Sung Wong Toi Station E-Passenger Guide

Total Page:16

File Type:pdf, Size:1020Kb

Sung Wong Toi Station E-Passenger Guide 宋皇臺站 其他公共交通⼯具 前往港鐵站 巴⼠綫 巴⼠站 Sung Wong Toi Station Alternative public transport To MTR station Bus route Bus stop 港島綫 Island Line 堅尼地城 113 2 Kennedy Town 101 13 香港⼤學 113 2 HKU 101 13 ⻄營盤 113 2 Sai Ying Pun 101 13 上環 Sheung Wan 113 2 中環 113 2 Central 101,111,N121 13 ⾦鐘 113 2 Admiralty 101,111,N121 13 灣仔 Wan Chai 101,111,N121 13 銅鑼灣 Causeway Bay 106,107,108,116 13 天后 Tin Hau 106,116 13 炮台⼭ Fortress Hill 106,116 13 鰂⿂涌 Quarry Bay 106,116 13 太古 Tai Koo 106 13 ⻄灣河 Sai Wan Ho 106 13 筲箕灣 Shau Kei Wan 106 13 柴灣 Chai Wan 106 13 南港島綫 South Island Line 海洋公園 Ocean Park 107 13 黃⽵坑 Wong Chuk Hang 107 13 荃灣綫 Tsuen Wan Line 1 2 1A,N216 3 尖沙咀 Tsim Sha Tsui 5,5A,5C 5 9 7 1A,26,9,N216 13 1 2 1A,95,N216 3 佐敦 Jordan 11,14,93K 5 203E,9 7 1A,203E,26,9,95,E23A,N216,N23 13 1 2 1A,95,N216 3 15 分鐘 (預計時間) 港鐵免費接駁巴⼠上⾞處 油⿇地 Yau Ma Tei 93K 5 步⾏前往⼟瓜灣站 20,203E,9 7 D Walking to To Kwa Wan Station 15 minutes Free MTR Shuttle Bus boarding point (estimated time) 資料只供參考:此處所載資料由運輸署提供。港鐵會定期更新資料,唯 1A,20,203E,9,95,N216,N23 13 因各交通⼯具營運者可能隨時改動有關資料,故港鐵不能保證所有資料 均準確無誤。如查詢有關服務時間或其他資訊,請瀏覽香港出⾏易網⾴ https://www.hkemobility.gov.hk 。 FOR REFERENCE ONLY: This information is provided by the Transport Department. Whilst MTR regularly updates the content, no responsibility can be taken for accuracy as all information is subject to change by the individual transport operator. Please visit the HKeMobility webpage at https://www.hkemobility.gov.hk for relevant service hours or other information. 2021-05-17 SUW-1 前往港鐵站 巴⼠綫 巴⼠站 前往港鐵站 巴⼠綫 巴⼠站 To MTR station Bus route Bus stop To MTR station Bus route Bus stop 1 2 11,111,116,21,5,61X,6D,9,N121,N216 1 1A,95,N216 3 75X 3 旺⾓ Mong Kok 93K 5 11,111,116,21,5,61X,N121 6 13D,16,203E,9 7 鑽⽯⼭ 9 8 13D,16,1A,203E,9,95,N216,N23 13 Diamond Hill 9,N216 9 1 2 6D 16 1A,213D,27,293S,95,N216,N293 3 75X 20 太⼦ Prince Edward 796C,98C 7 75X 21 1A,213D,27,293S,42,796C,95,98C,N216,N293 13 101,107,111,11B,11D,13D,14,15,16,17,1A,21,26,27,28,296C,297,2A,9, 1 42 18 93K,N121,N293 深⽔埗 796C,98C 7 27 3 Sham Shui Po 796C,98C 13 1A 4 2A,796C,98C 7 101,107,111,11B,14,15,17,21,26,28,297,93K,N121 6 13D,16,27,296C,2A,9 8 ⻑沙灣 Cheung Sha Wan 2A,42,6D,796C,98C 13 彩虹 Choi Hung 42,6D 18 13D,16,27,2A,9,N293 9 2A,98C 7 10 11 茘枝⾓ Lai Chi Kok 2A,42,6D,98C 13 27 13 42,6D 18 10 14 10 15 2A,98C 7 11D 16 美孚 Mei Foo 2A,42,6D,98C 13 42,6D 18 101,11B,11D,13D,14,15,16,17,1A,28,296C,2A,5D,6D,93K,N121,N293 1 1A 4 茘景 42 13 5D 5 Lai King 42 18 九龍灣 Kowloon Bay 101,11B,14,15,17,28,5D,93K,N121 6 42 13 葵芳 Kwai Fong 13D,16,296C,2A 8 42 18 13D,16,2A,N293 9 觀塘綫 Kwun Tong Line 11D,6D 16 5D,796X,85X 5 101,13D,93K,N293 1 黃埔 Whampoa 106,E23A,N23 13 ⽜頭⾓ 101,93K 6 12A 19 Ngau Tau Kok 13D 8 11,14,21,5,5A,5C,93K 5 13D,N293 9 何文⽥ Ho Man Tin 101,106,107,108,111,116,17,26,N121,N23 13 11B,11D,14,1A,93K 1 11K 19 1A 4 觀塘 Kwun Tong 2D 10 11B,14,93K 6 2D 12 11D 16 ⽯硤尾 Shek Kip Mei 6D 13 藍⽥ 14,15 1 2D 17 Lam Tin 14,15 6 6D 18 將軍澳綫 Tseung Kwan O Line 11D,11K,75X,85,85A,85B 3 N216 1 11K,85,85A,85B 6 油塘 Yau Tong 樂富 N216 9 Lok Fu 11D 13 796C,796X 1 11D,11K,75X,85,85A,85B 20 調景嶺 Tiu Keng Leng 796X 6 11D,11K,75X,85,85A,85B 21 796C 8 106,11,61X 1 75X 3 黃⼤仙 Wong Tai Sin 106,11,61X 6 75X 20 75X 21 SUW-2 前往港鐵站 巴⼠綫 巴⼠站 前往港鐵站 巴⼠綫 巴⼠站 To MTR station Bus route Bus stop To MTR station Bus route Bus stop 296C,796C,796X,N293 1 南昌 12A 3 796X 6 Nam Cheong 12A 6 將軍澳 Tseung Kwan O 296C,796C 8 95 3 N293 9 11,14 5 柯⼠甸 Austin 康城 796X 1 203E 7 LOHAS Park 796X 6 203E,95,E23A 13 293S,297,98C,N293 1 1 2 坑⼝ Hang Hau 297 6 1A,N216 3 293S,98C,N293 9 尖東 East Tsim Sha Tsui 5,5A,5C,796X 5 293S,297,93K,98C,N293 1 9 7 寶琳 Po Lam 297,93K 6 1A,26,9,N216 13 293S,98C,N293 9 11,14,15,21,3B,5,5A,5C,5D,796X,85X,93K 5 東涌綫、迪⼠尼綫及機場快綫 ⼟瓜灣 To Kwa Wan 101,106,107,108,111,116,26,E23A,N121,N23 13 Tung Chung Line,Disneyland Resort Line & Airport Express 11K,12A,75X,85,85B 19 香港 113 2 107,108,11B,11D,11X,13D,17,1A,20,213D,22,22M,24,26,27,293S, 1 Hong Kong 101,111,N121 13 296C,297,2A,42,5A,5D,796C,796X,85X,93K,95,98C,N213,N293 95 3 213D,24,27 3 11 5 1A,22 4 九龍 Kowloon 5D 5 203E 7 啟德 Kai Tak 203E,95,E23A 13 107,108,11B,11X,17,26,297,5D,796X,85X,93K 6 13D,20,24,27,296C,2A,796C 8 奧運 13D,16,20 7 Olympic 13D,16,20 13 13D,20,213D,24,27,293S,2A,95,98C,N213,N293 9 213D,22M,24,27 13 東涌 Tung Chung N23 13 11D,42 16 機場 Airport A22,E23A,N23 13 85B 3 85B 6 東鐵綫 East Rail Line 顯徑 Hin Keng 113 2 85B 20 N216 3 85B 21 紅磡 Hung Hom 21,5A,5C,796X 5 85,85B 3 85,85B 6 101,106,107,108,111,116,26,N121,N216 13 ⼤圍 Tai Wai 11K 19 85,85B 20 213D,24,27,293S,N293 3 85,85B 21 旺⾓東 Mong Kok East 93K 5 85B 3 213D,24,27,293S,N293 13 ⾞公廟 85B 6 Che Kung Temple 85B 20 九龍塘 22 3 Kowloon Tong 22 13 85B 21 85 3 85A 3 85A 6 沙⽥ 85 6 沙⽥圍 Sha Tin Wai Sha Tin 85 20 85A 20 85 21 85A 21 75X 3 85X 1 ⼤埔墟 Tai Po Market 75X 20 85A 3 75X 21 第⼀城 City One 85A,85X 6 屯⾺綫 85A 20 Tuen Ma Line 85A 21 61X 1 屯⾨ Tuen Mun ⽯⾨ 85X 1 61X 6 Shek Mun 85X 6 SUW-3 前往港鐵站 巴⼠綫 巴⼠站 To MTR station Bus route Bus stop ⼤⽔坑 85X 1 Tai Shui Hang 85X 6 恆安 85X 1 Heng On 85X 6 ⾺鞍⼭ 85X 1 Ma On Shan 85X 6 SUW-4.
Recommended publications
  • Cb(4)360/20-21 (01)
    LC Paper No. CB(4)360/20-21 (01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 30 September 2020) (Translation) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 30 September 2020. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom Section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty Section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. There are ten stations in SCL. Apart from bringing improvements to the existing Tai Wai Station, the SCL project involves construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of East Rail Line, Tsuen Wan Line, Island Line and South Island Line (East)(“SIL(E)”), as well as passengers of Tuen Ma Line and Kwun Tong Line Extension (“KTE”) respectively. 4.
    [Show full text]
  • LC Paper No. CB(4)1029/20-21(01)
    LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach.
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • MTR Corporation Limited
    MTR Corporation Limited Shatin to Central Link – Tai Wai to Hung Hom Section and Stabling Sidings at Hung Hom Freight Yard As-Built Drawings of Measures for Mitigating Landscape and Visual Impacts (December 2020) Certified by: _____Claudine Lee____________ Position: Independent Environmental Checker Date: ___________8 Dec 2020_____________ 1. Submission Summary of As-Built Drawings for Landscape and Visual Mitigation Measures Reference Drawing No. Works Contract Area Location Type of Mitigation Measures Drawing No. Remarks Handover Information in Approved VLTTP SCL 1101 Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A101B Annex Figure B1-1 Previously submitted to EPD in Dec 2015. Handed over to MTR Operation Team in Q4 2015 SCL 1101Tai Wai Area Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A102B Annex Figure B1-2 Previously submitted to EPD in Dec 2015. SCL 1102 Mei Tin Road Sitting-out Area OM1 1102/B/300/T73/A58/600 Annex E2 1102/B/300/T73/A58/600 Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2015 SCL 1101 Shek Mun Area Shek Mun Playground OM1 1101/W/300/T73/SFK/A58/001A Annex E2 1101/W/300/T73/SFK/A58/001A Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2014 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/W/HIK/POC/A58/300F Annex E2 1102/W/HIK/POC/A58/300F Previously submitted to EPD in Feb 2020. Handed over to MTR Operatiin Team in Q4 2018 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/B/HIK/T73/A58/101A Annex E2 1102/B/HIK/T73/A58/101A Previously submitted to EPD in Feb 2020.
    [Show full text]
  • PR042/21 12 June 2021 the Tuen Ma Line to Kwa Wan Station Open
    PR042/21 12 June 2021 The Tuen Ma Line To Kwa Wan Station Open Day Offers Early Glimpse of Station Highlights to Visitors With the full opening of the 56-km Tuen Ma Line (TML) on 27 June 2021, the brand new To Kwa Wan Station and Sung Wong Toi Station will also come into service. Around 2,600 visitors with registered tickets (each ticket for up to four persons for entry at the same timeslot) enjoyed a preview of To Kwa Wan Station at an Open Day today (12 June 2021), ahead of the official opening. From 10am onwards, pre-registered visitors arrived at the station to experience the new customer service concept and station facilities, including the Smart Customer Service Centre and caring facilities. They also met with the robot assistants who were on duty at the station. One of the focal points of attention is a 54-metre wall installation situated at the non-paid area of the concourse. Entitled ”Home”, this unique station artwork was created by a local artist Ms Leung Mee-ping with the participation of local residents. Over 100 residents in the area have contributed household items with sentimental value that is captured in the short synopsis in the art piece. “MTR Corporation strives to connect communities and we were glad to see the visitors, including local residents, railway enthusiasts and the general public, sharing their excitement and anticipation for the opening of the new line,” said Dr Jacob Kam, Chief Executive Officer of MTR Corporation. “The full TML will provide not only a fast and convenient railway service to the residents nearby, but also enhanced connectivity between various parts of Hong Kong.” An Open Day will be held at Sung Wong Toi Station, another brand new station along the TML, for pre-registered visitors to visit tomorrow (13 June 2021).
    [Show full text]
  • Hang Lung Young Architects Program (恒隆.築跡 年輕建築師計劃)
    Hang Lung Young Architects Program (恒隆.築跡 ── 年輕建築師計劃) The Hang Lung Young Architects Program (HLYAP) is an education initiative run by Hang Lung Properties in 2017, together with Walk in Hong Kong, an organisation focused on aspects of local culture, to give young people the chance to learn more about Hong Kong’s architectural DNA and to understand the city’s diverse cultural identity. The second edition of the HLYAP officially began on September 28, 2019 and the theme this time is “Sketch Your Sky”, with the aim of encouraging secondary students to explore and discover Hong Kong’s built history and the relationship between architecture and communities, delved deep into the culture and history of Hong Kong’s architectural gems, and honed their own architectural knowledge and skills. The program attracted nearly 700 students from 80 secondary schools to participate, and provided over 20,000 training hours to student participants. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cherry Luk, Sabrina Tang, Suzanne Lam, Natalie Ng and Megan Tse from F.4 was one of the winning teams of the Hang Lung Young Architects Program. The team's topic is "Community, Culture, Conservation - a Study in Kowloon City”. Well done! Your hard work and determination have paid off. Congrats to our young but great architects! See their proposal on the next page! ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Plan C: Community , Culture, Conservation - A Study in Kowloon City - An Overview of the District: Introduction to the Kowloon City District Kowloon City is located in the eastern half of the Kowloon peninsula, with an area of approximately 1,000 hectares, home to the famous Kowloon Walled City, Sung Wong Toi and the former Kai Tak Airport.
    [Show full text]
  • Project Abbreviations
    THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS The following sets forth the abbreviations of our design, supply, and installation projects used in this document. Detailed information on each project is set forth in the section headed ‘‘Business — Our design, supply, and installation projects’’ in this document. Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 01 Sai Ying Pun Station and Sai Ying Pun MTR Station and HKU Building metal MTR station HKU Station MTR Station, Hong Kong finishing works Project 02 Kennedy Town Station Kennedy Town MTR Station, Building metal MTR station Hong Kong finishing works Project 03 Ho Man Tin Station Yau Ma Tei to Whampoa tunnels and Building metal MTR station Ho Man Tin MTR Station, finishing works Kowloon Project 04 Kennedy Town Swimming KennedyTownSwimmingPool, Façade works Swimming pool Pool Hong Kong Project 05 Marriott Hotel (A) Marriott Hotel, Ocean Park, Façade works Hotel Hong Kong Project 06 Tsuen Wan Adventist Tsuen Wan Adventist Hospital, Façade works Hospital Hospital (A) New Territories Project 07 Argyle Street (A) Kadoorie Lookout, 110 Argyle Street, Façade works Residential property Mong Kok, Kowloon Project 08 Argyle Street (B) Kadoorie Lookout, 110 Argyle Street, Façade works Residential property Mong Kok, Kowloon Project 09 Kau To Shan STTL 525, Area 56A, Kau To Shan, Building metal Residential property Sha Tin, New Territories finishing works Project 10 Tseung Kwan O Industrial Lot No.
    [Show full text]
  • Last Updated: 1 August 2021 Railway-Related Facilities Under Settlement Monitoring Within Railway Protection Areas the MTR Corpo
    Last updated: 1 August 2021 Railway-related Facilities under Settlement Monitoring within Railway Protection Areas The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension. Total number of facilities currently under settlement monitoring: 75 Number of facilities where settlement monitoring has ceased since last announcement on 1 July 2021: 3 Number of newly-added facilities under settlement monitoring since last announcement on 1 July 2021: 2 Number of facilities under settlement monitoring with relevant works currently suspended: 2 Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Kwun Tong Line Civil Engineering Tseung Kwan O – Lam Tin 4 Civil works Public works and Development Near Lam Tin Station 20 +11 Tunnel Department Private Ho Man Tin Station Package 1 Building 6 project (Note 1) Ho Man Tin Station 71 -42 property development project works Footbridge connecting East Highways Kowloon Bay Station and 104 Kowloon Cultural Centre and Civil works Public works 20 -4 Department Kowloon Bay Depot Kowloon Bay Station Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Drainage Services Between Kwun Tong and 128 Revitalisation of Tsui Ping River Civil works Public works 20 +3 Department Lam Tin stations Between Ho Man Tin and Central Kowloon Route - Central Highways Yau Ma Tei stations, and 147 Civil works Public works 20 -1 Tunnel Department between Jordan and Yau Ma Tei stations Tsuen Wan Line Private Redevelopment project at No.
    [Show full text]
  • Age0+ Final Report
    Executive Summary In view of the current spatial issues and future development uncertainty, Age0+ is commissioned by DUPAD, HKU to provide consultancy services regarding creating an Age- friendly Community Plan for Kowloon City. Baseline review and evaluation as well as two community engagement exercise are conducted to understand community needs and aspirations towards an age-friendly Kowloon City. A draft AFCP was formulated and revised with community feedbacks, and the plan is assessed with sustainability impact indicators. The Age0+ AFCP for Kowloon City is formulated by three important building blocks, namely Healthy Network, Seamless Connectivity and Ageing in Vibrancy & Resilience. Individual proposals are suggested, referencing identified planning issues, planning opportunities and considering implementation schedule and feasibility. Sustainability Impact Assessment (SIA) has reflected a positive result for the AFCP. 「樂」康居 Healthy Network 1 Health corridors at 7 distributor roads 2 Urban natural trail near Ko Shan Theatre 3 Hoi Sham Park improvement works 4 Diversified waterfront 5 Smart building rehabilitation and retrofitting scheme in old buildings 「齡」距離 Seamless Connectivity 6 Smart Silver Zone near To Kwa Wan Market 7 MTR pedestrian access enhancement at 2 MTR stations 8 Silver bus route connecting 2 hospitals 9 Intergenerational universal access programme in old buildings 「家」智融 Ageing in Vibrancy and Resilience 10 Industrial revitalization in OU(B) areas of Hung Hom 11 Smart outpost & facilities enhancement in To Kwa Wan Municipal Building 12 Intergenerational co-living village at Sung Wong Toi Road 13 Art and cultural hub in Cattle Depot 14 Elderly community centre and rehabilitation walkway in Hung Hom 15 Sung Wong Toi complex As the summary of our AFCP, we have 13 spatial planning proposals with policy suggestions proposed additionally.
    [Show full text]
  • Reply Serial No. DEVB(W)049
    Examination of Estimates of Expenditure 2020-21 Reply Serial No. DEVB(W)049 CONTROLLING OFFICER’S REPLY (Question Serial No. 1818) Head: (42) Electrical and Mechanical Services Department Subhead (No. & title): Not specified Programme: (2) Mechanical Installations Safety Controlling Officer: Director of Electrical and Mechanical Services (Alfred W H SIT) Director of Bureau: Secretary for Development Question: With regard to the circumstances of lifts covered in the Programme, will the Government please: 1. provide the number of lifts built over the past three years as submitted by the Mass Transit Railway Corporation, with location details of the stations involved, expected completion dates of works and reasons for delay in completion of works; 2. provide the number of lifts planned / under construction in the Kowloon West District by the Government over the past three years, with their locations, expected completion dates of works and reasons for delay in completion of works; and where there was delay in works, the additional items of expenditure involved; 3. given that the estimated expenditure for the current year under Programme (2) sharply increased by 50.1% over last year, please tabulate details of the major items with an increase in expenditure, their respective percentage in relation to the total estimated expenditure and the reasons for the increase. Asked by: Hon CHAN Hoi-yan (LegCo internal reference no.: 40) Reply: 1. Since the Electrical and Mechanical Services Department (EMSD) is only responsible for vetting and approving applications for use permits for newly built lifts, the department does not have the information related to the works concerned.
    [Show full text]
  • MTR Corporation (C.I.) Limited
    Offering Circular (a company incorporated on 26th April 2000 in Hong Kong with company number 714016) and MTR Corporation (C.I.) Limited (a company with limited liability organised under the laws of the Cayman Islands on 30th October 2000) (Unconditionally and Irrevocably Guaranteed by MTR Corporation Limited) US$7,000,000,000 Debt Issuance Programme On 22nd December 1993, Mass Transit Railway Corporation (“MTRC”) entered into a US$1,000,000,000 Debt Issuance Programme (the “Programme”). The maximum aggregate nominal amount of Notes (as defined below) which may be outstanding under the Programme was increased to US$2,000,000,000 with effect from 1st June 1999, to US$3,000,000,000 with effect from 31st October 2006, to US$4,000,000,000 with effect from 13th March 2013 and to US$5,000,000,000 with effect from 20th October 2017 and to US$7,000,000,000 with effect from 30th October 2020. On 30th June 2000 MTR Corporation Limited (“MTRCL” or “the Company”) replaced MTRC as the issuer of Notes under the Programme. All the assets and liabilities of MTRC vested in MTRCL and MTRCL has adopted all of the accounts of MTRC. MTR Corporation (C.I.) Limited (“MTR Cayman”) became an additional issuer of Notes under the Programme with effect from 9th April 2001 pursuant to an Amending and Restating Programme Agreement dated 9th April 2001 made between MTRCL, MTR Cayman and the Dealers named therein (MTRCL and MTR Cayman together being the “Issuers” and each an “Issuer”). This Offering Circular supersedes any previous prospectus, listing particulars or offering circular describing the Programme.
    [Show full text]
  • Cb(4)368/20-21(03)
    立法會 Legislative Council LC Paper No. CB(4)368/20-21(03) Ref. : CB4/PS/1/20 Panel on Transport Subcommittee on Matters Relating to Railways Meeting on 15 January 2021 Updated background brief on the construction of the Shatin to Central Link Purpose 1. This paper provides updated background information on the construction of the Shatin to Central Link ("SCL"). It also summarizes the major views and concerns expressed by Legislative Council ("LegCo") Members during previous discussions on this subject. 2. The background of and the construction cost for the SCL project are set out in Appendix I. Overall works progress and delay of the Shatin to Central Link project 3. As at 30 June 2020, the overall works for SCL were 94% completed. Over 99% of the works of the Tai Wai to Hung Hom Section have been completed. Hung Hom to Admiralty Section was 86.9% completed as at 30 June 2020. For details of the progress of construction at the various stations and tunnels, railway works, fitting out and modification works, please refer to the "Progress update of the construction of the Shatin to Central Link (as at 30 June 2020)" provided by the Administration (Annex 2 to LC Paper No.CB(4)47/20-21(01)). 4. As mentioned by the Administration and the MTR Corporation Limited ("MTRCL") in previous reports, taking account of the delay of about 11 months to the Tai Wai to Hung Hom Section arising from the - 2 - archaeological discoveries and conservation works at Sung Wong Toi Station, the commissioning date of Tai Wai to Hung Hom Section of SCL was once deferred to end 2019.
    [Show full text]