 2mm....... Pkg. 4 $6.75 137 Rivets, valve gear, shouldered............... Pkg. 12 $7.50 138 Screws, valve gear,2mm thread,2.8mm long, Pkg. 12 $9.50 4.9mm head dia............................... 139 Rivets, valve gear, shouldered............... Pkg. 12 $7.50 140 Rivets, valve gear, 1.5 x 8.5............... -
Accucraft Fairymead 0-4-2
Accucraft Fairymead 0-4-2 AL87-810 7/8ths Fairymead Green AL87-812 7/8ths Fairymead Black Instruction Manual 0-4-2 Fairymead Note: Please read the entire manual prior to operation Unpacking and Assembly Remove inner box from the shipping carton, lift open and remove locomotive in its cocoon from the box. Set aside the small parts box for later use. Place the board on a hard surface and using a razor knife cut along the board edge. Carefully pull off the tape and plastic from the locomotive. Discard all tape and plastic. You will notice that the headlamp and stack were not shipped installed to avoid damage in transit. In the next steps we will install these on the locomotive. Open the small parts box and remove the tools, lamp and stack as you will now need a M2 and M3 nut driver to install the headlamp. You will also need a small pair of needle nose pliers (not included) to tighten the smokestack. Using the M2 nutdriver remove the 2 bolts on each side retaining the smoke box front, Be careful not to damage the finish. Set the screws aside and gently pull the front off with your fingers through the opened door. Next remove the brass deflector and insulation wrapping the inside smokebox. Instruction Manual 0-4-2 Fairymead The smokestack will be installed next, remove the nut and curved washed from the stack and insert the stack and base through the opening in the smokebox. Support the stack at all times and insert the curved washer then the nut. -
WG Bagnall Ltd Commenced Trading As a Locomotive Works
DIXIE is a 5" narrow gauge saddle tank loco- motive with open cab and footplate mounted coal bunkers and is based on the Kerr Stuart “Wren” class. These popular, diminutive but powerful locomotives were used widely in industry and because of this several survive today in preservation, including the well known and much travelled “PETER PAN”, the equally well known “PIXIE” and “LORNA DOONE”, a much worked engine, saved from the scrapmans torch and now, thankfully, safely in preservation. G Bagnall Ltd commenced trading as a locomotive works in the year 1887. Noted for their enormous diversity of fin- ished products, it wasn’t until 1891 when Ernest Baguley Wwas engaged as works manager that a production system was intro- duced. Baguley designed a standard range of locomotive types which characterised Bagnall from that time forward. These locomotives were the familiar narrow gauge saddle tanks so popular with small con- tractors and the type that Sapphire is based upon. Sapphire features a “round top” saddle tank, brass filler, full cab and bunkers with cir- cular brass window frames, handrails and cab mounted whistle. Slip eccentric valve gear is fitted as standard with optional Hackworth or Walschaerts valve gear. Other options available (see pricelist) are iron spoked wheels, brass top chimney, screw down brake, mechan- SWALLOW ical lubricator, injector and Tender. SWALLOW is a standard gauge 0-4-0 shunter based on the locomotive supplied to Messrs Cadbury Bros of Bournville in 1959. This engine joined four Avonside built locos of similar design, but of a much earlier date, they were introduced between 1910/20.All these locomotives were painted in the distinctive Cadbury livery of Bright red, lined out in Yellow & Black and with the Cadbury Bournville lettering along the tank sides, in Gold leaf , edged in Crimson. -
The Development of Locomotive Power at Speed by E
404 The Development of Locomotive Power at Speed By E. L. Diamond, M.Sc. (Eng.), A.M.I.Mech.E.* The power developed per unit of cylinder volume of locomotives in the speed range from 250 to 400 r.p.m. has in recent years been doubled. Forty years ago it was often the case that the diminution of the mean effective pressure with increase of speed, rather than the evaporative capacity of the boiler, limited the power of the engine. The most advanced designs maintain the mean pressure at a high percentage of the calculated value to the highest speeds, and the effect of valve events and clearance volume on the calculated mean pressure thus becomes of practical importance, especially as designers are endeavouring to use considerably higher steam pressures in single-expansion cylinders. The first part of this paper sets out the effect of these factors over a wide range of steam pressures in the form of basic data graphs of mean pressure, relative efficiency, and steam consumption. It is shown that without the decrease of clearance volume and increase of expansion ratio which com- pound expansion affords, the improved thermal efficiency which higher steam pressure offers cannot be fully realized above about 250 lb. per sq. in. boiler pressure, though greater power can be obtained. The second part of the paper is devoted to an examination of the actual deviation of mean pressure with speed for a wide range of locomotives, including some of the most recent designs, and the reasons for the radical improvement are indicated.