Sung Wong Toi Station of the Tuen Ma Line Opens for Public Visit Today

Total Page:16

File Type:pdf, Size:1020Kb

Sung Wong Toi Station of the Tuen Ma Line Opens for Public Visit Today PR043/21 13 June 2021 Sung Wong Toi Station of the Tuen Ma Line Opens for Public Visit Today MTR Corporation welcomed more than 3,000 visitors, including around 400 participants from NGOs and community organisations invited by the Corporation at an Open Day at the new MTR Sung Wong Toi Station today (13 June 2021). Apart from familiarising themselves with the new station facilities and services, visitors could also appreciate the history of the Sung Wong Toi area and the station artwork “Earth Song” at the station. Sung Wong Toi Station and To Kwa Wan Station are the two new stations to open on the day of service commencement of the full Tuen Ma Line (“TML”) on 27 June 2021. Upon the commissioning of Sung Wong Toi Station, residents and members of the public will be able to enjoy the convenient access to be brought by the new all-weather underground pedestrian network linking to the centre of Kowloon City. There are also entrances/exits connecting with the Kai Tak Development Area ready for its future development. Some of the archaeological relics unearthed during the construction of Sung Wong Toi Station will be displayed in cabinets inside the station upon the service commencement of the full TML. An ancient stone well that was discovered will be reinstated in-situ in the future. Stickers are placed on the floor and at the ceiling of the station concourse to introduce the stone well and indicate its future location when reinstated. With 27 stations spanning a route length of approximately 56 km, the TML connects the east and the west of the New Territories and extends the railway network into the To Kwa Wan and Kowloon City area. Upon the opening on 27 June, passengers will be able to enjoy a more extensive, environmentally friendly railway network with six interchange stations connecting the TML to four existing railway lines including East Rail Line, Tsuen Wan Line, Kwun Tong Line, and Tung Chung Line. -End- About MTR Corporation Every day, MTR connects people and communities. As a recognised world-class operator of sustainable rail transport services, we are a leader in safety, reliability, customer service and efficiency. MTR has extensive end-to-end railway expertise with more than 40 years of railway projects experience from design to planning and construction through to commissioning, maintenance and operations. Going beyond railway delivery and operation, MTR also creates and manages dynamic communities around its network through seamless integration of rail, commercial and property development. With more than 40,000 dedicated staff*, MTR carries over 13 million passenger journeys worldwide every weekday in Hong Kong, the United Kingdom, Sweden, Australia and the Mainland of China. MTR strives to grow and connect communities for a better future. For more information about MTR Corporation, please visit www.mtr.com.hk. *includes our subsidiaries and associates in Hong Kong and worldwide .
Recommended publications
  • Rail Construction Commences
    Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations.
    [Show full text]
  • Nvironmental Management and Performance
    ENVIRONMENTAL MANAGEMENT AND PERFORMANCE LAND AND WATERBORNE TRANSPORT Hong Kong is one of the most densely populated cities in the world. A safe, efficient, reliable and environment friendly transport system is important to the sustainable development of the city. On environmental management, we will continue to press ahead with the following initiatives - priority for efficient and environment friendly transport modes; reduction in traffic congestion and better inter-modal co-ordination; greater emphasis on pedestrian facilities; and application of Information Technology (IT) to transport management. Priority for Efficient and Environment Friendly Transport Modes Railways are environment friendly, safe and efficient mass carriers in Hong Kong, carrying about 40% of our public transport passengers. At present, the total length of our railways under operation is about 219 km. We are taking forward the following five railway projects in full swing - West Island Line; South Island Line (East); Kwun Tong Line Extension; Shatin to Central Link; and Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link. 7 Upon completion of these railway passenger lines by 2020, the total length of railways in operation in Hong Kong will be increased to about 280 km. We launched the consultancy study on the Review and Update of the Railway Development Strategy 2000 in March 2011 to further our policy for better use of railways as the backbone of the passenger transport system. Development of rail transport will significantly speed up passenger flow, alleviate road traffic congestion and reduce vehicle-induced air pollution. The study is expected to be completed in 2013. The Government will continue with its efforts to enhance the co-ordination between railway and other public transport modes to avoid unnecessary duplication of public transport resources and alleviate traffic congestion.
    [Show full text]
  • South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
    THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2
    [Show full text]
  • Cb(4)360/20-21 (01)
    LC Paper No. CB(4)360/20-21 (01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Progress Update of the Construction of the Shatin to Central Link (As at 30 September 2020) (Translation) Introduction This paper reports to Members on the progress of the main construction works of the Shatin to Central Link (“SCL”) as at 30 September 2020. Background 2. SCL, with a total length of 17 kilometres, consists of the following two sections – (a) Tai Wai to Hung Hom Section: this is an extension of the Ma On Shan Line from Tai Wai via Southeast Kowloon to Hung Hom where it will join the West Rail Line; and (b) Hung Hom to Admiralty Section: this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. 3. There are ten stations in SCL. Apart from bringing improvements to the existing Tai Wai Station, the SCL project involves construction of new stations or extension of existing stations at Hin Keng, Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin, Hung Hom, the Hong Kong Convention and Exhibition Centre, and Admiralty. It is a territory-wide strategic railway project (alignment layout at Annex 1). Admiralty Station and Ho Man Tin Station will become integrated stations providing interchange service to passengers of East Rail Line, Tsuen Wan Line, Island Line and South Island Line (East)(“SIL(E)”), as well as passengers of Tuen Ma Line and Kwun Tong Line Extension (“KTE”) respectively. 4.
    [Show full text]
  • Hong Kong Government's Policy Address 2020
    Hong Kong Government’s Policy Address 2020 Key Takeaways primarily relevant to the Real Estate and Infrastructure sector November 25, 2020 Summary Authors/Presenters This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land Andrew MacGeoch and housing supply, infrastructure, the environment, Co-Author collaboration with the Greater Bay Area (“GBA”), and HK’s Partner and Regional Practice Group Leader - Real Estate ongoing role as an international financial center. We set Asia out a list of key takeaways below highlighting primarily Hong Kong [email protected] those aspects involving real estate and infrastructure. OPENING This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land and housing supply, infrastructure, the environment, collaboration with the Greater Bay Area (“GBA”), and HK’s ongoing role as an international financial center. We set Page 1 of 11 out a list of key takeaways below highlighting primarily those aspects involving real estate and infrastructure. LAND SUPPLY Increasing land supply is a top priority of the Government. Glenn Haley At present, the Government has identified new land supply Co-Author with a total area of 90 hectares along the Northern Link, Partner Hong Kong including the San Tin / Lok Ma Chau Development Node. [email protected] Further initiatives to support the increase of land supply include: Development of Siu Ho Wan Depot Site.
    [Show full text]
  • LC Paper No. PWSC81/20-21(01) - 2
    LC Paper No. PWSC81/20-21(01) - 2 - Encl. c.c.(w/e) Antiquities and Monuments Office (Attn: Ms. Susanna SIU) Architectural Services Department (Attn: Ms. Jackie LEE) Leisure and Cultural Services Department (Attn: Mr. Horman CHAN) Civil Engineering and Development Department (Attn: Mr. Ricky CHAN) Enclosure Legislative Council Public Works Subcommittee PWP Item 470RO – Lung Tsun Stone Bridge Preservation Corridor at Kai Tak Follow-up Actions arising from the Meeting held on 27 January 2021 The Public Works Subcommittee discussed the LegCo Paper No. PWSC(2020-21)31. In response to the request from the Chairman and Hon Junius HO Kwan-yiu, the Administration hereby provide the following supplementary information to elaborate the heritage and historic value of remnants of Lung Tsun Stone Bridge (LTSB), and how the proposed item of LTSB preservation corridor can effectively preserve and interprete its heritage and historical values. The relevant supplementary information is as follows: History of LTSB 2. Built between 1873 and 1875, Lung Tsun Stone Bridge (LTSB) was was originally about 210 meters in length and 2.6 to 4 meters in width (Photo 1). In 1892, a wooden extension of 80 metres was added by the local charity organisation Lok Sin Tong (樂善堂) after fund raising (Photo 2). In 1910, the timber extension of LTSB was replaced by a concrete structure, which was later modified to become the Kowloon City Pier. Part of LTSB was buried by the Kai Tack Bund reclamation carried out by the Government between 1916 and 1924 at the west shore of Kowloon Bay for property development.
    [Show full text]
  • Tfkt-04-2017
    Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of February 2017 (Paper No. TFKT/04/2017) Planning Vision/ Themes/ Initiatives Planning Vision A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing Kowloon East initiatives 2 Kai Tak Outline Zoning Plan San Po Kong Basic information: Site Area : ~ 320 ha Kowloon City Open Space : ~ 100 ha Waterfront : ~ 11 km Infrastructure works Kowloon Bay Total cost : more than HK$100B Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm Kwun Tong Legend : Kai Tak Land Use Zoning Kwun Tong Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project Stage 3B Infrastructure Works at North Apron 新蒲崗 CEDD (2020) Reconstruction and San Po Kong Upgrading of Kai Tak Nullah CEDD (2018) Stage 3A Infrastructure Works at North Apron 九龍城 CEDD (2017) Stage 5A InfrastructureKowloon Works City at North Apron CEDD (2020) Stage 1 & 2 Infrastructure Works at North Apron CEDD (2013 & 2015) Shatin to Central Link HyD (2019) 啟德發展區 Kai Tak Development 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North
    [Show full text]
  • Of Kowloon's Uncrowned Kings and True Recluses
    ART RESEARCH SPECIAL ISSUE vol.1 Of Kowloon’s Uncrowned Kings and True Recluses: Commemoration, Trace, and Erasure, and the Shaping of a Hong-Kong-topia Of Kowloon Of from Chen Botao (1855–1930) to Tsang Tsou-choi (1921–2007) Shao-Lan Hertel (Tsinghua University Art Museum) E-mail: [email protected] ’ s Uncrowned Kings and Recluses: True Commemoration, and Trace, Erasure, and the Shaping of a abstract Whether as political exile for yimin-loyalists of the Qing dynasty, migrant destination for Chinese Mainlanders seeking work, or global hub for cultural exchangesthe topia of Hong Kong can be defined as both periphery and center; moreover: “The significance of Hong Kong art from the perspective of twentieth-century China is its identity as the exception” (Tsong-zung Johnson Chang). While the specificity of Hong Kong art lies in its intrinsically heterotopic condition, defying any fixed definition or essentialist narrative, an overarching recurrence within art discourse is a distinct sense of place and time; a consciousness that has shaped Hong Kong identity in the collective imagination over time. Against this backdrop, this essay explores the art-historical, -geographical, and -political landscape of Hong Kong through the lens of local artists active from the early twentieth century on, focusing on Tsang Tsou-choi (1921–2007), the “King of Kowloon,” known for his once ubiquitous street graffiti calligraphy marking the public spaces of Hong Kong; and further, literati-poet Chen Botao (1855–1930), the self-proclaimed “True Recluse of Kowloon,” who founded a loyalist tradition of “Exile Poetics” based on Song-dynasty poetry.
    [Show full text]
  • TFKT/02/2018 on 29 March 2018
    Task Force on Kai Tak Harbourfront Development For information TFKT/02/2018 on 29 March 2018 Kai Tak Development Progress Report as of February 2018 PURPOSE This report updates Members on the general progress of Kai Tak Development (KTD). BACKGROUND 2. KTD, covering an area of over 320 hectares, is a mega-sized and highly complex development project in the urban area offering a unique opportunity for transforming the ex-airport site for the future growth of Hong Kong, and at the same time providing an impetus for stimulating regeneration of the adjoining older districts. It also forms part of the Energizing Kowloon East initiative of transforming the industrial areas at Kowloon Bay and Kwun Tong together with KTD into another Core Business District (CBD). A master development plan1 was drawn up in early 2009 for the phased implementation of KTD projects. KTD has already witnessed the completion of various projects starting from 2013. CURRENT SITUATION 3. Given the scale and complexity of KTD, the project is being implemented in phases. Projects and development includes the Kai Tak Cruise Terminal Building and its two berths, Kai Tak Fire Station cum Ambulance Depot, public rental housing, Trade and Industry Tower, two primary schools, Kai Tak Cruise Terminal Park, Kwun Tong Promenade, Runway Park Phase I, Phase 1 improvement works at Kai Tak Approach Channel and Kwun Tong Typhoon Shelter, early phases of District Cooling System (DCS) and associated infrastructure works, all of which have been 1 Please refer to Legislative Council paper No. CB(1)570/08-09(03) for discussion at the Panel on Development on 20 January 2009.
    [Show full text]
  • Full Tuen Ma Line Sets to Connect the East and West of the New Territories Bringing Kowloon City and to Kwa Wan Into the Railway Network
    PR046/21 26 June 2021 Full Tuen Ma Line Sets to Connect the East and West of the New Territories Bringing Kowloon City and To Kwa Wan into the Railway Network The full Tuen Ma Line (“TML”) will commence service tomorrow (27 June 2021), ushering in a new phase of railway transportation in Hong Kong, with the east and west ends of the New Territories being connected by a single line. Accompanied by Chairman of MTR Corporation Dr Rex Auyeung, Chief Executive of the Hong Kong Special Administrative Region, Mrs Carrie Lam Cheng Yuet-ngor, GBM, GBS, today (26 June 2021) officiated at the TML launch in Sung Wong Toi Station, where she also unveiled the in-station exhibition of relics discovered during the excavation for the station. The full TML sees the extension of the existing TML Phase 1 from Kai Tak Station to Hung Hom Station via two newly-built stations, Sung Wong Toi and To Kwa Wan, via Ho Man Tin Station finally connecting to what is currently known as the West Rail Line. With 27 stations along a route length of approximately 56 kilometres, the full TML will be the longest railway line in Hong Kong. As Kowloon City and To Kwa Wan become reachable by railway service, those who live and work along the alignment will enjoy greater ease of travel, and the communities around the stations will also gain new impetus for growth and development. Dr Rex Auyeung, Chairman of MTR Corporation said, “TML is a railway line that will benefit everybody in Hong Kong.
    [Show full text]
  • LC Paper No. CB(4)1029/20-21(01)
    LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach.
    [Show full text]
  • PR003/20 17 January 2020 Tuen Ma Line Phase 1 Commences Service
    PR003/20 17 January 2020 Tuen Ma Line Phase 1 commences service on 14 February 2020 The MTR Corporation is making its final preparation for the opening of Tuen Ma Line (“TML”) Phase 1 on 14 February 2020, commencing services at three new stations, namely Hin Keng Station, the expanded part of Diamond Hill Station and Kai Tak Station. The MTR Corporation will provide special fare promotions for TML Phase 1. Upon the opening of TML Phase 1, passengers travelling on the Ma On Shan Line (“MOL”) will be able to travel to Kai Tak Station in East Kowloon via Hin Keng Station and Diamond Hill Station without the need to interchange. The expanded Diamond Hill Station will become a new interchange station between TML and the Kwun Tong Line, allowing passengers to travel from the New Territories (NT) North and NT East districts to the East Kowloon and Hong Kong Island East districts in a more efficient and convenient manner. Such new routing will help relieve the current peak passenger load between Tai Wai and Kowloon Tong Stations on the East Rail Line. At the end of January, all passenger trains on the MOL will carry out non-passenger trains testing along the new railway section, i.e. between Hin Keng and Kai Tak Stations. Train frequency of the MOL during peak hours will be slightly adjusted to around 3.5 minutes intervals, similar to the operation arrangements upon TML Phase 1 Opening. Passengers are reminded to pay attention to our announcement and arrangements. The timing for the full opening of TML would depend on the implementation of the suitable measures at Hung Hom Station extension and its connecting structures, and is expected to take place in 2021.
    [Show full text]