Appendix A – Major Flood Control Projects

Table 1.1 Major Drainage Projects in Northern NT (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits

Rural Drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks, Rehabilitation Scheme, drainage channels Kwan Tei, Wang Leng, Stage 1, Phase 1A – and box culvert , Leng Tsai, Rehabilitation Works at (about 170 m) Wang Shan Keuk San Tsuen, Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po

Rural Drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau, Rehabilitation Scheme, drainage channel Cheung Lek, Lin Tong Mei, Stage 1, Phase 1B – Tsiu Keng Lo Wai, Rehabilitation Works at Tsiu Keng Pang Uk, Sheung Yue River Tsiu Keng San Wai, Chan Uk Po

Rural Drainage 197# 1.7 05/2003 04/2006 Drainage rehabilitation Chow Tin Tsuen, Rehabilitation Scheme – works at Ta Kwu Ling Village, Drainage Rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu, Works at Ping Yuen River Lei Uk, Tong Fong, and Mo Fan Shui Hau Heung Stream (NNT Portion)

Regulation of 390 4 12/2001 11/2006 Training of Lo Wu, Yuen Leng Chai, Shenzhen River, Stage 3 River upstream of Nam Hang, Man Kam To, Lo Wu to Lo Shue Leng Muk Wu, Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling

Drainage Improvement 208 1.8 06/2005 09/2008 Construction of drainage Ma Wat and North of for Ma Wat River at channels in Ma Wat and Hong Lok Yuen Kau Lung Hang north of Hong Lok Yuen

River Training Works 756 4.6 08/1999 03/2003 Training of Fu Tei Au, Sheung Shui Wa Shan, for the Upper River Indus re-entered drainage channel Tin Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen

Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Tsung Yuen, Ho Sheung Heung, Development Package 4, Area 30 Yin Kong Engineering Works

River Training 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, Shek Ma, Works for the drainage channel Ngam Pin, Pai Tau Lo, Lower River Indus and Ho Sheung Heung, Tong Kok, River Beas Shek Tsai Leng, Kwu Tung, Yin Kong

# The total cost of the project. Appendix A – Major Flood Control Projects

Table 1.2 Major Drainage Projects in Northern NT (Projects Under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Drainage Improvement 261 5.2 12/2006 End 2010 Construction of Ping Kong, Works in Ping Kong, Kau Lung drainage channels Kau Lung Hang, Yuen Leng, Hang, Yuen Leng, Nam Wa Po and box culverts in Nam Wa Po and and Tai Hang Areas Ping Kong, Tai Hang Areas Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas

Drainage Improvement 116 3.5 06/2007 Mid 2010 Construction of , Works in Lung Yeuk Tau, drainage channels and Kwan Tei South and Kwan Tei South and box culverts in Leng Tsai Leng Tsai, Fanling Lung Yeuk Tau, Kwan Tei South and Leng Tsai

Drainage Improvement 162 3.6 12/2007 End 2011 Construction of Tai Po Tin, Ping Che, Works in Tai Po Tin and drainage channels and Man Uk Pin and Ping Che of Ta Kwu Ling, box culverts in Lin Ma Hang and Man Uk Pin and Tai Po Tin, Ping Che, Lin Ma Hang of Man Uk Pin and Lin Ma Hang

Drainage Improvement 222 3.1 08/2008 End 2010 Construction of Ki Lun Tsuen, Ma Tso Lung, in Ki Lun Tsuen, Ma Tso Lung, drainage channels and Ying Pun, Shek Tsai Leng and Ying Pun, Shek Tsai Leng and stormwater drains in Sha Ling Sha Ling in Ki Lun Tsuen, Ma Tso Lung, Ying Pun, Shek Tsai Leng and Sha Ling

Table 1.3 Major Drainage Projects in Northern NT (Projects Under Design/Planning)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Drainage Improvement 136 8 Early 2011 Mid 2014 Construction of Lin Ma Hang, Ping Che, in Northern New Territories – drainage channels in Tai Po Tin, Package C Lung Yeuk Tau, Sheung Shan Kai Wat, (NNT Portion) Man Uk Pin, Man Uk Pin, , Ta Kwu Ling, Ng Uk Tsuen, Ping Che and Lo Wai, Lin Ma Hang Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai Appendix A – Major Flood Control Projects

Table 2.1 Major Drainage Projects in Northwestern NT (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Yuen Long, Kam Tin, 139 3.2 06/2004 06/2007 Construction of Cheung Kong, Tai Kong Po, Ngau Tam Mei and secondary drainage Tsat Sing Kong, Ha Che, Tin Shui Wai Drainage channels in Kam Tin San Wai Tsuen Improvements, Stage 1, and Ngau Tam Mei Phase 2A – Kam Tin and Ngau Tam Mei

Main Drainage Channel for 125 1.5 09/2003 03/2006 Construction of Lung Tin Tsuen, Yuen Long and Kam Tin – drainage channel in Lam Hau Tsuen Shan Ha Tsuen to Lung Tin Tsuen Lam Hau Tsuen Section

Main Drainage Channels for 100 1.7 03/2000 12/2002 Construction of Yau Tam Mei Tsuen, Ngau Tam Mei, drainage channel from Yau Tam Mei San Tsuen, Phase 2 – Ngau Tam Mei to Ngau Tam Mei to Wai Tsai Yau Mei San Tsuen Section Yau Mei San Tsuen

Village Flood Protection for 109 0.9 12/2001 12/2004 Construction of Wang Chau and Pok Wai Yuen Long, Kam Tin and floodwater pumping Ngau Tam Mei, station in Wang Chau; North West New Territories, and construction of Stage 1 – Remainder Pok Wai drainage channel

Yuen Long Bypass Floodway 432 3.8 01/2003 03/2006 Construction of Yuen Long Town, drainage channels in Tung Shing Lei, Au Tau, Yuen Long South Small Traders New Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen

San Tin Eastern Main 354 2.4 10/2002 04/2006 Construction of Lok Ma Chau Drainage Channel the Eastern Main drainage channels in San Tin

Main Drainage Channels for 220 3.4 05/2001 07/2003 Construction of Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, drainage channels near Kam Tsin Wai, Nam Hing Lei, Stage 2 — Remainder Ng Ka Tsuen and Chung Sum Tsuen, Shek Tau Wai Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen

Main Drainage Channels 280 3.1 08/1999 03/2004 Construction of Kam Tin San Tsuen, for Yuen Long and drainage channel from Wing Lung Wai, Kiu Tau Tsuen, Kam Tin Stage 2 — Kam Tin San Tsuen Pang Ka Tsuen, Kam Tin San Tsuen to to Wan Toi Shan Shek Kong San Tsuen, Wang Toi Shan Section Wang Toi Shan

Main Drainage Channels 210 3.5 07/1999 03/2002 Construction of Kat Hing Wai, Tai Hong Tsuen, for Yuen Long and drainage channel from Shek Wu Tong, Tin Sam Tsuen, Kam Tin Stage 2 — Kam Tin Road to Tai Kek Tai Kek Kam Tin Road to Tai Kek Section

Main Drainage Channels 359 2.3 11/1999 03/2005 Construction of Yau Mei San Tsuen, for Ngau Tam Mei Phase 1 — drainage channels from Chuk Yuen Tsuen, Yau Mei San Tsuen to Yau Mei San Tsuen to Man Yuen Chuen Tai Sang Wai Section Tai Sang Wai

Village Flood Protection 122 - 11/2000 03/2003 Construction of Chuk Yuen Tsuen and for Chuk Yuen Tsuen and floodwater pumping Ha San Wai Ha San Wai, station in Chuk Yuen Tsuen North West New Territories and Ha San Wai

Village Flood Protection for 146 - 12/2001 08/2005 Construction of Mai Po Lo Wai, Mai Po Lo Wai, floodwater pumping Mai Po San Tsuen, Mai Po San Tsuen, stations in Mai Po Lo Wai, Ma Tin Tsuen and Ma Tin Tsuen and Shui Pin Wai, Ma Tin Tsuen and Shui Pin Wai North West New Territories Shui Pin Wai Appendix A – Major Flood Control Projects

Table 2.2 Major Drainage Projects in Northwestern NT (Projects under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Yuen Long, Kam Tin, 156 2.1 03/2007 End 2009 Construction of Cheung Chun San Tsuen and Ngau Tam Mei and drainage channels in Kam Tsin Wai Tin Shui Wai Drainage Cheung Chun San Tsuen Improvements, Stage 1, and Kam Tsin Wai Phase 2B – Cheung Chun San Tsuen and Kam Tsin Wai

Yuen Long, Kam Tin, 202 2.3 12/2007 Early 2011 Construction of Yuen Kong San Tsuen, Ngau Tam Mei and secondary drainage Cheung Po, Ma On Kong Tin Shui Wai Drainage channels in Kam Tin Improvement, Stage 1, Phase 2B – Remaining Works

Table 2.3 Major Drainage Projects in Northwestern NT (Projects under Design/Planning)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Drainage Improvement in 168 2.1 End 2012 End 2018 Construction of Western San Tin Northern New Territories – the western main Package A drainage channel in San Tin Appendix A – Major Flood Control Projects

Table 3.1 Major Drainage Projects in West Kowloon (Completed Projects)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

West Kowloon Drainage 686 23 12/1999 12/2004 Improvement of Tsim Sha Tsui, Mong Kok, Improvement, Stages 2 23km of Tai Kok Tsui, Lai Chi Kok, Phase 1 Works stormwater drains Cheung Sha Wan, Sham Shui Po

West Kowloon Drainage 1201 11 01/2001 08/2007 Construction of Yau Ma Tei, Mong Kok, Improvement, Stage 2 Tai Hang Tung flood Tai Kok Tsui, Sham Shui Po Phase 2 and Stage 3 stage scheme and Phase 1 Works Kai Tak stormwater transfer tunnel and improvement of 11km of storwmater drains

Table 3.2 Major Drainage Projects in West Kowloon (Projects under Construction)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

West Kowloon Drainage 1669 3.7 11/2008 Mid 2012 Construction of Sham Shui Po, Improvement – drainage tunnel Cheung Sha Wan and Lai Chi Kok Lai Chi Kok Drainage Tunnel

Table 3.3 Major Drainage Projects in West Kowloon (Projects under Design/Planning)

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

West Kowloon Drainage 308 2.8 End 2009 End 2012 Inter-reservoir Lai Chi Kok, Cheung Sha Wan Improvement – Transfer Scheme and Shum Shui Po Inter-Reservoir Transfer Scheme Appendix A – Major Flood Control Projects

Table 4 Achievements of Major Flood Prevention Projects in Other Areas

Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits

Drainage Improvement in 3045 18 11/2007 Early 2012 Construction of Causeway Bay, Wan Chai, Northern Island – stormwater drainage Central, Sheung Wan, Hong Kong West tunnel Kennedy Town Drainage Tunnel

Drainage Improvement in 373 4.4 07/2008 End 2012 Construction of Chai Wan, Shau Kei Wan, Northern Hong Kong Island – stormwater drains North Point, Causeway Bay, Western Lower Wan Chai, Central, Catchment Works Sheung Wan, Kennedy Town

Drainage Improvement 253 9.8 End 2009 End 2012 Construction of Tai Po Town Areas, Works in Shuen Wan, Tai Po stormwater drains, Tung Tsz, Shuen Wan, box culvert and Wai Ha, Ting Kok Road a stormwater pumping station

Drainage Improvement 421 4.4 09/2007 Mid 2011 Construction of Upper Lam Tsuen River, Works in Upper drainge channels She Shan River, Lam Tsuen River, and box-culvert Upper Tai Po River, She Shan River, Ping Long and Kwun Hang Upper Tai Po River, Ping Long and Kwun Hang

Drainage Improvement in 1260 5.35 12/2007 End 2011 Construction of Tsuen Wan and Kwai Chung Tsuen Wan, Kwai Chung and stormwater Tsing Yi – Tsuen Wan drainage tunnel Drainage Tunnel

Drainage Improvement in 158 2 03/2007 End 2009 Construction and Sha Ha, Pak Kong, Sai Kung drainage channels Ho Chung, Sai Kung Town

Drainage Improvement in 191 11 04/2007 Early 2011 Construction of Hung Hom, Ma Tau Wai, East Kowloon – stormwater drains Kowloon City, Package B Phase 2 Kwun Tong, San Po Kong

Drainage Improvement in 199 N/A 06/2006 End 2009 Construction of Sheung Wan Northern Hong Kong Island – stormwater Sheung Wan Stormwater pumping station Pumping Station

Drainage Improvement in 190 5.6 05/2005 01/2009 Construction of Tsim Sha Tsui, To Kwa Wan, East Kowloon – Package A drains and box culverts Wong Tai Sin, Yau Tong

Drainage Improvement in 222 5.6 05/2006 Early 2010 Construction of Hung Hom, Kowloon City and East Kowloon – Package B stormwater drains and San Po Kong Phase 1 box culverts