11.30 Am., Arrive Mnyangane Irrigation 7.10 P.M.; Tlieservice to Operate As Follows— (B) Depart Mnyangane Irrigation Monday and Sunday Route 2: Ca , "

Total Page:16

File Type:pdf, Size:1020Kb

11.30 Am., Arrive Mnyangane Irrigation 7.10 P.M.; Tlieservice to Operate As Follows— (B) Depart Mnyangane Irrigation Monday and Sunday Route 2: Ca , : 3 G ( | _ Published by Authority + Vol. LXII, No 71 - oo 22nd NOVEMBER, 1985 Price 30c 2 bay General Notice 708 of 1985. (b) depart Bulawayo Friday and Sunday 8.30 am., arrive Mnyangane 4.10 p.m.; ROADMOTOR TRANSPORTATION ACT [CHAPTER 262] (c) depart Mnyangane Monday, Thursday and Saturday 4.55 am., arrive Bulawayo 12.30 p.m. : . Applications in Connexion with Road Service Permits - Mucheche Investments (Pvt) Ltd. “ . ° IN terms of subsection (4) of-section 7 of the Road Motor gent Permit: 20501. Motor-omnibus. Passenger-capacity: Transportation Act [Chapter 262], notice is hereby given that the applications detailed in the Schedule, for the issue or Route 1: Harare - Arcturus Mine - Goromonzi - Graseley - amendment of road ‘service permits, have been received for Mwanza School - Mutoko Kraal. the consideration of the Controller of Road Motor Transporta- Route 2: Harare - James Farm - Goromonzi - Arcturus - tion. : . ‘ a Graseley - Mwanza School - Mutoko Kraal. - Anyperson wishing to object to any such application must By:. , oe lodge with the Controller of Road Motor Transportation, P.O. Box 8332, Causeway— > Route 1:.Deletion of route. (a) a notice, in writing, of his intention to object, so as to Route 2: ; . reach the Controller’s: office not later than the 13th (a) Extension of route from Mutoko Kraal - Oribi Store. December, ‘1985; (b) Introduction of route stages: Ruwa and Chibamu. (b) his objection and the grounds therefor, on form R.M.T. (c} Alteration to times. 24, together with two copies. thereof, so as to reach the - (d) Increase in frequencies. Controller’s office not later-than the 3rd January, 1986. Any person objecting to»an application. for the issue or Theservice operates as follows— amendmentof a road service permit must confine his grounds of Route 1: : objection to matters directly bearing on the considerations ‘(a) depart Harare Monday 6.10 a.m. and 2 p.m., arrive referred to in paragraph(a), (b), (©), (@), (©), or © of section Mutoko Kraal 7.35 a.m. and 3.30 p.m., respectively; . 8 of the said.Act. 7 (b) depart Harare Tuesday to Thursday 2 p.m., arrive ‘ R. N. TSOMONDO, Mutoko Kraal 3.30 p.m.; : 22-11-85. Controller of Road Motor Transportation. (c) depart Harare Friday 6.30 p.m., arrive Mutoko Kraal 8.20 p.m.; ‘ _ SCHEDULE / ° (d) depart Harare Saturday 9 a.m., 1.30 pm. and 6 pm, - MOTOR-OMNIBUSES arrive Mutoko Kraal 10.35 am., 3.05 pm. and 7.50 p.m., respectively; ; Amendments (e) depart Harare Sunday 6.30 p.m., arrive Mutoko Pelandaba Bus Services (Pvt.) Ltd. ‘ -~ -Kraal 8 pm; . Permit: 21708. Motor-omnibus. Passenger-capacity:. 7 0/407/85. (2) depart Mutoko’ Kraal Monday 4.30 am. and 6. t 740 am:, arrive Harare 6 am. and 9.30 am. Route 1: Bulawayo - Matopos - Kezi - Momestead - Tuli No. 2 respectively; Business School - Kafusi River - Manama Hospital - Nhwali to Friday 8.50 a.m., ; - (g) depart Mutoko Kraal Tuesday Centre -MnyanganiIrrigation. arrive Harare 10.40 a.m.; operate “as and when required” during three Route 2: To Mutoko Kraal Saturday 5 am., 10.35 a.m. and end of each school term and on (h) depart days; at the beginning arrive Harare 6.30 a.m., 12 noon and for the conveyance of persons connected and.3.10 p.m., public holidays 4.50 pm., respectively; with school activities to and from Bulawayo and Usher p.m., arrive Harare Institute, Matopos Mission, Mzingwane Mission, Gobatema (i) depart Mutoko Kraal Sunday 3.55 Mission, Homestead Mission, Tshelanyembe: Mission, an 5.30 p.m. David Livingstone Mission.’ Route 2: oo ; Condition: Standard local authority condition. (a) depart Harare Tuesday to Friday 7 am.,. arrive By: Alteration totimes. Mutoko Kraal 8.45 am.; -The service operates as follows— (b) depart Mutoko Kraal Tuesday to Friday 4.10 a.m., arrive Harare 6.20 a.m. '-{a) depart Bulawayo Wednesday, Friday and Sunday 11.30 am., arrive Mnyangane Irrigation 7.10 p.m.; Tlieservice to operate as follows— (b) depart Mnyangane Irrigation Monday and Sunday Route 2: ca , " . arrive Bulawayo 12.30 p.m; 4.55 a.m., (a) depart Harare Monday 6.10 am, 11.30 a.m. and a.m., arrive ‘(c) depart Mnyangane Irrigation Thursday 4.55 430 pm., arrive Acturus 7.55 a.m. Chibamu 1 p.m. _ Bulawayo 1.30 p.m. and Oribi Store 7.30 p.m., respectively; The service to operate as follows— (b) depart Harare Tuesday to Thursday 7 a.m., 11.30 a.m. Bulawayo Wednesday 11.30 am., arrive ‘and 4.30 p.m., arrive Arcturus. 8.40 am., Chibamu (a) depart . p.m., respectively; Mnyangane 7.10:p.m.; 1 pm. and Oribi Store 7.30 1048 ZIMBABWEAN GOVERNMENT GAZETTE, 22ND NovemBer, 1985 (c) depart Harare Friday 7 am., 11.30 a.m., 3.30 p.m. "©/654/85. Motor-omnibus. Passenger-capacity: 65. and 6.40 p.m., arrive Arcturus 8.40 am., Chibamu Route: Harare - Concession - Mvurwi - Shayevudel - Guruve 1 pm, Goromonzi 4.40 pm. and Oribi Store - Msengezi Junction - Chitsungo - Chief Chapota - Kanye- 9.35 p.m., respectively; mba. ) depart Harare Saturday 9 a.m., 1.30 p.m. and 6 p.m. The'service to operate as follows— arrive Oribi Store 11.20 a.m., 3.50 p.m, and 8.40 p.m., (a) depart Harare Tuesday and Thursday 8 a.m., arrive respectively; Kanyemba 3.45 p.m.; -(e) depart Harare Sunday 11 am. and 5 pm., arrive (b) depart. Harare Friday 5.40 p.m., arrive Kanyemba Oribi Store 1.20 pm. and 7.20 p.m., respectively; ’ Saturday 1.40 a.m.; (f depart Oribi Store Monday 3 am., arrive Harare (c) depart Harare Saturday 2.30 Pm, atrive: Kanyemba - 6am; - 10.50 p.m.; (g) depart. Arcturus Monday to Friday 8.45 am., “arrive (d) depart Harare ‘Sunday 4 p.m., arrive .Kanyemba — ' Harare 10.30 a.m.; ~ 41.50 p.m.; (h) . depart Chibamu Monday to Friday 1.10 p.m., arrive (e) depart Kanyemba Monday, Wednesday and Friday to ~ Harare 3 p.m.; Sunday 4,30 a.m., arrive Harare 12 noon. @ depart Oribi Store Tuesday to Friday 3.25 a.m., arrive Harare 6.20 a.m.; GOODS-VEHICLES G) depart Goromonzi Friday 4,50 pm., arrive Harare Amendments . 6.05 p.m.;. Zimat Hauliers (Pvt.} Ltd. _ (k) depart Oribi Store Saturday 3:25 a.m., 11.25 am., and .3.55 p.m., arrive. Harare 6.20 a.m., 12,45 p.m. G/546/85. Permit: 24147, ‘Goods-vehicle. Load: 37 155 and 5.15 p.m., respectively; kilograms, (2) depart Oribi Store Sunday 7 am. and 2 pm., arrive Area: Within an 80-kilometre radius of the post office, Gweru. Harare 10 a.m. and 4.05 p.m., respectively. Nature of carriage: Goods, wares and merchandise ofall kinds. Condition: Standard interlocking condition. Additionals By: Deletion of theexisting area of operation and substitution Dumbwizi Bus Service. of “Within an 80-kilometre radius of the post office, Gweru, 0/557/84. Motor-omnibus. Passenger-capacity: 76. with access to Zvishavane, Masvingo, Chiredzi and Plum- — Route 1: Harare - Macheke - Rusape - Matsika - Masvosva - tree.” . Mukonomuwi. G/547 to 549/85. Permits: 24146, 24145 and 24143. Three Route 2: Harare - Macheke - Rusape - Nyazura-- Mutare. goods-vehicles, Load: 37 155 kilograms each. The service to operate as follows— Area: Within an 80-kilometre radius of the General Post Office; Route 1: Bulawayo, with access to Plumtree. (a) depart Harare Tuesday, Saturday and Sunday 8 a.m., Nature of carriage: Goods, wares and merchandise of all kinds. arrive Mukonomuwi 1.06 p.m.; Condition: Standard interlocking condition. - (b) depart Mukonomuwi Wednesday 6 a.m., arrive Harare 11.06 a.m.; By: Deletion of the existing area of operation and substitution of “Within an 80-kilometre radius of the Genéral Post Office, . (c) depart Mukonomuwi Saturday and Sunday 2 p.m., Bulawayo, with access to _Plumtree, Zvishavane, “Masvingo arrive Harare 7.06 p.m. and Chiredzi.”’. Route 2: (a) depart Harare Wednesday 1.40 pm., arrive Mutare ” Gys50/85, Permit: 19275, Goods-vehicle. Load: 1900 6.45 p.m.; kilograms. (b) depart Harare Friday 10 a.m,, arrive Mutare 3.15 p.m.; Route: Bulawayo - Koce River- Queen’s Mine - Turk Mine- (c) depart Mutare Thursday 10 am., arrive Harare Lonely Mine - Swart Farm - Gwampa - Nkai D.A. Office - 3.15 pm; Godfrey Huggins Bridge - William Farrar Bridge - Nyange (d) depart Mutare ‘Friday 4 p.m., arrive Harare River - Lutope River - Mbumbus River - Sengwe River - 9.15 p.m. Gokwe D.A.Office. Nature of carriage: Goods, wares and merchandise of all kinds. Mhofu Express Services (Pvt.) Ltd. By: Extension of the existing route from Gokwe D.A.. Office - 0/614/85. Motor-omnibus. Passenger-capacity: 76. Harare. Route: Zamchiya - Makoho - Tilcor - Chiredzi - Triangle. Additionals The service to operate as follows— Consolidated Transport Services (Pvt.) Ltd. (a) depart Zamchiya Montay to Sunday -5 am., arrive G/516/85. Goods-vehicle. Load: 5 000 kilograms. : Triangle 10.30 a.m.; - Area: Within an 25-kilometre. radius of the General Post Office, (b) depart Triangle Monday to Sunday 10.45 am., arrive Harare. Zamchiya 7‘Pm. Nature of carriage: Goods, wares and merchandise of all kinds. O/615/85:. Motor-omnibus, Passenger-capacity: 76. Condition: For the collection and delivery of goods which are Route: Dumisa - Chikombedzi - Chibwedziwa - Chiredzi - to be carried, or which have been carried, on the com- _ Chief Chitsa - Gudo Township. pany’s recognized trunk services only. Note—This application is made to reinstate permit 20211, The service to operate as follows— which expired on the 31st May, 1984.
Recommended publications
  • Wfp.Org/Hunger‐AnalyCs‐Hub)
    FOOD SECURITY AND MARKETS MONITORING REPORT April 2021 17 April 2021 Contents Highlights ............................................................................................................................................... 3 Update on the COVID‐19 Situaon ....................................................................................................... 4 Macro‐Economic Situaon ................................................................................................................... 5 Food and Nutrion Security Situaon ................................................................................................... 6 Market Performance Update ............................................................................................................... 8 Food Commodity Prices in Foreign Currency (US$ terms) .............................................................................. 8 Rural markets – review of availability and prices in Zimbabwe dollars (ZWL) ............................................... 9 Urban markets – review of availability and prices in Zimbabwe dollars (ZWL) ............................................ 10 Recommendaons .............................................................................................................................. 11 Annex 1: Markets sample and data collecon……………………………………………………………………………...13 Annex 2: Urban Districts Maize Grain Prices ………………………………………………………………………………..13 Annex 3: Rural Districts Maize Grain Prices ………………………………………………………………………………....13 Annex 4:
    [Show full text]
  • Matebeleland South
    HWANGE WEST Constituency Profile MATEBELELAND SOUTH Hwange West has been stripped of some areas scene, the area was flooded with tourists who Matebeleland South province is predominantly rural. The Ndebele, Venda and the Kalanga people that now constitute Hwange Central. Hwange contributed to national and individual revenue are found in this area. This province is one of the most under developed provinces in Zimbabwe. The West is comprised of Pandamatema, Matesti, generation. The income derived from tourists people feel they have been neglected by the government with regards to the provision of education Ndlovu, Bethesda and Kazungula. Hwange has not trickled down to improve the lives of and health as well as road infrastructure. Voting patterns in this province have been pro-opposition West is not suitable for human habitation due people in this constituency. People have and this can be possibly explained by the memories of Gukurahundi which may still be fresh in the to the wild life in the area. Hwange National devised ways to earn incomes through fishing minds of many. Game Park is found in this constituency. The and poaching. Tourist related trade such as place is arid, hot and crop farming is made making and selling crafts are some of the ways impossible by the presence of wild life that residents use to earn incomes. destroys crops. Recreational parks are situated in this constituency. Before Zimbabwe's REGISTERED VOTERS image was tarnished on the international 22965 Year Candidate Political Number Of Votes Party 2000 Jelous Sansole MDC 15132 Spiwe Mafuwa ZANU PF 2445 2005 Jelous Sansole MDC 10415 Spiwe Mafuwa ZANU PF 4899 SUPPORTING DEMOCRATIC ELECTIONS 218 219 SUPPORTING DEMOCRATIC ELECTIONS BULILIMA WEST Constituency Profile Constituency Profile BULILIMA EAST Bulilima West is made up of Dombodema, residents' incomes.
    [Show full text]
  • Year Ending December 31, 2009 Estimates of Expenditure
    ESTIMATES OF EXPENDITURE FOR THE YEAR ENDING DECEMBER 31, 2009 SUMMARY CONSTITUTIONAL AND STATUTORY APPROPRIATIONS 2009 BUDGET ESTIMATES No. Title Page Amount Amount Amount Z$ US$ ZAR I. President and Cabinet 28 416,000 20,800 213,512 II. Parliament of Zimbabwe 28 548,000 27,400 281,261 III. Public Service 28 2,367,937,520 118,396,876 1,215,343,932 IV. Audit 29 320,000 16,000 164,240 V. Finance 29 20,000,000 34,495,061 10,265,000 VI. Justice and Legal Affairs 29 19,990,000 999,500 10,259,868 $2,409,211,520 $153,955,637 R1,236,527,813 DETAILED STATEMENT CONSTITUTIONAL AND STATUTORY APPROPRIATIONS I. PRESIDENT $416 000 Salary and allowances 416,000 20,800 213,512 (Section 31A (1) of the Constitution as read with Chapter 2:06) II. PARLIAMENT OF ZIMBABWE $548 000 Salary and allowances 548,000 27,400 281,261 (Section 45 (1) of the Constitution as read with Chapter 2:06) III. PUBLIC SERVICE $2 367 937 520 State Service, Judges and Ministerial and Parliamentary pensions and other benefits 1,233,670,340 61,683,517 633,181,302 (Section 112 of the Constitution (Paragraph 1 (4) of Schedule 6) as read with Chapter 2:02; Chapter 7:08; Chapter 16:01; Chapter 16:06 and S.I. 124 of 1992) Refunds of contributions 300,000 15,000 153,975 (Section 112 of the Constitution (Paragraph 1 (4) of Schedule 6) as read with Chapter 16:06) Commutation of pensions 780,160 39,008 400,417 Awards under Pensions (Supplementary) Acts 131,120 6,556 67,297 (Section 6 of Act No.
    [Show full text]
  • Zimbabwe Electricity Transmission & Distribution Company Important Notice to Customers 2012 Winter Load Shedding Programmes
    ZIMBABWE ELECTRICITY TRANSMISSION & DISTRIBUTION COMPANY IMPORTANT NOTICE TO CUSTOMERS 2012 WINTER LOAD SHEDDING PROGRAMMES INTRODUCTION The Zimbabwe Electricity Transmission & Distribution Company is experiencing a power shortfall due to generation constraints at Hwange Power Station, the low dispatch at the small thermal power stations and power import constraints. The power shortfall is being managed through load shedding in order to balance the power supply and demand. Power demand peaks to about 2100MW in Zimbabwe during the winter period. The load shedding programmes are only a guide for planning purposes. The power supply situation is DYNAMIC and load shedding on a day will depend on the power available and power demanded on the day. In the event of the supply shortfalls falling below anticipated averages on a particular day, then the additional areas indicated on the schedules will be load shed. ZETDC is doing everything possible to improve the available capacity. Customers are asked to use the limited power sparingly. All non-essential loads should be switched off. Domestic geysers and water heaters should be switched off manually between 5pm and 8pm to enable more residential areas to have power. All commercial customers are required to switch off all lights, office equipment and appliances that will not be in use over night. All customers are being called upon not to use lights during the day where possible. Essential services loads in the categories listed below are exempted from load shedding. • Major Referral Hospitals • Major Water & Sewer installations • National Security Establishments • Major Airports and Broadcasting Stations • Major Central Business Districts The major winter wheat clusters will receive priority supplies.
    [Show full text]
  • Literature Review
    UNIVERSITY OF ZIMBABWE Impact and sustainability of drip irrigation kits, in the semi-arid Lower Mzingwane Catchment, Limpopo Basin, Zimbabwe By Richard Moyo A thesis submitted to the University of Zimbabwe (Faculty of Engineering, Department of Civil Engineering) in partial fulfilment of requirements of Master of Science in Water Resources Engineering and Management ABSTRACT Smallholder farmers in the Mzingwane Catchment are confronted with low food productivity due to erratic rainfall and limitations to appropriate technologies. Several drip kit distribution programs were carried out in Zimbabwe as part of a global initiative aimed at 2 million poor households a year to take major step on the path out of poverty. Stakeholders have raised concerns of limitations to conditions necessary for sustainable usage of drip kits, such as continuing availability of minimum water requirement. Accordingly, a study was carried out to assess the impacts and sustainability of the drip kit program in relation to water availability, access to water and the targeting of beneficiaries. Representatives of the NGOs, local government, traditional leadership and agricultural extension officers were interviewed. Drip kit beneficiaries took part in focus group discussions that were organised on a village basis. A survey was then undertaken over 114 households in two districts, using a questionnaire developed from output of the participatory work. Data were analysed using SPSS. The results from the study show us that not only poor members of the community (defined for the purpose of the study as those not owning cattle), accounting for 54 % of the beneficiaries. This could have been a result of the condition set by some implementing NGOs that beneficiaries must have an assured water source - which is less common for poorer households.
    [Show full text]
  • PARKS and WILD LIFE ACT Acts 14/1975, 42/1976 (S
    TITLE 20 TITLE 20 Chapter 20:14 PREVIOUS CHAPTER PARKS AND WILD LIFE ACT Acts 14/1975, 42/1976 (s. 39), 48/1976 (s. 82), 4/1977, 22/1977, 19/1978, 5/1979, 4/1981 (s. 19), 46/1981, 20/1982 (s.19 and Part XXVI), 31/1983, 11/1984, 35/1985, 8/1988 (s. 164), 1/1990, 11/1991 (s. 24), 22/1992 (s. 14); 19/2001; 22/2001; 13/2002. R.G.Ns 1135/1975, 52/1977, 126/1979, 294/1979, 265/1979, 294/1979, 748/1979; S.Is 675/1979, 632/1980, 640/1980, 704/1980, 773/1980, 781/1980, 786/1980, 139/1981, 140/1981, 181/1981, 183/1981, 639/1981, 860/1981, 139/1982, 140/1982, 337/1983, 454/1983, 123/1991 ARRANGEMENT OF SECTIONS PART I PRELIMINARY Section 1. Short title. 2. Interpretation. PART II PARKS AND WILD LIFE MANAGEMENT AUTHORITY 3. Establishment of Parks and Wild Life Management Authority. 4. Functions of Parks and Wild Life Management Authority. 5. Establishment and composition of Parks and Wild Life Management Authority Board. 6. Minister may give Board policy directions. 7. Minister may direct Board to reverse, suspend or rescind its decisions or actions. 8. Execution of contracts and instruments by Authority. 9. Reports of Authority. 10. Appointment and functions of Director-General and Directors of Authority. 11. Appointment of other staff of Authority. PART IIA FINANCIAL PROVISIONS 12. Funds of Authority. 13. Financial year of Authority. 14. Annual programmes and budgets of Authority. 15. Investment of moneys not immediately required by Authority. 16. Accounts of Authority.
    [Show full text]
  • Mm. ZIMBABWEAN
    i ; • .» R mM. ZIMBABWEAN .1' 1 GOVERNMENT GAZETTE Published bv Authoritv '.rb % V f Vol. LXXXV, No. 84 7th DECEMBER, 2007 Price $250 000,00 General Notice 248 of 2007. CHANGI£ OF NAME I STATE PROCUREMENT BOARD TAKE notice that, on the 27th day ot November. 2007. Emmanuel Tenders Invited Miichabaiwa(born on 4th .August. 1978) appeared before me. Blessing Chadyiwa, a legal practitioner and notaiy public, and changed his j- TENDERS must be enclosed in sealed envelopes, endorsed on the outside with the I '’“me tO Emmanuel Mupanduki.—Blessing Chadyi wit. c/oChadyiwa ad\ ertised lender number, description, closing dale and must be posted in tim*e to be & Associates, 166, Chinhoyi Street, Harare. , .4126711 sorted into Post OtTice Box Numlwr CY 408. Causeway or delixcred by hand to the Principal OtTicer, State Procurement Hoard. Fifth Floor, Old Reserve Bank Budding, CHANGEOF NAME Samora Machel Avenue. Harare, before 10.00 a.m. on the closing date. TAKE notice that, on tjie 27th day of November. 2007, Richard S. MLITANHAURWA, Muchabaiwa (born on 30ih November, 1968) appeared before me. 7-12-2007. Acting Principal Officer, Stale PnKurcmeni Board. Blessing Chadyiwa. a legal practitioner and notary public, and Tender itumher changed his name to Richard Mupanduki.—Blessing Chadyiwa. c/o Chadyiwa & Associates, 166. Chinhoyi Street, Harare. 312672f RDS.8 of2007. The provision of security guard services to Ministry of Transport and Communications Department of Roads for CHANGE OF NAME the period 1st January, 2008 to 31st December. 2008. Documents are obtainable from the Secretary for Transport TAKE notice that, on the 30th day of November, 2007, Modester and Communicati6ns, Room 88, Seventeenth.Floor, Kaguvi Tsumele (born on 28th March.
    [Show full text]
  • PN17 Waternet Project Report Mar10 Final.Pdf (3.967Mb)
    Research Highlights CPWF Project Report CPWF Project Report The Challenge of Integrated Water Resource Management for Improved Rural Livelihoods: Managing Risk, Mitigating Drought and Improving Water Productivity in the Water Scarce Limpopo Basin Project Number 17 Bongani Ncube, Emmanuel Manzungu, David Love, Manuel Magombeyi, Bekithemba Gumbo, Keretia Lupankwa WaterNet, PO Box MP600, Harare, Zimbabwe for submission to the March, 2010 Page | 1 Contents CPWF Project Report Acknowledgements This paper is an output of the CGIAR Challenge Program on Water and Food Project ‘‘Integrated Water Resource Management for Improved Rural Livelihoods: Managing risk, mitigating drought and improving water productivity in the water scarce Limpopo Basin’’, led by WaterNet, with additional funding provided by the International Foundation for Science (Grants W4029-1 and S/4596-1), FSP Echel Eau, CGIAR System-wide Program on Collective Action and Property Rights (CAPRi), RELMA-in-ICRAF and matching (contributed) funds from the research partners. The opinions and results presented in this paper are those of the authors and do not necessarily represent the donors or participating institutions. Secondary biophysical data (from outside the field study sites) were kindly provided by the governments of Mozambique, South Africa and Zimbabwe. Project Partners: Program Preface: The Challenge Program on Water and Food (CPWF) contributes to efforts of the international community to ensure global diversions of water to agriculture are maintained at the level of the year 2000. It is a multi-institutional research initiative that aims to increase the resilience of social and ecological systems through better water management for food production. Through its broad partnerships, it conducts research that leads to impact on the poor and to policy change.
    [Show full text]
  • ZIMBABWE COUNTRY of ORIGIN INFORMATION (COI) REPORT COI Service
    ZIMBABWE COUNTRY OF ORIGIN INFORMATION (COI) REPORT COI Service 13 July 2012 ZIMBABWE 13 JULY 2012 Contents Preface Latest News EVENTS IN ZIMBABWE FROM 7 JUNE 2012 TO 13 JULY 2012 Useful news sources for further information REPORTS ON ZIMBABWE PUBLISHED OR ACCESSED BETWEEN 7 JUNE AND 13 JULY 2012 Paragraphs Background Information 1. GEOGRAPHY ............................................................................................................ 1.01 Public holidays ..................................................................................................... 1.06 Map ........................................................................................................................ 1.07 2. ECONOMY ................................................................................................................ 2.01 Remittances .......................................................................................................... 2.12 Military involvement in the economy ................................................................. 2.17 Sanctions .............................................................................................................. 2.18 3. HISTORY (19TH CENTURY TO 2010) ............................................................................. 3.01 Matabeleland massacres 1983 - 87 (aka ‘Gurkurahundi’) ................................. 3.03 ZANU-PF win 1990s elections ............................................................................. 3.07 Land reform and War Veterans: 1990-97 ...........................................................
    [Show full text]
  • 36571 21-6 Roadcarrierp
    Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA June Vol. 576 Pretoria, 21 2013 Junie No. 36571 PART 1 OF 3 N.B. The Government Printing Works will not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes AIDS HELPLINE: 0800-0123-22 Prevention is the cure 302509—A 36571—1 2 No. 36571 GOVERNMENT GAZETTE, 21 JUNE 2013 IMPORTANT NOTICE The Government Printing Works will not be held responsible for faxed documents not received due to errors on the fax machine or faxes received which are unclear or incomplete. Please be advised that an “OK” slip, received from a fax machine, will not be accepted as proof that documents were received by the GPW for printing. If documents are faxed to the GPW it will be the senderʼs respon- sibility to phone and confirm that the documents were received in good order. Furthermore the Government Printing Works will also not be held responsible for cancellations and amendments which have not been done on original documents received from clients. CONTENTS INHOUD Page Gazette Bladsy Koerant No. No. No. No. No. No. Transport, Department of Vervoer, Departement van Cross Border Road Transport Agency: Oorgrenspadvervoeragentskap aansoek- Applications for permits:.......................... permitte: .................................................. Menlyn..................................................... 3 36571 Menlyn..................................................... 3 36571 Applications concerning Operating Aansoeke
    [Show full text]
  • Breaking the Silence, Building True Peace: a Report on the Disturbances in Matabeleland and the Midlands, 1980 - 1988
    The Catholic Commission for Justice and Peace in Zimbabwe & The Legal Resources Foundation BREAKING THE SILENCE, BUILDING TRUE PEACE: A REPORT ON THE DISTURBANCES IN MATABELELAND AND THE MIDLANDS, 1980 - 1988 A SUMMARY This report is a short version of a much longer book, which was published and released for sale in Zimbabwe in 1997. This first book was researched and written by the Legal Resources Foundation (LRF) and the Catholic Commission for Justice and Peace. (CCJP ) 2000 copies of this longer book have been published, and most have been sold. A copy was sent to His Excellency the President, and other Cabinet Ministers in Zimbabwe have also read the report. There has been no official comment about the report from the President or Government. Why was the first book written? People who live in Matabeleland and parts of the Midlands know only too well what happened to them during the 1980s. Their lives were affected in serious ways by both government troops and also by dissidents and youth brigades at this time. However, most people from other parts of Zimbabwe still have no idea what it was like for those who were suffering. They have no idea how people still suffer as a result of the violence that took place. People who were affected also do not have ways of talking to people in other parts of the country about what happened. Ordinary people all over Zimbabwe need to know what happened during those years in their own country. Why has this summary been written? The first book was very long, and had to include many details in order to make sure that the claims of the book were well supported.
    [Show full text]
  • 73 Appendix 4
    Appendix 4 All Eligible Health Facilities, HFS, Zimbabwe 2007 Province District HF Nr Health Facility H F Type Manicaland Chipinge 1 Chikore Mission H 2 Chipinge District H 3 Mt Selinda H 4 St Peters H 5 Chinyamukwakwa R 6 Chipangayi R 7 Chiriga R 8 Hakwata R 9 Kopera R 10 Mahenye R 11 Maparadze R 12 Musirizwi R 13 Chibuwe R 14 Paidamoyo R 15 Rimbi R 16 Southdowns R 17 Tamandai R 18 Tanganda R 19 Tuzuka R 20 Zamchiya R Nyanga 21 Elim H 22 Nyanga District H 23 Regina H 24 Nyarumvurwe R 25 Sabvure R 26 Spring Valley R 27 Gotekote R 28 Nyautare R 29 Ruchera R 30 Gairezi R 31 Nyatate R 32 Nyamombe R 33 Nyamaropa R 34 Chiwarira R 35 Tombo R Mashonaland East Mudzi 36 Kotwa H 37 Kondo R 38 Chikwizo R 39 Chiunye R 40 Dendera R 73 Province District HF Nr Health Facility H F Type 41 Kapotesa R 42 Makaha R 43 Masarakufa R 45 Nyamanyora R 46 Nyamatawa R 47 Suskwe R Mutoko 48 Mutoko District H 49 Nyadire Mission H 50 Nyamuzuwe H 51 Charewa R 52 Chindenga R 53 Kapondoro R 54 Kawazva R 55 Kushinga R 56 Makosa R 57 Mushimbo R 58 Nzira R UMP 59 Mutawatawa H 60 Chipfunde R 61 Chitsungo R 62 Dindi R 63 Manyika R 64 Marembera R 65 Muskwe R 66 Nyakasoro R 67 Nyanzou R 68 Sowa R Mashonalan d West Chegutu 69 Chegutu District H 70 Norton H 71 Mhondoro H 72 Chegutu Rural R 73 Chinengundu R 74 Chivero R 75 Katanga Utano R 76 Monera R 77 Musengezi R 78 Pfupajena R 79 Rwizi R 80 Sandringham R 81 Selous R 82 Watyoka R Hurungwe 83 Hurungwe Rural H 84 Karoi District H 85 Mwami H 86 Chikangwe R 87 Chinhere R 74 Province District HF Nr Health Facility H F Type 88 Chirundu
    [Show full text]