Barking Riverside Extension (London Overground) Barking Riverside

Barking Riverside Extension (London Overground) Barking Riverside

Barking Riverside Extension Barking Riverside Extension (London Overground) (London Overground) RAILWAY PERMENANT WAY CIVIL RAILWAY PERMENANT WAY CIVIL ELECTRIFICATION ENGINEERING ELECTRIFICATION ENGINEERING he Barking Riverside Exten- • Installation of new ballasted track Tsion extends the existing • Transition section between London Overground to 10,800 ballast and slab track new homes and facilities such • Installation of new crossovers as a new school and health- • Track lubrication and buffer stops care. • Stressing Project - Pod Trak is contracted to • Installation of chainage plates, “Multidisciplinary deliver: gradient signs and datum plates • A 4.5km extension to Barking scope, Permanent Riverside, from the Tilbury Loop Way, Overhead Line Line between Barking and Traction / OLE Dagenham Dock stations to The scope of the Traction / OLE & Civil Engineering Barking Riverside; works: all self-delivered • Reconfiguration of Network Rail’s • Electrification of the Up & Down Ripple Lane goods yard to allow Barking Riverside Extension using Pod-Trak the extension to connect to the • Installation of new series 2 OLE staff and in house Tilbury Loop; structures and catenary along plant fleet” • Continuation of the rail system with RC & EW the route over a new 1.5km viaduct into • Modifications / replacement to the heart of Barking Riverside; the existing infrastructure Dozer cutting formation ready for new • Upgrade to West Ham & Barking bottom ballast & track installation Feeder Stations Installation of a new Twin PWay Scope • New Neutral sections Track Cantilever as part The high-level scope of the • Testing and Commissioning of of the OLE Renewals Permanent Way works: new Overhead Line Equipment WEEKEND • Creating a new up a Tilbury Loop and up & down Barking Riverside POSSESSION • Breakout and excavation work VALUE BARKING, lines Civils – General / Ancillary BLOCKADE The scope of the civils general / • Foul Drainage and surface water LONDON • Installation of new double track HIGH STREET MARCH 2019 £19m ancillary works: • Ducts / trough routes – MAY 2021 spur line on the viaduct (slab ENVIRONMENT track circa 1.5km) • Piling / Foundations • Installation of URX / UTX.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us