5.7 St Peters and local street upgrades

5.7.1 St Peters Interchange associated service buildings are located The design allows for future stages of the The St Peters interchange is located within above the tunnel portals, at the corner of interchange to adopt similar approaches to the Alexandria Landfill site, connecting with Canal Road and (the St materials and detailing to achieve overall the local road network at the of Peters motorway operations complex - project cohesion and an integrated ‘whole Campbell and Euston Roads. The site is MOC4). The facility would be located of project outcome’. The landscape bound by Canal Road in the west, Burrows directly over the exit ramp cut and cover approach in this zone is essentially to Road in the south, Princes Highway in the structure along with an electrical create ‘green volume’ and remediate the north and Campbell Road in the east. The distribution facility, fire pump rooms and former landfill site by creating an ‘urban St Peters interchange is a key connection adjacent deluge tanks. Access to these forest’, capable of competing with the scale in the overall Westconnex journey. With the facilities is provided from Canal Road. The of the proposed interchange. New M5 tunnel entry/exit point at the motorway control centre (MOC5) is located southern reaches of the St Peters at the corner of Burrows Road and Large areas of new tree planting would be Interchange, connections would be made to Campbell Road. incorporated on both sides of the New M5 the surrounding local road network as well ramps and above the portals to present a as the future M4-M5 Link and In developing the design, a strategy has continuous green canopy and create a Gateway. These two future links would been proposed for the overall interchange, sense of green immersion for the motorist provide regional connections to Sydney focusing on the following objectives: upon entry or exit from the tunnel. Airport and western Sydney as well as the Landscape treatments surrounding the • Return surplus lands to the community remainder of Sydney’s orbital road network. Canal Road MOC4 would focus on creating as public open space. a defined street edge with street tree To achieve a lasting and cohesive urban • Provide an extensive green volume of planting, and feature Fig Tree plantings to design strategy for the overall interchange, vegetation to compete with and soften offer increased ‘green volume’ and help the site requires a design solution that the scale of the proposed multi-level define a sense of landscape character for would unify and shape the different stages interchange, creating an ‘urban forest’ the site. These figs would also provide of the project, including the New M5, and • Promote the use of a tall, established valuable shade for park users. the future and M4-M5 tree canopy cover to not only soften the link. scale of the proposed infrastructure, but also provide a counterpoint and The St Peters interchange consists of the extension of the green open space of motorway control centre, ventilation facility, distribution substation, fire pump rooms • Built form designed to enhance the and deluge tanks and the interchange road existing street character. network. The ventilation facility and

77 New M5 WestConnex Urban Design Urban Design 5.7.2 Local Streets Proposed pedestrian and cycleway bridges The overall design intent is to create a over Campbell Road and the New M5 series of tree lined local streets that offer ramps and Alexandra Canal will become an amenity for local residents, create a high integral element, creating new connections quality environment for pedestrians and for the cycle network. cyclists, and integrate the local streetscape with adjacent open space and parkland, The design of the pedestrian and cycle particularly in the vicinity of Sydney Park. bridges would feature simple and elegant solutions, with a focus on creating sinuous The design incorporates a series of feature horizontal alignments that respond to the pedestrian and cycleway bridges that would adjacent landscape environment of Sydney increase connectivity for and allow Park and the proposed landscaped earth integration of the open space proposed for treatments for St Peters Interchange. the St Peters interchange. Tree and landscape plantings would be designed to The urban design intent for the following six match , Botany Bay and local street character zones are explored in guidelines. Vegetation detail in Appendix B: Figure 52 Connectivity and tree plantings would be used to create • Princes Highway business corridor a sense of visual separation for pedestrians and cyclists from the road edge. • Campbell Road / park extension • Bourke Road connection / industrial The design of wall structures would be • Burrows Road / Alexandra Canal / refined and elegant, without unnecessary industrial fussiness or embellishment, with landscape • Canal Road / park extension treatments used to soften the appearance of retaining walls and other structures. • Brickpit / interchange.

Figure 53 Open space

78 New M5 WestConnex Urban Design Urban Design 5.7.3 Master Plan A ‘master plan’ solution has been developed for the St Peters interchange that provides an overall design response for the site accommodating road, pedestrian and cycle infrastructure with open space. The master plan provides the opportunity to create six hectares of new open space across the site and continue the design language of landscaped mounds from Sydney Park further south.

The achievement of the complete master plan solution is subject to the future M4-M5 Link and Sydney Gateway projects. Sites within the interchange have been allocated for construction staging of these two projects and the ultimate design of resultant land would be subject to separate planning processes.

Figure 54 St Peters artitis impression

79 New M5 WestConnex Urban Design Urban Design Figure 55 St Peters interchange master plan 80 New M5 WestConnex Urban Design Urban Design Figure 56 St Peters interchange master plan 81 New M5 WestConnex Urban Design Urban Design 5.7.4 Burrows Road Motorway A long span roof supported from the The long linear nature of the building is Operations Complex northern and southern walls provides near articulated with vertical louvres spaced at The Burrows Road Operations Complex limitless flexibility for the interiors. different intervals along the Burrows Road (MOC5) would be the central building for all Uninterrupted power supply and electrical façade. The spacing responds to the communications and control of the project’s equipment rooms are located in a private or public nature of the spaces operational management control systems consolidated block to the north of the floor within, and provides a shifting rhythm. (OCMS). The motorway control centre plate. Egress stairs and plant spaces at the would be staffed 24 hours per day, seven ground level are exposed smooth faced days per week, and would require around The horizontal nature of the building is concrete block, expressing their function. 26 full time equivalent staff. Located on the accentuated by the expression of the floor The substation to the rear is clad in brick, corner of Campbell and Burrows Roads the and roof lines on the south elevation to referencing the sites history and ground level accommodates an open Burrows Road. The floor and roof lines acknowledging the building’s more carpark, bike storage and waste facilities. return around the eastern and western utilitarian purpose. The carpark is softened by a large ends and fold vertically down the south landscaped buffer between the kerb and elevation to meet and form a continuous ‘C’ The following pages contain a site plan, building. Slender concrete columns support shaped loop. A series of vertical louvres elevations and perspectives of the the upper level allowing views out from punctuate the Burrows Road façade and motorway control centre. These plans beneath the building and raise it above return to the east to form a screen to the would be updated during detailed design of flood event levels. The upper level houses double height entry space. the project. reception, open plan offices, enclosed offices, breakout space, a lunch room and Materials, colours and finishes associated staff amenities. Clad in composite aluminium panels, the southern elevation of the control centre Design intent wraps up and over the building to form a The intent for the design of the motorway ‘casing’ into which the building is inserted. control centre is to blend with the The motorway control rooms are clad in surrounding light industrial land use, whilst corten steel panels, emphasising its secure maintaining the New M5 identity. It is a two nature. The office and breakout spaces are level building with an open carpark below enclosed with clear glass to provide natural the main functional spaces. The main light to the working environments. address, vehicle and pedestrian access is from Burrows Road. A substation building is sited to the rear of the main structure.

82 New M5 WestConnex Urban Design Urban Design Substation

Emergency access road

Burrows Road motorway operations complex (MOC 5)

Bioretention basin Carparking beneath motorway operations complex Burrows Road

Incident response parking

Burrows Road

N

0 25 50m

LEGEND New M5 ramps Watercourse Alexandra Canal

Figure 5-42 Burrows Road motorway operations complex (MOC 5) layout Figure 57 Indicative MOC5 Burrows Road site plan

83 New M5 WestConnex Urban Design Urban Design 1 2 3 7212 7212 7212 LP LM LL LK LJ LH LG LF LE LD LC LB LA RL 11.500 ROOF LEVEL 7 1

RL 10.500 L01 CEILING LEVEL

RL 7.000 LEVEL 01

RL 3.000 GROUND LEVEL

2 2 2 NORTH ELEVATION 1 SCALE 1 : 250 7204

3 2 1 7212 7212 7212 LA LB LC LD LE LF LG LH LJ LK LL LM LP

RL 11.500 7 6 1 1 ROOF LEVEL 3 8 5 1 4 3 RL 10.500 L01 CEILING LEVEL

RL 7.000 LEVEL 01

RL 3.000 GROUND LEVEL

2 2 3 SOUTH ELEVATION 4 SCALE 1 : 250 7204

4 4 L5 L4 7212 L3 L2 L1 L1 L2 L3 7212 L4 L5 MATERIAL & FINISHES 1 PROPRIETARY CURTAIN WALL GLAZING SYSTEM 2 CONCRETE BLOCKWORK, STACK BOND PATTERN, RL 11.500 RL 11.500 7 6 3 1 7 6 CORE FILLED TO ACHIEVE REQUIRED FIRE RATING ROOF LEVEL ROOF LEVEL BETWEEN ROOMS. RL 10.500 RL 10.500 3 ALUMINIUM VERTICAL LOUVRES @ 600 SPACING L01 CEILING L01 CEILING 4 ALUMINIUM VERTICAL LOUVRES @ 1200 SPACING LEVEL LEVEL 3 5 ALUMINIUM VERTICAL LOUVRES @ 1800 SPACING 6 PERFORATED CORTEN CLADDING RL 7.000 RL 7.000 7 EXTERNAL CLADDING - METAL WALL CLADDING LEVEL 01 LEVEL 01 8 FRAMELESS GLASS BALUSTRADE - SS BRACKET CIRCULAR D30H900 2 RL 3.000 RL 3.000 GROUND LEVEL GROUND LEVEL 2 2 3 EAST ELEVATION WEST ELEVATION Figure 58 Indicative MOC5 at Burrows Road elevations SCALE 1 : 250 7205 SCALE 1 : 250 7204 INFORMATION SHOWN ON THIS DRAWING IS PRELIMINARY ONLY AND SUBJECT TO ADJUSTMENT DURING DETAILED DESIGN STAGE. TITLE INITIAL DATE ORIGINAL DRAWING AT SIZE CLIENT: LEIGHTON DRAGADOS SAMSUNG C&T JOINT VENTURE PROJECT: WESTCONNEX STAGE 2 STATUS CONCEPT DESIGN 84 New M5 WestConnex Urban Design DRAFTSPERSON SL 27-03-15 NEW M5 MAIN WORKS DESIGN & CONSTRUCT NOT FOR CONSTRUCTIONUrban Design DRAFTING CHECK EW 27-03-15 TITLE: RFT APP.2 - TENDER INFORMATION REQUIREMENTS VOLUME DESIGNER SL 27-03-15 URBAN DESIGN 2E - DESIGN OF STRUCTURES AND BUILDINGS C:\_Revit Projects\010962_LCC_CENTRAL_KENYA.rvt C:\_Revit DESIGN CHECK MG 27-03-15 2.5 0 2.5 5 MOTORWAY CONTROL CENTER AT 2P - URBAN AND LANDSCAPE DESIGN

8/07/2015 9:10:39 AM 9:10:39 8/07/2015 1 08-07-15 RE-ISSUED TO REFLECT POST-TENDER ADDENDUM 1 AK MG PM SCALE 1:250 DRAWING NUMBER REV DESIGN MANAGER 0 27-03-15 CONCEPT DESIGN ISSUE SL MG PM PM 27-03-15 AT A3 BURROWS ROAD REV DATE DESCRIPTION DRAWN REVIEWED APPROVAL PROJECT DIRECTOR PC 27-03-15 CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D. M5-HAS-DWG-700-610-AR-7210 1

DATE: LOCATION: ELEVATIONS 0 5 10 15 20 25 mm ON A3 ORIGINAL This Drawing may have been prepared using colour and may be incomplete if copied CAMPB ELL ROAD

ROAD OWS BURR

Figure 59 Indicative MOC5 at Burrows Road visualisation

MATERIAL & FINISHES AERIAL AXONOMETRIC 85 New1 M5 LIGHT WestConnex WEIGHT PROFILED Urban METAL Design ROOF DECK WITH CONCEALED FASTENINGS AND SCALE Urban Design NOM. 2-DEGREE FALL TO CONCEALED BOX GUTTERS ADJACENT TO EXTERNAL WALLS. RAFTERS AND PURLINS TO SUPPORT AIR-CONDITION EQUIPMENT ON ROOF WHERE SHOWN 2 PERFORATED CORTEN CLADDING 3 ALUMINIUM VERTICAL LOUVRES @ 600 SPACING 4 CONCRETE BLOCKWORK, STACK BOND PATTERN, CORE FILLED TO ACHIEVE REQUIRED FIRE RATING BETWEEN ROOMS.

INFORMATION SHOWN ON THIS DRAWING IS PRELIMINARY ONLY AND SUBJECT TO ADJUSTMENT DURING DETAILED DESIGN STAGE. TITLE INITIAL DATE ORIGINAL DRAWING AT A3 SIZE CLIENT: LEIGHTON DRAGADOS SAMSUNG C&T JOINT VENTURE PROJECT: WESTCONNEX STAGE 2 STATUS CONCEPT DESIGN DRAFTSPERSON SL 27-03-15 NEW M5 MAIN WORKS DESIGN & CONSTRUCT NOT FOR CONSTRUCTION DRAFTING CHECK EW 27-03-15 TITLE: RFT APP.2 - TENDER INFORMATION REQUIREMENTS VOLUME DESIGNER SL 27-03-15 URBAN DESIGN 2E - DESIGN OF STRUCTURES AND BUILDINGS C:\_Revit Projects\010962_LCC_CENTRAL_KENYA.rvt C:\_Revit DESIGN CHECK MG 27-03-15 MOTORWAY CONTROL CENTER AT 2P - URBAN AND LANDSCAPE DESIGN

8/07/2015 9:10:50 AM 9:10:50 8/07/2015 1 08-07-15 RE-ISSUED TO REFLECT POST-TENDER ADDENDUM 1 AK MG PM DRAWING NUMBER REV DESIGN MANAGER 0 27-03-15 CONCEPT DESIGN ISSUE SL MG PM PM 27-03-15 BURROWS ROAD REV DATE DESCRIPTION DRAWN REVIEWED APPROVAL PROJECT DIRECTOR PC 27-03-15 CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D. M5-HAS-DWG-700-610-AR-7213 1

DATE: LOCATION: AERIAL AXONOMETRIC 0 5 10 15 20 25 mm ON A3 ORIGINAL This Drawing may have been prepared using colour and may be incomplete if copied Figure 60 Indicative MOC5 artist impression VIEW FROM BURROWS ROAD LOOKING WEST SCALE 86 New M5 WestConnex Urban Design Urban Design

INFORMATION SHOWN ON THIS DRAWING IS PRELIMINARY ONLY AND SUBJECT TO ADJUSTMENT DURING DETAILED DESIGN STAGE. TITLE INITIAL DATE ORIGINAL DRAWING AT A3 SIZE CLIENT: LEIGHTON DRAGADOS SAMSUNG C&T JOINT VENTURE PROJECT: WESTCONNEX STAGE 2 STATUS CONCEPT DESIGN DRAFTSPERSON SL 27-03-15 NEW M5 MAIN WORKS DESIGN & CONSTRUCT NOT FOR CONSTRUCTION DRAFTING CHECK EW 27-03-15 TITLE: RFT APP.2 - TENDER INFORMATION REQUIREMENTS VOLUME DESIGNER SL 27-03-15 URBAN DESIGN 2E - DESIGN OF STRUCTURES AND BUILDINGS C:\_Revit Projects\010962_LCC_CENTRAL_KENYA.rvt C:\_Revit DESIGN CHECK MG 27-03-15 MOTORWAY CONTROL CENTER AT 2P - URBAN AND LANDSCAPE DESIGN

8/07/2015 9:10:54 AM 9:10:54 8/07/2015 1 08-07-15 RE-ISSUED TO REFLECT POST-TENDER ADDENDUM 1 AK MG PM DRAWING NUMBER REV DESIGN MANAGER 0 27-03-15 CONCEPT DESIGN ISSUE SL MG PM PM 27-03-15 BURROWS ROAD REV DATE DESCRIPTION DRAWN REVIEWED APPROVAL PROJECT DIRECTOR PC 27-03-15 CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D. M5-HAS-DWG-700-610-AR-7214 1

DATE: LOCATION: PERSPECTIVE A 0 5 10 15 20 25 mm ON A3 ORIGINAL This Drawing may have been prepared using colour and may be incomplete if copied Figure 61 Indicative MOC5 artist impression

87 New M5 WestConnex Urban Design Urban Design VIEW FROM BURROWS ROAD LOOKING EAST SCALE

INFORMATION SHOWN ON THIS DRAWING IS PRELIMINARY ONLY AND SUBJECT TO ADJUSTMENT DURING DETAILED DESIGN STAGE. TITLE INITIAL DATE ORIGINAL DRAWING AT A3 SIZE CLIENT: LEIGHTON DRAGADOS SAMSUNG C&T JOINT VENTURE PROJECT: WESTCONNEX STAGE 2 STATUS CONCEPT DESIGN DRAFTSPERSON SL 27-03-15 NEW M5 MAIN WORKS DESIGN & CONSTRUCT NOT FOR CONSTRUCTION DRAFTING CHECK EW 27-03-15 TITLE: RFT APP.2 - TENDER INFORMATION REQUIREMENTS VOLUME DESIGNER SL 27-03-15 URBAN DESIGN 2E - DESIGN OF STRUCTURES AND BUILDINGS C:\_Revit Projects\010962_LCC_CENTRAL_KENYA.rvt C:\_Revit DESIGN CHECK MG 27-03-15 MOTORWAY CONTROL CENTER AT 2P - URBAN AND LANDSCAPE DESIGN

8/07/2015 9:10:59 AM 9:10:59 8/07/2015 1 08-07-15 RE-ISSUED TO REFLECT POST-TENDER ADDENDUM 1 AK MG PM DRAWING NUMBER REV DESIGN MANAGER 0 27-03-15 CONCEPT DESIGN ISSUE SL MG PM PM 27-03-15 BURROWS ROAD REV DATE DESCRIPTION DRAWN REVIEWED APPROVAL PROJECT DIRECTOR PC 27-03-15 CO-ORDINATE SYSTEM: MGA Zone 56 HEIGHT DATUM: A.H.D. M5-HAS-DWG-700-610-AR-7215 1

DATE: LOCATION: PERSPECTIVE B 0 5 10 15 20 25 mm ON A3 ORIGINAL This Drawing may have been prepared using colour and may be incomplete if copied 5.7.5 Canal Road Complex Materials, colours and finishes The horizontal portions of the building are Design intent clad in horizontally oriented dark and light The facility at Canal Road (MOC4), St grey terracotta façade panels – responding Peters is conceived as one building to the predominantly masonry construction articulated through form and material to of the residential houses nearby. Openings express the three main functions within. providing service access to the plant rooms The building is nestled into the sloping site are grouped into common recesses, to reduce its apparent height and respond exposing the structure – a smooth-faced to its context. The lowest section of the concrete block (stack bond pattern). Access building, which fronts Canal Road and doors within the block work are painted to wraps around the southern end, houses the match. The lower scale supply building is distribution substation. Immediately clad in vertically oriented terracotta panels adjacent and slightly higher the exhaust which reflect its function and verticality ventilation equipment is placed in a two whilst acknowledging its moderate scale. level section, the lower level being entirely below ground. The following pages provide preliminary site plans, elevations and perspectives of Horizontally oriented fans allow for a lower MOC4. These plans would be developed overall building. Horizontally oriented during the detailed design of the project. terracotta façade panels emphasise the low nature of the building, with the ventilation facility rising up from the southern end. The vertical structure is visually separated from the horizontal building. The design of the ventilation facility will be finalised in accordance with the methodology outlined in section 5.2.

88 New M5 WestConnex Urban Design Urban Design A36 M4 - M5 Link stub tunnels

Supply building Mary Street Alfred Street

Ventilation extraction tunnels

Ventilation building

Ventilation facility

Substation

Pump room (below ground)

Deluge tanks (above ground)

N

0 40 80m

LEGEND New (tunnel) Canal Road Gardeners Road on-ramp to New M5 (westbound) New M5 ramps Sydney Gateway on-ramp to New M5 (westbound) New M5 (eastbound) off-ramp to Gardeners Road and the Sydney Gateway Tunnel portal location

Figure 5-41 St Peters motorway operations complex (MOC 4) Figure 62 Indicative MOC4 facility at St Peters

89 New M5 WestConnex Urban Design Urban Design Subject to detailed design

Figure 63 Indicative MOC4 facility at St Peters

90 New M5 WestConnex Urban Design Urban Design Subject to detailed design

Figure 64 Indicative MOC4 facility at St Peters

91 New M5 WestConnex Urban Design Urban Design Subject to detailed design

Figure 65 Indicative MOC4 facility at St Peters

92 New M5 WestConnex Urban Design Urban Design Subject to detailed design

Figure 66 Indicative MOC4 facility at St Peters

93 New M5 WestConnex Urban Design Urban Design Figure 67 Artist’s impression - Indicative MOC4 facility at St Peters

94 New M5 WestConnex Urban Design Urban Design Figure 68 Artist’s impression - Indicative MOC4 facility at St Peters

95 New M5 WestConnex Urban Design Urban Design