Last Updated: 1 August 2021 Railway-Related Facilities Under Settlement Monitoring Within Railway Protection Areas the MTR Corpo

Total Page:16

File Type:pdf, Size:1020Kb

Last Updated: 1 August 2021 Railway-Related Facilities Under Settlement Monitoring Within Railway Protection Areas the MTR Corpo Last updated: 1 August 2021 Railway-related Facilities under Settlement Monitoring within Railway Protection Areas The MTR Corporation will upload latest information when there are changes in the railway-related facilities under settlement monitoring, updates in the settlement limit for suspension or when the latest settlement level exceeds the limit for suspension. Total number of facilities currently under settlement monitoring: 75 Number of facilities where settlement monitoring has ceased since last announcement on 1 July 2021: 3 Number of newly-added facilities under settlement monitoring since last announcement on 1 July 2021: 2 Number of facilities under settlement monitoring with relevant works currently suspended: 2 Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Kwun Tong Line Civil Engineering Tseung Kwan O – Lam Tin 4 Civil works Public works and Development Near Lam Tin Station 20 +11 Tunnel Department Private Ho Man Tin Station Package 1 Building 6 project (Note 1) Ho Man Tin Station 71 -42 property development project works Footbridge connecting East Highways Kowloon Bay Station and 104 Kowloon Cultural Centre and Civil works Public works 20 -4 Department Kowloon Bay Depot Kowloon Bay Station Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Drainage Services Between Kwun Tong and 128 Revitalisation of Tsui Ping River Civil works Public works 20 +3 Department Lam Tin stations Between Ho Man Tin and Central Kowloon Route - Central Highways Yau Ma Tei stations, and 147 Civil works Public works 20 -1 Tunnel Department between Jordan and Yau Ma Tei stations Tsuen Wan Line Private Redevelopment project at No. 2 Building Between Central and 18 project (Note 1) 20 +7 Murray Road project Admiralty stations works Public Housing Development at Building Hong Kong Underground water main 91* North West Kowloon Public works 20 -28 project Housing Authority on Tung Chau Street Reclamation Site 1 (East) Private Redevelopment project at No. Building Between Central and 101 project (Note 1) 20 -2 10 Harcourt Road project Admiralty stations works Private Redevelopment Project at No. Building Between Tsim Sha Tsui 130 project (Note 1) 20 -3 200 Nathan Road project and Jordan stations works Private Redevelopment Project at 1-1A Building 135 project (Note 1) Tsim Sha Tsui Station 20 -2 & 2-2A Humphreys Avenue project works Retrofitting of Escalators for Footbridge across Castle Peak Public Highways 138 Civil works Tai Wo Hau Station 20 0 Road – Kwai Chung near Tai Wo Works Department Hau Station Private Redevelopment Project at 916- Building Between Lai Chi Kok and 144 project (Note 1) 20 -1 922 Cheung Sha Wan Road project Mei Foo stations works Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Private Redevelopment Project at 924- Building Between Lai Chi Kok and 145 project (Note 1) 20 -1 926 Cheung Sha Wan Road project Mei Foo stations works Provision of New External MTR 146 Passengers Lift near Entrance A Civil works Corporation (Note 1) Mei Foo Station 20 -2 at Mei Foo Station works Island Line Private Redevelopment project at No.2 Building Between Central and 19 project (Note 1) 20 -2 Murray Road project Admiralty stations works Private Redevelopment project at No. Building Between Wan Chai and 74 project (Note 1) 20 +3 369-371 Hennessy Road project Causeway Bay stations works Redevelopment project at No. Private 46-56 Queen’s Road East, No. 2- Building Between Admiralty and 90 project (Note 1) 20 +2 12 Anton Street and No. 1-11 project Wan Chai stations works Landale Street Private Redevelopment project at No. Building 100 project (Note 1) Sheung Wan Station 20 0 78-90 Wing Lok Street project works Chai Wan Station Upgrading of Chai Wan Salt Water Supplies Relevant works has been 112 Civil works Public works 20 +1 Water Supply System Department completed thus settlement monitoring ceased in July 2021 Private Redevelopment project at No. Building Between Wan Chai and 119 project (Note 1) 20 -1 472 Hennessy Road project Causeway Bay stations works Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Sai Wan Ho Station Private Development project at No.78 Building Relevant works has been 120 project (Note 1) 20 -1 Shau Kei Wan Road project completed thus settlement works monitoring ceased in July 2021 Private Redevelopment project at No. Building Between Wan Chai and 125 project (Note 1) 20 -1 199-203 Hennessy Road project Causeway Bay stations works Private Redevelopment project at No. Building Between Fortress Hill and 126 project (Note 1) 20 -1 383-385 King's Road project North Point stations works Private Redevelopment project at No. Building 127 project (Note 1) Sai Ying Pun Station 20 +2 44-50 Third Street project works Private Redevelopment Project at 20 Building 133 project (Note 1) Central Station 20 +1 Des Voeux Road Central project works Private Redevelopment Project at 152- Building Between Sai Ying Pun 134 project (Note 1) 20 -3 155 Connaught Road Central project and Sheung Wan stations works South Island Line Wong Chuk Hang Station Private Building 67 Package 2 property project (Note 1) Wong Chuk Hang Depot 20 -7 project development works Wong Chuk Hang Station Private Wong Chuk Hang Station Building 89 Package 3 property project (Note 1) and Wong Chuk Hang 20 -2 project development works Depot Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Wong Chuk Hang Station Private Wong Chuk Hang Station Building 132 Package 4 property project (Note 1) and Wong Chuk Hang 20 0 project development works Depot Tseung Kwan O Line Civil Engineering Between Tiu King Leng Footbridge of Tseung Kwan O – 75 Civil works Public works and Development and Tseung Kwan O 20 +2 Lam Tin Tunnel Department stations Private Building 78 Works at Tseung Kwan O Depot project (Note 1) Tseung Kwan O Depot 20 -4 project works Civil Engineering Near Tseung Kwan O 79 Cross Bay Link, Tseung Kwan O Civil works Public works and Development 20 -4 Depot Department Private Composite Development on Ko Building Ventilation Building at 98 project (Note 1) 20 +6 Chiu Road project Yau Tong works Private Yau Tong Ventilation Building Building Ventilation Building at 106 project (Note 1) 20 +6 property development project Yau Tong works Public Housing Development at Hong Kong Pak Shing Kok ventilation 113 Civil works Public works 20 -3 Chiu Shun Road Housing Authority Building Between Tseung Kwan O and Hang Hau stations, Water Supplies 121 Mainlaying in Tseung Kwan O Civil works Public works and between Tseung 20 -1 Department Kwan O and LOHAS Park stations Tung Chung Line, Airport Express and Disneyland Resort Line Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Private Hong Kong International Airport Building Between Airport and 29 project (Note 1) 20 -4 Three-runway System project AsiaWorld-Expo stations works Highways Between Kowloon and 73 Central Kowloon Route Civil works Public works 20 -12 Department Olympic stations Private Airport Terminal 2 Building 102 project (Note 1) Airport Station 20 -5 demolition work project works Architectural Tsim Sha Tsui Fire Station Building Between Kowloon and 111 Public works Services 20 -14 Complex on To Wah Road project Olympic stations Department Central Kowloon Route Highways Between Kowloon and 123 Civil works Public works 20 +4 Yau Ma Tei Ventilation Building Department Olympic stations East Rail Line Private Tai Wai Station property Building 38 project (Note 1) Tai Wai Station 50 -46 development project works MTR Lo Wu Station improvement Building 88 Corporation (Note 1) Lo Wu Station 20 -7 works project works Private Comprehensive Development at Building Between University and 103 project (Note 1) 20 -3 Pak Shek Kok project Tai Po Market stations works Shek Wu Hui Effluent Polishing Drainage Services Between Sheung Shui 107 Civil works Public works 20 -7 Plant work Department and Lo Wu stations Settlement Nearby MTR Project Project Responsible Limit for Latest Settlement Code Project Station/Railway Type Nature Party Suspension Level (mm)# Facilities (mm) Provision of barrier-free facilities Highways Between Sha Tin and Fo 108 Civil works Public works 20 -3 for highway structures Department Tan stations Construction of Tong Hang No.3 Water Supplies Between Tai Wo and 110 Fresh Water Service Reservoir Civil works Public works 20 -5 Department Fanling stations and Associated Mainlaying Road widening and retrofitting Civil Engineering Between Sha Tin and 115 noise barriers on Tai Po Road Civil works Public works and Development 20 -3 Fo Tan stations (Sha Tin Section) Department Central Kowloon Route - Central Highways Between Hung Hom and 136 Civil works Public works 20 -4 Tunnel works Department Mong Kok East stations Tuen Ma Line Private Between Kam Sheung Yuen Long Station viaduct Building 45 project (Note 1) Road and Yuen Long 20 -13 column improvement works project works stations Private Property development project – Building -13 53*
Recommended publications
  • Cb(4)360/20-21 (01)
    LC Paper No. CB(4)360/20-21 (01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 30 September 2020) (Translation) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 30 September 2020. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom Section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty Section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. There are ten stations in SCL. Apart from bringing improvements to the existing Tai Wai Station, the SCL project involves construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of East Rail Line, Tsuen Wan Line, Island Line and South Island Line (East)(“SIL(E)”), as well as passengers of Tuen Ma Line and Kwun Tong Line Extension (“KTE”) respectively. 4.
    [Show full text]
  • LC Paper No. CB(4)1029/20-21(01)
    LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach.
    [Show full text]
  • LCQ15-Annex2 (2010)
    Annex 2 Record of Train Service Delays of 8 Minutes or More from 01/01/2010 to 31/12/2010 Incident Railway Line Delay Incident Time Cause of Incidents / Findings of Investigation Remedial Action Taken Date Affected (min.) 3-Jan-10 8:25 PM Light Rail A Light Rail Vehicle (LRV) was withdrawn from service after it was hit by a New Territories taxi at the No injuries were reported. Light Rail service resumed at 8:59 p.m. after the site was cleared. 35 junction between Tai Fong Street and Tai Hing Bus Terminus egress. The left-hand-side of the LRV car body was damaged. 4-Jan-10 6:30 PM Light Rail A LRV was withdrawn from service after a pair of doors failed to close after platform duties at Tin Shui Investigation found a faulty door component which was immediately replaced. 12 Wai Stop. The concerned LRV was pushed away from the site. 8-Jan-10 7:32 AM Tsuen Wan Line A Central-bound train was withdrawn from service at Tsuen Wan Station because the left-hand-side Investigation found a coin was jammed in the doors. It was immediately removed. 8 driving cab door failed to close after platform duties. 8-Jan-10 8:42 AM Tung Chung Line A Tung Chung- bound train was delayed at Tsing Yi Station because a points failed to detect its position. Investigation found faulty components of points equipment which were immediately replaced. 20 The train had to work in Restricted Manual Mode at a speed not more than 22 kph to pass the affected area.
    [Show full text]
  • Minutes of the Third Meeting of Yuen Long District Council in 2018 Date
    The minutes were confirmed on 4 September 2018 without amendment. Minutes of the Third Meeting of Yuen Long District Council in 2018 Date : 26 June 2018 (Tuesday) Time : 9:30 a.m. – 6:30 p.m. Venue : Conference Room, Yuen Long District Council, 13/F., Yuen Long Government Offices, 2 Kiu Lok Square, Yuen Long Present Time of Arrival Time of Withdrawal Chairman: Mr SHUM Ho-kit (Beginning of the meeting) (End of the meeting) Vice-chairman: Mr WONG Wai-shun, MH (Beginning of the meeting) (End of the meeting) Members: Mr CHAM Ka-hung, Daniel, (Beginning of the meeting) (End of the meeting) BBS, MH, JP Ms CHAN Mei-lin (Beginning of the meeting) (4:50 p.m.) Mr CHEUNG Muk-lam (Beginning of the meeting) (3:30 p.m.) Mr CHING Chan-ming (Beginning of the meeting) (End of the meeting) Ms CHIU Sau-han, MH (Beginning of the meeting) (End of the meeting) Mr CHOW Wing-kan (Beginning of the meeting) (End of the meeting) Mr KWOK Hing-ping (Beginning of the meeting) (2:55 p.m.) Mr KWOK Keung, MH (Beginning of the meeting) (End of the meeting) The Hon KWONG Chun-yu (Beginning of the meeting) (End of the meeting) Mr LAI Wai-hung (Beginning of the meeting) (11:15 a.m.) Ms LAU Kwai-yung (Beginning of the meeting) (End of the meeting) Mr LEE Yuet-man, MH (Beginning of the meeting) (End of the meeting) The Hon LEUNG Che-cheung, (Beginning of the meeting) (12:15 p.m.) SBS, MH, JP Mr LEUNG Fuk-yuen (Beginning of the meeting) (End of the meeting) Mr LEUNG Ming-kin (Beginning of the meeting) (End of the meeting) Mr LUI Kin, MH (9:45 a.m.) (6:10 p.m.) The Hon LUK Chung-hung
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • MTR Corporation Limited
    MTR Corporation Limited Shatin to Central Link – Tai Wai to Hung Hom Section and Stabling Sidings at Hung Hom Freight Yard As-Built Drawings of Measures for Mitigating Landscape and Visual Impacts (December 2020) Certified by: _____Claudine Lee____________ Position: Independent Environmental Checker Date: ___________8 Dec 2020_____________ 1. Submission Summary of As-Built Drawings for Landscape and Visual Mitigation Measures Reference Drawing No. Works Contract Area Location Type of Mitigation Measures Drawing No. Remarks Handover Information in Approved VLTTP SCL 1101 Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A101B Annex Figure B1-1 Previously submitted to EPD in Dec 2015. Handed over to MTR Operation Team in Q4 2015 SCL 1101Tai Wai Area Noise Cover at Mei Tin Road OM3 1101/Z/TAW/SFJ/C23/A102B Annex Figure B1-2 Previously submitted to EPD in Dec 2015. SCL 1102 Mei Tin Road Sitting-out Area OM1 1102/B/300/T73/A58/600 Annex E2 1102/B/300/T73/A58/600 Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2015 SCL 1101 Shek Mun Area Shek Mun Playground OM1 1101/W/300/T73/SFK/A58/001A Annex E2 1101/W/300/T73/SFK/A58/001A Previously submitted to EPD in Feb 2020. Handed over to LCSD in Q4 2014 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/W/HIK/POC/A58/300F Annex E2 1102/W/HIK/POC/A58/300F Previously submitted to EPD in Feb 2020. Handed over to MTR Operatiin Team in Q4 2018 SCL 1102 Hin Keng Station and Approach Structures OM1 1102/B/HIK/T73/A58/101A Annex E2 1102/B/HIK/T73/A58/101A Previously submitted to EPD in Feb 2020.
    [Show full text]
  • Our Network Hong Kong Operating Network with Future Extensions
    OUR NETWORK HONG KONG OPERATING NETWORK WITH FUTURE EXTENSIONS Shenzhen Lo Wu Intercity Through Train Route Map Beijing hau i C Lok Ma Shanghai Sheung Shu g Beijing Line Guangzhou Fanlin Shanghai Line Kwu Tung Guangdong Line n HONG KONG SAR Dongguan San Ti Tai Wo Long Yuen Long t Ping 48 41 47 Ngau a am Tam i Sh i K Mei a On Shan a Tai Po Marke 36 K Sheungd 33 M u u ui Wa W Roa Au Tau Tin Sh 49 Heng On y ui Hung Shui Ki g ng 50 New Territories Tai Sh Universit Han Siu Ho 30 39 n n 27 35 Shek Mu 29 Tuen Mu cecourse* e South Ra o Tan Area 16 F 31 City On Tuen Mun n 28 a n u Sha Ti Sh n Ti 38 Wai Tsuen Wan West 45 Tsuen05 Wa Tai Wo Ha Che Kung 40 Temple Kwai Hing 07 i 37 Tai Wa Hin Keng 06 l Kwai Fong o n 18 Mei Fo k n g Yi Diamond Hil Kowloon Choi Wa Tsin Tong n i King Wong 25 Shun Ti La Lai Chi Ko Lok Fu d Tai Si Choi Cheung Sha Wan Hung Sau Mau Ping ylan n ay e Sham Shui Po ei Kowloon ak u AsiaWorld-Expo B 46 ShekM T oo Po Tat y Disn Resort m Po Lam Na Kip Kai k 24 Kowl y Sunn eong g Hang Ha Prince n Ba Ch o Sungong 01 53 Airport M Mong W Edward ok ok East 20 K K Toi ong 04 To T Ho Kwa Ngau Tau Ko Cable Car n 23 Olympic Yau Mai Man Wan 44 n a Kwun Ti Ngong Ping 360 19 52 42 n Te Ti 26 Tung Chung East am O 21 L Tung Austi Yau Tong Tseung Chung on Whampo Kwan Tung o n Jordan Tiu g Kowl loo Tsima Hung 51 Ken Chung w Sh Hom Leng West Hong Kong Tsui 32 t Tsim Tsui West Ko Eas 34 22 ha Fortress10 Hill Hong r S ay LOHAS Park ition ew 09 Lantau Island ai Ying Pun Kong b S Tama xhi aus North h 17 11 n E C y o y Centre Ba Nort int 12 16 Po 02 Tai
    [Show full text]
  • Minutes of the Fourth Meeting of Yuen Long District Council in 2018 Date
    The minutes were confirmed on 30 October 2018 without amendment. Minutes of the Fourth Meeting of Yuen Long District Council in 2018 Date : 4 September 2018 (Tuesday) Time : 9:30 a.m. – 2:25 p.m. Venue : Conference Room, Yuen Long District Council, 13/F., Yuen Long Government Offices, 2 Kiu Lok Square, Yuen Long Present Time of Arrival Time of Withdrawal Chairman: Mr SHUM Ho-kit, JP (Beginning of the meeting) (End of the meeting) Vice-chairman: Mr WONG Wai-shun, MH (Beginning of the meeting) (End of the meeting) Members: Mr CHAM Ka-hung, Daniel, (Beginning of the meeting) (End of the meeting) BBS, MH, JP Ms CHAN Mei-lin (Beginning of the meeting) (End of the meeting) Mr CHAN Sze-ching (Beginning of the meeting) (End of the meeting) Mr CHING Chan-ming (Beginning of the meeting) (End of the meeting) Ms CHIU Sau-han, MH (Beginning of the meeting) (End of the meeting) Mr CHOW Wing-kan (Beginning of the meeting) (1:30 p.m.) Mr KWOK Hing-ping (Beginning of the meeting) (End of the meeting) Mr KWOK Keung, MH (Beginning of the meeting) (End of the meeting) The Hon KWONG Chun-yu (9:35 a.m.) (10:30 a.m.) Ms LAU Kwai-yung (Beginning of the meeting) (End of the meeting) Mr LEE Yuet-man, MH (Beginning of the meeting) (End of the meeting) Mr LEUNG Fuk-yuen (Beginning of the meeting) (End of the meeting) Mr LEUNG Ming-kin (Beginning of the meeting) (End of the meeting) The Hon LUK Chung-hung, JP (Beginning of the meeting) (12:30 p.m.) Ms MA Shuk-yin (Beginning of the meeting) (End of the meeting) Mr MAK Ip-sing (Beginning of the meeting) (1:55 p.m.)
    [Show full text]
  • PR042/21 12 June 2021 the Tuen Ma Line to Kwa Wan Station Open
    PR042/21 12 June 2021 The Tuen Ma Line To Kwa Wan Station Open Day Offers Early Glimpse of Station Highlights to Visitors With the full opening of the 56-km Tuen Ma Line (TML) on 27 June 2021, the brand new To Kwa Wan Station and Sung Wong Toi Station will also come into service. Around 2,600 visitors with registered tickets (each ticket for up to four persons for entry at the same timeslot) enjoyed a preview of To Kwa Wan Station at an Open Day today (12 June 2021), ahead of the official opening. From 10am onwards, pre-registered visitors arrived at the station to experience the new customer service concept and station facilities, including the Smart Customer Service Centre and caring facilities. They also met with the robot assistants who were on duty at the station. One of the focal points of attention is a 54-metre wall installation situated at the non-paid area of the concourse. Entitled ”Home”, this unique station artwork was created by a local artist Ms Leung Mee-ping with the participation of local residents. Over 100 residents in the area have contributed household items with sentimental value that is captured in the short synopsis in the art piece. “MTR Corporation strives to connect communities and we were glad to see the visitors, including local residents, railway enthusiasts and the general public, sharing their excitement and anticipation for the opening of the new line,” said Dr Jacob Kam, Chief Executive Officer of MTR Corporation. “The full TML will provide not only a fast and convenient railway service to the residents nearby, but also enhanced connectivity between various parts of Hong Kong.” An Open Day will be held at Sung Wong Toi Station, another brand new station along the TML, for pre-registered visitors to visit tomorrow (13 June 2021).
    [Show full text]
  • Hang Lung Young Architects Program (恒隆.築跡 年輕建築師計劃)
    Hang Lung Young Architects Program (恒隆.築跡 ── 年輕建築師計劃) The Hang Lung Young Architects Program (HLYAP) is an education initiative run by Hang Lung Properties in 2017, together with Walk in Hong Kong, an organisation focused on aspects of local culture, to give young people the chance to learn more about Hong Kong’s architectural DNA and to understand the city’s diverse cultural identity. The second edition of the HLYAP officially began on September 28, 2019 and the theme this time is “Sketch Your Sky”, with the aim of encouraging secondary students to explore and discover Hong Kong’s built history and the relationship between architecture and communities, delved deep into the culture and history of Hong Kong’s architectural gems, and honed their own architectural knowledge and skills. The program attracted nearly 700 students from 80 secondary schools to participate, and provided over 20,000 training hours to student participants. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Cherry Luk, Sabrina Tang, Suzanne Lam, Natalie Ng and Megan Tse from F.4 was one of the winning teams of the Hang Lung Young Architects Program. The team's topic is "Community, Culture, Conservation - a Study in Kowloon City”. Well done! Your hard work and determination have paid off. Congrats to our young but great architects! See their proposal on the next page! ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Plan C: Community , Culture, Conservation - A Study in Kowloon City - An Overview of the District: Introduction to the Kowloon City District Kowloon City is located in the eastern half of the Kowloon peninsula, with an area of approximately 1,000 hectares, home to the famous Kowloon Walled City, Sung Wong Toi and the former Kai Tak Airport.
    [Show full text]
  • Project Abbreviations
    THIS DOCUMENT IS IN DRAFT FORM, INCOMPLETE AND SUBJECT TO CHANGE AND THAT THE INFORMATION MUST BE READ IN CONJUNCTION WITH THE SECTION HEADED ‘‘WARNING’’ ON THE COVER OF THIS DOCUMENT. PROJECT ABBREVIATIONS The following sets forth the abbreviations of our design, supply, and installation projects used in this document. Detailed information on each project is set forth in the section headed ‘‘Business — Our design, supply, and installation projects’’ in this document. Nature of the Project buildings or number Project name Project location/description Type of project facilities Project 01 Sai Ying Pun Station and Sai Ying Pun MTR Station and HKU Building metal MTR station HKU Station MTR Station, Hong Kong finishing works Project 02 Kennedy Town Station Kennedy Town MTR Station, Building metal MTR station Hong Kong finishing works Project 03 Ho Man Tin Station Yau Ma Tei to Whampoa tunnels and Building metal MTR station Ho Man Tin MTR Station, finishing works Kowloon Project 04 Kennedy Town Swimming KennedyTownSwimmingPool, Façade works Swimming pool Pool Hong Kong Project 05 Marriott Hotel (A) Marriott Hotel, Ocean Park, Façade works Hotel Hong Kong Project 06 Tsuen Wan Adventist Tsuen Wan Adventist Hospital, Façade works Hospital Hospital (A) New Territories Project 07 Argyle Street (A) Kadoorie Lookout, 110 Argyle Street, Façade works Residential property Mong Kok, Kowloon Project 08 Argyle Street (B) Kadoorie Lookout, 110 Argyle Street, Façade works Residential property Mong Kok, Kowloon Project 09 Kau To Shan STTL 525, Area 56A, Kau To Shan, Building metal Residential property Sha Tin, New Territories finishing works Project 10 Tseung Kwan O Industrial Lot No.
    [Show full text]
  • Panel on Transport Subcommittee on Matters Relating to Railways Issues
    LC Paper No. CB(4)1504/17-18(01) Panel on Transport Subcommittee on Matters Relating to Railways Issues relating to the settlement of existing railway facilities of MTR Corporation Limited Purpose This paper briefs the Subcommittee on matters relating to the settlement of existing railway facilities of the MTR Corporation Limited (MTRCL), and explains the measures taken by the Government and MTRCL on the impact of nearby construction works on existing railway facilities. Impact of nearby construction works on existing railway facilities 2. Generally speaking, foundation works causing settlement in nearby structures is not uncommon. To protect railway safety, the Government and MTRCL have put in place stringent monitoring mechanisms to handle settlement of railway facilities arising from construction works within the railway protection area. Regulatory regime of the Government 3. The Government has always accorded top priority to railway safety and has put in place a stringent regulatory system. The Electrical and Mechanical Services Department (EMSD) regulates and monitors the safe operation of the railway system according to the Mass Transit Railway Ordinance and its subsidiary regulations. The Buildings Department (BD) regulates the planning, design and construction of buildings and associated works on private land to ensure compliance with building safety standards according to the Buildings Ordinance (BO). 4. To safeguard the structural safety of railway facilities, construction works located within the railway protection area as stipulated under Schedule 5 of the BO should comply with a more stringent set of standards. BD would require the registered building professionals responsible for the works to monitor the effect arising from the building works to the adjacent railway structures according to the requirements set out in the BO and its subsidiary regulations, and the “Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers” (PNAP) issued by BD.
    [Show full text]