Project Abbreviations

Total Page:16

File Type:pdf, Size:1020Kb

Project Abbreviations THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS The following sets forth the abbreviations of our design, supply, and installation projects used in this document. Detailed information on each project is set forth in the section headed ‘‘Business — Our design, supply, and installation projects’’ in this document. Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 01 Sai Ying Pun and Sai Ying Pun MTR Station and HKU Building metal MTR station HKU Stations MTR Stations, Hong Kong finishing works Project 02 Kennedy Town Station Kennedy Town MTR Station, Hong Building metal MTR station Kong finishing works Project 03 Ho Man Tin Station Yau Ma Tei to Whampoa tunnels and Building metal MTR station Ho Man Tin MTR Station, finishing works Kowloon Project 04 Kennedy Town Swimming KennedyTownSwimmingPool, Façade works Swimming pool Pool Hong Kong Project 05 Marriott Hotel (A) Marriott Hotel, Ocean Park, Hong Façade works Hotel Kong Project 06 Tsuen Wan Adventist Tsuen Wan Adventist Hospital, New Façade works Hospital Hospital (A) Territories Project 07 Argyle Street (A) Kadoorie Lookout, 110 Argyle Street, Façade works Residential Mong Kok, Kowloon property Project 08 Argyle Street (B) Kadoorie Lookout, 110 Argyle Street, Façade works Residential Mong Kok, Kowloon property Project 09 Kau To Shan STTL 525, Area 56A, Kau To Shan, Building metal Residential Sha Tin, New Territories finishing works property Project 10 Tseung Kwan O Industrial Lot No. 39, Tseung Kwan O Building metal Commercial Estate Industrial Estate, New Territories finishing works property Project 11 Sha Tin Shatin Area 4C, 4D & 31, New Building metal Residential Territories finishing works property Project 12 Perkins Road No. 47-49 Perkins Road, Jardine’s Façade works Residential Lookout, Hong Kong property/ Private Project 13 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (A) Kowloon finishing works – 13 – THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 14 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (B) High Speed Rail finishing works Project 15 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (C) High Speed Rail finishing works Project 16 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (D) High Speed Rail finishing works Project 17 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (E) High Speed Rail finishing works Project 18 Sheung Yuet Road Chevalier Engineering Service Centre, Façade works Commercial No. 21 Sheung Yuet Road, property Kowloon Bay, Kowloon Project 19 Salisbury Road Salisbury Garden, Salisbury Road, Building metal Recreational Kowloon finishing works garden Project 20 Hong Kong West Hong Kong West Kowloon Station, Building metal MTR station Kowloon Station (F) Kowloon finishing works Project 21 Lohas Park Lohas Park Package 5, Tseung Kwan Façade works Residential O, New Territories property Project 22 Argyle Street (C) Kadoorie Lookout, 110 Argyle Street, Façade works Residential Mong Kok, Kowloon property Project 23 Marriott Hotel (B) Marriott Hotel, Ocean Park, Hong Building metal Hotel Kong finishing works Project 24 Sai Yee Street Sai Yee Street, Mong Kok, Kowloon Façade works Composite building Project 25 THEi New Campus (A) THEi New Campus, Chai Wan, Hong Façade works Education Kong institute Project 26 Sung Wong Toi Station Sung Wong Toi and To Kwa Wan Building metal MTR station and To Kwa Wan MTR Stations, finishing works Station (A) Shatin to Central Link Project 27 Sung Wong Toi Station Sung Wong Toi and To Kwa Wan Building metal MTR station and To Kwa Wan MTR Stations, finishing works Station (B) Shatin to Central Link – 14 – THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 28 Fuk Tong Road Integrated Rehabilitation Services Façade works Composite Complex, 4 Fuk Tong Road, Kwun building Tong, Kowloon Project 29 So Kwun Wat Road (A) So Kwun Wat Road, Area 56, Tuen Façade works Residential Mun, New Territories property Project 30 So Kwun Wat Road (B) So Kwun Wat Road, Area 5, Tuen Façade works Residential Mun, New Territories property Project 31 King’s Road 999-1021 King’s Road, Quarry Bay, Façade works Commercial Hong Kong property Project 32 Museum+ (A) Museum+, The West Kowloon Building metal Museum Cultural District, Kowloon finishing works Project 33 Museum+ (B) Museum+, The West Kowloon Building metal Museum Cultural District, Kowloon finishing works Project 34 Hai Tan Street Hai Tan Street, Sham Shui Po, Façade works Residential Kowloon property Project 35 Au Tau Au Tau, Yuen Long, New Territories Façade works Residential property Project 36 Hong Kong International Hong Kong International Airport — Façade works Airport terminal Airport Terminal 1, East Hall Expansion Works Project 37 Kwun Tong Road Grande Building, 398–402 Kwun Façade works Commercial Tong Road, Kowloon property Project 38 Yuen Long YLTL510, Yuen Long, New Façade works Residential Territories property Project 39 Sheung Shui Advanced Technology Centre, Sheung Façade works Commercial Shui, 2 Choi Fat Street property Project 40 THEi New Campus (B) THEi New Campus, Chai Wan, Hong Façade works Education Kong institute Project 41 Tsuen Wan Adventist Tsuen Wan Adventist Hospital, New Façade works Commercial Hospital (B) Territories property – 15 – THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 42 Poly U The Hong Kong Polytechnic Building metal Education University finishing works institute Project 43 Xiqu Centre The West Kowloon Cultural District, Building metal Cultural facilities 88 Austin Road West, Kowloon, finishing works The Xiqu Centre Pedestrian Link Project 44 Wan Chai Exhibition Wan Chai Exhibition Centre MTR Façade works MTR station Centre MTR Station Station, Shatin to Central Link (A) Project 45 Wan Chai Exhibition Wan Chai Exhibition Centre MTR Building metal MTR station Centre MTR Station Station, Shatin to Central Link finishing works (B) Project 46 Cochrane Street Cochrane Street, Central, Hong Kong Façade works Commercial property Project 47 Pok Fu Lam Pok Fu Lam Road, Hong Kong Façade works Residential property Nature of the Project number Project name Type of prospective project buildings or facilities Prospective Project 01 Sham Shui Po Façade works Residential property Prospective Project 02 Tai Po Façade works Residential property Prospective Project 03 Kowloon Bay Façade works Commercial property Prospective Project 04 Sheung Shui Façade works Commercial property – 16 –.
Recommended publications
  • Cb(4)360/20-21 (01)
    LC Paper No. CB(4)360/20-21 (01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 30 September 2020) (Translation) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 30 September 2020. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom Section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty Section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. There are ten stations in SCL. Apart from bringing improvements to the existing Tai Wai Station, the SCL project involves construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of East Rail Line, Tsuen Wan Line, Island Line and South Island Line (East)(“SIL(E)”), as well as passengers of Tuen Ma Line and Kwun Tong Line Extension (“KTE”) respectively. 4.
    [Show full text]
  • LC Paper No. CB(4)1029/20-21(01)
    LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach.
    [Show full text]
  • Personal Pocket 2020 A4 for Efast
    DISC OVER YOUR DESTINATION Located at the south side of Hong Kong, Le Méridien Cyberport overlooks the stunning panoramic view of the South China Sea, which is one of the most important international shipping lanes in the world. More than half of the world's supertanker trac passes through the region's waters, including half of the world's oil and gas trac. Jogging Track VICTORIA ROAD VICTORIA ROAD VICTORIA ROAD SANDY BAY ROAD Cyberport 3 CYBERPORT ROAD Cyberport 2 Cyberport 1 RESIDENTIAL SHA WAN DRIVE Supermarket – The Arcade WATERFRONT PARK - Broadway Cinema CYBERPORT - Food Court & Restaurants PIER SHA WAN DRIVE CYBERPORT ROAD LAMMA ISLAND LE MERIDIEN CYBERPORT 數碼港艾美酒店 100 Cyberport Road Hong Kong 香港數碼港道100號 T +852 2980 7788 F +852 2980 7888 lemeridiencyberport.com GM’S FAVOURITE ACTIVITIES Le Méridien Cyberport presents its “General Manager’s favourite activities” for tourists and travellers in Hong Kong. Inspired by eight years of living on Hong Kong Island and welcoming many friends and family from around the world, the “best-of” Hong Kong by Pierre-Antoine Penicaud is showcased here, taking the hotel as the reference point. 04 A Day at Ocean Park and sunset drinks at Repulse Bay beach 海洋公園一日遊及淺水灣海灘欣賞日落 數碼港艾美酒店呈獻「總經理最喜歡的活動」給香港旅客。 在香港島生活八年,招待過來自世界各地的朋友和家人, Ocean Park is the most popular amusement park in Hong Kong. Numerous high-quality attractions featuring animals are oered 酒店總經理Pierre-Antoine Penicaud潘沛仁以酒店為據點, (including among others a dolphin show, a jellyfish aquarium, and 誠意推薦他最愛的香港行程,帶您感受香港最精彩一面。 pandas). The roller coasters and other thrill rides oer a beautiful view of the coast and the sea. Whether with friends or family, you can spend a pleasant whole day here.
    [Show full text]
  • Administration's Paper on Railway Station Design to Showcase Local
    LC Paper No.CB(1)2088/09-10(03) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Railway Station Design to Showcase Local History and Culture Purpose This paper aims to give an account of how local history and cultural elements have been incorporated into railway station design and the way forward. Looking Back 2. Railway is closely related with our daily living and has become an important part of it. Railway stations were first designed with practical function, then gradually transform into venues displayed with local art, history and cultural elements with a view to bring some colours to our hectic and busy lives. Design of MTR Stations in 1980s 3. The first MTR line was commissioned in 1979. MTR stations built in those days were practical and functional driven with very limited touch of local characteristics. For example, the navy blue wall tiles of Choi Hung Station were decorated with a border of rainbow colour on the pillars as Choi - 2 - Hung in Chinese means rainbow; the dark grey Diamond Hill wall tiles were decorated with silver sparkles. Other stations along the Kwun Tong Line and Tsuen Wan Line follow the same architectural language. 4. In 1985, the MTR Island Line between Chai Wan and Admiralty was opened for service. Chinese calligraphy of station names were applied on the wall panels of station platforms, adding a touch of art for the stations. This concept was later extended to other new railway lines, such as the Tseung Kwan O Extension that opened in 2002. Art in MTR from 1998 5.
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • MTR Corporation Limited
    MTR Corporation Limited Shatin to Central Link – Tai Wai to Hung Hom Section and Stabling Sidings at Hung Hom Freight Yard As-Built Drawings of Measures for Mitigating Landscape and Visual Impacts (December 2020) Certified by: _____Claudine Lee____________ Position: Independent Environmental Checker Date: ___________8 Dec 2020_____________ 1. Submission Summary of As-Built Drawings for Landscape and Visual Mitigation Measures Reference Drawing No. Works Contract Area Location Type of Mitigation Measures Drawing No. Remarks Handover Information in Approved VLTTP SCL 1101 Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A101B Annex Figure B1-1 Previously submitted to EPD in Dec 2015. Handed over to MTR Operation Team in Q4 2015 SCL 1101Tai Wai Area Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A102B Annex Figure B1-2 Previously submitted to EPD in Dec 2015. SCL 1102 Mei Tin Road Sitting-out Area OM1 1102/B/300/T73/A58/600 Annex E2 1102/B/300/T73/A58/600 Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2015 SCL 1101 Shek Mun Area Shek Mun Playground OM1 1101/W/300/T73/SFK/A58/001A Annex E2 1101/W/300/T73/SFK/A58/001A Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2014 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/W/HIK/POC/A58/300F Annex E2 1102/W/HIK/POC/A58/300F Previously submitted to EPD in Feb 2020. Handed over to MTR Operatiin Team in Q4 2018 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/B/HIK/T73/A58/101A Annex E2 1102/B/HIK/T73/A58/101A Previously submitted to EPD in Feb 2020.
    [Show full text]
  • Information Note Strategic Cavern Area No. 40 – Pok Fu
    - 1 - CAVERN MASTER PLAN – INFORMATION NOTE STRATEGIC CAVERN AREA NO. 40 – POK FU LAM This Information Note describes the characteristics, key development opportunities and constraints of Strategic Cavern Area No. 40 - Pok Fu Lam (the SCVA). It indicates the potential land uses suitable for cavern development within the area but would not pre-empt other possible land uses put forward by the project proponents with justifications. It also denotes the extent of potential portal locations. The spatial context of the SCVA is illustrated in the Reference Drawing appended to this Information Note. Reference should be made to the Explanatory Statement of the Cavern Master Plan for its background and purposes, as well as the definition and delineation criteria of SCVAs. 1. Location Plan Information Note (SCVA40 – Pok Fu Lam) - 2 - 2. Strategic Cavern Area Details Outline Zoning Plans (OZPs): Draft Pok Fu Lam OZP No. S/H10/16 Approved Mid-Levels West OZP No. S/H11/15 Draft The Peak Area OZP No. S/H14/12 Area: 86.1 ha Maximum elevation in the SCVA: +360 mPD Minimum elevation in the SCVA: +75 mPD 3. District Context Location The SCVA is located in the northwestern part of Hong Kong Island. It occupies the area of Lung Fu Shan in Mid-Levels. Sai Wan and Sai Ying Pun are to the north and northeast of the SCVA, Victoria Peak and Pok Fu Lam Country Park are to the east and south, Pok Fu Lam is to the southwest and Kennedy Town is to the west. The SCVA is generally hilly with a maximum elevation of about +360 mPD.
    [Show full text]
  • 41912405 Masters Thesis CHEUNG Siu
    University of Queensland School of Languages & Comparative Cultural Studies Master of Arts in Chinese Translation and Interpreting CHIN7180 - Thesis Translation of Short Texts: A case study of street names in Hong Kong Student: Shirmaine Cheung Supervisor: Professor Nanette Gottlieb June 2010 ©2010 The Author Not to be reproduced in any way except for the purposes of research or study as permitted by the Copyright Act 1968 Abstract The topic of this research paper is “Translation of Short Texts: A case study of street names in Hong Kong”. It has been observed that existing translation studies literature appears to cater mainly for long texts. This suggests that there may be a literature gap with regard to short text translation. Investigating how short texts are translated would reveal whether mainstream translation theories and strategies are also applicable to such texts. Therefore, the objectives of the paper are two-fold. Firstly, it seeks to confirm whether there is in fact a gap in the existing literature on short texts by reviewing corpuses of leading works in translation studies. Secondly, it investigates how short texts have been translated by examining the translation theories and strategies used. This is done by way of a case study on street names in Hong Kong. The case study also seeks to remedy the possible paucity of translation literature on short texts by building an objective and representative database to function as an effective platform for examining how street names have been translated. Data, including street names in English and Chinese, are collected by way of systematic sampling from the entire data population.
    [Show full text]
  • We Shape Our Buildings; Thereafter They Shape Us
    SMART COMMUNITIES & BUILT ENVIRONMENTS SHAPING THE FUTURE OF SMART COMMUNITIES THROUGH DESIGN, INNOVATION AND TECHNOLOGY 25th – 27th July 2016 | Suntec Singapore Convention and Exhibition Centre, Singapore WE SHAPE OUR BUILDINGS; THEREAFTER THEY SHAPE US. WINSTON CHURCHILL BENEFIT FROM THE PRACTICAL EXPERIENCE AND EXPERT PRESENTATIONS FROM EXCLUSIVE DAY 3 OUR DISTINGUISHED ADVISORY PANELLISTS TRANSIT ORIENTED DEVELOPMENTS: Vasudevan Suresh Director William Lau Principal Norliza Hashim Secretary General DELIVERING VIBRANT MIXED USE HIRCO PROJECT COMPANIES, INDIA A.ALLIANCE DESIGN EAROPH - EASTERN REGIONAL COMMUNITIES Chairman – Policy & Advocacy INTERNATIONAL, SINGAPORE ORGANISATION FOR PLANNING & Here we will have a series of Plenaries, Case Studies Committee Immediate Past President HUMAN SETTLEMENTS, MALAYSIA to Discuss the challenges and best practices when INDIAN GREEN BUILDING COUNCIL SINGAPORE INSTITUTE OF PLANNERS Director designing Transit Oriented Developments (IGBC) Peter J. Kindel Director MALAYSIAN INSTITUTE OF SOM, HONG KONG PLANNERS - LOW CARBON CITIES & SUSTAINABILITY CENTRE INTERACTIVE PANEL P DISCUSSIONS & SHOWCASING KEY REGIONAL & INTERNATIONAL PRESENTATIONS FROM INNOVATIVE SpOTLIGHTS DISTINGUISHED SPEAKERS 3 CITY TRAILBLAZERS Djoko Prihanto Deputy Managing Saeed Zaki Regional Managing Director David Singleton Chairman & Director These thought leaders will share their experience Director dwp, MALAYSIA & SINGAPORE INFRASTRUCTURE SUSTAINABILITY and case studies on the latest breakthroughs, as SURBANA JURONG PLANNING Layton
    [Show full text]
  • PR042/21 12 June 2021 the Tuen Ma Line to Kwa Wan Station Open
    PR042/21 12 June 2021 The Tuen Ma Line To Kwa Wan Station Open Day Offers Early Glimpse of Station Highlights to Visitors With the full opening of the 56-km Tuen Ma Line (TML) on 27 June 2021, the brand new To Kwa Wan Station and Sung Wong Toi Station will also come into service. Around 2,600 visitors with registered tickets (each ticket for up to four persons for entry at the same timeslot) enjoyed a preview of To Kwa Wan Station at an Open Day today (12 June 2021), ahead of the official opening. From 10am onwards, pre-registered visitors arrived at the station to experience the new customer service concept and station facilities, including the Smart Customer Service Centre and caring facilities. They also met with the robot assistants who were on duty at the station. One of the focal points of attention is a 54-metre wall installation situated at the non-paid area of the concourse. Entitled ”Home”, this unique station artwork was created by a local artist Ms Leung Mee-ping with the participation of local residents. Over 100 residents in the area have contributed household items with sentimental value that is captured in the short synopsis in the art piece. “MTR Corporation strives to connect communities and we were glad to see the visitors, including local residents, railway enthusiasts and the general public, sharing their excitement and anticipation for the opening of the new line,” said Dr Jacob Kam, Chief Executive Officer of MTR Corporation. “The full TML will provide not only a fast and convenient railway service to the residents nearby, but also enhanced connectivity between various parts of Hong Kong.” An Open Day will be held at Sung Wong Toi Station, another brand new station along the TML, for pre-registered visitors to visit tomorrow (13 June 2021).
    [Show full text]
  • Justin Bishop Editor
    Green Energy and Technology Justin Bishop Editor Building Sustainable Cities of the Future Green Energy and Technology More information about this series at http://www.springer.com/series/8059 Justin Bishop Editor Building Sustainable Cities of the Future 123 Editor Justin Bishop University of Cambridge Cambridge UK ISSN 1865-3529 ISSN 1865-3537 (electronic) Green Energy and Technology ISBN 978-3-319-54456-4 ISBN 978-3-319-54458-8 (eBook) DOI 10.1007/978-3-319-54458-8 Library of Congress Control Number: 2017945687 © Springer International Publishing AG 2017 This work is subject to copyright. All rights are reserved by the Publisher, whether the whole or part of the material is concerned, specifically the rights of translation, reprinting, reuse of illustrations, recitation, broadcasting, reproduction on microfilms or in any other physical way, and transmission or information storage and retrieval, electronic adaptation, computer software, or by similar or dissimilar methodology now known or hereafter developed. The use of general descriptive names, registered names, trademarks, service marks, etc. in this publication does not imply, even in the absence of a specific statement, that such names are exempt from the relevant protective laws and regulations and therefore free for general use. The publisher, the authors and the editors are safe to assume that the advice and information in this book are believed to be true and accurate at the date of publication. Neither the publisher nor the authors or the editors give a warranty, express or implied, with respect to the material contained herein or for any errors or omissions that may have been made.
    [Show full text]
  • Hang Lung Young Architects Program (恒隆.築跡 年輕建築師計劃)
    Hang Lung Young Architects Program (恒隆.築跡 ── 年輕建築師計劃) The Hang Lung Young Architects Program (HLYAP) is an education initiative run by Hang Lung Properties in 2017, together with Walk in Hong Kong, an organisation focused on aspects of local culture, to give young people the chance to learn more about Hong Kong’s architectural DNA and to understand the city’s diverse cultural identity. The second edition of the HLYAP officially began on September 28, 2019 and the theme this time is “Sketch Your Sky”, with the aim of encouraging secondary students to explore and discover Hong Kong’s built history and the relationship between architecture and communities, delved deep into the culture and history of Hong Kong’s architectural gems, and honed their own architectural knowledge and skills. The program attracted nearly 700 students from 80 secondary schools to participate, and provided over 20,000 training hours to student participants. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cherry Luk, Sabrina Tang, Suzanne Lam, Natalie Ng and Megan Tse from F.4 was one of the winning teams of the Hang Lung Young Architects Program. The team's topic is "Community, Culture, Conservation - a Study in Kowloon City”. Well done! Your hard work and determination have paid off. Congrats to our young but great architects! See their proposal on the next page! ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Plan C: Community , Culture, Conservation - A Study in Kowloon City - An Overview of the District: Introduction to the Kowloon City District Kowloon City is located in the eastern half of the Kowloon peninsula, with an area of approximately 1,000 hectares, home to the famous Kowloon Walled City, Sung Wong Toi and the former Kai Tak Airport.
    [Show full text]