Section 2 Facility Plans
Section 2 Facility Plans 1 Transport Facilities (1) Roads a. Urban Planning Road Roads are essential urban facilities to support urban activities and life, and in Tokyo, the Urban Planning Roads of about 3,210km have been approved. On the other hand, the completion ratio remains about 64%, and the implementation plan is formulated every about 10 years. The roads to preferentially develop are selected and systematically and efficiently developed. Regarding the Urban Planning Roads in the wards area in the past, after the City Planning had been approved in 1946 (initial approval), due to changes in social and economic conditions, the review of the entire Urban Planning Roads (re-examination of the Urban Planning Roads) were carried out in 1950, in 1964 (inside Loop 6), in 1966 (outside Loop 6), and in 1981 (the entire wards area). Regarding the Urban Planning Roads in the Tama region, after the plan in the Hachioji City Planning Area had been approved in 1930, as the plan for each City Planning Area has been individually approved, those plans were not the ones integrated for the entire Tama region. Therefore, the Urban Planning Roads were reviewed in consideration of the entire Tama region in 1961 and 1962. After that, the network of the Urban Planning Roads was examined in 1989 due to changes in social and economic conditions. In carrying out the development, the implementation plans to select the roads to develop preferentially were formulated, for the wards area in FY1981, FY1991 and FY2003, and the Tama region in FY1989, FY1995 and FY2006, and systematically and efficiently carried out.
[Show full text]