The M18 Motorway and the M1 Motorway (Thurcroft Interchange) (Temporary Restriction and Prohibition of Traffic) Order 2011 No. 2

Total Page:16

File Type:pdf, Size:1020Kb

The M18 Motorway and the M1 Motorway (Thurcroft Interchange) (Temporary Restriction and Prohibition of Traffic) Order 2011 No. 2 782 THE LONDON GAZETTE THURSDAY 13 OCTOBER 2011 SUPPLEMENT No. 1 The M18 Motorway and the M1 Motorway (Thurcroft The M25 Motorway, the M4 Motorway and the M40 Interchange) (Temporary Restriction and Prohibition Motorway (M25 Junctions 14 - 16, M4 Junction 4B and of Traffic) Order 2011 No. 2011/2118. - Enabling power: M40 Junction 1A) (Temporary Prohibition of Traffic) Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: Order 2011 No. 2011/2127. - Enabling power: Road 05.09.2011. Made: 26.08.2011. Coming into force: Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 09.09.2011. Effect: None. Territorial extent & 07.09.2011. Made: 30.08.2011. Coming into force: classification: E. Local. - Available at 17.09.2011. Effect: None. Territorial extent & http://www.legislation.gov.uk/uksi/2011/2118/contents/ma classification: E. Local. - Available at de Non-print http://www.legislation.gov.uk/uksi/2011/2127/contents/ma The M18 Motorway and the M62 Motorway (Langham de Non-print Interchange) (Temporary Restriction and Prohibition The M25 Motorway, the M23 Motorway and the M3 of Traffic) Order 2011 No. 2011/2109. - Enabling power: Motorway (M25 Junctions 7 - 13, Slip/Link Roads) Road Traffic Regulation Act 1984, s. 14 (1) (a) (7). - (Temporary Restriction and Prohibition of Traffic) Issued: 05.09.2011. Made: 25.08.2011. Coming into force: Order 2011 No. 2011/2140. - Enabling power: Road 04.09.2011. Effect: None. Territorial extent & Traffic Regulation Act 1984, s. 14 (1) (a) (7). - Issued: classification: E. Local. - Available at 08.09.2011. Made: 30.08.2011. Coming into force: http://www.legislation.gov.uk/uksi/2011/2109/contents/ma 22.09.2011. Effect: None. Territorial extent & de Non-print classification: E. Local. - Available at The M18 Motorway (Junction 5 and Junction 6) http://www.legislation.gov.uk/uksi/2011/2140/contents/ma (Temporary Prohibition of Traffic) Order 2011 No. de Non-print 2011/2110. - Enabling power: Road Traffic Regulation Act The M27 Motorway (Junction 12, Eastbound) 1984, s. 14 (1) (a). - Issued: 05.09.2011. Made: (Temporary Prohibition of Traffic) Order 2011 No. 25.08.2011. Coming into force: 04.09.2011. Effect: None. 2011/2321. - Enabling power: Road Traffic Regulation Act Territorial extent & classification: E. Local. - Available at 1984, s. 14 (1) (a). - Issued: 23.09.2011. Made: http://www.legislation.gov.uk/uksi/2011/2110/contents/ma 19.09.2011. Coming into force: 08.10.2011. Effect: None. de Non-print Territorial extent & classification: E. Local. - Available at The M20 Motorway and the A20 Trunk Road http://www.legislation.gov.uk/uksi/2011/2321/contents/ma (Roundhill Viaduct, Coastbound) (Temporary de Non-print Restriction of Traffic) Order 2011 No. 2011/2135. - The M27 Motorway (Junctions 11 - 12) (Temporary Enabling power: Road Traffic Regulation Act 1984, s. 14 Restriction and Prohibition of Traffic) Order 2011 No. (1) (b). - Issued: 08.09.2011. Made: 30.08.2011. Coming 2011/2238. - Enabling power: Road Traffic Regulation Act into force: 05.09.2011. Effect: None. Territorial extent & 1984, s. 14 (1) (a). - Issued: 14.09.2011. Made: classification: E. Local. - Available at 05.09.2011. Coming into force: 24.09.2011. Effect: None. http://www.legislation.gov.uk/uksi/2011/2135/contents/ma Territorial extent & classification: E. Local. - Available at de Non-print http://www.legislation.gov.uk/uksi/2011/2238/contents/ma The M23 Motorway (Junction 8 - North of Junction 9) de Non-print (Temporary Restriction of Traffic) Order 2011 No. The M32 Motorway (Junction 1 Northbound Entry 2011/2128. - Enabling power: Road Traffic Regulation Act Slip Road) (Temporary Prohibition of Traffic) Order 1984, s. 14 (1) (a) (7). - Issued: 07.09.2011. Made: 2011 No. 2011/2147. - Enabling power: Road Traffic 30.08.2011. Coming into force: 17.09.2011. Effect: None. Regulation Act 1984, s. 14 (1) (a). - Issued: 08.09.2011. Territorial extent & classification: E. Local. - Available at Made: 30.08.2011. Coming into force: 01.09.2011. Effect: http://www.legislation.gov.uk/uksi/2011/2128/contents/ma None. Territorial extent & classification: E. Local. - de Non-print Available at The M25 Motorway (Junction 8, Slip Roads) http://www.legislation.gov.uk/uksi/2011/2147/contents/ma (Temporary Prohibition of Traffic) (No. 2) Order 2011 de Non-print No. 2011/2278. - Enabling power: Road Traffic Regulation The M42 Motorway (Junction 1/A38 Roundabout) Act 1984, s. 14 (1) (a). - Issued: 20.09.2011. Made: (Temporary Prohibition of Traffic) Order 2011 No. 12.09.2011. Coming into force: 01.10.2011. Effect: None. 2011/2172. - Enabling power: Road Traffic Regulation Act Territorial extent & classification: E. Local. - Available at 1984, s. 14 (1) (a). - Issued: 09.09.2011. Made: http://www.legislation.gov.uk/uksi/2011/2278/contents/ma 23.08.2011. Coming into force: 30.08.2011. Effect: None. de Non-print Territorial extent & classification: E. Local. - Available at http://www.legislation.gov.uk/uksi/2011/2172/contents/ma de Non-print Road traffic: Traffic regulation.
Recommended publications
  • Operation Stack
    House of Commons Transport Committee Operation Stack First Report of Session 2016–17 HC 65 House of Commons Transport Committee Operation Stack First Report of Session 2016–17 Report, together with formal minutes relating to the report Ordered by the House of Commons to be printed 23 May 2016 HC 65 Published on 1 June 2016 by authority of the House of Commons Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its associated public bodies. Current membership Mrs Louise Ellman MP (Labour (Co-op), Liverpool, Riverside) (Chair) Robert Flello MP (Labour, Stoke-on-Trent South) Mary Glindon MP (Labour, North Tyneside) Karl McCartney MP (Conservative, Lincoln) Stewart Malcolm McDonald MP (Scottish National Party, Glasgow South) Mark Menzies MP (Conservative, Fylde) Huw Merriman MP (Conservative, Bexhill and Battle) Will Quince MP (Conservative, Colchester) Iain Stewart MP (Conservative, Milton Keynes South) Graham Stringer MP (Labour, Blackley and Broughton) Martin Vickers MP (Conservative, Cleethorpes) Powers The Committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication Committee reports are published on the Committee’s website at www.parliament.uk/transcom and in print by Order of the House. Evidence relating to this report is published on the inquiry publications page of the Committee’s website. Committee staff The current staff of the Committee are Gordon Clarke (Committee Clerk), Gail Bartlett (Second Clerk), James Clarke (Committee Specialist), Andrew Haylen (Committee Specialist), Adrian Hitchins (Committee Specialist), Daniel Moeller (Senior Committee Assistant), Michelle Owens (Committee Assistant) and Estelle Currie (Media Officer).
    [Show full text]
  • Infrastructure Delivery Plan
    Tunbridge Wells Borough Council Infrastructure Delivery Plan March 2021 1.0 Introduction .................................................................................................................... 1 2.0 Background and Policy Context ..................................................................................... 2 National Policy ...................................................................................................................... 2 Local Policy .......................................................................................................................... 3 Local Plan policy context and strategy for growth ................................................................ 4 Policy STR 1 - The Development Strategy .............................................................................. 6 What is infrastructure? ......................................................................................................... 8 Engagement ....................................................................................................................... 10 Prioritisation of infrastructure .............................................................................................. 11 Identified risks .................................................................................................................... 12 Timing ................................................................................................................................ 12 Costs .................................................................................................................................
    [Show full text]
  • Call for Sites 2021 Justification Statement V3
    Planning Justification Statement Representation to Hertsmere Local Plan Process Commercial Redevelopment Land and Buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH March 2021 Contents 1. Introduction 2 2. The Site 4 3. The Proposal 7 4. Exceptional Circumstances 12 5. Economic Need 16 6. Green Belt and Landscape 25 7. Transport and Accessibility 31 8. Flood Risk 34 9. Ecology and Trees 37 10. Heritage 40 11. Other Technical Matters 41 12. Case of Exceptional Circumstances 43 13. Conclusion 51 Appendix A: Site Planning History 1 1. Introduction This Planning Justification Statement is submitted by Warner Planning on behalf of Regen Properties LLP. This submission is made to the Hertsmere Borough Council 'Employment Land Call for Sites' 2021. We promote land and buildings at the Mercure Hotel Watford, A41 Bypass WD25 8JH for allocation for B8 with ancillary B1 commercial development. The hotel has been struggling for several years, which has been further compounded by the Covid-19 Pandemic, and the hotel is due to close in late 2021/early 2022. This statement, therefore, provides representations in respect of the whole site, including the hotel buildings and the land to the south-east of the building, which is part of the same plot. Through this statement, we will demonstrate that this is a credible and deliverable opportunity with no technical issues. This submission is supported by a wealth of technical reports, including: • Masterplans – UMC • Economic Benefits Assessment - Lichfields • Landscape Visual Overview – CSA Environmental • Ecology Overview- CSA Environmental • Aboricultural Assessment – DCCLA • Flood Risk and Drainage Apprisal – EAS • Transport Review – EAS • Desk Based Phase 1 Environmental Site Assessment – TRC • This Statement – Warner Planning • Market Report – Knight Frank • Employment Call for Sites Submission Form There are limited alternatives to this proposal.
    [Show full text]
  • First Point, Buckingham Gate Gatwick Airport, Gatwick, RH6
    PRIME SOUTH EAST REFURBISHED MULTI LET OFFICE INVESTMENT FIRST First Point, Buckingham Gate POINT Gatwick Airport, Gatwick, RH6 0PP » Prime South East multi-let office investment located adjacent to Gatwick Airport, within INVESTMENT walking distance of the terminal buildings. » Highly specified Grade A building totalling SUMMARY 62,028 sq ft which has recently been significantly refurbished at a cost of £3.1m. » Excellent proximity to Gatwick Airport, the M23 and M25 motorways and access via train to central London within 30 minutes. » 92% let to 5 tenants on 6 leases providing and attractive WAULT of 7.2 years to expiry 4.2 years to break. » Currently producing £1,423,451 per annum reflecting an average rent on let space of £22.55 psf. Latest deals reflect up to £24.60 psf with £26.00 psf being promoted on the vacant element. » Strong tenant profile from a good balance of airport related users and large corporates. Major tenants include HSBC, Close Asset Management, Norwegian and Amadeus. » Outstanding parking provision of 270 spaces reflecting a ratio of 1:230 sq ft. » Freehold. » Offers are sought in excess of £17,210,000 (seventeen million two hundred and ten thousand pounds) subject to contract and exclusive of VAT reflecting a net initial yield of 7.75% assuming standard purchasers costs. Prime South East refurbished multi let office investment First Point, Buckingham GateGate, , Gatwick Airport, Gatwick, RH6 0PP M25 LOCATION/SITUATION 14 LONDON M4 First Point is located within immediate proximity to M25 Gatwick Airport within the eastern perimeter of the A2 airport boundary, and adjacent to junction 9A of the BROMLEY M23 motorway.
    [Show full text]
  • 160 Great Britain for Updates, Visit Wigan 27 28
    160 Great Britain For Updates, visit www.routex.com Wigan 27 28 Birkenhead Liverpool M62 36 Manchester Stockport M56 Mold Chester 35 Congleton Wrexham 59 M6 Shrewsbury 64 65 07 Wolverhampton Walsall West Bromwich Llandrindod Birmingham Wells Solihull M6 03 Coventry Warwick02 Carmarthen Hereford 01 51 60 Neath M5 Swansea 06 Pontypridd Bridgend Caerphilly Newport Cardiff M4 13 Barry Swindon M5 Bristol 61 14 Weston-super-Mare Kingswood 31 Bath 32 M4 05 Trowbridge 62 Newbury Taunton M5 20 Yeovil Winchester Exeter Southampton 55 Exmouth M27 Poole Lymington Bournemouth Plymouth Torbay Newport GB_Landkarte.indd 160 05.11.12 12:44 Great Britain 161 Wakefield 16 Huddersfield Hull Barnsley Doncaster Scunthorpe Grimsby Rotherham Sheffield M1 Louth 47M1 Heanor Derby Nottingham 48 24 Grantham 15 Loughborough 42 King's Leicester Lynn 39 40 Aylsham Peterborough Coventry Norwich GB 46 01 Warwick Huntingdon Thetford Lowestoft 45 M1 Northampton 02 43 44 Cambridge Milton Bedford Keynes Biggleswade Sawston 18 M40 19 Ipswich Luton Aylesbury Oxford Felixstowe Hertford 21 50 M25 M11 Chelmsford 61 30 53 52 Slough London Bracknell Southend-on-Sea Newbury Grays 54 Wokingham 29 Rochester Basingstoke 22 M3 Guildford M2 M25 Maidstone Winchester 23 M20 17 M27 Portsmouth Chichester Brighton La Manche Calais Newport A16 A26 Boulogne-sur-Mer GB_Landkarte.indd 161 05.11.12 12:44 162 Great Britain Forfar Perth Dundee 58 Stirling Alloa 34 Greenock M90 Dumbarton Kirkintilloch Dunfermline 57 Falkirk Glasgow Paisley Livingston Edinburgh Newton M8 Haddington Mearns 04 56 Dalkeith 26 Irvine Kilmarnock Ayr Hawick A74(M) 41 Dumfries 25 Morpeth Newcastle Carlisle Upon Whitley Bay 12Tyne 08 South Shields Gateshead 09 11 Durham 49 Redcar 33 Stockton-on-Tees M6 Middlesbrough 10 38 M6 A1(M) 37 Harrogate York 63 M65 Bradford Leeds Beverley M6 28 M62 Wakefield Wigan 16 27 Huddersfield Birkenhead Liverpool Manchester Barnsley M62 Scunthorpe 35 36Stockport Doncaster Rotherham Sheffield GB_Landkarte.indd 162 05.11.12 12:44 Great Britain 163 GPS Nr.
    [Show full text]
  • 15-19 North Street Ashford, Kent, Tn24 8Lf 15-19 North Street, Ashford, Kent, Tn24 8Lf 2
    FREEHOLD TOWN CENTRE OFFICE INVESTMENT OPPORTUNITY WITH REDEVELOPMENT POTENTIAL 15-19 NORTH STREET ASHFORD, KENT, TN24 8LF 15-19 NORTH STREET, ASHFORD, KENT, TN24 8LF 2 INVESTMENT SUMMARY Located in Ashford town centre, close to the High Street and within walking distance of Ashford International train station. Three self contained office buildings comprising 9,461 sq ft in total, with 10 car parking spaces Freehold Multi-let to three tenants on three separate leases AWULT of approximately 0.73 years to break options and 3.55 years to lease expiries Barclays in occupation of no. 17 have exercised their break in September 2016, leaving 5,340 sq ft (NIA) vacant and prime for alternative use or re-letting Current rent of £104,415 per annum, equating to an average rent of £11.04 per sq ft Asset Management Initiatives • Explore change of use on vacant space • Let vacant space • Settle dilapidations with Barclays Offers are invited in excess of £800,000 (Eight Hundred Thousand Pounds), reflecting a Capital Value of £85 per sq ft (assuming purchaser’s costs at 5.49%) A10 M1 M50 15-19 NORTH STREET, ASHFORD, KENT, TN24 8LF M40 3 A44 Colchester . Gloucester T S HA RDIN GE H ROA D T KEY R A40 W N E O M1 O Y M5 R W E LOCATION N M11 R L L A IL Oxford B H S D A1(M) S 11 E Chelmsford A T A D L O O R S L A40 E T R Bus route OM ER M25 E SE SET E R The property is located in Ashford, Kent, a historic market town T ER GH ROAD RO N M R A W A12 O O BU D M25 R S DIN W E H approximately 55 miles to the South East of London and 15 T A420 Watford O Knoll LanePARK MALL .
    [Show full text]
  • The M1 Motorway (Junctions 5 – 6A
    THE M1 MOTORWAY(JUNCTIONS 5–6A) TEMPORARYOVERNIGHT CLOSURES Notice is hereby given that Highways England Company Limited(a) intends to make an Order on the M1 Motorway,inthe County of Hertfordshire, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works areproposed to be executed on the road. The effect of the Order would be to authorise the overnight closureofthe following – (a) the slip roads leading to and from both carriageways of the M1 at Junction 5(A41, A4008); (b) the slip roads leading to and from both carriageways of the M1 at Junction 6(A405); and (c) the link road leading from the southbound carriageway of the M1 at Junction 6A to both carriageways of the M25 at Junction 21. These measures would be in the interest of road safety to enable contractors to undertake cyclical maintenance work. It is expected that the work would take place for approximately 1-2nights for each closureat(a) –(c) above every two months at the following times: Monday-Thursday nights 22:00 –05:30 Friday nights 23:00 –06:00 Saturday nights 22:00 –06:00 Sunday nights 22:30 –05:30 The Order would come into force on 1August2017 and have amaximum duration of twelve months. During the closures outlined above, traffic affected would be diverted using other junctions of the M1, the A41, the A405 and the A410. The slip road closures, link road closureand diversion routes would be clearly indicated by traffic signs throughout the works periods. MTaylor, an official of Highways England Company Limited Ref: HA/M1/35/3/1894 (a)Registered in England and Wales under company no.
    [Show full text]
  • The Regional Impact of the Channel Tunnel Throughout the Community
    -©fine Channel Tunnel s throughpdrth^Çpmmunity European Commission European Union Regional Policy and Cohesion Regional development studies The regional impact of the Channel Tunnel throughout the Community European Commission Already published in the series Regional development studies 01 — Demographic evolution in European regions (Demeter 2015) 02 — Socioeconomic situation and development of the regions in the neighbouring countries of the Community in Central and Eastern Europe 03 — Les politiques régionales dans l'opinion publique 04 — Urbanization and the functions of cities in the European Community 05 — The economic and social impact of reductions in defence spending and military forces on the regions of the Community 06 — New location factors for mobile investment in Europe 07 — Trade and foreign investment in the Community regions: the impact of economic reform in Central and Eastern Europe 08 — Estudio prospectivo de las regiones atlánticas — Europa 2000 Study of prospects in the Atlantic regions — Europe 2000 Étude prospective des régions atlantiques — Europe 2000 09 — Financial engineering techniques applying to regions eligible under Objectives 1, 2 and 5b 10 — Interregional and cross-border cooperation in Europe 11 — Estudio prospectivo de las regiones del Mediterráneo Oeste Évolution prospective des régions de la Méditerranée - Ouest Evoluzione delle prospettive delle regioni del Mediterraneo occidentale 12 — Valeur ajoutée et ingénierie du développement local 13 — The Nordic countries — what impact on planning and development
    [Show full text]
  • The Truth Behind Op Stack.Pdf
    THE TRUTH BEHIND OPERATION STACK 1. What is Operation Stack? Operation Stack is an emergency procedure implemented by Kent Police to ‘stack’ coast-bound cross-Channel freight traffic on parts of the M20 motorway. History Although originally operated on the A2 by Kent Police before the M20 was completed, once the Channel Tunnel was built and the trunk road from the M20 through to Dover was completed, the M20 became the primary route for cross-Channel freight vehicles. A new version of Operation Stack was subsequently devised for the M20, initially comprising of a coast-bound closure between Junction 11 and Junction 13 as Phase 1 and, if required, a closure of the London-bound carriage way for Phase 2. Purpose Stack is activated when there is a significant blockage to the flow of cross-Channel freight traffic beyond the control of the Port that results in demand for space at either the Channel Tunnel or Port of Dover Ferry Terminal outstripping their parking capacity, resulting in traffic backing up onto the surrounding road network. It has been needed during times of stress such as:- Strike action in Calais Extreme weather conditions Channel Tunnel problems (e.g. migrant incursions, line failure etc) 1 2. Stack Today Implementation Operation Stack is activated by Kent Police based on information received from several sources including the Port of Dover and the Channel Tunnel. Good communication with Kent Police is essential in notifying of any problems that may lead to the need for Stack as it takes approximately two hours from the time of notification to actually closing the motorway and takes a considerable amount of police resource.
    [Show full text]
  • SPOC | Central Pennines Strategic
    This document is Not for Publication - On-going Research Central Pennines: Strategic Development Corridor - Strategic Programme Outline Case Contents 1 Introduction .................................................................................. 7 Strategic Dimension ........................................................................... 15 2 Introduction ................................................................................ 15 3 The Case for Change .................................................................... 26 4 The Need for Intervention ........................................................... 66 5 Wider Context ............................................................................. 70 6 Option Assessment Process ......................................................... 72 7 Strategic Dimension Summary ..................................................... 87 Economic Dimension........................................................................... 89 8 Introduction ................................................................................ 89 9 Approach to Cost Estimation ........................................................ 95 10 Quantified SDC Programme Impacts ............................................ 98 11 Economy Impacts ...................................................................... 104 12 Environment Impacts ................................................................ 106 13 Social Impacts........................................................................... 111 14
    [Show full text]
  • M1 Motorway (Junctions 1-3), M25
    M1 MOTORWAY(JUNCTIONS 1-3), M25 MOTORWAYJUNCTION 23, AND A1 TRUNK ROAD TEMPORARYTRAFFIC RESTRICTIONS Notice is hereby given that Highways England Company Limited intends to make an Order on the M25 Motorway in the County of Hertfordshire and the London Boroughs of Barnet and Hendon, under Section 14(1)(a) of the Road Traffic Regulation Act 1984 because works are proposed to be executed on the road. The effect of the Order would be to authorise the overnight closure, in phases, of:- a) the entirecirculatory carriageway of the roundabout at M25 Junction 23 (A1(M)/A1); b) the roads leading to and from both carriageways of the M25 at Junction 23 (A1(M) Junction 1/A1); c) the roads leading to and from both carriageways of the A1(M)/A1 at Junction 23 (A1(M) Junction 1/A1); d) the southbound carriageway of the A1 between Bignell’sCorner (M25 Junction 23) and Borehamwood Interchange (A5135); e) the road leading from the southbound carriageway of the A1 at Borehamwood Interchange (A5135); f) the northbound carriageway of the M1 between Junction 1(A406) and the tip of the nosing of the entry slip road at Junction 3 (London Gateway Services); g) the road leading to the northbound carriageway of the M1 at Junction 1(A406); h) the road connecting to the M1 northbound entry slip road from the eastbound road connecting the EdgwareRoad roundabout to Staples Corner roundabout at Junction 1 (A406); i) theroads connecting to and from both carriageways of the M1 at Junction 2(A1); and j) all of the roads leading to and from both carriageways of the M1 at London Gateway Services.
    [Show full text]
  • The A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011
    STATUTORY INSTRUMENTS 2011 No. 89 ROAD TRAFFIC The A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011 Made - - - - 11 January 2011 Coming into force - - 16 January 2011 WHEREAS, the Secretary of State for Transport, being the traffic authority for the A1(M) Motorway, the A64 Trunk Road and connecting roads, in the Districts of Leeds and Selby in the Counties of West Yorkshire and North Yorkshire, is satisfied that traffic on that motorway and some of those connecting roads should be prohibited because survey, investigation and general maintenance works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) of the Road Traffic Regulation Act 1984(a), makes the following Order: - 1. This Order may be cited as the A1(M) Motorway (Junction 42 to Junction 43 and Junction 44) and the A64 Trunk Road (Temporary Prohibition of Traffic) Order 2011 and shall come into force on 16 January 2011. 2. In this Order; – “the A1(M)” means the A1(M) Motorway; “the M1” means the M1 Motorway at Junction 48 (Hook Moor); “the A64” means the A64 Trunk Road “the northbound carriageway” means the A1(M) northbound carriageway from the nose of the northbound exit slip road at Junction 42 (Selby Fork) to its junction with the M1 northbound carriageway at Hook Moor (the A1(M) Junction 43), a distance of 4800 metres; “the southbound carriageway” means the A1(M) southbound carriageway from its junction with the M1
    [Show full text]