Appendix a – Major Flood Control Projects
Total Page:16
File Type:pdf, Size:1020Kb
Appendix A – Major Flood Control Projects Table 1.1 Major Drainage Projects in Northern NT (Completed Projects) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost ($M) (km) Date Improvements and Benefits Rural Drainage 203 4.2 11/1998 12/2001 Construction of San Wai Barracks, Rehabilitation Scheme, drainage channels Kwan Tei, Wang Leng, Stage 1, Phase 1A – and box culvert Hung Leng, Leng Tsai, Rehabilitation Works at (about 170 m) Wang Shan Keuk San Tsuen, Ng Tung River Tai Tong Wu, Shan Tong, San Tong Po Rural Drainage 156 4.9 04/1999 12/2001 Construction of Hang Tau Tai Po, Hang Tau, Rehabilitation Scheme, drainage channel Cheung Lek, Lin Tong Mei, Stage 1, Phase 1B – Tsiu Keng Lo Wai, Rehabilitation Works at Tsiu Keng Pang Uk, Sheung Yue River Tsiu Keng San Wai, Chan Uk Po Rural Drainage 197# 1.7 05/2003 04/2006 Drainage rehabilitation Chow Tin Tsuen, Rehabilitation Scheme – works at Ta Kwu Ling Village, Drainage Rehabilitation Ping Yuen River Kan Tau Wai, Fung Wong Wu, Works at Ping Yuen River Lei Uk, Tong Fong, and Mo Fan Shui Hau Heung Stream (NNT Portion) Regulation of 390 4 12/2001 11/2006 Training of Shenzhen Lo Wu, Yuen Leng Chai, Shenzhen River, Stage 3 River upstream of Nam Hang, Man Kam To, Lo Wu to Lo Shue Leng Muk Wu, Muk Wu Nga Yiu, Lo Shue Ling, Ta Kwu Ling Drainage Improvement 208 1.8 06/2005 09/2008 Construction of drainage Ma Wat and North of for Ma Wat River at channels in Ma Wat and Hong Lok Yuen Kau Lung Hang north of Hong Lok Yuen River Training Works 756 4.6 08/1999 03/2003 Training of Fu Tei Au, Sheung Shui Wa Shan, for the Upper River Indus re-entered drainage channel Tin Ping Shan Tsuen, Shek Wu San Tsuen, Wu Nga Lok Yeung, Ma Shi Po, Siu Hang San Tsuen, Siu Hang Tsuen, Kan Lung Tsuen, San Wai, San Uk Tsuen Shek Wu Hui 891 1.7 09/1998 02/2002 River training in Tsung Yuen, Ho Sheung Heung, Development Package 4, Area 30 Yin Kong Engineering Works River Training 258 2.6 03/1999 03/2001 Construction of Lo Wu, Tak Yuet Lau, Shek Ma, Works for the drainage channel Ngam Pin, Pai Tau Lo, Lower River Indus and Ho Sheung Heung, Tong Kok, River Beas Shek Tsai Leng, Kwu Tung, Yin Kong # The total cost of the project. Appendix A – Major Flood Control Projects Table 1.2 Major Drainage Projects in Northern NT (Projects Under Construction) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Drainage Improvement 261 5.2 12/2006 End 2010 Construction of Ping Kong, Works in Ping Kong, Kau Lung drainage channels Kau Lung Hang, Yuen Leng, Hang, Yuen Leng, Nam Wa Po and box culverts in Nam Wa Po and and Tai Hang Areas Ping Kong, Tai Hang Areas Kau Lung Hang, Yuen Leng, Nam Wa Po and Tai Hang areas Drainage Improvement 116 3.5 06/2007 Mid 2010 Construction of Lung Yeuk Tau, Works in Lung Yeuk Tau, drainage channels and Kwan Tei South and Kwan Tei South and box culverts in Leng Tsai Leng Tsai, Fanling Lung Yeuk Tau, Kwan Tei South and Leng Tsai Drainage Improvement 162 3.6 12/2007 End 2011 Construction of Tai Po Tin, Ping Che, Works in Tai Po Tin and drainage channels and Man Uk Pin and Ping Che of Ta Kwu Ling, box culverts in Lin Ma Hang and Man Uk Pin and Tai Po Tin, Ping Che, Lin Ma Hang of Sha Tau Kok Man Uk Pin and Lin Ma Hang Drainage Improvement 222 3.1 08/2008 End 2010 Construction of Ki Lun Tsuen, Ma Tso Lung, in Ki Lun Tsuen, Ma Tso Lung, drainage channels and Ying Pun, Shek Tsai Leng and Ying Pun, Shek Tsai Leng and stormwater drains in Sha Ling Sha Ling in New Territories Ki Lun Tsuen, Ma Tso Lung, Ying Pun, Shek Tsai Leng and Sha Ling Table 1.3 Major Drainage Projects in Northern NT (Projects Under Design/Planning) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Drainage Improvement 136 8 Early 2011 Mid 2014 Construction of Lin Ma Hang, Ping Che, in Northern New Territories – drainage channels in Tai Po Tin, Package C Lung Yeuk Tau, Sheung Shan Kai Wat, (NNT Portion) Man Uk Pin, Man Uk Pin, Loi Tung, Ta Kwu Ling, Ng Uk Tsuen, Ping Che and Tan Chuk Hang Lo Wai, Lin Ma Hang Tan Chuk Hang, San Tong Po, Tai Wo, Ma Wat Wai, Ma Liu Shui San Tsuen, Leng Tsai Appendix A – Major Flood Control Projects Table 2.1 Major Drainage Projects in Northwestern NT (Completed Projects) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Yuen Long, Kam Tin, 139 3.2 06/2004 06/2007 Construction of Cheung Kong, Tai Kong Po, Ngau Tam Mei and secondary drainage Tsat Sing Kong, Ha Che, Tin Shui Wai Drainage channels in Kam Tin San Wai Tsuen Improvements, Stage 1, and Ngau Tam Mei Phase 2A – Kam Tin and Ngau Tam Mei Main Drainage Channel for 125 1.5 09/2003 03/2006 Construction of Lung Tin Tsuen, Yuen Long and Kam Tin – drainage channel in Lam Hau Tsuen Shan Ha Tsuen to Lung Tin Tsuen Lam Hau Tsuen Section Main Drainage Channels for 100 1.7 03/2000 12/2002 Construction of Yau Tam Mei Tsuen, Ngau Tam Mei, drainage channel from Yau Tam Mei San Tsuen, Phase 2 – Ngau Tam Mei to Ngau Tam Mei to Wai Tsai Yau Mei San Tsuen Section Yau Mei San Tsuen Village Flood Protection for 109 0.9 12/2001 12/2004 Construction of Wang Chau and Pok Wai Yuen Long, Kam Tin and floodwater pumping Ngau Tam Mei, station in Wang Chau; North West New Territories, and construction of Stage 1 – Remainder Pok Wai drainage channel Yuen Long Bypass Floodway 432 3.8 01/2003 03/2006 Construction of Yuen Long Town, drainage channels in Tung Shing Lei, Au Tau, Yuen Long South Small Traders New Village, Yeung Uk Tsuen, Chuk San Tsuen, Kong Tau San Tsuen, Shung Ching San Tsuen, Sham Chung Tsuen San Tin Eastern Main 354 2.4 10/2002 04/2006 Construction of Lok Ma Chau Drainage Channel the Eastern Main drainage channels in San Tin Main Drainage Channels for 220 3.4 05/2001 07/2003 Construction of Tsz Tong Tsuen, Ng Ka Tsuen, Yuen Long and Kam Tin, drainage channels near Kam Tsin Wai, Nam Hing Lei, Stage 2 — Remainder Ng Ka Tsuen and Chung Sum Tsuen, Shek Tau Wai Pak Pin Tsuen, Uk Tau Tsuen, To Uk Tsuen, Shek Tau Wai, Tsz Tong Tsuen Main Drainage Channels 280 3.1 08/1999 03/2004 Construction of Kam Tin San Tsuen, for Yuen Long and drainage channel from Wing Lung Wai, Kiu Tau Tsuen, Kam Tin Stage 2 — Kam Tin San Tsuen Pang Ka Tsuen, Kam Tin San Tsuen to to Wan Toi Shan Shek Kong San Tsuen, Wang Toi Shan Section Wang Toi Shan Main Drainage Channels 210 3.5 07/1999 03/2002 Construction of Kat Hing Wai, Tai Hong Tsuen, for Yuen Long and drainage channel from Shek Wu Tong, Tin Sam Tsuen, Kam Tin Stage 2 — Kam Tin Road to Tai Kek Tai Kek Kam Tin Road to Tai Kek Section Main Drainage Channels 359 2.3 11/1999 03/2005 Construction of Yau Mei San Tsuen, for Ngau Tam Mei Phase 1 — drainage channels from Chuk Yuen Tsuen, Yau Mei San Tsuen to Yau Mei San Tsuen to Man Yuen Chuen Tai Sang Wai Section Tai Sang Wai Village Flood Protection 122 - 11/2000 03/2003 Construction of Chuk Yuen Tsuen and for Chuk Yuen Tsuen and floodwater pumping Ha San Wai Ha San Wai, station in Chuk Yuen Tsuen North West New Territories and Ha San Wai Village Flood Protection for 146 - 12/2001 08/2005 Construction of Mai Po Lo Wai, Mai Po Lo Wai, floodwater pumping Mai Po San Tsuen, Mai Po San Tsuen, stations in Mai Po Lo Wai, Ma Tin Tsuen and Ma Tin Tsuen and Shui Pin Wai, Ma Tin Tsuen and Shui Pin Wai North West New Territories Shui Pin Wai Appendix A – Major Flood Control Projects Table 2.2 Major Drainage Projects in Northwestern NT (Projects under Construction) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Yuen Long, Kam Tin, 156 2.1 03/2007 End 2009 Construction of Cheung Chun San Tsuen and Ngau Tam Mei and drainage channels in Kam Tsin Wai Tin Shui Wai Drainage Cheung Chun San Tsuen Improvements, Stage 1, and Kam Tsin Wai Phase 2B – Cheung Chun San Tsuen and Kam Tsin Wai Yuen Long, Kam Tin, 202 2.3 12/2007 Early 2011 Construction of Yuen Kong San Tsuen, Ngau Tam Mei and secondary drainage Cheung Po, Ma On Kong Tin Shui Wai Drainage channels in Kam Tin Improvement, Stage 1, Phase 2B – Remaining Works Table 2.3 Major Drainage Projects in Northwestern NT (Projects under Design/Planning) Project Title Construction Length Start Date Compl. Brief Description Location of Significant Cost($M) (km) Date Improvements and Benefits Drainage Improvement in 168 2.1 End 2012 End 2018 Construction of Western San Tin Northern New Territories – the western main Package A drainage channel in San Tin Appendix A – Major Flood Control Projects Table 3.1 Major Drainage Projects in West Kowloon (Completed Projects) Project Title Construction Length Start Date Compl.