Instruction Manual SOUTHERN PACIFIC S12 0-6-0 LIVE STEAM
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Walschaerts Valve-Gear 2 Return Cranks with Steel Screws & Nuts
This pack contains the following parts: - Walschaerts Valve-Gear 2 Return Cranks with steel screws & nuts. 2 Expansion links with bushes & This kit contains parts to construct 2BA nuts. a set of Walschaerts type valve- 2 Lifting arms with grub screws & Allen key. gear as used on ROUNDHOUSE 2 Lifting links. locomotives. It is of a simplified 4 M2 steel screws & nuts. design, which does not use a 6 5BA steel washers. combination lever and is intended 2 Radius rods. for use with the ROUNDHOUSE 2 Weigh shaft brackets 1 Weigh shaft. Cylinder set. 2 Starlock washers 2 Roll pins. NOTE:- Frames, Cylinders, 6 Short crank pins. Coupling Rods, Connecting Rods, 2 Plain crank pins Axles and Outside Cranks are not included with this set of parts. 1 Push Rod Connector, Screw & Starlock. 1 Stainless Steel spring & Long Crank Pin. 1 Reversing lever handle. 1 Reversing lever base. 3 M2 screws and nuts. 2 M3 mounting screws. 1 Steel push rod & quicklink connector. Roundhouse Engineering Co. Ltd 2 Eccentric rods. Units 6 to 9, Churchill Business Park, Churchill Road, Wheatley, Doncaster. DN1 2TF. England. Tel 01302 328035 Fax 01302 761312 Email: [email protected] www.roundhouse-eng.com 1 Walschaerts Valve-Gear Part Number WVG Assembly of Walschaerts type valve-gear 1). Radius Rod. 2). Lifting Link. 3). Lifting Arm. Diagram4). Expansion showing Linkgeneral Bush. arrangement 5). Weigh of Walschaerts Shaft Bracket valve (Penguin). gear. NOTE:- Frames, Coupling rods, connecting rods and outside cranks are not included6). Weigh with this Shaft. set of 7). parts. Starlock Washer. 8). 2BA Nut. -
O-Steam-Price-List-Mar2017.Pdf
Part # Description Package Price ======== ================================================== ========= ========== O SCALE STEAM CATALOG PARTS LIST 2 Springs, driver leaf........................ Pkg. 2 $6.25 3 Floor, cab and wood grained deck............. Ea. $14.50 4 Beam, end, front pilot w/coupler pocket...... Ea. $8.00 5 Beam, end, rear pilot w/carry iron.......... Ea. $8.00 6 Bearings, valve rocker....................... Pkg.2 $6.50 8 Coupler pockets, 3-level, for link & pin..... Pkg. 2 $5.75 9 Backhead w/fire door base.................... Ea. $9.00 10 Fire door, working........................... Ea. $7.75 11 Journal, 3/32" bore.......................... Pkg. 4. $5.75 12 Coupler pockets, small, S.F. Street Railway.. Pkg.2 $5.25 13 Brakes, engine............................... Pkg.2 $7.00 14 Smokebox, 22"OD, w/working door.............. Ea. $13.00 15 Drawbar, rear link & pin..................... Ea. $5.00 16 Handles, firedoor............................ Pkg.2. $5.00 17 Shelf, oil can, backhead..................... Ea. $5.75 18 Gauge, backhead, steam pressure.............. Ea. $5.50 19 Lubricator, triple-feed, w/bracket, Seibert.. Ea. $7.50 20 Tri-cock drain w/3 valves, backhead.......... Ea. $5.75 21 Tri-cock valves, backhead, (pl. 48461)....... Pkg. 3 $5.50 23 Throttle, nonworking......................... Ea. $6.75 23.1 Throttle, non working, plastic............... Ea. $5.50 24 Pop-off, pressure, spring & arm.............. Ea. $6.00 25 Levers, reverse/brake, working............... Kit. $7.50 26 Tri-cock drain, less valves.................. Ea. $5.75 27 Seat boxes w/backs........................... Pkg.2 $7.50 28 Injector w/piping, Penberthy,................ Pkg.2 $6.75 29 Oiler, small hand, N/S....................... Pkg.2 $6.00 32 Retainers, journal........................... Pkg. -
Hielan Lassie’ Built by Ken Neilsen Nearly Fifty Years Ago
Newsletter of THE PALMERSTON NORTH MODEL ENGINEERING CLUB INC Managers of the “MARRINER RESERVE RAILWAY” Please address all correspondence to :- 22b Haydon St, Palmerston North. PRESIDENT SECRETARY TRACK CONVENOR EDITOR Chris Rogers Murray Bold Richard Lockett Doug Chambers May 2005 (06) 356-1759 (06) 355-7000 (06) 323-0948 (06) 354-9379 No 301 PNMEC Home Page www.pnmec.org.nz Email:- [email protected] TRACK RUNNING T This is held on the FIRST and THIRD Sunday of each month, from 1 pm to 4 pm Summer and 1 pm to 3 pm during the Winter. All club members are welcome to attend and help out with loco coaling, watering and passenger marshalling - none of the tasks being at all onerous. H Visiting club members too, are always welcome at the track, at the monthly meeting, or if just visiting and wishing to make contact with members, please phone one of the above office bearers. E Sender:- PNMEC Place 22b Haydon St, stamp Palmerston North here G E N E This Months Featured Model R A T O ‘Hielan Lassie’ built by Ken Neilsen nearly fifty years ago. R - 2 - ANNUAL GENERAL MEETING SUBSCRIPTIONS REPORT. ARE NOW DUE There was a good attendance of members Subscriptions remain at $28.00 for members. braving a cold night. Reports from the Presi- Juniors and Country members $14.00. dent, Auditor, Track Convener and Boiler You can send your sub to: Committee were all read and confirmed. The Treasurer Election of Officers resulted in the follow- PNMEC ing ; C/o 22B Haydon Street, Palmerston North President Chris Rogers or hand it to Barry Parker at the next meeting. -
Class 2F Dock Tank Manual.Pdf
www.MeshTools.co.uk 1 Contents Background………………………………………………………………………………………………... 2 Technical Data……………………………………………………………………………………………. 3 Controls…………………………………………………………………………………………………….. 4 Liveries………………………………………………………………………………………………………. 11 Scenarios…………………………………………………………………………………………………… 14 Reskinning/Sound Policy……………………………………………………………………………… 14 Head codes………………………………………………………………………………………………… 15 Credits……………………………………………………………………………………………………….. 17 Background In 1928 Sir Henry Fowler introduced these small 2F 0-6-0T dock tanks for use in dockyards and depots with very tight radius curves. The design was prepared at Horwich but featured a number of Derby features such as cab, bunker and boiler fittings as well as a Derby boiler which made the engine look distinctly like the Fowler 3F 0-6-0 “Jinty”. The engines were built at Derby and the first five of the class were sent to Scotland while the remaining 5 were dispatched to Fleetwood and Birkenhead. The class was able to negotiate curves of two and a half chains by use of a very short wheelbase and a Cartazzi self-centring axlebox on the rear axle. Due to this arrangement inside Stephenson valve gear was somewhat impractical so outside Walschaerts valve gear was provided with short travel slide valves above the cylinders. Withdrawals of the class began in 1959 with the final member 47165 being retired in 1964. www.MeshTools.co.uk 2 Technical data – LMS 2F 0-6-0T Dock tank: Introduced: 1928 Power Classification: 2F Configuration: 0-6-0T Total Built: 10 Length: 27' 6" Width: 8' 8" Height: -
Full Page Photo
THE LIFE AND TIMES OF A DUKE Martyn J. McGinty AuthorHouse™ UK Ltd. 500 Avebury Boulevard Central Milton Keynes, MK9 2BE www.authorhouse.co.uk Phone: 08001974150 © 2011. Martyn J. McGinty. All rights reserved No part of this book may be reproduced, stored in a retrieval system, or transmitted by any means without the written permission of the author. First published by AuthorHouse 04/25/2011 ISBN: 978-1-4567-7794-4 (sc) ISBN: 978-1-4567-7795-1 (hc) ISBN: 978-1-4567-7796-8 (e) Front Cover Photo: Th e Duke at Didcot (Courtesy P. Treloar) Any people depicted in stock imagery provided by Th inkstock are models, and such images are being used for illustrative purposes only. Certain stock imagery © Th inkstock. Th is book is printed on acid-free paper. Because of the dynamic nature of the Internet, any web addresses or links contained in this book may have changed since publication and may no longer be valid. Th e views expressed in this work are solely those of the author and do not necessarily refl ect the views of the publisher, and the publisher hereby disclaims any responsibility for them. Born out of Tragedy and Riddles, his lineage traceable, unerasable, back through the great houses of Chapelon, Giffard, Stephenson, Belpaire and Watt, the Duke was laid to rust by the sea, a few meagre miles from the mills that shaped the steel that formed the frames that bore the machine that Crewe built. Time passed and the Duke was made well again by kindly strangers. -
HO-Steam-Price-List-Mar2017.Pdf
Part # Description Package Price ======== ================================================== ========= ========== HO SCALE STEAM CATALOG PARTS LIST 44 Springs, coil, .075" dia. x .165" long, Pkg. 12 $6.50 journal, for trucks & draft gear............. 78 Caps, delrin crank pins...................... Pkg. 4 $5.00 107 Screw, gear box retainer, for KTM gear boxes, Pkg. 2 $6.00 4x1.8mm thread, 5.8mm overall................ 108 Washers, .180 ID, .300 OD, .020 thick........ Pkg. 12 $6.50 118 Bearings, oilite,.125 ID, .187 OD, flanged... Pkg. 4 $6.50 119 Washers, .110 ID, .190 OD, .018 thick........ Pkg. 12 $6.50 120 Washer, .125 ID, .237 OD, .008 thick, plastic Pkg. 12 $6.50 123 Washers, .163 ID,.317 OD,.011 thick,PLASTIC.. Pkg. 12 $6.50 124 Washers, .160 ID, .248 OD, .020 thick........ Pkg. 12 $6.50 125 Washers,.160 ID,.248 OD,.020 thick,plastic... Pkg. 12 $6.50 126 Motor mount, multi-use for smaller can Ea. $6.00 motors, HO................................... 128 Washers, .160 ID, .275 OD, .030 thick........ Pkg. 12 $6.50 129 Washers, .161 ID, .237 OD, .020 thick........ Pkg. 12 $6.50 130 Washers, .077 ID, .241 OD, .020 thick........ Pkg. 12 $6.50 131 Crank pin screws, small head,4.2x 1.8mm...... Pkg. 4 $6.75 132 Crank pin screws; large head,4.5 x 2mm....... Pkg. 4 $6.75 137 Rivets, valve gear, shouldered............... Pkg. 12 $7.50 138 Screws, valve gear,2mm thread,2.8mm long, Pkg. 12 $9.50 4.9mm head dia............................... 139 Rivets, valve gear, shouldered............... Pkg. 12 $7.50 140 Rivets, valve gear, 1.5 x 8.5............... -
WG Bagnall Ltd Commenced Trading As a Locomotive Works
DIXIE is a 5" narrow gauge saddle tank loco- motive with open cab and footplate mounted coal bunkers and is based on the Kerr Stuart “Wren” class. These popular, diminutive but powerful locomotives were used widely in industry and because of this several survive today in preservation, including the well known and much travelled “PETER PAN”, the equally well known “PIXIE” and “LORNA DOONE”, a much worked engine, saved from the scrapmans torch and now, thankfully, safely in preservation. G Bagnall Ltd commenced trading as a locomotive works in the year 1887. Noted for their enormous diversity of fin- ished products, it wasn’t until 1891 when Ernest Baguley Wwas engaged as works manager that a production system was intro- duced. Baguley designed a standard range of locomotive types which characterised Bagnall from that time forward. These locomotives were the familiar narrow gauge saddle tanks so popular with small con- tractors and the type that Sapphire is based upon. Sapphire features a “round top” saddle tank, brass filler, full cab and bunkers with cir- cular brass window frames, handrails and cab mounted whistle. Slip eccentric valve gear is fitted as standard with optional Hackworth or Walschaerts valve gear. Other options available (see pricelist) are iron spoked wheels, brass top chimney, screw down brake, mechan- SWALLOW ical lubricator, injector and Tender. SWALLOW is a standard gauge 0-4-0 shunter based on the locomotive supplied to Messrs Cadbury Bros of Bournville in 1959. This engine joined four Avonside built locos of similar design, but of a much earlier date, they were introduced between 1910/20.All these locomotives were painted in the distinctive Cadbury livery of Bright red, lined out in Yellow & Black and with the Cadbury Bournville lettering along the tank sides, in Gold leaf , edged in Crimson. -
The Development of Locomotive Power at Speed by E
404 The Development of Locomotive Power at Speed By E. L. Diamond, M.Sc. (Eng.), A.M.I.Mech.E.* The power developed per unit of cylinder volume of locomotives in the speed range from 250 to 400 r.p.m. has in recent years been doubled. Forty years ago it was often the case that the diminution of the mean effective pressure with increase of speed, rather than the evaporative capacity of the boiler, limited the power of the engine. The most advanced designs maintain the mean pressure at a high percentage of the calculated value to the highest speeds, and the effect of valve events and clearance volume on the calculated mean pressure thus becomes of practical importance, especially as designers are endeavouring to use considerably higher steam pressures in single-expansion cylinders. The first part of this paper sets out the effect of these factors over a wide range of steam pressures in the form of basic data graphs of mean pressure, relative efficiency, and steam consumption. It is shown that without the decrease of clearance volume and increase of expansion ratio which com- pound expansion affords, the improved thermal efficiency which higher steam pressure offers cannot be fully realized above about 250 lb. per sq. in. boiler pressure, though greater power can be obtained. The second part of the paper is devoted to an examination of the actual deviation of mean pressure with speed for a wide range of locomotives, including some of the most recent designs, and the reasons for the radical improvement are indicated. -
Decauville, Live Steam
Accucraft Decauville 3.5t Type 1 – 1:13.7 B77-531 7/8ths Type 1 Maroon B77-532 7/8ths Type 1 Green B77-533 7/8ths Type 1 Black Instruction Manual for Decauville Type 1 Note: Please read the entire manual prior to operation Unpacking and Assembly Remove inner box from the shipping carton, lift open and remove the locomotive, in its cocoon, from the box. Place the board on a hard surface and using a razor knife cut along the board edge. Carefully pull off the tape and plastic from the locomotive. Discard all tape and plastic. There is a small parts bag with the tools, tank caps and headlamp. General Information Operating a live steam model is different from an electrically powered version. It is a hands on interactive model. Never leave any working engines unattended once the burner is lit or if the locomotive is under way. Always know where and how the locomotive is operating including the boiler water levels. • Always read and understand the manual prior to operation for the first time. • Always maintain the lubrication on the motion parts and lubricator as it is designed for extended run times. The lubricator will last for about 45-60mins. • Never let the engine run completely out of water – if the locomotive suddenly stops and there is still pressure or if the glass is empty shut down the burner. DO NOT ADD WATER TO A HOT EMPTY BOILER • When filing the gas tank, keep away from any open flame or passing by locomotives, especially Alcohol fired locomotives. -
LNWR G2 0-8-0 Heavy Goods Engine by Meshtools
LNWR G2 0-8-0 Heavy Goods Engine By Meshtools Contents Section Page Number History 1 Technical data 2 Controls 3 Advice 27 Scenarios 28 Credits 29 History The LNWR (London and North Western Railway) G2s were the last in the line of LNWR 0-8-0s whose lineage dates back to 1892. The G2s were a series of 60 new build engines being built from 1921 to 1922 under C.J. Bowen Cooke at Crewe works and were in essence an improved version of the earlier G1. They featured a redesigned and strengthened direct acting joy valve gear, strengthened frames, large axles and axle boxes and a higher boiler pressure of 175psi over the G1’s 160psi. The G1s themselves were an amalgamation of rebuilt and upgraded earlier classes along with a handful of new built engines (and so comprised of members of the A, B, C, C2X, D, E, F and G classes). Over time most of the G1s would be rebuilt into the class known as the G2A which raised the boiler pressure to 175psi, strengthened the motion and often replaced the indirect acting joy valve gear with direct acting gear. Combined the G2, G1 and G2A class were comprised of around 502 members making it the 6th largest class of locomotives to operate in the UK and 4th of the LMS classes (only being beaten by Black fives, 4Fs and 8Fs). This means that the LNWR 0-8-0s became something of a quasi- standard heavy freight engine class of the LMS, something that the higher ups in the LMS would only begrudgingly admit, although a lot of rebuilding and improvements to the classes were unusually done under William Stanier of all people! The G2s could practically be found on all types of trains on the LMS and under BR, from heavy mineral, coal and goods trains, fast vacuum fitted express goods, pickup goods, banking, piloting, shunting, snow plough duties, stopping passenger trains, excursions, railtour specials and even express passenger trains, they did the lot. -
Modular Locomotive System Instruction Manual for HBK3 Billy Boiler Kit
Modular Locomotive System Instruction Manual for HBK3 Billy Boiler Kit Roundhouse Engineering Co. Ltd. Units 6-10 Churchill Business Park. Churchill Road, Wheatley. Doncaster. DN1 2TF. England. Tel. 01302 328035 Fax. 01302 761312 Email. [email protected] www.roundhouse-eng.com HBK3—Gas Fired Boiler and Fittings HBK3 Gas Fired Boiler and Equipment These instructions cover the installation of a gas fired boiler to the HBK1 Walschaerts valve-geared 0-4-0 chassis kit. Before starting to actually assemble these parts, read through these instructions fully so that you identify all parts and understand where each is fitted. Refer to diagrams at all times as these will make it clear which way round certain parts go. Before starting assembly, refer to the checklist on the back page, and check that all parts are included. Cab Layout This diagram shows the layout of the cab fittings on the finished model fitted with Walschaerts valve gear for manual control. Note that the bodywork and cab floor shown in the diagram are not included in this kit, but are available in the HBK5 body kit. Construction BOILER AND STEAM FITTINGS Before fitting the boiler, all fittings have to be removed. Unscrew and remove the safety valve. This will enable the brass wrapper to slide forwards and off the boiler. The steam fittings (regulator and pressure gauge) can now be removed. These are just loosely screwed on for ease of packing. The brass wrapper can be painted the desired colour at this stage. The brass should be thoroughly cleaned and rubbed down with fine wet and dry paper before painting. -
LM5-Valve Gear and Motion
Developing these modules has taken time and expense. We hope you will benefit from the information contained within the modules. If you wish to make a donation to help BESTT recover our costs and promote further modules it would be gratefully appreciated. You can make a donation HERE. Thank You… ©2019 Boiler & Engineering Skills Training Trust Steam Locomotive Repair and Overhaul Module LM5 Steam Locomotive Valve Gear & Motion DISCLAIMER. The Boiler and Engineering Skills Training Trust (BESTT) has used its best endeavours to ensure that the content shown herein is accurate, complete and suitable for its stated purpose. However, it makes no warranties, express or implied that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. Accordingly BESTT will not be liable for its content or any subsequent use to which this document may be put. Richard Gibbon & Tony Simons October 2017 – version 1.1 Module BESTT LM5 Steam Locomotive Valve Gear & Motion Aim This unit will give learners an understanding of how Locomotive Valve gear and the associated motion operates and how to examine for wear. The learner will consider: - * Valve Gear * Eccentrics * Expansion Links * Different types of Valve Gear * Setting of valves * Motion * Examination and reporting Learning Outcomes LO1 General Valve gear operation LO2 Stephenson’s Valve Gear LO3 Walschaerts Valve Gear LO4 Other Valve Gear LO5 Valve Setting LO6 Routine Examination for Valve Gear LO7 Locomotive Motion LO8 Locomotive Motion Examination INTRODUCTION Valve Gear is the name we give to the mechanism that imparts movement to the valve of a steam engine whether it be the simple slide valve or more complex piston valve, or even poppet valves.