Construction of MRT-LRT Common Station 72 INFRASTRUCTURE Construction of MRT-LRT common station After 8 years of delay, the construction of Metro Rail Transit-Light Railway Transit (MRT-LRT) common station is scheduled to begin in December 2017 following the signing of a memorandum of agreement (MOA) by concerned companies and government agencies. The completion of the P2.8-billion common station project is set for 2019. nder the MOA, the common station for the MRT and LRT will connect 3 main lines of LRT-1, MRT- U3 and the MRT-7 (from North Avenue, Quezon City to San Jose, Del Monte Bulacan). Signatories of the MOA were SM Prime Holdings Inc. (SM Prime), Universal LRT Corporation Limited (ULC) of the San Miguel Corporation (SMC); Light Rail Manila Corporation (LRTC); North Triangle Depot Commercial Corporation, Department of Public Works and Highways (DPWH); Light Rail Transit Authority (LRTA); and Department of Transportation (DOTr). The stakeholders met last September 28, 2016 to sign a memorandum of understanding (MOU), which lacked details, but considered an important event that gave way to the agreement by all concerned parties to finally work together for the completion of the common station project. The DOTr will undertake the financing and construction of the project, which it said, will have the benefits of seamless transfer from one line to another, bigger space and (sqm) station, passenger flow within the common station, as well connection to both SM North and TriNoma malls in Quezon City. as traffic management for the roads below, and commitment by The proposed design will be presented to concerned constituents, both public and private entities involved on specific expenses. representatives of various organizations and local officials to obtain It is also seen as an end to a legal row that has badly affected their feedback before coming up with the final design, according commuters of LRT-1 and MRT due to the absence of a connection to to the DOTr. The proposed common station consists of 3 areas: the 1.2-kilometer (km) disrupted tramline along EDSA, a piece of h Area A — location of the platform and concourse for LRT-1 property that is now being used as parking lot by the TriNoma mall. and MRT-3; The project has been delayed for 8 years as Sy family’s SM h Area B — location of the 2 concourses connecting Areas A North Edsa and Ayala Group’s TriNoma fought to acquire the right and C; and for the common station location. According to the DOTr, after the h Area C — location of the platform for MRT-7. completion of the detailed designs by 4Q2017, it is expected that an appeal for the dismissal of the case filed by SM Prime that led The MOA includes a blueprint for the implementation of the to the Supreme Court (SC) issuance of a temporary restraining common station and the role of each stakeholder in the project. order (TRO) in 2014 will result in the final resolution of the case. It contains the design parameters of the 13,700-square meter Philippine ANALYST INFRASTRUCTURE March 2017 INFRASTRUCTURE 73 The MRT-LRT common station will be built at a cost of P2.8 billion. The new location of the MRT-LRT common station as compared to earlier proposed sites. Source: Department of Transportation (DoTr) The common station will have 3 areas. Source: Department of Transportation (DoTr) Philippine ANALYST INFRASTRUCTURE March 2017 74 INFRASTRUCTURE The case stemmed from an agreement signed by the New timeline for regional airports PPP project government and SM Prime in 2009 for the construction of a common station near the annex mall of SM City North Edsa. The Department of Transportation (DOTr) announced the SM Prime paid the government P200 million in the deal that also new timeline for the regional airports under the public- included naming rights. But the project was delayed when a change private partnership (PPP) project. of government took place in 2010. A legal battle ensued when the Aquino government decided to transfer the location of the common The revised timeline for the regional airports project involves station near TriNoma citing that construction cost would be P1.4 finance, design, construction, operation and maintenance billion lower than in the original site. But the common station near of the Bacolod-Silay, Davao, Iloilo, Laguindingan, and TriNoma was criticized as commuters would need to walk farther. the New Bohol (Panglao) airports under the PPP scheme. In the proposed location of the common station under Under the PPP, the private partner will undertake the the MOA, commuters transferring from MRT-3 to LRT- operation and maintenance of the airport and build additional 1 and MRT-7 need only walk up 50 to 200 meters, facilities and other necessary improvements for passenger safety, depending on which train they use. In addition, the passenger security of the facility, passenger and cargo movement, and concourse can be expanded depending on future needs. overall operational efficiency under an agreed concession period. At the Senate hearing, some senators agreed that the current The submission of qualification documents has been set location is the best option although the Senate committee wants on May 11. Then, DOTr will release instructions to bidders “someone to be held liable for the P200-million naming rights and draft concession agreement on June 1. Bid proposals contract of SM Prime, which was not even auctioned off.” submission date is on December 8, while the issuance of the The senators also questioned the increase in project cost to notice of award is expected to take place by January 2018. P2.8 billion from P1.4 billion at 2,500 sqm in 2014, and P2.4 The Aquino administration offered the regional airports project billion at 7,200 sqm in 2009. The DOTr responded that the new in 2 bundles: Bundle 1 consisted of Iloilo Airport and Bacolod- location is bigger at 13,700 sqm and almost double the capacity Silay Airport, while Bundle 2 consisted of Davao Airport, New of the original 2009 design. The original design had single tracks Bohol (Panglao) Airport and the Laguindingan Airport. To speed and narrower concourses, while the latest design has dual tracks up the selection and awarding of the contracts, however, the Duterte to reduce headway to around 2.5 minutes, while the platform administration opted to unbundle the 5 regional airports PPP project. will span 6 meters compared to 3 meters from the previous plan. Below are the indicative costs of the regional Thirteen foreign and local business groups have urged the airports. All airports are existing except for the Bohol government to fast-track completion of the common train station, (Panglao) airport, which is being constructed by the a major transport project that was being derailed by prolonged joint venture of Mitsubishi and Chiyoda corporations. discussions in Congress given the questions on the construction Prior to the issuance of the revised timeline, several concerns were cost. The joint statement issued by the business groups urge the raised by interested bidders on the DOTr requirements. A request “expeditious completion of the common train station to link the for the extension of the submission of qualification documents was LRT-1, MRT-3 and the ongoing MRT-7 rail commuter lines in put forward by Filinvest Development Corp. Two firms, Metro a location that will conveniently serve the expected 1.5 million Pacific Investments Corp. (MPIC) and Aboitiz InfraCapital voiced commuters,” as they threw full support to the MOA signed. their concerns on the requirement that an airport operator of the participating group should have a 10% stake in the consortium. Philippine ANALYST INFRASTRUCTURE March 2017 INFRASTRUCTURE 75 INDICATIVE COSTS OF 5 REGIONAL AIRPORTS AIRPOrt IN BILLION PESOS NEW BOHOL (PANGLAO) 2.34 LAGUINDINGAN 14.62 DAVAO 40.57 BACOLOD-SILAY 20.26 ILOILO 30.40 TOTAL 108.19 The 5 regional airports have total indicative cost of P108.19 billion. Philippine Airports Consortium – which includes MPIC, Aeroports de Paris, and ADP Ingenierie – was pre-qualified by the Aquino administration to bid for the project. But its foreign partner, Aeroports de Paris, pulled out from the consortium after the Duterte administration announced its decision to unbundle the airports. Unbundling the PPP project into individual airport places uncertainty on the operator’s returns since each airport is small. As a result, MPIC is now looking for another foreign partner. Under the Aquino administration, the conglomerates that were pre-qualified to bid were: h Filinvest-Jatco-Sojitz Consortium - composed of Filinvest Development Corp., Japan Airport Terminal Co. Ltd, and Sojitz Corp.; h GMR Infrastructure and Megawide Consortium - composed of Megawide Construction Corp. and GMR Infrastructure Singapore Pte. Limited; h Maya Consortium - composed of Aboitiz Equity Ventures Inc. and VINCI Airports SAS; h Philippine Airports Consortium (Metro Pacific Investments Corp. and Philippines Airport Management Co.; and h SMHC-IIAC Airport Consortium - composed of San Miguel Holdings Corporation and Incheon International Airport Corp. Philippine ANALYST INFRASTRUCTURE March 2017 76 INFRASTRUCTURE Three major railway projects outside Metro The feasibility study for the initial phase of the subway Manila is set to be completed by September, while that of the commuter rail to Laguna is yet to be started. The feasibility The Japanese government committed to provide funding for 3 for the railway to Clark will be completed in April 2018. railway projects in the Philippines amounting to $8.8 billion. Details of the Mega Metro Manila subway were also These projects are included in the flagship infrastructure announced. To start construction by 4Q2020, the project will apply Japanese tunneling expertise and is targeted for projects of the Duterte administration. completion by 2Q2024.
Recommended publications
  • Infrastructure Tracker – RAILS
    TAPP II: Infrastructure Tracker as of November 20, 2017 Funding Type Cost Private (GPH, ODA, Phase/Status No. Sector Location Project Name (in PhP or Agency Description Date of Information Counterpart PPP, Private, (Completion Date) US$ B) PDMF) Rails Projects Phase 1: 50.5 km from the Malolos end of North-South Commuter Railway up to Clark Rails North-South Railway Project (north line) Phase 1 construction: Q2 2019 1 Luzon DOTr airport will have five stations—Malolos, ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 1) Completion: Q2 2022 Apalit, San Fernando City, Clark and Clark ₱ 211.42 International Airport. Phase 2: 19 km railway to connect airport to Rails North-South Railway Project (north line) Clark Green City through three more 2 Luzon DOTr ODA/GOJ 06-Jun-17 Projects (Malolos-Clark Railway Phase 2) stations—Calumpit, Angeles City and Clark Green City. Financing, design, construction, operation & maintenance of 23km elevated railway line with 14 stations from San Jose Del Monte, Under Construction Rails 3 NCR MRT Line 7 Project ₱ 69.30 DOTr SMC Bulacan to MRT 3 North Avenue in Quezon PPP (unsolicited) On-going civil works 20-Oct-17 Projects City and 22km asphalt road from Bocaue (10.35% complete) Interchange of NLEX to intermodal terminal in Tala. A Brown Construction, operation and maintenance of Company Inc., Rails 11-station East-West Rail (EWR), a mostly 4 NCR East-West Rail Project $ 1.00 PNR and MTD PPP (unsolicited) For evaluation by ICC-TWG 20-Nov-17 Projects elevated 9.4km railway line from Diliman, Philippines, Quezon City to Lerma, Manila.
    [Show full text]
  • Riders Digest 2019
    RIDERS DIGEST 2019 PHILIPPINE EDITION Rider Levett Bucknall Philippines, Inc. OFFICES NATIONWIDE LEGEND: RLB Phils., Inc Office: • Manila • Sta Rosa, Laguna • Cebu • Davao • Cagayan de Oro • Bacolod • Iloilo • Bohol • Subic • Clark RLB Future Expansions: • Dumaguete • General Santos RIDERS DIGEST PHILIPPINES 2019 A compilation of cost data and related information on the Construction Industry in the Philippines. Compiled by: Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levett Bucknall Group Main Office: Bacolod Office: Building 3, Corazon Clemeña 2nd Floor, Mayfair Plaza, Compound No. 54 Danny Floro Lacson cor. 12th Street, Street, Bagong Ilog, Pasig City 1600 Bacolod City, Negros Occidental Philippines 6100 Philippines T: +63 2 234 0141/234 0129 T: +63 34 432 1344 +63 2 687 1075 E: [email protected] F: +63 2 570 4025 E: [email protected] Iloilo Office: 2nd Floor (Door 21) Uy Bico Building, Sta. Rosa, Laguna Office: Yulo Street. Iloilo Unit 201, Brain Train Center City Proper, Iloilo, 5000 Lot 11 Block 3, Sta. Rosa Business Philippines Park, Greenfield Brgy. Don Jose, Sta. T:+63 33 320 0945 Rosa City Laguna, 4026 Philippines E: [email protected] M: +63 922 806 7507 E: [email protected] Cagayan de Oro Office: Rm. 702, 7th Floor, TTK Tower Cebu Office: Don Apolinar Velez Street Brgy. 19 Suite 602, PDI Condominium Cagayan De Oro City Archbishop Reyes Ave. corner J. 9000 Philippines Panis Street, Banilad, Cebu City, 6014 T: +63 88 8563734 Philippines M: +63 998 573 2107 T: +63 32 268 0072 E: [email protected] E: [email protected] Subic Office: Davao Office: The Venue Bldg.
    [Show full text]
  • Transportation History of the Philippines
    Transportation history of the Philippines This article describes the various forms of transportation in the Philippines. Despite the physical barriers that can hamper overall transport development in the country, the Philippines has found ways to create and integrate an extensive transportation system that connects the over 7,000 islands that surround the archipelago, and it has shown that through the Filipinos' ingenuity and creativity, they have created several transport forms that are unique to the country. Contents • 1 Land transportation o 1.1 Road System 1.1.1 Main highways 1.1.2 Expressways o 1.2 Mass Transit 1.2.1 Bus Companies 1.2.2 Within Metro Manila 1.2.3 Provincial 1.2.4 Jeepney 1.2.5 Railways 1.2.6 Other Forms of Mass Transit • 2 Water transportation o 2.1 Ports and harbors o 2.2 River ferries o 2.3 Shipping companies • 3 Air transportation o 3.1 International gateways o 3.2 Local airlines • 4 History o 4.1 1940s 4.1.1 Vehicles 4.1.2 Railways 4.1.3 Roads • 5 See also • 6 References • 7 External links Land transportation Road System The Philippines has 199,950 kilometers (124,249 miles) of roads, of which 39,590 kilometers (24,601 miles) are paved. As of 2004, the total length of the non-toll road network was reported to be 202,860 km, with the following breakdown according to type: • National roads - 15% • Provincial roads - 13% • City and municipal roads - 12% • Barangay (barrio) roads - 60% Road classification is based primarily on administrative responsibilities (with the exception of barangays), i.e., which level of government built and funded the roads.
    [Show full text]
  • CADP 2.0) Infrastructure for Connectivity and Innovation
    The Comprehensive Asia Development Plan 2.0 (CADP 2.0) Infrastructure for Connectivity and Innovation November 2015 Economic Research Institute for ASEAN and East Asia The findings, interpretations, and conclusions expressed herein do not necessarily reflect the views and policies of the Economic Research Institute for ASEAN and East Asia, its Governing Board, Academic Advisory Council, or the institutions and governments they represent. All rights reserved. Material in this publication may be freely quoted or reprinted with proper acknowledgement. Cover Art by Artmosphere ERIA Research Project Report 2014, No.4 National Library of Indonesia Cataloguing in Publication Data ISBN: 978-602-8660-88-4 Contents Acknowledgement iv List of Tables vi List of Figures and Graphics viii Executive Summary x Chapter 1 Development Strategies and CADP 2.0 1 Chapter 2 Infrastructure for Connectivity and Innovation: The 7 Conceptual Framework Chapter 3 The Quality of Infrastructure and Infrastructure 31 Projects Chapter 4 The Assessment of Industrialisation and Urbanisation 41 Chapter 5 Assessment of Soft and Hard Infrastructure 67 Development Chapter 6 Three Tiers of Soft and Hard Infrastructure 83 Development Chapter 7 Quantitative Assessment on Hard/Soft Infrastructure 117 Development: The Geographical Simulation Analysis for CADP 2.0 Appendix 1 List of Prospective Projects 151 Appendix 2 Non-Tariff Barriers in IDE/ERIA-GSM 183 References 185 iii Acknowledgements The original version of the Comprehensive Asia Development Plan (CADP) presents a grand spatial design of economic infrastructure and industrial placement in ASEAN and East Asia. Since the submission of such first version of the CADP to the East Asia Summit in 2010, ASEAN and East Asia have made significant achievements in developing hard infrastructure, enhancing connectivity, and participating in international production networks.
    [Show full text]
  • Status Date Finished Days Lapsed Cost Appeal
    Year Tracking Request Date Days Appeal /s Date Received Title of Request Extension? Status Cost Remarks Quarter Number Type Finished Lapsed Filed DOTR- UV Express Franchise information needed is under the 2017-Q1 e-FOI 1/4/2017 no Denied 1/26/2017 16 Free no 493758717655 Application supervision of LTFRB MCIA Passenger Terminal DOTr- information needed is under the 2017-Q1 e-FOI 1/11/2017 Building Instruction to no Denied 1/26/2017 11 Free no 994100021135 supervision of MCIAA Bidders DOTr- 2017-Q1 e-FOI 1/18/2017 LRT Cavite Update no Successful 1/18/2017 22 Free no 534815247132 DOTr- Offloading Policies for information needed is under the 2017-Q1 e-FOI 1/28/2017 no Denied 2/8/2017 8 Free no 887071901543 Tourists supervision of BI DOTr- Construction of Highways information needed is under the 2017-Q1 e-FOI 2/6/2017 no Denied 2/9/2017 1 Free no 440781755331 in the PH supervision of DPWH Ferry Transportation to DOTr- information needed is under the 2017-Q1 e-FOI 2/9/2017 reduce Cebu North Road no Denied 4/5/2017 40 Free no 012473838941 supervision of PPA Traffic DOTr- information needed is under the 2017-Q1 e-FOI 2/17/2017 Demand for Vanity Plates no Denied 3/10/2017 15 Free no 964933716374 supervision of LTO DOTr- List of the entire fleet of 2017-Q1 e-FOI 2/23/2017 no Successful 3/22/2017 19 Free no 262625516597 light rail vehicles of MRT-3 DOTr- MOA Between DOTr, 2017-Q1 e-FOI 2/24/2017 no Successful 3/7/2017 7 Free no 964712148970 Ayala, & SM DOTr- Jeepney Modernization Partially 2017-Q1 e-FOI 3/1/2017 no 4/5/2017 18 Free no 633307958466
    [Show full text]
  • Investment Opportunities Awarded Ppp Projects
    investmentawa r d ed opportunitiesppp projects Investment opportunities 1 Republic of the Philippines Public-Private Partnership Center 8th Floor, One Cyberpod Centris PPp concept EDSA cor. Quezon Avenue, Quezon City 1100 (+632) 8709-4146 Public-Private Partnership (PPP) can be broadly defined as a contractual agreement between For more information, please visit: the government and a private firm targeted www.ppp.gov.ph toward financing, designing, implementing, and For inquiries, e-mail us: operating infrastructure facilities and services [email protected] that are traditionally provided by the public sector. It embodies optimal risk allocation Or follow our social media accounts: between the parties—minimizing cost while realizing project developmental objectives. The PPPCenter.Philippines project is also structured in such a way that the @PPP_Ph private sector gets a reasonable rate of return on its investment. PPPPinas Public-Private Partnership Center of the Philippines ppp process DEVELOPMENT STAGE Table of Contents • Project preparation (feasibility study and market sounding activity) • Finalization of project structure 3 PPP Concept and PPP Process 4 Legal Framework 5 The PPP Program and PPP Program Participants APPROVAL STAGE • Project submission to relevant approving bodies 6 The PPP Center of the Philippines • Project assessment and appraisal 7 Solicited PPP Projects • Project approval by appropriate approving bodies (e.g., local development 28 Unsolicited PPP Projects councils, Investment Coordination Committee, NEDA Board,
    [Show full text]
  • The Supplementary Survey on North South Commuter Rail Project (Phase II-A) in the Republic of the Philippines PRE-FINAL REPORT
    DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS (DOTC) REPUBLIC OF THE PHILIPPINES THE SUPPLEMENTARY SURVEY ON NORTH SOUTH COMMUTER RAIL PROJECT (PHASE II-A) IN THE REPUBLIC OF THE PHILIPPINES PRE-FINAL REPORT NOVEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS GLOBAL CO., LTD. ALMEC CORPORATION KATAHIRA & ENGINEERS INTERNATIONAL 1R TOSTEMS, INC. JR(先) 15-049 DEPARTMENT OF TRANSPORTATION AND COMMUNICATIONS (DOTC) REPUBLIC OF THE PHILIPPINES THE SUPPLEMENTARY SURVEY ON NORTH SOUTH COMMUTER RAIL PROJECT (PHASE II-A) IN THE REPUBLIC OF THE PHILIPPINES PRE-FINAL REPORT NOVEMBER 2015 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS GLOBAL CO., LTD. ALMEC CORPORATION KATAHIRA & ENGINEERS INTERNATIONAL TOSTEMS, INC. Exchange Rate ( June 2015) 1 Philippine Pesos (PhP) = Japanese Yen (JpY) 2.72 1 US dollar (US$) = JpY 120.7 1 US$ = PhP 44.4 The Supplementary Survey on North South Commuter Rail Project (Phase II-A) in the Republic of the Philippines PRE-FINAL REPORT Republic of the Philippines STUDY LOCATION MAP Basic Data of Philippines Source: Ministry of Foreign Affairs, Japan, National Statistics Office of Philippines (NSO) 2 ■Area: 29.9 Thousand Km (2012), consist of ■Total Amount of Trade (FOB) (NSO, 2014) 7,109 islands. (1) Exports: US$ 61.80 billion ■ Population: 92.34 million (National Population (2) Imports: US$ 63.92 billion Census, 2010) ■Major Items of Trade ■Capital: Manila (Population in Metro Manila: (1) Exports: Electrical and electronic equipments approx. 11.86 million (ditto)) (majority: semiconductors) (2) Imports: Raw materials, intermediates (majority: ■Ethnic: Malayo-Polynesian (the largest group), Chinese, Hispanics, mixed race of them intermediates of chemical goods), capital goods and minorities (2014) (majority: communication and electronic equipments) and fuel (e.g.
    [Show full text]
  • An Inventory and Assessment of National Urban Mobility in the Philippines
    An Inventory and Assessment of National Urban Mobility in the Philippines A Project of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with the Philippine Department of Transportation (DOTr) 1 Contents List Of Acronyms and Abbreviations ............................................................................................................. 6 Executive Summary ....................................................................................................................................... 9 1. Introduction ............................................................................................................................................ 14 1.1. Background of the Study ............................................................................................................. 14 1.2. Objectives and Scope .................................................................................................................. 15 1.3. Methodology ............................................................................................................................... 15 2. Inventory and Assessment of Mobility Indicators .................................................................................. 17 2.1. Socio-demographic and economic accounts .............................................................................. 17 2.2. State of Passenger and Goods Transport .................................................................................... 20 2.2.1. Public Transport Infrastructure
    [Show full text]
  • Arangkada Philippines Publication 2017
    and the Philippine Copyright © 2017 Published by: The Arangkada Philippines Project (TAPP) The American Chamber of Commerce of the Philippines, Inc. (AmCham) Address: 7th Floor, Corinthian Plaza Bldg., 121 Paseo de Roxas, Makati City, Philippines Tel. No.: +63 (2) 751-1495 Fax No.: +63 (2) 811-3081 Website: www.arangkadaphilippines.com All rights reserved. This publication may not be reproduced in whole or in part, in any form, for commercial purposes. It is, however, an advocacy publication and its use for economic policy advocacy is highly encouraged with or without attribution. The views expressed in the publication are those of the author of the document and various experts who have cooperated with the Arangkada Philippines Project administered by the American Chamber of Commerce of the Philippines, and not in each and every instance those of the many private and public sector sponsors listed elsewhere in the document. Some of the activities reviewed in this document are made possible by the support of the American people through the United States Agency for International Development (USAID) and do not necessarily reflect the views of USAID or the United States Government. ii Page TABLE OF CONTENTS List of Tables and Figures iv Acknowledgements vii Messages viii Introduction to Arangkada Philippines xi Arangkada Philippines and the Ten-point Socio-Economic Agenda x Chapter 1: Continue Macroeconomic Agenda (Points 1 and 2) 1 A. Macroeconomic Policies (Point 1) 2 B. Tax Reform (Point 2) 8 Chapter 2: Increase Competition and the Ease of Doing Business (Point 3) 15 A. Increasing Competitiveness 17 B. Reducing Cost of Doing Business: Red Tape 22 C.
    [Show full text]
  • September 14, 2015 PHILIPPINE STOCK EXCHANGE, INC. 3Rd Floor
    September 14, 2015 PHILIPPINE STOCK EXCHANGE, INC. 3rd Floor, Philippine Stock Exchange Plaza Ayala Triangle, Ayala Avenue Makati City ATTENTION : MS. JANET ENCARNACION Head, Disclosure Department PHILIPPINE DEALING & EXCHANGE CORP. Market Regulatory Services Group 37/F, Tower 1, The Enterprise Center 6766 Ayala Avenue corner Paseo de Roxas, Makati City ATTENTION : MS. VINA VANESSA S. SALONGA Head - Issuer Compliance and Disclosures Department Re : Clarification to the September 13, 2015 News Article from The Manila Times (Internet Edition) Gentlemen: This refers to your letter requesting us to confirm the veracity of the information contained in the The Manila Times (Internet Edition) news article dated September 13, 2015 entitled “Aboitiz group eyes LRT 4, LRT 6 PPP” a portion of which are quoted hereunder: ………………….. “ABOITIZ Equity Ventures Inc. (AEV), the listed conglomerate of the Aboitiz family, will ‘look at’ two big-ticket rail transport projects given its keen interest bagging major projects under the publicprivate partnership (PPP) scheme. At the sidelines of a media event last week, AEV First Vice President for Business Development Roman Azanza 3rd said they are considering the Light Rail Transit (LRT) Line 4 and LRT Line 6. Asked if the LRT 4 and 6 are attractive enough to AEV, Azanza said: ‘Well, we look at rail, airports, road and bulk water projects… So we’ll probably take a look at it.’ . The P42.89-billion LRT Line 4 involves the financing, design, construction, operations and maintenance of an 11-kilometer route that will run from SM City Taytay to the intersection of Ortigas Avenue and EDSA, where a transfer station will connect the LRT 4 to the Metro Rail Transit (MRT) 3 Ortigas station.
    [Show full text]
  • LRT Line 6 Project
    Republic of the Philippines Department of Transportation and Communications LRT Line 6 Project Information Memorandum December 2015 Transaction Advisors LRT Line 6 Project Information Memorandum Disclaimer This Information Memorandum (“IM”) has been prepared by the Government of the Philippines’ (“GOP”) Department of Transportation & Communications (“DOTC”) with the assistance of the Public- Private Partnership Center (“PPPC”). A consortium of advisors led by Ernst & Young Solutions LLP (“EY”) as transaction advisors and CPCS Transcom Limited (“CPCS”) as technical advisor (EY and CPCS each a “Transaction Advisor” and collectively, the “Transaction Advisors”) has been appointed to assist the DOTC in the structuring and tendering of the Light Rail Transit (LRT) Line 6 Project (“LRT Line 6 Project” or the “Project”). This IM aims to provide preliminary information about the Project and does not purport to be all- inclusive or to contain all of the information that a prospective recipient may consider material or desirable in making its decision to participate in the tender. This IM or any part of it shall not form the basis of or be relied upon in connection with any contract or commitment whatsoever. No representation or warranty, expressed or implied, is made, and no responsibility of any kind is or will be accepted by the DOTC, the PPPC, any Transaction Advisor (or any of their sub-consultants) or the GOP or any of its agencies, with respect to the accuracy and completeness of this preliminary information. The DOTC by itself or through the PPPC or the Transaction Advisors (or any of their sub-consultants) may amend or replace any of the information contained in this IM at any time, without giving any prior notice or providing any reason.
    [Show full text]
  • Investment Brochure.Indd
    SECOND EDITION Table of Contents 3 PPP in the Philippines 4 What is PPP? 5 Public-Private Partnership Center of the Philippines 6 Overview of the PPP Process and Nationality Requirements 7 Fiscal Incentives 8 Pipeline of PPP Projects 10 Investment Opportunities 45 Awarded Projects 56 Doing Business in the Philippines 57 The PDMF & Panel of Consulting Firms 58 Policy Initiatives 61 Awards & Citations 62 Directory 63 Acknowledgements 2 Public-Private Partnership in the Philippines The 1987 Philippine Constitution explicitly acknowledges the critical role that the private sector plays in the development agenda of the country. In this context, the Philippine Public- Private Partnership (PPP) Program was forged as a fl agship program for development under the Aquino Administration. Its vision is to accelerate the country’s infrastructure development agenda that will contribute to the country’s goals of attaining inclusive growth for all Filipinos. Guided by the principles of transparency, accountability, and good governance, the Program will engage the private sector as vital partners who can bankroll critical infrastructure projects that will deliver much needed services for its growing populace. Under the hallmark of good governance, the Philippine government guarantees that the private sector will be able to do business in an environment that nurtures fair and transparent transactions. Government ensures that the interests of both the private sector and its citizens are balanced, where policies and procedures are continually enhanced. The robust pipeline of PPP projects is a product of the government’s continuing efforts to deliver viable and well-structured proposals that will attract investors to bring their business to the Philippines.
    [Show full text]