Agenda • an Overview of the Construction Schedule, Sequence and Phasing of Work on the Portion of East Link Comprised of 5-7 P.M

Total Page:16

File Type:pdf, Size:1020Kb

Agenda • an Overview of the Construction Schedule, Sequence and Phasing of Work on the Portion of East Link Comprised of 5-7 P.M CENTRAL BELLEVUE CONSTRUCTION OPEN HOUSE EAST LINK EXTENSION The purpose of tonight’s meeting is to provide: Agenda • An overview of the construction schedule, sequence and phasing of work on the portion of East Link comprised of 5-7 p.m. Open House the East Main, Bellevue Downtown, Wilburton and Spring Meet with project staff and review District/120th Stations. information about the construction schedule, sequence and phasing. • A chance to talk with the central Bellevue project team and meet the Contractor that will build the central Bellevue 5:30 p.m. Presentation portion of the East Link project. 7 p.m. Meeting adjourns 5/ 17 LIGHT RAIL ALIGNMENT EAST LINK EXTENSION Length: 14 miles Redmond Technology Center P NE 40th Ride times: • Mercer Island Overlake to University of 520 Spring District/ Village Washington: 20 minutes 120th P • East Main to Westlake: Bel-Red/ 21 minutes Wilburton Ave NE 152nd 130th Lake NE 8th St • Redmond Technology Washington NE 6th St Bellevue Center to Bellevue Downtown Downtown: 10 minutes East Main Main St Rider projection: About 50,000 riders will use East Intl District/ Judkins Link every day by 2030 Chinatown Park Mercer Island Budget: $2.8 billion P Rainier Ave S P South Bellevue (2010 $) Start of service: 23rd Ave S Targeted 2023 77th Ave SE 80th Ave SE 2006-2011 2011-2015 2015 2016-2022 Targeted 2022 Targeted 2023 Planning and Start of Heavy civil Testing and East Link environmental Final design advanced utility construction pre-operations in service review relocation 5/ 17 CENTRAL BELLEVUE OVERVIEW EAST LINK EXTENSION Highlights: • Four stations including the East Main, Bellevue Downtown, Wilburton and Spring District/120th stations. • Nearly two miles of new light rail including at-grade track, track within a tunnel and track on an elevated structure, which includes the segment that will allow light rail to cross over I-405. Travel times • East Main to University of Washington Station: 28 minutes • Bellevue Downtown to Westlake Station: 24 minutes • Wilburton to Redmond Technology Center Station: 9 minutes • Spring District/120th to Stadium Station: 30 minutes 5/ 17 LIGHT RAIL CONSTRUCTION IN CENTRAL BELLEVUE EAST LINK EXTENSION Spring District/120th 5 120th Ave SE NE 12th St 6 NE 12th St Bellevue Way 108th Ave SE NE Bel-Red Rd Lake Bellevue 124th Ave SE 124th Wilburton NE 8th St 4 NE 8th St Bellevue 3 The Central Bellevue portion of the project NE 6th St Downtown breaks construction into six distinct areas: 116th Ave SE 116th • Area 1: East Main Station • Area 2: South tunnel portal and downtown NE 4th St Bellevue tunnel • Area 3: North tunnel portal, City Hall Downtown Park parking garage and Bellevue Downtown Station area 2 • Area 4: Elevated light rail structure and Wilburton Station area Main St • Area 5: At-grade track area near NE 12th St Map key • Area 6: Spring District/120th Station area Station Ave SE 112th Surface route East Main Tunnel route Wilburton Hill Park Elevated route 1 Retained cut/fill 5/ 17 AREA 1: EAST MAIN STATION EAST LINK EXTENSION Key construction elements Main St 108th Ave SE Ave SE 110th Ave SE 112th • Structure demolition • East Main Station SE 2nd St • New crosswalk on 112th Avenue SE East Main Map key Station 1 Surface route Typical work hours: Tunnel route SE 4th St Monday-Friday, 7 am-6 pm Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 Site preparation, clearing and demolition of structures Utility work Construction of infrastructure, East Main Station, track and amenities Light rail systems installation, testing and certifications Light rail stations open and service begins 5/ 17 AREA 2: SOUTH TUNNEL PORTAL AND DOWNTOWN BELLEVUE TUNNEL EAST LINK EXTENSION Bellevue Downtown Key construction elements • Tunnel finishes NE 4th St Downtown • Traction power substation Bellevue tunnel • New, two-acre Main Street Park (currently under construction) at the south tunnel portal NE 2nd St 2 Map key Station Main St 112th Ave SE 112th Surface route Typical work hours: Tunnel route Elevated route Monday-Friday, 7 am-6 pm Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 Demolition of temporary sound wall Utility work Construction of infrastructure and amenities Light rail systems installation, testing and certifications Light rail stations open and service begins 5/ 17 AREA 3: NORTH TUNNEL PORTAL, CITY HALL AND THE BELLEVUE DOWNTOWN STATION EAST LINK EXTENSION 108th Ave SE 110th Ave SE 110th Key construction elements NE 8th St • North tunnel portal Bellevue 3 • Bellevue Downtown Station Downtown • Reconfigured Bellevue City Hall NE 6th St plaza and garage • New crosswalk on 110th Avenue NE 112th Ave SE 112th Map key Station Tunnel route NE 4th St Typical work hours: Elevated route Monday-Friday, 7 am-6 pm Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 Site preparation, clearing and demolition of select City Hall infrastructure Utility work Construction of infrastructure, Bellevue Downtown Station, reconfigured Bellevue City Hall garage and amenities Construction of north tunnel portal Light rail systems installation, testing and certifications Light rail stations open and service begins North tunnel portal construction – traffic control This summer, Sound Transit will begin a long-term closure of a portion of 110th Avenue NE between NE 4th and NE 6th streets in order to construct the north tunnel portal near Bellevue City Hall. As early as this August, the closure on 110th Avenue NE will begin and occur in multiple phases: • Phase 1 (approximately Summer 2017 – Spring 2018): scheduled to last approximately nine months, phase 1 will require the closure of all lanes on 110th Avenue in the work area (illustrated in the graphic) from NE 6th Street to just north of the entrance to the City Center garage. • Phase 2 (approximately Spring 2018 – Winter 2018): one lane of traffic will be reopened in both the north and southbound direction. • Phase 3 (approximately Winter 2018 – Spring 2019): phase 3 will require a full closure of all lanes on 110th Avenue in the work area (illustrated in the graphic) as utilities are reinstalled and the roadway is restored. 5/ 17 AREA 4: ELEVATED LIGHT RAIL STRUCTURE AND WILBURTON STATION EAST LINK EXTENSION Map key Station Ave SE 116th 112th Ave SE 112th NE 12th St Key construction elements Surface route Tunnel route • Structure demolition Elevated route Retained cut/fill • Elevated light rail construction Lake Bellevue including a long-span over I-405 NE 10th St 110th Ave SE 110th • Sturtevant Creek pedestrian bridge • Wilburton Station Wilburton 4 NE 8th St 120th Ave SE 120th Typical work hours: Monday-Friday, 7 am-6 pm NE 6th St Work in area 4 will require night and weekend construction during select Bellevue Downtown time periods Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 Site preparation, clearing and demolition of structures Utility work Construction of infrastructure, Wilburton Station, elevated track and amenities Light rail systems installation, testing and certifications Light rail stations open and service begins Elevated guideway construction Nearly 40 columns will be constructed to support the elevated guideway that will cross I-405 and transport riders between the Bellevue Downtown and Wilburton stations. Typical elevated guideway construction consists of: 1. Drilling shafts for column foundations 2. Installing columns 3. Building the guideway, bridge spans and rail A long-span aerial guideway will be constructed to cross I-405. This work will require nighttime construction to build and remove temporary construction support and is anticipated to commence in mid-2018. After completion of the temporary construction support, work will resume during daytime hours. Additional night work will be necessary to set precast girders for the NE 8th Street crossing. 5/ 17 AREA 5: AT-GRADE TRACK NEAR NE 12TH ST EAST LINK EXTENSION 116th Ave SE 116th Key construction elements Spring • Traction power substation District/120th • Coordination with City of Bellevue’s Spring Boulevard project • Interface with Sound Transit’s 5 120th Ave SE Operations and Maintenance Map key Facility: East project Station NE 12th St Surface route Tunnel route Typical work hours: Elevated route Retained cut/fill Monday-Friday, 7 am-6 pm Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 Site preparation, clearing and demolition of existing BNSF track Utility work Construction of infrastructure, track and amenities Light rail systems installation, testing and certifications Light rail stations open and service begins 5/ 17 AREA 6: SPRING DISTRICT/120TH STATION EAST LINK EXTENSION Spring District/120th Key construction elements • Spring District/120th Station • Coordination with City of Bellevue’s 124th Ave SE 124th 120th and 124th Avenue overpass 120th Ave SE Map key projects Station Surface route Tunnel route 6 Elevated route Typical work hours: Retained cut/fill Lake Monday-Friday, 7 am-6 pm Bellevue NE 12th St NE Bel-Red Rd Approximate construction schedule 2017 2018 2019 2020 2021 2022 2023 120th Avenue overpass (City of Bellevue project) 124th Avenue overpass (City of Bellevue project) Site preparation, clearing and hardscape demolition Utility work Construction of infrastructure, Spring District/120th Station, track and amenities Light rail systems installation, testing and certifications Light rail stations open and service begins 5/ 17 EAST MAIN STATION EAST LINK EXTENSION SOUTH PLAZA VIEW EAST MAIN STATION AREA LANDSCAPE PLAN 5/ 17 BELLEVUE DOWNTOWN
Recommended publications
  • Annual Meeting TUESDAY, MAY 16Th, 6:00Pm for 6:30Pm BELLEVUE CHURCH of CHRIST – 1212 104TH AVE SE
    Surrey Downs Community Club Annual Meeting TUESDAY, MAY 16th, 6:00pm for 6:30pm BELLEVUE CHURCH OF CHRIST – 1212 104TH AVE SE Suggested Annual Dues of $30 per household can be paid at the meeting PROPOSED OFFICERS FOR 2017-18 President: Scott Lampe First Vice-President: Ken Rosenow Secretary: David Slight Treasurer: Charles Fisher Vice-Presidents: Rossen Atanassov, Mary Hoole, Tim Horsfall, Leonard Marino, Beth Muller, Steve Hall, Rich Strophy, Jim Tran, Keith Zhang Other topics … • Treasurer's Report • Park Redevelopment • Light Rail • Construction update • South Bellevue Park n Ride • Traffic Mitigation • Calendar of Activities • Any Other Business Treasurer’s Report Revenue from dues and donations: $1710 Expenses: $ 436 Balance: $1591 Expenses were much reduced in 2016-2017 Annual picnic was very inexpensive this year at $259 Holiday party was also inexpensive (Church Rental only ) Annual meeting costs No change in amount of expenses foreseen The court house has gone ☺ First markers showing the position of new buildings City has the park redesign in the 2018/2019 budget Primary Path designed for asphalt, secondary paths crushed gravel Walking paths have been pulled away from residents property lines (increased buffer with plantings) Construction will start in March / April 2018 Surrey Downs Park Plan With access to the park removed from 112th, the only park access will be from within Surrey Downs community Park will be a neighborhood park versus a community park which means no scheduled activities 1 4 Park design decreased in intensity and major features pulled away from neighboring houses 5 1. Small Parking lot – entrance on North end.
    [Show full text]
  • Addendum 3.1
    ADDENDUM 3.1 SECTION 00 73 00 SPECIAL CONDITIONS ADDENDUM 3.1 TABLE OF CONTENTS Note: Special Conditions SC-1.01 through SC-11.04 are numbered to correspond to the General Conditions. SC-1.01 DEFINITIONS .......................................................................................... 3 SC-2.04 CONTRACTOR’S PROJECT MANAGEMENT AND SUPERVISION ...... 3 SC-3.02 COORDINATION WITH OTHERS ........................................................... 4 SC-6.01 CONTRACT TIME ................................................................................ 21 SC-7.08 PERMITS, FEES, AND NOTICES ........................................................ 36 SC-7.11 OWNERSHIP OF WORK PRODUCT ................................................... 38 SC-9.02 SCHEDULE OF VALUES ..................................................................... 42 SC-10.02 DELAYS ................................................................................................ 44 SC-11.04 PARTNERING ....................................................................................... 46 APPENDIX A KING COUNTY METRO TRACK ACCESS PERMIT PROCESS .......... 48 APPENDIX B TRACK ALLOCATION REQUEST/WORK PERMIT FORM .................. 51 APPENDIX C DOWNTOWN TUNNEL/STATION ACCESS PERMIT/WORK PERMIT REQUEST FORM .................................................................................. 53 Northgate & East Link Extensions Section 00 73 00 RFFP No. CN 0115-14 Systems GC/CM Special Conditions Link Contract N830/E750 DECEMBER 2017 CO 001 MARCH 2018 CO 008 JUNE 2018 CO 016
    [Show full text]
  • RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) And/Or Design-Build (DB)
    State of Washington Capital Projects Advisory Review Board (CPARB) Project Review Committee (PRC) APPLICATION FOR RECERTIFICATION OF PUBLIC BODY RCW 39.10 Alternative Public Works Contracting General Contractor/Construction Manager (GC/CM) and/or Design-Build (DB) The CPARB PRC will consider recertification applications based upon agency’s experience, capability, and success in undertaking Alternative Public Works Contracting utilizing the General Contractor/Construction Manager (GCCM) and/or Design-Build (DB) project delivery process. Incomplete applications may delay action on your application. 1. Identification of Applicant a) Legal name of Public Body (your organization): Central Puget Sound Regional Transit (dba Sound Transit) b) Address: 401 S. Jackson Street, Seattle, WA 98104-2826 c) Contact Person Name: Nick Datz Title: Manager, Procurement and Contracts d) Phone Number: 206-398-5236 Fax: N/A E-mail: [email protected] e) Effective Dates of current Certification GC/CM 5/28/2018 DB f) Type of Certification Being Sought GC/CM X DB 2. Experience and Qualifications for Determining Whether Projects Are Appropriate for GCCM and/or DB Alternative Contracting Procedure(s) in RCW 39.10 (RCW 39.10.270 (2)(a)) Limit response to two pages or less. If there have been any changes to your agency’s processes addressing items (a) and (b) below, please submit the revised process chart or list. (a) The steps your organization takes to determine that use of GCCM and/or DB is appropriate for a proposed project; and (b) The steps your organization
    [Show full text]
  • Public Involvement Summary Table of Contents
    East Link Extension February 25, 2014 East Main Station Segment 60% Design Open House Public Involvement Summary Table of Contents 1 Background 2 Overview 2 Notification 3 Open house overview 4 Comment summary 4 East Main Station Design 7 Construction impacts 8 How do you plan to use East Link? 9 Permanent station naming 10 Next steps Sound Transit East Link Background East Link Extension is a key element of the regional mass stretching more than 50 miles. By 2030, about 50,000 transit system approved by voters in 2008. This 14-mile riders will use East Link every day. light rail line will benefit local communities and support East Link is advancing in final design. During this phase, regional growth with fast, frequent and reliable light project architects and engineers define the light rail system, rail service, connecting Seattle to the Eastside’s biggest determining the technical specifications for the stations, population and employment centers. bridges, tracks and other elements as well as construction The project builds on the Central Link light rail system methods and sequencing. The Sound Transit art program, running between Sea-Tac Airport and downtown Seattle STart, also begins work to select station artists and artworks and the University Link and S. 200th Link Extensions that during final design. Sound Transit hosted a public meeting are scheduled to open in 2016. East Link is part of the new in May 2013 to share design plans and we have since light rail extensions being built north, south and east from advanced design to approximately 60 percent completion.
    [Show full text]
  • East Link Light Rail
    East Link light rail Segment C: Downtown Bellevue July 2011 Segment Details Segment C serves downtown Bellevue with alternatives running from approximately SE 6th and NE 12th Streets. Sound Transit evaluated 10 alternatives in the 2011 Final Environmental Impact C9T Statement (FEIS). C11A There are two preferred alternatives in this segment: a cut-and- cover tunnel along 110th Avenue NE (C9T) and an at-grade alignment on 108th Avenue NE (C11A). C9T begins on the east side of 112th Avenue SE, then transitions C9T C11A to the west side at SE 6th Street before turning west into a tunnel C9T portal on Main Street. C9T then turns north under 110th Avenue C11A NE to the Bellevue Transit Center Station at NE 4th Street. C9T turns east at NE 6th Street and exits the tunnel portal, transitions to an elevated profile in the center of NE 6th Street, and then crosses to the north side of NE 6th Street to pass over 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor. C11A begins on the east side of 112th Avenue SE, then travels C9T & C11A on the south side of Main Street in a retained cut to the 108th Station and turns north at-grade over Main Street to the center of 108th Avenue NE. At NE 6th Street, C11A turns east in the center of the street to the at-grade Bellevue Transit Center Station. C11A then crosses 110th Avenue NE at-grade, transitioning to a C9T & C11A (Preferred Alternatives) and other EIS Alternatives retained-fill and then an elevated profile before crossing 112th Avenue NE, I-405, and 116th Avenue NE to the elevated Hospital Station in the former BNSF Railway corridor.
    [Show full text]
  • The Bulletin in MEMORIAM: WILLIAM J
    ERA BULLETIN — SEPTEMBER, 2020 The Bulletin Electric Railroaders’ Association, Incorporated Vol. 63, No. 9 September, 2020 The Bulletin IN MEMORIAM: WILLIAM J. MADDEN, 1947-2020 Published by the Electric Railroaders’ by Jeff Erlitz Association, Inc. P. O. Box 3323 Grand Central Station New York, NY 10163 For general inquiries, or Bulletin submissions, contact us at bulletin@erausa. org or on our website at erausa. org/contact Editorial Staff: Jeff Erlitz Editor-in-Chief Ron Yee Tri-State News and Commuter Rail Editor Alexander Ivanoff North American and World News Editor David Ross Production Manager Copyright © 2020 ERA This Month’s Cover Photo: Public Service of New Jer- sey double-truck motor cars 2282 and 2235 on Main Avenue & Glendale Street in Nutley, New Jersey on February 11, 1936. Unknown photographer William J (Bill) Madden during a station stop on the Canadian at Thunder Bay, Ontario, July 24, 1977. Jeff Erlitz photograph With deep sadness, I must pass along the around 1970, initially on Saturday mornings In This Issue: news that William Madden passed away on and then on Monday evenings. Like most of Assorted Wednesday, August 12, at the age of 73 due us, he could be found collating, stamping Travels from to complications from COVID-19. envelopes, and bagging sacks of mail for Bill, as everyone knew him, joined the Elec- both the New York Division Bulletin and Na- the First Half of tric Railroaders’ Association on February 21, tional’s Headlights. When the ERA began 2020…Page 18 1964 and was member number 3062. He offering Life memberships, Bill was one of probably started volunteering at headquar- the few members who took up that offer.
    [Show full text]
  • East Link Extension Update System Expansion Committee
    East Link Extension Update System Expansion Committee 01/14/21 Why we are here • Provide a project update on the East Link Extension construction progress • Increase contract contingency request for: • E130 contingency increase request (M2021-04) • E340 contingency increase request (M2021-05) • E335 contingency increase request (M2021-06) 2 2012-15 2016 2017 2018 2019 2020 2021 2022 2023 2024 Final Design We are here E130 – Seattle to South Bellevue (I-90) E320 South Bellevue E330 Downtown Bellevue Tunnel E335 Downtown Bellevue to Spring District E340 Bel-Red E360 SR520 to Redmond E750 Systems Pre-Revenue Float Revenue Service Challenges / Upcoming Milestones Challenges • COVID-19 Impacts • Station Schedules and Systems Access • Redmond Technology Station Garage Upcoming Milestones • Mercer Island Transit Interchange – Bids Due (Q1 2021) • South Bellevue (E320) Substantial Completion (Q1 2021) • Bel-Red (E340) Substantial Completion (Q1 2021) • I-90 (E130) Substantial Completion (Q2 2021) • Overlake (E360) Substantial Completion (Q2 2021) 4 Judkins Park Station 5 Mercer Island Station 6 Mercer Island Transit Interchange 7 South Bellevue Station 8 East Main Station 9 Bellevue Downtown Station 10 Wilburton Station 11 Spring District/120th Station 12 Bel-Red/130th Station 13 Overlake Village Station 14 Redmond Technology Station 15 Redmond Technology Station Garage 16 Q2 2021 Weekend Closures • Weekend #1: • Pioneer Square Temp Platform Removal • Weekend #2: • Signaling Work • Traction Power • Weekend #3: • Pioneer Square Temp Platform Removal
    [Show full text]
  • Motion No. M2021-46 Easements with City of Bellevue As Part of the East Link Extension
    Motion No. M2021-46 Easements with City of Bellevue as part of the East Link Extension Meeting: Date: Type of action: Staff contact: System Expansion Committee 08/12/2021 Recommend to Board Ron Lewis, DECM Executive Director Board 08/26/2021 Final action Faith Roland, Director, Real Property Rhonda Thomsen, Real Property Project Manager Proposed action Authorizes the chief executive officer to grant two permanent easements to the City of Bellevue to construct, operate, and maintain sewer facilities on Sound Transit owned property as part of the East Link Extension at no cost to the City. Key features summary • Resolution No. R2018-40, the Board’s Procurement and Delegated Authority Policy, requires all permanent easements (excluding standard utility easements that service Sound Transit) be approved by the Board. • This action will grant two permanent easements to the City of Bellevue comprising of air, surface, and subsurface rights on the portion of Sound Transit property located between 111th Ave SE and 112th Ave SE in Bellevue, WA. • Easement locations and size: o Easement 1: EL193, Lots 27 through 31, Block 8 of Surrey Downs No 2, for 217 square feet o Easement 2: EL197/198, Lots 1 and 2, Block 8, Surrey Downs No 1, for 2,164 square feet • The City of Bellevue requires these easements to construct, operate, and maintain their sewer facilities. • No monetary consideration need be exchanged due to Sound Transit’s guideway and station location interfering with the City of Bellevue’s existing sewer line. • Granting the easements to the City of Bellevue will not impact Sound Transit’s planned use of the property to construct, operate, and maintain facilities for the East Link light rail project.
    [Show full text]
  • Agency Progress Report: 2019 Q4
    Agency Progress Report Capital Programs U District Station 120th Ave. Station Northgate Link Ext. East Link Ext. Hilltop Tacoma Link Ext. OMF OMF East December | 2019 Prepared by Project Control & VE | Design, Engineering & Construction Management Editor’s Note Sound Transit’s Quarterly Agency Progress Report summarizes projects and major contracts status, risk, and performance for capital projects. Due to timing differences in the production of the APR and the ST financial statements, actual cost data presented in the APR may not match the quarterly financial statements. However, the actual cost data is reconciled to the financial statements on a monthly basis. We always appreciate any suggestions you might have for future refinements to this document. To be added to the distribu- tion list for this report or to make suggestions, please contact Aniekan Usoro at (206) 398-5000. The Agency Progress Report can also be found on the web at http://www.soundtransit.org/get-to-know-us/documents- reports/agency-progress-reports. SOUND TRANSIT Central Puget Sound Regional Transit Authority Union Station 401 S. Jackson St. Seattle, WA 98104-2826 Reception: (206) 398 5000 Facsimile: (206) 398 5499 CHAIR Agency Progress Report John Marchione Redmond Mayor TABLE of CONTENTS VICE CHAIRS Executive Summary 1 Kent Keel University Place Mayor Link Light Rail 5 Paul Roberts University Link Extension 11 Everett Councilmember Northgate Link Extension 15 Lynnwood Link Extension 35 BOARD MEMBERS Nancy Backus I-90 Two-way Transit/HOV Ops 51 Auburn Mayor East
    [Show full text]
  • Active Transportation Plan Appendix a Regional Bicycle Network Maps
    Active Transportation Plan Appendix A Regional Bicycle Network Maps and Gap List Regional Bicycle Network Development Map Series KEY by SMART Corridors West Snohomish 2 East Snohomish 2 East Snohomish 1 West Snohomish 1 North Eastside Kitsap NW King King 1 NE King 1 SW Eastside South Kitsap King 1 King 2 and Vashon Island SE King 1 SW West King 2 SE King 2 Pierce 1 West Pierce 2 East Pierce 1 East Pierce 2 H T E 204TH 7 2 4 204TH 04T 8 H B K PINE PC-44-b 0 E NELSON A KT-3 T L 1 H D H - D Y Y S T ELLISPORT O E 1 E E N R G L 1 O E 3 N N E 1 B V 2 T N R W D D E 1 I U I N A I N T S S R E C S E K T L M L Y E L S E U G L Y E I L 220 TH N L H W O A K 1 H 60 TH M V D K T C N T 6 2 O T N 6 6 H C - E H G T A 1 C T 4 O E Y S 0 4 1 P O 9 D E T 232ND - D R R d S H R 1 PC U C -44-d T 3 ²³ P PC I -44- 7 c C 1 0 S H 6 144TH 1 S 1 I G H O Y L T L D R E 8 B L M S 1 A L T Highline 1 N H A H Kent DesMoines P&R T V P H G 4 I H T A Community College SR 3 5 02 C L T R N N H L 4 *# E S W T - O 9 T 8 4 C R T 1 128TH 4 S O K 1 E M C - N R CREVISTO a O L C D L I D H O H T C 4 K H K T 3 WO T ODHILL C S 1 6 1 O 2 3 1 C S 1 A A S I L 112TH E L U P H B S D N T R T 0 I N E 7 L 2 H N R L E 2 G E O 1 I P M M N H R S Y A S EHMEL Y O E C 100TH A E W R I K H C M L N C S O A L A B A B H M A A J U Y OLSON V V T P V I R E U W A N LRT 272nd Station T H H HALL C B H N T A 6 E D M 92ND C 94TH 8 B C N U u S 2 J s A h 8 HN C E UG m I R VA C H Y H a T C SOU E n ²³ K H C S T H T r A H R a A 6 L T i R l 8 E 1 Talehquah Ferry Terminal L 6 B A 6 O D 6 SE R H O ROSEDALE E V S R I I K
    [Show full text]
  • Employing Life-Cycle Assessment and Comparative Analysis to Reveal Holistic Perspectives in Regional Sustainable Development
    Employing life-cycle assessment and comparative analysis to reveal holistic perspectives in regional sustainable development by Samuel J. Wilson A Thesis Submitted in partial fulfillment of the requirements for the degree Master of Environmental Studies The Evergreen State College June 2014 © 2014 by Sam Wilson. All rights reserved. This Thesis for the Master of Environmental Studies Degree by Samuel J. Wilson has been approved for The Evergreen State College by ________________________ Martha L. Henderson, PhD Director, Graduate Program on the Environment Member of the Faculty ________________________ Date ABSTRACT Employing life-cycle assessment and comparative analysis to reveal holistic perspectives in regional sustainable development Samuel J Wilson To combat climate change, rapid population growth, and sprawl, many urban areas are increasing public transit infrastructure. In Seattle, Washington, the first regional extension of a central light-rail line is planned to open its doors in 2023. This study closely examines the climate change mediation potential of the extension, known as East Link. While the system’s pollution reduction potential was addressed in an environmental impact statement, it did not include the impact from manufacturing construction and infrastructure materials. Previous studies have shown construction materials to be the single largest source of greenhouse gasses over a transit system’s life cycle (Chester and Horvath, 2009; Chester et al 2012). This study aims to fill this gap by conducting a life-cycle assessment of East Link’s construction materials. The results of the life-cycle assessment show a vast underestimate of greenhouse gas impacts in the East Link environmental impact statement. Additionally, this study provides a comparative analysis of historic regional transit and development policy in Seattle and Portland, a city that has had success in early adoption of regional light-rail.
    [Show full text]
  • Feds Offer Big Grants for Puget Sound-Area Transit Projects
    Seattle Times, 2/10/16 http://www.seattletimes.com/seattle-news/transportation/feds-offer-big-grants-for-puget-sound-area-transit- projects/?utm_source=The+Seattle+Times&utm_campaign=63ef1b0dd1- Morning_Brief_2_10_2016&utm_medium=email&utm_term=0_5beb38b61e-63ef1b0dd1-120294717 Feds offer big grants for Puget Sound-area transit projects Originally published February 9, 2016 at 8:19 pm Updated February 9, 2016 at 10:02 pm The Federal Transit Administration has offered grants to a First Avenue streetcar line, Community Transit’s Swift 2 bus-rapid transit line, and Northgate-Lynnwood Link light rail. The grants would have to be approved by Congress first, but history suggest that will happen. by Mike Lindblom Seattle Times transportation reporter Uncle Sam is offering to contribute $1.2 billion toward Sound Transit’s light-rail line from Northgate to Lynnwood, according to the president’s proposed budget — just one of three huge transit gifts in the pipeline for Puget Sound travelers. The proposed First Avenue streetcar line could win another $75 million in federal money, which suddenly places Seattle’s third streetcar corridor on the political fast track. And the feds want to give an additional $43 million toward Community Transit’s Swift 2 bus- rapid transit line connecting Bothell, Mill Creek, Everett’s McCollum Park and Paine Field. The three awards, and many others proposed around the country by the Federal Transit Administration, must still be ratified by Congress in its transportation budget. Each represents at least half the capital cost, and would stoke the transit-construction frenzy under way throughout the region. Sound Transit is already building a new Northgate Station, to open in 2021, followed by plans to reach North Seattle, Shoreline, Mountlake Terrace and Lynnwood with another 8½ miles of track by 2023, for a total $2.35 billion.
    [Show full text]