Barking Riverside Extension (London Overground) Barking Riverside
Total Page:16
File Type:pdf, Size:1020Kb
Barking Riverside Extension Barking Riverside Extension (London Overground) (London Overground) RAILWAY PERMENANT WAY CIVIL RAILWAY PERMENANT WAY CIVIL ELECTRIFICATION ENGINEERING ELECTRIFICATION ENGINEERING he Barking Riverside Exten- • Installation of new ballasted track Tsion extends the existing • Transition section between London Overground to 10,800 ballast and slab track new homes and facilities such • Installation of new crossovers as a new school and health- • Track lubrication and buffer stops care. • Stressing Project - Pod Trak is contracted to • Installation of chainage plates, “Multidisciplinary deliver: gradient signs and datum plates • A 4.5km extension to Barking scope, Permanent Riverside, from the Tilbury Loop Way, Overhead Line Line between Barking and Traction / OLE Dagenham Dock stations to The scope of the Traction / OLE & Civil Engineering Barking Riverside; works: all self-delivered • Reconfiguration of Network Rail’s • Electrification of the Up & Down Ripple Lane goods yard to allow Barking Riverside Extension using Pod-Trak the extension to connect to the • Installation of new series 2 OLE staff and in house Tilbury Loop; structures and catenary along plant fleet” • Continuation of the rail system with RC & EW the route over a new 1.5km viaduct into • Modifications / replacement to the heart of Barking Riverside; the existing infrastructure Dozer cutting formation ready for new • Upgrade to West Ham & Barking bottom ballast & track installation Feeder Stations Installation of a new Twin PWay Scope • New Neutral sections Track Cantilever as part The high-level scope of the • Testing and Commissioning of of the OLE Renewals Permanent Way works: new Overhead Line Equipment WEEKEND • Creating a new up a Tilbury Loop and up & down Barking Riverside POSSESSION • Breakout and excavation work VALUE BARKING, lines Civils – General / Ancillary BLOCKADE The scope of the civils general / • Foul Drainage and surface water LONDON • Installation of new double track HIGH STREET MARCH 2019 £19m ancillary works: • Ducts / trough routes – MAY 2021 spur line on the viaduct (slab ENVIRONMENT track circa 1.5km) • Piling / Foundations • Installation of URX / UTX.