Spain Asset Portfolio Key figures and location
DECEMBER, 2018 Index
1. SPAIN Footprint 03 2. ASSETS 04 Toll Roads Ports | Railways 06 Office Locations 10
2 Spain | Concessions
Toll Roads
Infrastructure Km Stake % Managed Investment* Status
A-2 Highway Section 1 56.0 20 205 Mn € Operation
M-45 Highway Section 3 8.3 100 96 Mn € Operation
Ports
Infrastructure Ha Stake % Managed Investment* Status
Port of Alicante 36.5 100 117 Mn € Operation
Port of Tenerife 15.3 100 62 Mn € Operation
Railways
Infrastructure Km Stake % Managed Investment* Status
West Light Rail Lines 22.4 23 597 Mn € Operation
* Total managed investment as of December, 31 2018.
3 Spain | Toll Roads
Autovía de Aragón Tramo 1, S.A. A-2 Highway, Section 1
20 % Stake
Ministry of Public Works Client
56 km Length
€ 205 Mn € Investment
113,935 (average daily intensity) AADT
Concession term: 19 years. Contract term: December 2007 – December 2026
4 Spain | Toll Roads
Euroglosa 45, C.C.A. de Madrid, S.A. M-45 Highway, Section 3
100 % Stake
Community of Madrid Client
8.3 km Length
€ 96 Mn € Investment
95,592 (average daily intensity) AADT
Concession term: 29 years. Contract term: October 1998 – December 2027
5 Spain | Ports
Terminales Marítimas del Sureste, S.A. TMS. Port of Alicante
100 % Stake
Alicante Port Authority Client
36.5 ha of esplanade 1,670 m of berthing line Surface area
€ 117 Mn € Investment
95,557 MOV 2 Post Panamax Cranes 3 Transtainers Kone 7 Reach Stackers Kone Machinery 16 Mafis / Tractors 11 Platforms 4 Forklift Concession term: 42 years. Contract term: June 2003 – July 20147 6 Spain | Ports
Terminal de Contenedores de Tenerife, S.A. TCTenerife. Port of Tenerife
100 % Stake
Santa Cruz de Tenerife Port Authority Client
15.3 ha of esplanade 700 m of berthing line Surface area
€ 62 Mn € Investment
238,118 MOV 6 Over Post Panamax Cranes 8 RTG Machinery 3 Reach Stackers 12 Maffis 12 Platforms Concession term: 42 years. Contract term: May 2012 – May 2054
7 Spain | Railways
Metro Ligero Oeste, S.A. West Light Rail Lines ML2 & ML3
23 % Stake
Community of Madrid Client
22,4 km Length
€ 597 Mn € Investment
18,725 (average daily passengers) Passengers
Concession term: 30 years. Contract term: September 2006 – September 2036
8 Spain| Other map resources
Spain| Toll Roads Spain | Metropolitan Area & Henares Corridor
9 Office Locations
ALEATICA SPAIN Paseo de la Castellana, 259 D Torre Espacio 28046 Madrid – ESPAÑA Telephone: +34 91 348 41 00 [email protected] aleatica.com
ALEATICA Labs Calle Caleruega 102, Edificio Anexo 1ª Planta 28033 Madrid – España Telephone: +34 91 348 78 38 [email protected] aleaticalabs.com aleatica.com