Rehabilitation of the Railway in Cambodia (Financed by the Japan Special Fund)

Total Page:16

File Type:pdf, Size:1020Kb

Rehabilitation of the Railway in Cambodia (Financed by the Japan Special Fund) Technical Assistance Consultant’s Report Project Number: 37269 November 2006 Cambodia: Preparing the Greater Mekong Subregion: Rehabilitation of the Railway in Cambodia (Financed by the Japan Special Fund) Prepared by Japan Railway Technical Service in association with Nippon Koei Co., Ltd. and Engconsult Ltd. Tokyo, Japan For the Ministry of Public Works and Transport, Royal Government of Cambodia This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. Asian Development Bank TA 6251-REG GMS REHABILITATION OF THE RAILWAY IN CAMBODIA FINAL REPORT (Volume 2) November 2006 in association with Engconsult Ltd. FINAL REPORT CONTENTS • VOLUME 1 – The Study for Main Lines APPENDICES Appendix 1 Initial Environmental Examination (separate volume) Appendix 2 Resettlement Plan (separate volume) Appendix 3 Hydrological Data (separate volume) Appendix 4 Track Condition Survey Report Appendix 5 Structure Condition Survey Report (separate volume) Appendix 6 Sleepers Condition Survey Report (separate volume) Appendix 7 Description of Requirements for Detail Design and Construction Supervision Appendix 8 Tender Documents (separate volumes) Bidding Document for Design and Construction of Railway Rehabilitation Volume 1 Instructions, General Conditions, Particular Conditions, Bid, Forms, Schedules, Eligible Countries Volume 2 Employer’s Requirements, Design Criteria, Specifications Volume 3 Employer’s Requirements, Bridge & Culvert Data Volume 4.1 Drawings RRL 1 – Southern Line Volume 4.2 Drawings RRL 2 – Northern Line: Section 1 – Phnom Penh to Sisophon Volume 4.3 Drawings RRL 2 – Northern Line: Section 2 – Sisophon – Poipet • VOLUME 2 – The Study for Branch Lines APPENDICES Appendix 9 Preliminary Engineering Design Drawings for Branch Lines (separate volume) Appendix 10 Preliminary Train Operation Plans Appendix 11 Resettlement: Socio-economic Indicators Appendix 12 Economic and Financial Analysis REHABILITATION OF RAILWAY IN CAMBODIA Final Report (Volume 2) ADB T.A. NO. 6251-REG Contents VOLUME 2 THE STUDY FOR BRANCH LINES TABLE OF CONTENTS Abbreviations and Definitions Executive Summary ........................................................................................................... i 1. INTRODUCTION .............................................................................................................. 1-1 1.1 Purpose of Supplementary Study ............................................................. 1-6 2. REVIEW OF THE PREVIOUS STUDIES ....................................................................... 2-1 2.1 Review of Inception and Draft Final Report ......................................................... 2-1 2.1.1 Inception Report ....................................................................................... 2-1 2.1.2 Draft Final Report .................................................................................... 2-1 3. PRELIMINARY ENGINEERING DESIGN ..................................................................... 3-1 3.1 General .................................................................................................................. 3-1 3.1.1 Geometric Design .................................................................................... 3-1 3.1.2 Track Structure ......................................................................................... 3-3 3.1.3 Bridge and Culvert ................................................................................... 3-4 3.1.4 Cost Estimate ...........................................................................................3-12 3.2 Branch Line to Cement Factory at Touk Meas ...................................................... 3-14 3.2.1 Outline of the Branch Line ....................................................................... 3-14 3.2.2 Hydrological Conditions .......................................................................... 3-16 3.2.3 Geotechnical Conditions .......................................................................... 3-21 3.2.4 Environmental Issues ............................................................................... 3-23 3.2.5 Resettlement and Socio-economic Issues ................................................ 3-27 3.2.6 Preliminary Engineering Design .............................................................. 3-31 3.2.7 Cost Estimate ........................................................................................... 3-36 3.2.8 Selection of Recommended Alignment and Project Implementation Schedule ............................................................ 3-37 3.3 Branch Line to Cement Factories at Kampot ........................................................ 3-38 3.3.1 Outline of the Branch Line ....................................................................... 3-38 3.3.2 Hydrological Conditions .......................................................................... 3-39 3.3.3 Geotechnical Conditions .......................................................................... 3-42 3.3.4 Environmental Issues ............................................................................... 3-44 3.3.5 Resettlement and Socio-economic Issues ................................................ 3-47 3.3.6 Preliminary Engineering Design .............................................................. 3-51 REHABILITATION OF RAILWAY IN CAMBODIA Final Report (Volume 2) ADB T.A. NO. 6251-REG Table of Contents 3.3.7 Cost Estimate ........................................................................................... 3-55 3.3.8 Recommended Alignment and Project Implementation Schedule ........... 3-56 3.4 Branch Line to Phnom Penh Port (GTW) ............................................................. 3-58 3.4.1 Outline of the Branch Line ....................................................................... 3-58 3.4.2 Hydrological Conditions .......................................................................... 3-59 3.4.3 Geotechnical Conditions .......................................................................... 3-61 3.4.4 Environmental Issues ............................................................................... 3-64 3.4.5 Resettlement and Socio-economic Issues ................................................ 3-67 3.4.6 Preliminary Engineering Design .............................................................. 3-71 3.4.7 Possibility to Use Piers in GTW as a Base of Conveyor for Cement Transportation ....................................................................... 3-76 3.4.8 Cost Estimate ...........................................................................................3-79 3.4.9 Recommended Alignment and Project Implementation Schedule ........... 3-80 3.5 Rail Access to Phnom Penh Airport ...................................................................... 3-81 3.5.1 Outline of the Branch Line ....................................................................... 3-81 3.5.2 Hydrological Conditions .......................................................................... 3-82 3.5.3 Geotechnical Conditions .......................................................................... 3-83 3.5.4 Environmental Issues ............................................................................... 3-84 3.5.5 Resettlement and Socio-economic Issues ................................................ 3-86 3.5.6 Preliminary Engineering Design .............................................................. 3-90 3.5.7 Cost Estimate ........................................................................................... 3-93 3.5.8 Recommended Alignment and Project Implementation Schedule ........... 3-94 3.6 Rail Access to Kampong Chhnang Airport ........................................................... 3-95 3.6.1 Outline of the Branch Line ....................................................................... 3-95 3.6.2 Hydrological Conditions .......................................................................... 3-96 3.6.3 Geotechnical Conditions .......................................................................... 3-101 3.6.4 Environmental Issues ............................................................................... 3-103 3.6.5 Resettlement and Socio-economic Issues ................................................ 3-106 3.6.6 Preliminary Engineering Design .............................................................. 3-110 3.6.7 Cost Estimate ........................................................................................... 3-113 3.6.8 Recommended Alignment and Project Implementation Schedule ........... 3-114 4. PRELIMINARY DESIGN OF SIGNALLING AND TELECOMMUNICATION .......... 4-1 4.1 Technical Survey of Infrastructure ........................................................................ 4-1 4.1.1 General ..................................................................................................... 4-1 4.1.2 Block System ........................................................................................... 4-1 4.1.3 Train Operation ........................................................................................ 4-3 4.1.4 Train Radio .............................................................................................. 4-4 4.1.5
Recommended publications
  • Thai Railway Guide
    1 THAI RAILWAY GUIDE Effective 1 October 2015 2 Table of Contents Table of contents ...................................................................... 2 Southern Lines Schematic...................................................... 73 2015 calendar ........................................................................... 3 Table 13 Southern Lines – Southward Trains ................. 74 – 76 2016 calendar ........................................................................... 4 Table 14 Southern Lines – Northward Trains ................. 77 – 79 Using the timetable ................................................................... 5 Table 17 Special Tourism Trains ............................................. 80 Travel warning .......................................................................... 5 Table 18 Kanchanburi – River Kwai – Nam Tok ..................... 80 Contact information .................................................................. 5 Table 17 Maha Chai Line – Westward Trains ......................... 81 System map.............................................................................. 6 Table 18 Maha Chai Line – Eastward Trains .......................... 82 Railway access to points of interest ......................................... 7 Table 19 Mae Khlong Line ...................................................... 83 General information .................................................................. 8 Table 20 Thon Buri – Salaya commuter service ..................... 83 Principal stations .....................................................................
    [Show full text]
  • Report on Power Sector of the Kingdom of Cambodia
    ELECTRICITY AUTHORITY OF CAMBODIA REPORT ON POWER SECTOR OF THE KINGDOM OF CAMBODIA 2013 EDITION Compiled by Electricity Authority of Cambodia from Data for the Year 2012 received from Licensees Electricity Authority of Cambodia ELECTRICITY AUTHORITY OF CAMBODIA REPORT ON POWER SECTOR OF THE KINGDOM OF CAMBODIA 2013 EDITION Compiled by Electricity Authority of Cambodia from Data for the Year 2012 received from Licensees Report on Power Sector for the Year 2012 0 Electricity Authority of Cambodia Preface The Annual Report on Power Sector of the Kingdom of Cambodia 2013 Edition is compiled from informations for the year 2012 availble with EAC and received from licensees, MIME and other organizations in the power sector. The data received from some licensees may not up to the required level of accuracy and hence the information provided in this report may be taken as indicative. This report is for dissemination to the Royal Government, institutions, investors and public desirous to know about the situation of the power sector of the Kingdom of Cambodia during the year 2012. With addition of more HV transmission system and MV sub-transmission system, more and more licensees are getting connected to the grid supply. This has resulted in improvement in the quality of supply to more consumers. By end of 2012, more than 91% of the consumers are connected to the grid system. More licensees are now supplying electricity for 24 hours a day. The grid supply has reduced the cost of supply and consequently the tariff for supply to consumers. Due to lower cost and other measures taken by Royal Government of Cambodia, in 2012 there has been a substantial increase in the number of consumers availing electricity supply.
    [Show full text]
  • Executive Summary
    EXECUTIVE SUMMARY The Context and Objectives Infrastructure is a key factor in economic development. Infrastructure development can also help in narrowing gaps between developed and backward regions. Infrastructure, especially transport and connectivity, is crucial for regional cooperation and integration. In the absence of efficient physical connectivity, any initiatives taken towards regional trade liberalization will remain ineffective. The Association of Southeast Asian Nations (ASEAN) secretariat has identified infrastructure development as one of the Priority Integrated Sectors (PIS) of the ASEAN economic community. It would also be of crucial importance for programmes of regional economic cooperation and integration within the East Asia Summit (EAS) framework. It was in that context that infrastructure development was studied as part of the work programme of the Economic Research Institute for ASEAN and East Asia (ERIA). This project aims to analyze the current status, issues, and challenges facing infrastructure development in East Asia and examine the role that regional cooperation can play in meeting these challenges. Specific objectives include 1) examining infrastructure rankings of EAS countries in terms of availability and quality of infrastructure development globally as well as within the region and progress made over time; 2) surveying and analyzing the status of infrastructure development, issues, and challenges faced by different EAS countries; 3) collecting basic geographical data at the subregional level and developing a spatial economic model to simulate various effects xii of infrastructure development on contiguous subnational regions. Methodology The study adopted a three-pronged approach to achieve its objectives. The methodology followed included the construction of an East Asian Index of Infrastructure Development.
    [Show full text]
  • Singapore – Kunming Rail Link
    SINGAPORE – KUNMING RAIL LINK Ad-Hoc Expert Group Meeting for Cooperation on Facilitation of International Railway Transport 12-13 March 2015 1 BACKGROUND • 6,617 km rail development project to link ASEAN with China • To provide more enviromentally friendly, efficient and economical mode for passenger and freight transport . • Flagship Project under ASEAN-Mekong Basin Development Cooperation. • Prioritised project under Master Plan on ASEAN Connectivity • Track Gauge: Meter Gauge • Two lines: • Eastern Line : Thailand, Cambodia, Viet Nam • Western Line : Thailand, Myanmar • Common line : Singapore, Malaysia, Thailand • Spur line to Lao PDR 2 BACKGROUND • Current network : • Cambodia • Lao PDR (Spur Line) • Malaysia • Myanmar • Singapore • Thailand • Viet Nam • Kunming, PRC • Future interest: • Surabaya, Indonesia to Singapore @ Malaysia via: 1.Port (Multimodal); or 3 2.Bridge PROGRESS MISSING LINK SPUR LINE Cambodia Myanmar Lao PDR – Viet Nam Thailand Viet Nam UPGRADE Cambodia Malaysia Thailand 4 MISSING LINK 5 MISSING LINK CAMBODIA Section Status Poipet (Thailand - Ongoing. border) – - Estimate completion by Sisophon end of 2015. [48 km] Phnom Penh – Loc Ninh (Viet - Funding negotiation Nam Border) ongoing [254 km] 6 MISSING LINK THAILAND Section Status Namtok - Three - Feasibility of this section Pagoda Pass is still being discussed (Myanmar between Thailand and border) [153 km] Myanmar - Expected completion by end of 2015 Aranyaprathet – - Simultaneous with Klongluk Cambodia portion of [6 km] 7 missing link [Poipet – Sisophon] ARANYAPRATHET-KLONGLUK-POIPET-SISOPHON THAILAND-CAMBODIA RAIL BRIDGE POIPET-SISOPHON 8 ARANYAPRATHET-KLONGLUK MISSING LINK MYANMAR Section Status - Feasibility of this Thambyuzayat - section is still being Three Pagoda discussed between Pass (Thailand Thailand and border) [153 km] Myanmar 9 MISSING LINK VIET NAM Section Status Mu Gia – Tan - Technical assistance Ap – Vung for Feasibility Study Anh (119km) being discussed with Republic of Korea.
    [Show full text]
  • List of Interviewees
    mCÄmNÐlÉkßrkm<úCa DOCUMENTATION CENTER OF CAMBODIA Phnom Penh, Cambodia LIST OF POTENTIAL INFORMANTS FROM MAPPING PROJECT 1995-2003 Banteay Meanchey: No. Name of informant Sex Age Address Year 1 Nut Vinh nut vij Male 61 Banteay Meanchey province, Mongkol Borei district 1997 2 Ol Vus Gul vus Male 40 Banteay Meanchey province, Mongkol Borei district 1997 3 Um Phorn G‘¿u Pn Male 50 Banteay Meanchey province, Mongkol Borei district 1997 4 Tol Phorn tul Pn ? 53 Banteay Meanchey province, Mongkol Borei district 1997 5 Khuon Say XYn say Male 58 Banteay Meanchey province, Mongkol Borei district 1997 6 Sroep Thlang Rswb føag Male 60 Banteay Meanchey province, Mongkol Borei district 1997 7 Kung Loeu Kg; elO Male ? Banteay Meanchey province, Phnom Srok district 1998 8 Chhum Ruom QuM rYm Male ? Banteay Meanchey province, Phnom Srok district 1998 9 Than fn Female ? Banteay Meanchey province, Phnom Srok district 1998 Documentation Center of Cambodia Searching for the Truth EsVgrkKrBit edIm, IK rcg©M nig yutþiFm‘’ DC-Cam 66 Preah Sihanouk Blvd. P.O.Box 1110 Phnom Penh Cambodia Tel: (855-23) 211-875 Fax: (855-23) 210-358 [email protected] www.dccam.org 10 Tann Minh tan; mij Male ? Banteay Meanchey province, Phnom Srok district 1998 11 Tatt Chhoeum tat; eQOm Male ? Banteay Meanchey province, Phnom Srok district 1998 12 Tum Soeun TMu esOn Male 45 Banteay Meanchey province, Preah Net Preah district 1997 13 Thlang Thong føag fug Male 49 Banteay Meanchey province, Preah Net Preah district 1997 14 San Mean san man Male 68 Banteay Meanchey province,
    [Show full text]
  • Cambodia 27-28 October 2009
    Thirteenth Meeting of the GMS Subregional Transport Forum Siem Reap, Cambodia 27-28 October 2009 SUMMARY OF PROCEEDINGS Introduction 1. The Thirteenth Meeting of the Subregional Transport Forum (STF-13) was held in Siem Reap, Cambodia on 27-28 October 2009. The Meeting was jointly organized by the Ministry of Public Works and Transport of Cambodia and the Asian Development Bank (ADB). The objectives of the Meeting were: (i) to review the first draft report on the GMS Railway Strategy Study, outlining a proposed strategy and plan for the development of an integrated railway network that enhances connectivity within the GMS and with neighboring subregions; (ii) to review the progress of the transport projects contained in the Vientiane Plan of Action for GMS Development (2008-2012); and (iii) to further review and prioritize key GMS transport projects along the GMS transport corridors. (The Meeting Program and Agenda is attached as Appendix 1.) 2. The Meeting participants included delegations from the Kingdom of Cambodia, the People’s Republic of China (PRC), the Lao People's Democratic Republic (Lao PDR), the Union of Myanmar, the Kingdom of Thailand, the Socialist Republic of Viet Nam, and ADB. Representatives from various development partner organizations also attended the Meeting. (The list of participants is attached as Appendix 2.) 3. The Meeting was chaired by H.E. Mr. Tauch Chankosal, Deputy Minister, Ministry of Public Works and Transport, Cambodia and co-chaired by Mr. James P. Lynch, Director, Transport and Urban Development Division, Southeast Asia Department, ADB. Day 1 Proceedings: 27 October 2009 I. Opening Session 4.
    [Show full text]
  • Buddhist Policy Chart of Witness Evidence from Each
    ERN>01462446</ERN> E457 6 1 2 14 Buddhist Policy Annex 002 19 09 200 7 ECCC TC ANNEX E BUDDHIST POLICY CHART OF WITNESS EVIDENCE FROM EACH DK ZONE TABLE OF CONTENTS Southwest Zone [SWZ] 2 East Zone [EZ] 12 Sector 505 Kratie [505S] 21 Sector 105 Mondulkiri [105S] 24 Northeast Zone [NEZ] 26 North Zone [NZ] 28 Northwest Zone [NWZ] 36 West Zone [WZ] 43 Phnom Penh Special Zone Phnom Penh Autonomous Municipality [PPSZ PPAM] 45 ’ Co Prosecutors Closing Brief in Case 002 02 Annex E Page 1 of 49 ERN>01462447</ERN> E457 6 1 2 14 Buddhist Policy Annex 002 19 09 200 7 ECCC TC SOUTHWEST ZONE [SWZ] Southwest Zone No Name Quote Source Sector 25 Koh Thom District Chheu Khmau Pagoda “But as in the case of my family El 170 1 Pin Pin because we were — we had a lot of family members then we were asked to live in a monk Yathay T 7 Feb 1 ” Yathay residence which was pretty large in that pagoda 2013 10 59 34 11 01 21 Sector 25 Kien Svay District Kandal Province “In the Pol Pot s time there were no sermon El 463 1 Sou preached by monks and there were no wedding procession We were given with the black Sotheavy T 24 Sou ” 2 clothing black rubber sandals and scarves and we were forced Aug 2016 Sotheavy 13 43 45 13 44 35 Sector 25 Koh Thom District Preaek Ph ’av Pagoda “I reached Preaek Ph av and I saw a lot El 197 1 Sou of dead bodies including the corpses of the monks I spent overnight with these corpses A lot Sotheavy T 27 of people were sick Some got wounded they cried in pain I was terrified ”—“I was too May 2013 scared to continue walking when seeing these
    [Show full text]
  • Thailand: Improvement of Railway Passenger Services (Financed by the Government of France)
    Technical Assistance Consultant’s Report Project Number: TA-8183 THA April 2014 Thailand: Improvement of Railway Passenger Services (Financed by the Government of France) Final Report Prepared by PADECO Co., Ltd. Tokyo, Japan For Ministry of Finance, Thailand Ministry of Transport, Thailand State Railway of Thailand This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Capacity Development Technical Assistance TA–8183 (THA): Improvement of Passenger Railway Services TABLE OF CONTENTS ABBREVIATIONS ...................................................................................................................I EXECUTIVE SUMMARY ................................................................................................... E-1 1. INTRODUCTION ............................................................................................................ 1 2. STRATEGY FRAMEWORK FOR SRT PASSENGER SERVICES .................................. 5 2.1 Current Situation: SRTs Circle of Decline ............................................................ 5 2.2 Breaking SRTs Circle of Decline ......................................................................... 6 2.2.1 Investments to Renew the Network, Rolling Stock and Equipment ............ 7 2.2.2 Safety – A Priority .................................................................................... 10 2.2.3 Rebuilding the Passenger Business ........................................................
    [Show full text]
  • The High-Speed Railway (HSR) Service, the Eastern Economic Corridor's Development, and Thailand: a Geographical Simulation Analysis
    Daisuke Hiratsuka, “High-Speed Railway, the EEC, and the Change of the Landscape of Thailand and its Neighboring Countries” BRC Research Report, Bangkok Research Center, JETRO Bangkok/IDE-JETRO, 2018 Chapter 2 The High-speed Railway (HSR) Service, The Eastern Economic Corridor's Development, and Thailand: A Geographical Simulation Analysis Ikumo Isono# 1 Overseas Research Fellow (Seville), IDE-JETRO Abstract: The economic impact of Thailand's HSR project, and development of the Eastern Economic Corridor (EEC), has been estimated using the Geographical Simulation Model (IDE-GSM). The HSR service will generate a positive economic impact in the areas along the routes and in the areas extending from the stations, but will generate a negative economic impact in other areas. Adding the EEC's development to the Eastern Line project will generate a highly positive economic impact along the Eastern Line route, but other areas will suffer a negative economic impact in comparison with the baseline scenario. In order to spread the economic impact of development in one area across the whole country, additional measures are necessary, and in this paper, we propose the Mekong-India Economic Corridor (MIEC) as an example. Keywords: Simulation, Thailand, High-speed railway, Economic Corridor JEL Classification: O53; R12; R13 1. Introduction As the initiative of Thailand's high-speed railway and the development of the Eastern Economic Corridor (EEC) is being embodied, the economic impact of these projects has been estimated using the Geographical Simulation Model (IDE-GSM, Kumagai el al. 2013). Currently, four HSR projects, the Northeastern, Northern, Southern and Eastern Lines are planned, and construction of the Northeastern Line started in January 2018, and the EEC will cover from Bangkok to Rayong.
    [Show full text]
  • Chapter 4: Development Strategy for Kampot
    The Study on National Integrated Strategy of Coastal Area and Master Plan of Sihanouk-ville for Sustainable Development Final Report (Book II) CHAPTER 4: DEVELOPMENT STRATEGY FOR KAMPOT 4.1 Issues in the Present Conditions of Kampot 4.1.1 Socio Economic Condition According to the 2008 Census, the total population in the Kampot province was 585,850, of which only 8.2% of population was living in urban area. Population density of the province was 120/km2, which was considerably higher than the national average of 56/km2. In Kampot, 36.4% of the population (225,039) was under 15 years of age. Working age population (age between 15 and 64) was 377,315 or 61.0% of the population. Labor force participation rate1 of Kampot (81.5%) in 2008 was higher than that of the national average (76.9%) and the Study area average (76.4%). About 85% of labor force in the province was engaged in agriculture. The high labor force participation rate in Kampot is considered to be a result from extensive self-employed agricultural activities. The economically active segment of the population (employed population + unemployed population) was 309,098, which accounted for 49.9% of the total population in the province. Population of the Kampot province has increased by 1.0% per annum between 1998 and 2008. During the same period, the number of labor force in the Study area has increased more rapidly from 230,411 to 309,093 with annual average increase rate of 3.0%. Table 4.1.1 Change in Population and Number of Labor Force in Kampot Province Population Labor Force Urban Rural Total 1998 Census 45,240 483,165 528,405 230,411 2008 Census 48,274 537,576 585,850 309,093 Annual Growth Rate (98-08) 0.7% 1.1% 1.0% 3.0% Source: CENSUS 1998 and 2008, NIS Such a rapid increase in labor force was attributed to 4 main factors; namely 1) increase in the total population, 2) increase in the percentage of working age population to total population (51.6% -> 61.0%), 3) increase in the labor force participation rate (75.4% -> 81.5%), and 4) decrease in the crude unemployment rate (3.7% -> 1.4%).
    [Show full text]
  • Title Kampot of the Belle Epoque: from the Outlet of Cambodia to A
    Kampot of the Belle Epoque: From the Outlet of Cambodia to a Title Colonial Resort(<Special Issue>New Japanese Scholarship in Cambodian Studies) Author(s) Kitagawa, Takako Citation 東南アジア研究 (2005), 42(4): 394-417 Issue Date 2005-03 URL http://hdl.handle.net/2433/53808 Right Type Departmental Bulletin Paper Textversion publisher Kyoto University Southeast Asian Studies, Vol. 42, No. 4, 東南アジア研究 March 2005 42巻 4 号 Kampot of the Belle Époque: From the Outlet of Cambodia to a Colonial Resort KITAGAWA Takako* Abstract Historical studies about Cambodia have paid little attention to regional factors, and historians have been hardly able to give much perspective about the history of particular regions within the country. Therefore, this paper looks at Kampot as it was during the French colonial period in order to understand the foundations of present-day Kampot. Presently, Kampot is the name of a province and its capital city, which face the Gulf of Thailand. During the colonial period, it was an administrative center for the circonscription résidentielle that extended over the coastal region. The principal sources for this paper are the “Rapports périodiques, économiques et politiques de la résidence de Kampot,” from 1885 to 1929, collected in the Centre des Archives d’Outre-Mer in Aix-en-Provence, France. Drawing from the results of our examination, we can recognize two stages in the history of Kampot. These are (1) the Kampot of King Ang-Duong, and (2) modern Kampot, which was con- structed by French colonialism. King Ang-Duong’s Kampot was the primary sea outlet for his landlocked kingdom.
    [Show full text]
  • Annual Report Annual Report
    Cambodia Road Crash and Victim Information System Annual Report © HIB Developed by: Ministry of Interior Ministry of Health Ministry of Public Works Handicap International Belgium and Transport Notice: This report may be freely reviewed, abstracted, reproduced or translated in part or in whole, but not for the purposes of sale. Website: www.roadsafetycambodia.info Cambodia Road Crash and Victim Information System Annual Report 2008 Table of Contents List of Figures.......................................................................................................................................................... 3 Foreword .................................................................................................................................................................. 5 Foreword .................................................................................................................................................................. 5 Note from the Minister of Public Works and Transport............................................................................. 5 Note from the Minister of Health ............................................................................................................... 6 Note from the Ministry of Interior............................................................................................................... 7 Note from World Health Organization....................................................................................................... 8 Note from Handicap
    [Show full text]