Nvironmental Management and Performance
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Railway Network
Railway Network Railways play a vital role in serving the transport needs of COVID-19 pandemic. By end 2020, the AEL carries about Hong Kong. They account for about 39 per cent of domestic 8 400 passenger trips per day. public transport by end 2020. Light Rail: Light Rail is a local transportation network Existing Network: The existing railway network in Hong which started operation in 1988 to meet the transport needs of Kong has a total route length of about 263 kilometres. The the residents in the northwest New Territories. It now has a Legislative Council passed in June 2007 the Rail Merger route length of about 36 km with 68 stops. By end 2020, it Ordinance which provides the legal framework for the carries an average of about 305 600 passenger trips every post-merger corporation to operate both the Mass Transit day. It has four interchange stations in Yuen Long, Tin Shui Railway (MTR) system and Kowloon-Canton Railway (KCR) Wai, Siu Hong and Tuen Mun to facilitate passenger system. The post-merger Corporation, i.e. the MTR interchange between the Light Rail and West Rail Line Corporation Limited (MTRCL) has been granted a 50-year networks. franchise to operate the MTR and KCR systems with effect from December 2, 2007. Other fixed track systems include the Hong Kong Section of Guangzhou-Shenzhen-Hong Tramway and the Peak Tram. Kong Express Rail Link (XRL): The Hong Kong section of the XRL, commissioned in September 2018, is a 26-km long MTR: MTR is a heavily patronized railway network underground rail corridor connecting Hong Kong with the consisting of 10 heavy rail lines, Airport Express and the Hong national high-speed rail network. -
Barrier Free Conditions of Mass Rapid Transit Stations in Hong Kong
View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Muroran-IT Academic Resource Archive Barrier Free Conditions of Mass Rapid Transit Stations in Hong Kong 著者 OSAKAYA Yoshiyuki, AOYAMA Takeshi, RATANAMART Suphawadee journal or Proceedings of TRANSED 2010 publication title volume 2010 number A078 page range 1-10 year 2010-06-02 URL http://hdl.handle.net/10258/1148 Barrier Free Conditions of Mass Rapid Transit Stations in Hong Kong 著者 OSAKAYA Yoshiyuki, AOYAMA Takeshi, RATANAMART Suphawadee journal or Proceedings of TRANSED 2010 publication title volume 2010 number A078 page range 1-10 year 2010-06-02 URL http://hdl.handle.net/10258/1148 BARRIER FREE CONDITIONS OF MASS RAPID TRANSIT STATIONS IN HONG K ONG Osakaya Yoshiyuki ,Muroran Institute of Technology Muroran ,Japan ,E-mail : osakaya@mmm .muroran-i t. ac .jp Aoyama Takeshi ,Muroran City Council Muroran ,Japan ,E-mail : t-aoyama@beige .plala .or .jp Ratanamart Suphawadee , King Mongkut Institute of Technology Ladkrabang Bangkok ,Thailand ,E-mail : nuibooks@yahoo .com SUMMARY In In Hong Kong ,it is estimated that aging will be rapidly going on after 2010 Increase Increase of the elderly means increase of the disabled . In Hong Kong , there are 3 KCR lines (East Li ne ,West Li ne and Ma On Shan Li ne) and 7 MTR lines (Kwun Tong Li ne ,Tsuen Wan Li ne , Island Li ne ,Tsueng Wan 0 Li ne ,Tung Chung Li ne , Airport Airport Li ne and Disneyland Li ne) in 2006 This This study firstly made the actual conditions of barrier free at all 81 stations clear It It secondly made problems clear . -
Announcement of Unaudited Results for the Six Months Ended 30 June 2020
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. MTR CORPORATION LIMITED 香港鐵路有限公司 (the “Company”) (Incorporated in Hong Kong with limited liability) (Stock code: 66) ANNOUNCEMENT OF UNAUDITED RESULTS FOR THE SIX MONTHS ENDED 30 JUNE 2020 RESULTS Six months ended 30 June HK$ million 2020 2019 Change Revenue from recurrent businesses 21,592 28,272 -23.6% Profit from recurrent businesses^ 433 2,665 -83.8% Profit from property development 5,200 775 +571.0% Investment property revaluation (loss) / gain (5,967) 2,066 n/m Net (loss) / profit attributable to shareholders of the Company (334) 5,506 n/m ^ : including share of profit /( loss) of associates and joint venture n/m : not meaningful - Interim ordinary dividend of HK$0.25 per share declared (with scrip dividend alternative) HIGHLIGHTS Hong Kong Businesses - Hong Kong transport operations, station commercial and property rental businesses have been significantly and adversely affected as a result of the COVID-19 pandemic. Various relief measures have been offered to our passengers as well as tenants to ease their financial burden during the pandemic - In spite of the pandemic, train service delivery and passenger journeys on-time in our heavy rail remained at 99.9% world-class level - Tuen Ma Line Phase 1 was opened in February 2020. -
Whole Fruit Address Store List
Whole Fruit Address Store List Shop C, G/F., Elle Bldg., 192-198 Shaukiwan Road, Shaukiwan, HK Shop 3 & 4 Yue Fung House, Yue Wan Estate, HK Shop 120 & Portion of Shop 119 Level 1, New Jade Shopping Arcade, Chai Wan, HK Shop E, G/F, Hing Cheung Building, 15-31 Shaukiwan Road, HK Shop A, G/F, Healthy Village, 180-182 Tsat Tsz Mui Rd, Podium Lvl, NP, HK G/F & C/L, Siu King Bldg., 14-16 Tsat Tsz Mui Rd, North PoiN.T., HK G/F., 98 Electric Road, North PoiN.T., HK Shop G14 on G/F., Fu Shan Mansion, Stage III, Tai Koo Shing, HK Shop No.47 + 48, Harmony Garden, 9 Siu Sai Wan Road, Chai Wan, HK Shop C,D,E & F, G/F., 8 North PoiN.T. Road, North PoiN.T., HK G/F., Shop 3, Hing Wah Shopping CeN.T.re, Hing Wah Estate, Chai Wan, HK Shop No.G5, G/F., Fok Cheong Building, Nos.1032-1044 King's Rd., HK G/F., King's Road 963A, Quarry Bay, HK Shop 6 G/F, Home World, ProvideN.T. CeN.T.re, 21-53 Wharf Rd, North PoiN.T., HK Shop 3, G/F., Youth Outreach Jockey Club Building,1-18 Hing Man Street, Shaukeiwan, HK Shop No.1 on Lower Ground Floor, Braemar Hill Shopping CeN.T.re, No.45 Braemar Hill Road, Braemar Hill, HK Shop GC04, G/F., Lei King Wan, Site C, 35 Tai Hong Street, HK Shop C & D, G/F, Yan Wo Building, 70 Java Road, North PoiN.T., HK Shop No. -
October 2019
News October 2019 Ladbroke Grove Resilience Back to basics what have we learnt and the digital railway fundamentals of train control systems back to business Saying goodbye to summer is always hard but why not get back to business and improve your existing knowledge or start afresh as a signalling engineer. Here at Signet Solutions we've got courses to suit all! Our training school is here to offer excellent value for money, training to meet each customer’s requirements, and not to mention fully qualified and competent trainers to ensure each trainee’s needs are met...what more could you want? Take a look online at our courses coming up, our friendly staff will be happy to give you all the information you’ll need when booking a course. +44 (0)1332 343 585 [email protected] www.signet-solutions.com back to business People resilience Issue 259 This month’s IRSE News features a number of articles exploring the topic of engineering resilience. Resilience on the railway can mean the ability to keep the October 2019 railway running during equipment failure, or during environmental events such as bad weather, but it can also mean the ability to cope with changes in the workforce and the skillsets expected of them. Resilience also applies to human health with In this issue evidence showing that serious harm to physical and mental well-being can be caused by stress at work. A recent newspaper article claimed that the incidence of mental issues in the Feature articles construction industry is greater than average, with suicides occurring in extreme cases. -
Building on Strength Interim Report 2009 Vision We Aim to Be a Globally Recognised Leader That Connects and Grows Communities with Caring Service
Building on Strength Interim Report 2009 Vision We aim to be a globally recognised leader that connects and grows communities with caring service. Mission • Enhance customers’ quality of life and anticipate their needs. • Actively engage in communities we serve. • Foster a company culture that staff can learn, grow and take pride in. • Provide sustainable returns to investors. • Set ourselves new standards through innovation and continuous improvement. • Grow in Hong Kong, Mainland of China and capture opportunities in Europe by extending our core competencies. Values • Excellent Service • Mutual Respect • Value Creation • Enterprising Spirit Highlights Financial Operational • Financial results resilient despite economic downturn, • Merger synergies ahead of schedule and on track to with revenue increasing 1.2% to HK$8,630 million and achieve HK$450 million per year within 2009 EBITDA increasing marginally to HK$4,799 million • Patronage of Domestic Service increased 0.3%; Cross- • Property development profit of HK$2,147 million boundary and Airport Express decreased 0.4% and 11.5% respectively • Profit from underlying businesses (i.e. net profit attributable to equity shareholders, excluding • About 85% of the 2,169 units of Lake Silver have been investment property revaluation and related deferred sold while all 1,688 units of Phase A of Le Prestige have tax) increased 43% to HK$3,903 million been sold • Net profit attributable to equity shareholders • Project Agreement signed for West Island Line (including investment property revaluation) -
Hung Hom Station to Transform Into an Upgraded Interchange Hub New Interchange Arrangements for the East Rail Line and West Rail Line
PR040/21 7 June 2021 Hung Hom Station to Transform into an Upgraded Interchange Hub New Interchange Arrangements for the East Rail Line and West Rail Line The new Tuen Ma Line (“TML”) platform at Hung Hom Station (“HUH”) will be opened on 20 June 2021 (Sunday), i.e. one week before the commissioning of TML, and new interchange arrangements for the West Rail Line (“WRL”) and the East Rail Line (“EAL”) will be in place on the same day. A series of upgrading works, including the construction of new platforms, have been implemented at HUH to cope with the full opening of the TML, as well as the commissioning of the Cross-Harbour Section of EAL. The new platforms will be put into service in phases according to the progress of the two projects. While the Cross-Harbour Section of EAL is still under construction, upon the opening of the new TML platform at HUH, passengers have to pass through the concourse to reach the existing EAL platform and the WRL (future TML) platform for changing between EAL and WRL (future TML) at HUH. (Please refer to annex for details). Passengers will have to follow the new interchange arrangements until the commissioning of the Cross-Harbour Section of EAL and the full launch of the new two-level platforms at HUH. By then passengers will be taking the EAL and TML at the new platforms. “Signage with colours corresponding to the relevant rail lines will be installed to direct passengers to the platforms they want to go to. We will also deploy additional staff, put up notices and make public announcements to assist and remind passengers of the new arrangements. -
LC Paper No. CB(4)1029/20-21(01)
LC Paper No. CB(4)1029/20-21(01) Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Operating Arrangements for the Tuen Ma Line (Translation) Introduction The Tuen Ma Line (“TML”) under the Shatin to Central Link (“SCL”) project will be commissioned on 27 June 2021. This paper informs Members of the operating arrangements for the TML. Background 2. The SCL project consists of two Sections: (a) the Tai Wai to Hung Hom Section comprising the stations of Tai Wai, Hin Keng, expanded Diamond Hill, Kai Tak, Sung Wong Toi, To Kwa Wan, Ho Man Tin and expanded Hung Hom. This section will join the original Ma On Shan Line and the existing West Rail Line to form the TML, while the TML Phase 1 (“TML1”), comprising the section between Tai Wai and Kai Tak, was commissioned in February 2020; and (b) the Hung Hom to Admiralty Section comprising the stations of expanded Hung Hom, Exhibition Centre and expanded Admiralty – this is an extension of the East Rail Line from Hung Hom across the Victoria Harbour to Wan Chai North and Admiralty. The alignment of the TML and updated MTRCL route map are at Annex 1. 3. The SCL is funded and owned by the Government under the concession approach. In preparation for the commissioning of the TML, the Government, the Kowloon-Canton Railway Corporation (“KCRC”) and the MTR Corporation Limited (“MTRCL”) make an arrangement similar to that of the commissioning of the TML1 in February 2020. Prior to the commissioning of the TML, the Government will vest the TML in KCRC which is wholly owned by the Government and then KCRC will grant the right to operate the TML to MTRCL under the service concession approach. -
Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line on 17 September 2019
港鐵東鐵綫 紅磡站列車出軌事故 技術調查報告 Technical Investigation Report on Train Derailment Incident at Hung Hom Station on MTR East Rail Line 事故日期︰2019 年 9 月 17 日 Date of Incident : 17 September 2019 英文版 English Version 出版日期︰2020 年 3 月 3 日 Date of Issue: 3 March 2020 CONTENTS Page Executive Summary 2 1 Objective 3 2 Background of Incident 3 3 Technical Details Relating to Incident 4 4 Incident Investigation 8 5 EMSD’s Findings 19 6 Conclusions 22 7 Measures Taken after Incident 22 Appendix I – Photos of Wheel Flange Marks, Broken Rails, Rail Cracks and Damaged Point Machines On-Site 23 1 Executive Summary On 17 September 2019, a passenger train derailed while it was entering Platform No. 1 of Hung Hom Station of the East Rail Line (EAL). This report presents the results of the Electrical and Mechanical Services Department’s (EMSD) technical investigation into the causes of the incident. The investigation of EMSD revealed that the cause of the derailment was track gauge widening1. The sleepers2 at the incident location were found to have various issues including rotting and screw hole elongation, which reduced the strength of the sleepers and their ability to retain the rails in the correct position. The track gauge under dynamic loading of trains would be even wider, and this excessive gauge widening caused the train to derail at the time of incident. After the incident, MTR Corporation Limited (MTRCL) have reviewed the timber sleeper condition across the entire EAL route and replaced the sleepers of dissatisfactory condition. MTRCL were requested to enhance the maintenance regime to closely monitor the track conditions with reference to relevant trade practices to ensure railway safety. -
PR003/20 17 January 2020 Tuen Ma Line Phase 1 Commences Service
PR003/20 17 January 2020 Tuen Ma Line Phase 1 commences service on 14 February 2020 The MTR Corporation is making its final preparation for the opening of Tuen Ma Line (“TML”) Phase 1 on 14 February 2020, commencing services at three new stations, namely Hin Keng Station, the expanded part of Diamond Hill Station and Kai Tak Station. The MTR Corporation will provide special fare promotions for TML Phase 1. Upon the opening of TML Phase 1, passengers travelling on the Ma On Shan Line (“MOL”) will be able to travel to Kai Tak Station in East Kowloon via Hin Keng Station and Diamond Hill Station without the need to interchange. The expanded Diamond Hill Station will become a new interchange station between TML and the Kwun Tong Line, allowing passengers to travel from the New Territories (NT) North and NT East districts to the East Kowloon and Hong Kong Island East districts in a more efficient and convenient manner. Such new routing will help relieve the current peak passenger load between Tai Wai and Kowloon Tong Stations on the East Rail Line. At the end of January, all passenger trains on the MOL will carry out non-passenger trains testing along the new railway section, i.e. between Hin Keng and Kai Tak Stations. Train frequency of the MOL during peak hours will be slightly adjusted to around 3.5 minutes intervals, similar to the operation arrangements upon TML Phase 1 Opening. Passengers are reminded to pay attention to our announcement and arrangements. The timing for the full opening of TML would depend on the implementation of the suitable measures at Hung Hom Station extension and its connecting structures, and is expected to take place in 2021. -
MTR's Experiences in PPP for Railway Projects
MTR’s Experiences in PPP for Railway Projects Dr Jacob Kam Managing Director – Operations & Mainland Business 11 May 2017 MTR Businesses in China and Overseas 港铁公司在国内及海外的铁路业务 Line 4 & Daxing Line 1.881 Mil Line 14, Line 16 113.4 km Elizabeth Line Stockholm Metro 14.2k 1.228 mil 32.5 km 110km South Western rail Contract started MTR Express Hangzhou Metro Line 537k 53.7km from Aug 2017 455km(shared track) 1 and Ext Shenzhen Metro 550k Stockholm Hong Kong MTR Line 4 and Ext Commuter rail 20.5km 8.6 mil 34.3k 266 km 241 km Sydney Metro 36 km North West Under construction Melbourne Metro • Over 1,200km route length (exclude shared track) • Over 14 Million Passenger trips per weekday (using line based counting) 812k • Line based passenger trips do not match with the passenger trip data in annual report 390km MTR Corporation 5/16/2017 Page 2 Why cities need railways? • High capacity • High energy efficiency, low carbon emission In persons per hour in both direction Source: UITP MTR Corporation 5/16/2017 Page 3 Why cities need railways? Effective land use Modal Bus Rapid Bus Tram Light Rail Metro Characteristics Transit Max Flow 2,500 6,000 12,000 18,000 30,000 & above (per hour per direction) Average speed 10-14 15-22 15-22 18-40 18-40 (kph) Reliability Improving Good Medium to Good Good Very Good Mixed running Largely Road-space Mixed running Totally segregated and on-road tram segregated Totally segregated with traffic alignment Allocation lanes alignments All underground: Land Consumed 15 – 25 times 10 – 15 times 5 – 10 times 3 – 6 times 1 -
The Arup Journal
KCRC EAST RAIL EXTENSIONS SPECIAL ISSUE 3/2007 The Arup Journal Foreword After 10 years' planning, design, and construction, the opening of the Lok Ma Chau spur line on 15 August 2007 marked the completion of the former Kowloon Canton Railway Corporation's East Rail extension projects. These complex pieces of infrastructure include 11 km of mostly elevated railway and a 6ha maintenance and repair depot for the Ma On Shan line, 7.4km of elevated and tunnelled route for the Lok Ma Chau spur line, and a 1 km underground extension of the existing line from Hung Hom to East Tsim Sha Tsui. Arup was involved in all of these, from specialist fire safety strategy for all the Ma On Shan line stations, to multidisciplinary planning, design, and construction supervision, and, on the Lok Ma Chau spur line, direct work for a design/build contractor. In some cases our involvement went from concept through to handover. For example, we were part of a special contractor-led team that carried out a tunnel feasibility study for the Lok Ma Chau spur line across the ecologically sensitive Long Valley. At East Tsim Sha Tsui station we worked closely with the KCRC and numerous government departments to re-provide two public recreation spaces - Middle Road Children's playground at the foot of the historic Signal Hill, and Wing On Plaza garden - examples that show the importance of environmental issues for the KCRC in expanding Hong Kong's railway network. This special issue of The Arup Journal is devoted to all of our work on the East Rail extensions, and our feasibility study for the Kowloon Southern Link, programmed to connect West Rail and East Rail by 2009.