Jordan River Bridge

Total Page:16

File Type:pdf, Size:1020Kb

Jordan River Bridge CASE STUDY ––––––––––––––––––––––––– JORDAN RIVER BRIDGE Brighton, TAS, Australia TerraClass® Abutment Owner: DIER Consultant: GHD Contractor: VTJV (VEC Civil Engineering-Thiess Joint Venture) Construction: May 2011 – July 2011 Background Challenge The Jordan River Bridge is a 300 m In 2008 the Jordan River Levee component of the northern section site was identified as having of the Brighton Bypass Project in potential for significant Aboriginal Tasmania. It enables the crossing heritage values. Investigation of the Jordan River and the findings confirmed that the site is associated levee deposit. the oldest known site in Tasmania The Brighton Bypass was the and is about 600 m long and about largest transport infrastructure 60 m wide. project ever conducted in Tasmania. It provides a bypass of As these indications became the towns of Brighton and Pontville, apparent, the Tasmanian approximately 70 km north of Department of Infrastructure, Hobart, and its purpose is to Energy and Resources (DIER) improve the efficiency and safety of responded by investigating ways to the Midland Highway. The ensure that historical artefacts and Midland Highway is Tasmania’s major north-south transport corridor the site itself would not be lost as a and provides a crucial freight result of the construction of the connection supporting the region’s bypass. To ensure the site was reliance on the northern ports. protected, the contractor, designer and DIER worked closely to modify The Brighton Bypass has delivered the bridge design accordingly. a new dual carriageway between the East Derwent Highway at DIER states in a fact sheet Bridgewater and the existing published in August 2010, that Midland Highway at a cost of $191 million. “NO artefacts contained within the important levee deposit will be The Reinforced Earth Company destroyed as a result of the Main Picture: Construction site. (RECO) was engaged by VEC Civil construction of the proposed Top: Lifting the first bridge girder into Engineering – Thiess Joint Venture bridge.” place from outside the Levee area. Above: Artefacts found on the Levee (VTJV) to provide abutment walls for the Jordan River crossing which site. Solution supports twin 166 m bridges. A short embankment, bridge These bridges incorporate a single abutments and multiple span span of 70 m, which is believed to bridge was constructed outside the be the longest single simply levee to complete the crossing. supported bridge span ever launched in Australia. Transport infrastructure Left Above: The wall needed to be adjusted during construction to accommodate 2 large culverts. A bridge design involving a 70 the completion of the backfill Project specifications metre bridge span was developed placement. The Reinforced to avoid permanent impacts on the Earth® wall was designed for a –––––––––––––––––––––––––––– levee deposit. The long bridge temporary bridge beam launching a System TerraClass® span was launched from above live load of 150 kPa acting at road –––––––––––––––––––––––––––– rather than lifted from below to level in response to this Finish Smooth, Grey further protect the area. The requirement. Reinforced Earth® bridge abutment –––––––––––––––––––––––––––– needed to be in place to allow the The Jordan River Bridge is a Structure Reinforced Earth® first girder of the long span to be significant component of the Abutment Wall launched from high above the Brighton Bypass and the planning –––––––––––––––––––––––––––– levee. The first girder was then and construction achieved a used to carry the remaining three successful result. The DIER, the Area 400m² girders across the levee. VTJV, and the designers at RECO –––––––––––––––––––––––––––– worked together to develop new Max. Height 7m It was necessary to operate a 100t and innovative techniques to crane to lift the girders into place. manage the strict limitations on –––––––––––––––––––––––––––– The crane was placed on top of the access to a heritage site. Length 72m Reinforced Earth® block prior to –––––––––––––––––––––––––––– Design load 25 kPa –––––––––––––––––––––––––––– Design life 100 years –––––––––––––––––––––––––––– Main Picture: Crane on top of the Reinforced Earth TerraClass® bridge abutment. Left: Cross-section of the Reinforced Earth® Block Reinforced Earth Pty Limited Reinforced Earth Limited Level 4, 20 George Street PO Box 72 734 Hornsby NSW 2077 Australia Papakura Auckland New Zealand Ph +61 2 9910 9910 Ph +64 9 236 3385 Fax +61 2 9910 9999 Fax +64 9 236 3385 www.reco.com.au www.reco.com.au .
Recommended publications
  • Otago Lagoon and Coastal Reserves Activity Plan 2016
    Reserve Activity Plan _______________________________________________________ 2016 - 2020 OTAGO LAGOON AND COASTAL RESERV EEESSS ADVICE PREPARED BY TASFLORA FOR CLARENCE CITY COUNCIL MAY 2016 © Tasflora 2016. This work is copyright. Apart from any use permitted under the Commonwealth Copyright Act 1968 , no part (including the format, structure and style) may be reproduced by any process, nor may any other exclusive right be exercised, without prior written permission from Tasflora. Reserve Activity Plan 2016-2020 Otago Lagoon and Coastal Reserves CONTENTS 1 BACKGROUND ................................................................................................ 5 2 OBJECTIVES ................................................................................................... 5 3 SITE DESCRIPTION ......................................................................................... 5 4 SITE VALUES................................................................................................... 6 4.1 Native flora .................................................................................................. 6 4.2 Native fauna .............................................................................................. 10 4.3 Cultural heritage ....................................................................................... 11 4.3.1 Aboriginal heritage ............................................................................... 11 4.3.2 Historic heritage ..................................................................................
    [Show full text]
  • Tasmanian Road Futures
    TASMANIAN ROAD FUTURES FUNDING PRIORITIES 2019 & BEYOND Road Funding Commitments Funding Total Funding Total Funding Total from cost from cost from cost 2019 2019 2019 Greater Hobart Traffic Solution $72.1M $93.8M Includes: East Tamar Highway $6M $7M Northern Road Upgrades State and Federal $44.9M $54.2M State and Federal – Mowbray Connector Midland Highway 10 year plan Control of Macquarie and Davey streets Includes: West Tamar Highway $11.2M $12M Bass Highway – Deloraine to Latrobe Southern Outlet fifth lane Traffic Solution: Pedestrian crossing Campbell Town River Derwent ferry service Gravelly Beach Road to Rosevears Drive Tasman Highway at Myrtle Park Traffic incident response Atkinsons Road and Waldhorn Drive Dorset Roads Package and transport access points Overtaking opportunities between Exeter Bus priorities and active transport initiatives and Batman Highway junction Tomahawk to Gladstone Northern suburbs light rail Resealing and widening north of Batman Prossers Road Highway intersection to Lightwood Hills Road Underground bus transit centre Esk Main Road Left turn lane Motor Road/West Greater Hobart master plan Tamar Highway junction Airport to Evandale Road Improved Hadspen access Urban Congestion Fund State $24M State and Federal $84.7M $0.4m Federal $58.7M State $58M State Bridgewater Bridge $576M Midland Highway 10 year plan $325M Hobart Congestion Package (linked to Federal $236M Federal $111.4M projects in Greater Hobart Traffic Solution) Roads of Strategic Importance: Bass State $25.8M North West Road Upgrades State and Federal $35.7M $50.1M Tasman Highway Intelligent Transport Systems Highway (Wynyard to Marrawah), $606M Hobart to Sorell corridor, Birralee Federal $205M Bass Highway (West of Wynyard), including South East Traffic Solution State and Federal $25.9M $27M Main Road, Old Surry Road/Massey- Brittons Swamp, Wynyard to Smithton passing Greene Drive, Murchison Highway, lanes, access to Boat Harbour Primary School Tasman Highway near Tasmania Golf Club Lyell Highway.
    [Show full text]
  • Bypass Means New Approach for Golfers
    VOL 12 NO 5 AUGUST 2010 Volcanic Drive extended 300 metres for access Bypass means new approach for golfers Catnip Cattery owners Narelle and Lionel Brown are delighted with their state award in the Telstra Tasmanian GOLFERS at the Tea Tree business awards. Golf Club are taking a new approach to the clubhouse as Golf Club Road has been Purrfect awards closed to make way for the new bypass. Access to the golf club is now via Volcanic Drive outcome for which has been extended 300 Golfers can metres to become the new now access the Tea Tree permanent road to the golf Golf Club Catnip Cattery club. from the Brighton Bypass Project Volcanic (northern section) commu- OLD Beach business Cat- growth. Drive nity relations officer Karyn extension. nip Cattery was recently Other winners in the Kennedy said work was pro- named as one of six win- 2010 Telstra Tasmanian Busi- gressing well. ners in the 18th Testra Tas- ness Awards were: “With heavy machinery manian Business Awards • InSPArations Day Spa and trucks in the area, along and the owners couldn’t be of Spreyton – MYOB small with deep cuttings in the more delighted. business award. road, safety is incredibly Narelle and Lionel • Maintenance Systems important,” she said. Brown were recently named Solutions of Shearwater – “Parents and grandpar- winners in the business Panasonic Australia medium ents with young children are owner micro-business business award. asked to talk about these awards category. • Insight4 of Hobart – safety risks with their chil- Mr Brown said Catnip AMP innovation award. dren. enter the site.” traders are finding it a little struction continued.
    [Show full text]
  • Brighton Bypass Project Will Provide Safer, More Efficient Movement of Freight and General Traffic Between Hobart and Tasmania’S Northern Cities and Ports
    ANCIENT ARTEFACTS INSPIRE A BRAVE NEW FIRST The Brighton Bypass Project will provide safer, more efficient movement of freight and general traffic between Hobart and Tasmania’s northern cities and ports. MAIN CONSTRUCTION COMpany : VEC Thiess Joint Venture CLIENT : Tasmania Department of Infrastructure, Energy & Resources COMPLETION : November 2012 ProjeCT VALUE : $120 Million The VEC Thiess Joint Venture faced enormous challenges in Completing these works required an estimated 450,000 cubic metres VIC/SA/TAS/NZ Business Unit Engineering Manager Dougie Wight these factors, we can prepare for them and manage them accordingly to delivering the northern section of the Brighton Bypass, Tasmania’s of bulk earthworks, 10,000 cubic metres of concrete, 3,000 tonnes of says, “The VEC Thiess Joint Venture has worked very hard over many ensure everyone remains safe at all times.” John added. largest ever road infrastructure project. In the process of doing so, they reinforcing steel and 170 precast Super T beams. These were manufactured months on the planning, design, and preparation for these works. After not only set a new benchmark for Australian bridge construction, they also in a dedicated precast yard constructed by VEC near the project site, in so much effort it was very gratifying to see the launch go so smoothly Thiess’ Regional General Manager Rod Heale commended the team delivered their entire package of works three months ahead of schedule. order to save the time and costs associated with transporting the beams and entirely according to plan”. on its meticulous planning. from VEC’s nearest pre-existing precast yard 300kms away.
    [Show full text]
  • Congestion in Greater Hobart
    Congestion in Greater Hobart Summary report July 2011 Department of Infrastructure, 1 Energy and Resources CONTENTS 1 Summary ......................................................................................................................... 3 2 What influences congestion ............................................................................................. 3 3 Measuring congestion ...................................................................................................... 3 4 Community responses to congestion ............................................................................... 4 4.1 Major infrastructure responses ................................................................................. 4 4.2 One way streets ........................................................................................................ 5 5 DIER’s approach to managing congestion ...................................................................... 5 5.1 What is DIER doing? ................................................................................................ 5 2 1 SUMMARY • The Department of Infrastructure Energy and Resources (DIER) has developed a report on congestion in Greater Hobart which outlines the influences of congestion and the approach DIER is undertaking to manage congestion. • DIER recognises that there is community concern regarding congestion on key urban roads in Greater Hobart and that appropriate measures need to be put in place to manage traffic growth and delays. • DIER’s strategic planning
    [Show full text]
  • Brighton Bypass
    2009 (No. 10) 2009 _______________ PARLIAMENT OF TASMANIA _______________ PARLIAMENTARY STANDING COMMITTEE ON PUBLIC WORKS Brighton Bypass ______________ Presented to His Excellency the Governor pursuant to the provisions of the Public Works Committee Act 1914. ______________ MEMBERS OF THE COMMITTEE Legislative Council House of Assembly Mr Harriss (Chairman) Mr Best Mr Hall Mr Green Mrs Napier By Authority: Government Printer, Tasmania 00000 1 TABLE OF CONTENTS INTRODUCTION ..........................................................................................................................3 BACKGROUND..............................................................................................................................3 SCOPE OF WORKS....................................................................................................................... 7 ENVIRONMENTAL AND SOCIAL IMPLICATIONS ....................................................... 14 STAKEHOLDER CONSULTATION...................................................................................... 24 SOCIAL IMPLICATIONS ..........................................................................................................25 ECONOMIC DEVELOPMENT BENEFITS...........................................................................26 PROJECT COSTS .........................................................................................................................28 EVIDENCE .....................................................................................................................................28
    [Show full text]
  • 04 March 2009
    [295] VOL. CCCXII OVER THE COUNTER SALES $2·75 INCLUDING G.S.T. TASMANIAN GOV ERNMENT • U • B E AS RT LIT AS•ET•FIDE TASMANIA GAZETTE PUBLISHED BY AUTHORITY WEDNESDAY 4 MARCH 2009 No. 20 924 ISSN 0039-9795 CONTENTS Administration and Probate Notice Page Adjustment Factors ............................................ 304 ADMINISTRATION AND PROBATE ACT 1935 Notice of Intention to Apply for Letters of Administration Administration and Probate ............................... 295 NOTICE is given that after the expiration of fourteen days Associations Incorporation ................................ 299 from the publication of this notice application will be made Business Names ................................................. 300 to the Supreme Court of Tasmania in its Ecclesiastical Forest Practices .................................................. 302 Jurisdiction that Letters of Administration of the Estate of AL A ST A IR IA N BE A TON late of 2 Russell Street Evandale Freedom of Information ..................................... 297 in Tasmania financial consultant/single deceased may be Land Acquisition ................................................ 297 granted to Daphne Clare Mary Habibis of 2 Russell Street Evandale in Tasmania sociology lecturer/divorced the Marine Safety ..................................................... 301 partner of the said deceased. Mining ................................................................ 297 Dated this fourth day of March 2009. Nomenclature Board .........................................
    [Show full text]
  • Government's Management Plan Protects Aboriginal Heritage Values
    VOL 12 NO 4 JULY 2010 Government’s management plan protects Aboriginal heritage values Bypass move welcomed BRIGHTON Council has Council and the municipal- ment also announced that a we are very proud of that duct the most extensive “It enables both the long- taken into account a number welcomed the Tasmanian ity. permit application had been cultural heritage and our archaeological investigation term protection of the levee of requirements, including Government’s announce- The State Government received from the Depart- strong cultural links. ever carried out in Tasmania. site and allows Tasmanians minimising combined social, ment of a management announced that the manage- ment of Infrastructure “At the same time the “These investigations to benefit from an important heritage and environmental plan to protect the Aborigi- ment plan would ensure that Energy and Resources community is keen to see the found that the 500-metre- transport infrastructure proj- impacts, transport needs and nal heritage values in and historical Aboriginal (DIER) to enable the con- Brighton bypass proceed as long levee area, which inter- ect. the provision of safe road around the proposed remains, discovered in a levee struction of a long-span it is a major piece of infra- sects the bypass, contained a “In what is understood to standards. Brighton bypass. during the construction of bridge at the Jordan River on structure that will ensure we stratified cultural deposit of be an Australian first, the “In fact, if the Brighton Brighton Mayor Tony the bypass, would be pre- the Brighton bypass. can meet the demands of our national significance dating construction methodology bypass had not followed this Foster said the decision to served.
    [Show full text]
  • STRATEGIC MASTER PLAN ROYAL TASMANIAN BOTANICAL GARDENS Prepared for Royal Tasmanian Botanical Gardens Board
    Final STRATEGIC MASTER PLAN ROYAL TASMANIAN BOTANICAL GARDENS prepared for Royal Tasmanian Botanical Gardens Board Inspiring Place Pty Ltd April 2009 Final STRATEGIC MASTER PLAN ROYAL TASMANIAN BOTANICAL GARDENS prepared for Royal Tasmanian Botanical Gardens Board Inspiring Place Pty Ltd Environmental Planning, Landscape Architecture, Tourism & Recreation 208 Collins St Hobart TAS 7000 T: 03) 6231-1818 F: 03) 6231 1819 E: [email protected] ACN 58 684 792 133 in association with Anna Housego Strategic Communications and Interpretation Godden Mackay Logan Pty Ltd Heritage Consultants Alan Matchett Dunedin Botanic Gardens and assisted and/or advised by David Parham Austral Archaeology Pty Ltd Lindy Scripps Consultant Historian Brian and Ros Correy Myriad Research Pty Ltd Date Version 12.07 Draft Values Issues and Opportunities Report to Project Steering Committee and RTBG Board 03.08 Draft SMP for review by Project Steering Committee and RTBG Board 04.08.08 Preliminary Draft for Steering Committee and Board Review Prior to Public Consultation 10.12.08 Draft for Public Consultation 18.05.09 Final Report IP Project No. 07-15/06-HH TABLE OF CONTENTS Section 1 Introducing the Project .................................................................... 1 1.1 Background to the Project ....................................................................................... 1 1.2 Purpose of the SMP ................................................................................................ 6 1.3 Approach to SMP ...................................................................................................
    [Show full text]
  • Download Edition
    [37] VOL. CCCXXII OVER THE COUNTER SALES $2.75 INCLUDING G.S.T. TASMANIAN GOV ERNMENT • U • B E AS RT LIT AS•ET•FIDE TASMANIA GAZETTE PUBLISHED BY AUTHORITY WEDNESDAY 15 JANUARY 2014 No. 21 396 ISSN 0039-9795 CONTENTS Notices to Creditor Notice Page THOMAS GRAEME RAPHAEL late of 43 Stanley Street Oatlands in Tasmania primary industry worker single never married died on the twenty-second day of August 2013: Administration and Probate ............................... 38 Creditors next of kin and others having claims in respect of the property of the abovenamed deceased are required by the Fee Units ............................................................ 40 Executor Ursula Jean Raphael c/- Page Seager Level 2 179 Murray Street Hobart in Tasmania to send particulars of their Heritage .............................................................. 39 claim in writing to the Registrar of the Supreme Court of Tasmania by 14 February 2014 after which date the Executor Industrial Relations ............................................ 38 may distribute the assets having regard only to the claims of which she then has notice. Interstate Transfer .............................................. 38 Dated this fifteenth day of January 2014. Land Acquisitions .............................................. 38 PAGE SEAGER LAWYERS, Practitioners for the Estate. Living Marine Resources ................................... 39 BARBARA ANN LILLIE late of Lillian Martin Nursing Home 281 Cambridge Road Mornington in Tasmania who died on the the sixteenth day
    [Show full text]
  • December 2020
    Community News VOL 11 NO 11 DECEMBER 2020 www.brightoncommunitynews.com.au A PLACE OF PRIDE Survey sets community PARKLAND PROJECT MILESTONE aspirations BRIGHTON Municipality should be a place to feel proud of, that is clean and tidy with great local services and liveable neighbourhoods and housing. Those are some of the key findings of a recent community survey conducted by Brighton Council as part of a goal to develop a 30-year vision. The online survey, held August 27 to September 18, attracted more than 600 responses from every suburb in the municipality, particularly from residents and property owners. Asked how the municipality should be different in 2050, almost one in five called for more parks, trees, footpaths and bike and walking tracks. Other desires included more shopping and food options (16%), better transport (19%), opportunities for children and young people (11%), better planning and design (11%), a safer place to live (9%) and action on climate change and sus- tainability (9%). More than 60% of those who responded were positive or very positive about the forecast 34% growth of the municipality over the next 30 years. Mayor Tony Foster, Senator Claire Chandler and Brighton Council senior project engineer The community felt or hoped this Callum Pearce-Rasmussen check out the Bridgewater Parkland Master Plan. growth would deliver more services and facilities (22%), more infrastructure THE second phase of Brighton Plan 2016-2026 was endorsed by ago. Senator Claire Chandler along joined by Brighton Council’s senior (15%) and more businesses and jobs Council’s Bridgewater Parkland Brighton Council following extensive with Brighton Mayor Tony Foster project engineer Callum Pearce- (17%) while attracting people of diverse project is expected to be completed stakeholder and community recently viewed progress on the Rasmussen, right, with construction cultures and ages (10%).
    [Show full text]
  • Brighton Structure Plan
    Brighton Structure Plan June 2009 Ref: 38318-001 Document Control Document ID: P:\URBAN\CURRENT PROJECTS\38318 BRIGHTON STRUCTURE PLAN\REPORT\PDF JUNE 09\REPORT REV 6.DOC Rev No Date Revision Details Typist Author Verifier Approver 0 17.11.08 Partial Draft – Stage 1 SA SA RM RM 1 04.12.08 Partial Draft – Stage 1 – Revised SA SA RM RM 2 24.03.09 Provisional Draft Report (Revised scope) SA SA RM RM 3 06.04.09 Final Draft Report SA SA RH (client) RM 4 12.05.09 Final Report SA SA RH (client) RM 5 18.05.09 Final Report following Planning Committee comments SA SA RH (client) RM 6 03.06.09 Final Report following Council and DIER comments SA SA RH (client) RM A person using Connell Wagner documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Connell Wagner. Brighton Structure Plan Brighton Council Contents Section Page 1. Executive Summary 3 2. Introduction 4 2.1 Context 4 2.2 The Project 5 2.3 Structure Plan Process and Stages 5 3. Vision 7 4. Existing Conditions and Site Analysis 8 4.1 Location 8 4.2 Physical Form 8 4.3 Transport 8 4.4 Infrastructure 11 4.5 Natural Environment 11 4.6 Heritage and Cultural Significance 13 4.7 SWOT Analysis 14 5. Policy and Strategic Planning Context 16 5.1 Introduction 16 5.2 State 16 5.3 Regional 17 5.4 Local 22 6.
    [Show full text]